HomeMy WebLinkAboutWQCS00294_Compliance Evaluation Inspection_20241023Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
ROY COOPER
Governor
MARY PENNY KELLEY
Secretary
RICHARD E. ROGERS, JR.
Director
Charles E. Hester, Mayor
Town of Selma
100 N Raiford St
Selma, NC 27576-2833
NORTH CAROLINA
Environmental Quality
October 23, 2024
SUBJECT: COMPLIANCE EVALUATION INSPECTION REPORT
Permit No. WQCS00294
Selma Collection System
Johnston County
Dear Mr. Hester:
On September 23, 2024, Division of Water Resources (DWR) Raleigh Regional Office (RRO) staff Jesse Barnes
conducted a routine compliance evaluation inspection of the subject wastewater collection system to evaluate
compliance with the subject permit. Walter Kenneth Wall, designated ORC at the time of the inspection, was present
during the inspection. A review of records, operations, maintenance, and system components was completed. This
review reflected noncompliance with the subject permit. Any permit violation(s), item(s) of concern, and/or
general observations are listed below. Inspection findings are detailed in the attached Compliance Inspection Report.
Permit Violation(s)
1. Contingency plans for pump failure were not present at any of the inspected pump stations and no written
contingency plan was available for review. Part I. 7. of the subject permit requires the permittee to maintain a
contingency plan for pump failure at each pump station.
No record of high priority line inspection was available, and Mr. Wall stated that there is no schedule for high
priority line inspection. Part V. 4. of the subject permit requires all high priority lines to be inspected at least
once per every six-month period.
Item) of Concern
3. Permittee staff did not have a current copy of the subject permit during the inspection. Version 3.0 of permit
WQCS00294 is attached to this letter for your convenience.
4. A copy of the Sewer Use Ordinance was not available for review during the inspection. Mr. Wall indicated that
a Sewer Use Ordinance does exist in the Town's ordinances. Part I. 3. of the subject permit requires the
permittee to establish by ordinance, inter -local agreement, or contract its legal authority to require new sewers
be properly constructed; to ensure proper inspection and testing of sewer mains and service laterals; to address
flows from satellite systems and to take enforcement action.
5. A written copy of the fats, oils, and grease (FOG) program rules for non-residential users was not available
during the inspection. The program was described orally by Mr. Wall. Part I. 4. of the subject permit requires
the development and implementation of an enforceable FOG program for non-residential users.
D --A North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 1 3800 Barrett Drive I Raleigh, North Carolina 27609
Noart+caaouN.a
oeaaro.��+mim�ma�viowoh 919,791.4200
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Page 2 of 4
6. A copy of the Capital Improvement Plan (CIP) was not available during the inspection. Part I. 5. of the subject
permit requires the permittee to adopt and implement a CIP to designate funding for reinvestment into the
wastewater collection system infrastructure. The CIP should typically cover a three to five-year period and
include a goal statement, description of the project area, description of the existing facilities, known deficiencies,
and forecasted future needs. Cost analysis is integral to the CIP.
7. A record of reviewing inspection, maintenance, operational, and complaint logs was not provided during the
inspection. Part II. 2. of the subject permit requires the permittee to develop and adhere to a schedule for
reviewing all inspection, maintenance, operational, and complaint logs.
8. Written records of sewer line cleaning were not available during the inspection. Mr. Wall stated that 10% of
the system has been cleaned annually and a contractor cleaned the entire system during 2022-2023. Part II.
7. of the subject permit requires the permittee to develop and implement a program for cleaning the collection
system. At least 10 percent of the gravity wastewater collection system shall be cleaned each year.
9. The sewer collection system comprehensive map does not include the following information, as required by
Part III. 3. of the subject permit: pipe material, pipe age, and pump station capacity.
10. A copy of the most recent Annual Performance Report was not available during the inspection. According to
DWR's records, no Annual Performance Report for 2023 has been submitted. Section IV. 3. of the subject permit
requires the permittee to provide users, customers, and DWR an annual report that summarizes the
performance of the collection system and the extent to which the collection system has violated the permit or
other regulations.
11. Each inspected pump station listed 911 as the emergency contact phone number on its signage. Part I. 8. of
the subject permit requires pump station signage to list an emergency contact telephone number at which an
individual who can initiate or perform emergency service for the wastewater collection system 24 hours per
day, seven days per week can be contacted.
12. The following high-water alarms were tested and found to be not operational during the inspection: pump
station #7 audible and visual alarms, and pump station #12 audible alarm. All pump stations employ automatic
polling via SCADA.
13. Excessive grease and debris were observed in pump station #9.
General Observation Items
14. Permit Details: Version 3.0 of the subject permit became effective January 10, 2024, and will expire December
31, 2031. DWR records indicate the wastewater collection system consists of approximately 41 miles of gravity
sewer, approximately 7.4 miles of force main, and 19 duplex pump stations. The system appeared to be as
described in the permit.
15. Reported Sanitary Sewer Overflows (SSOs): During the 12-month period prior to the inspection, there were no
SSOs reported to DWR from this collection system.
16. Fats, Oils and Grease Program: The permittee has developed and implements an educational fats, oils, and
grease program that includes at least bi-annual distribution of educational material targeted at both residential
and non-residential users. See Item 5, above. Mr. Wall stated that FOG educational material is included on
customers' monthly bills. Mr. Wall stated that the permittee has developed and implements an enforceable FOG
program for non-residential users, which is established within the permittee's Sewer Use Ordinance. No formal
enforcement actions had been taken within the previous year.
17. Capital Improvement Plan: See Item 6, above.
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Page 3 of 4
18. Contingency Plan for Pump Failure: See Item 1, above. The permittee maintains at least one (1) backup pump
on hand per pump station, for a total of nineteen (19).
19. Pump Stations Inspected: The following pump stations were inspected: #1, #7, #9, #12, and #16. See Items
12, 13, & 14, above. The inspector's observations noted in the next five items below refer to the five pump
stations inspected. All inspected pump stations were checked for general condition, proper operation and
maintenance with appropriate recordkeeping, presence of debris, evidence of spills, and operational standby
power.
20. Pump Station Signage: Each pump station is required to have signage clearly and conspicuously posted that
identifies the pump station, provides an emergency 24-hour contact telephone number(s), and provides
instructions for notification if the visual alarm illuminates and/or the audible alarm sounds, or if an emergency
is apparent. Item 11, above.
21. Pump Station Restricted Access: Each of the inspected pump station sites, equipment, and components were
observed to have restricted access via locked gated fences.
22. Pump Station High Water Alarms: All pump stations employ automatic polling via SCADA. The inspected pump
stations were equipped with audible and visual high-water alarms and were operable during the inspection
except the following: #7 audible and visual alarm, and #12 audible alarm. See Item 12, above.
23. Pump Station Inspection Program: The permittee has developed and implements a routine inspection of each
pump station that includes the following maintenance activities: cleaning and removing debris from the pump
station area and wet well; inspecting all valves; inspecting pumps and other mechanical equipment; and
verifying the proper operation of the alarms, telemetry system, and auxiliary equipment. Pump Stations are
inspected weekly, and all pump stations employ automatic polling via SCADA. See Item 7, above. The inspector
reviewed the inspection logs of the pump stations visited and observed adequate entries of the date and time
of the operator's inspection, observations made, and any maintenance, repairs, or corrective actions taken.
24. Designated Operators: The subject collection system is classified as a CS-2 system, and the designated certified
operators are as follows: Backup ORC Nicholas Hill (CS-2), Backup ORC Gary James (CS-2), and Backup ORC
Guadalupe Tarango (CS-2). The certification status for each operator is reflected as active in DWR's records.
After the inspection, a review of DWR records indicated that Mr. Wall is no longer listed as the facility ORC and
no new ORC has been designated. Part II. 1. of the subject permit requires the permittee to employ and
designate one ORC and at least one back-up ORC. 15A NCAC 08G .0201(3)(b) requires the owner of classified
water pollution control systems to designate an ORC within 120 days following a vacancy in the position of ORC.
Please use the attached ORC Designation Form to report updated operator designations to DWR.
25. Cleaning Sewer Lines: The permittee has developed and implements a program for cleaning the sewer lines.
Part II. 7. of the subject permit requires at least 10% of the wastewater collection system to be cleaned each
year. Preventative cleaning is not required for sewer lines less than five years old, unless an inspection reveals
the need for cleaning. Mr. Wall stated that 100% of the system was cleaned by a contractor in 2022-2023. See
Item 8, above.
26. Spill Response Action Plan: The permittee has developed and maintains a Spill Response Action Plan that
includes 24-hour contact numbers, response time, access to cleaning equipment, access to construction crews,
site sanitation and cleanup materials, and post-SSO assessment.
27. SSO Records: The permittee has maintained adequate records pertaining to SSOs and sewer complaints for the
three-year period prior to the inspection. No unreported SSOs were present in the permittee's records.
Complaints and maintenance work orders have been documented on paper and were available for review during
the inspection.
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Page 4 of 4
28. Comprehensive Sewer Maw The permittee maintains an up-to-date comprehensive map of its sewer collection
system digitally via ArcGIS. The map includes pipe size, pipe location, flow direction, and each pump station's
identification and location. An updated number of active service taps is also available. See Item 9, above.
29. Inspection of High Priority Lines: Part V. 4. of the subject permit requires an inspection of all high priority sewer
lines (HPLs) to be performed at least once every six months. See Item 2, above.
Reauired Action(s)
Within thirty (30) days of receipt of this report, please provide a written response with the following
requested information:
• A copy of a contingency plan for pump failure, as required to be maintained at each pump
station by Part I. 7. of the subject permit.
• A copy of the Town's Sewer Use Ordinance, as required by Part I. 3. of the subject permit.
• A copy of the most recent Annual Performance Report for the wastewater collection system, as
required by Part IV. 3. of the subject permit.
• A copy of the Capital Improvement Plan for the wastewater collection system, as required by
Part I. 5. of the subject permit.
Additionally, corrective actions addressing each permit violation and item of concern above should be
planned and completed within a reasonable time.
Failure to provide a response with the above -requested information within thirty (30) days of receipt
of this report and/or failure to plan and complete corrective actions addressing each above -listed
permit violation and item of concern within a reasonable time may result in enforcement action.
Please be aware that DWR may take enforcement action against any individual who fails to comply with the
requirements of all applicable permits, regulations, and/or statutes. Pursuant to NC General Statute (NCGS) 143-
215.6A, a civil penalty of not more than twenty-five thousand dollars ($25,000.00) may be assessed against any
person who violates or fails to act in accordance with the terms, conditions, or requirements of any permit, or
applicable regulations, issued pursuant to G.S. 143-215.1.
If you need assistance, please contact Jesse Barnes at (919) 791-4254 or jesse.barnes@deq.nc.gov. Thank you for
your time and attention to this matter.
Sincerely,
Signed by:
ariessa t21Manuel, Assistant Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
Attachment(s):
Compliance Inspection Report, WQCS00294
Copy of Permit WQCS00294
ORC Designation Form
Cc: Laserfiche Files
Richard Douglas, Town Manager (townmanager@selma-nc.com)
Alex Fuller, Public Works Director (publicworksdirector@selma-nc.com)
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Compliance Inspection Report
Permit: WQCS00294 Effective: 01/10/24 Expiration: 12/31/31 Owner: Town of Selma
SOC: Effective: Expiration: Facility: Selma Collection System
County: Johnston
Region: Raleigh
Contact Person: Alex Fuller
Directions to Facility:
System Classifications: CS2,
Primary ORC:
Secondary ORC(s):
On -Site Representative(s):
Title: Public Works Director
Certification:
Phone: 919-965-9841
Phone:
Related Permits:
NC0030716 Johnston County Public Utilities - Central Johnston County WWTP
Inspection Date: 09/23/2024 Entry Time 10:OOAM Exit Time: 01:OOPM
Primary Inspector: Jesse Barnes Phone: 919-791-4254
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling
Permit Inspection Type: Collection system management and operation
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Miscellaneous Questions General Sewer & FOG Ordinances
Capital Improvement Plan Map Reporting Requirements
Inspections Spill Response Plan Spills
Lines Pump Stations
(See attachment summary)
Page 1 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
Inspection Summary:
On September 23, 2024, Division of Water Resources (DWR) Raleigh Regional Office (RRO) staff Jesse Barnes conducted a
routine compliance evaluation inspection of the subject wastewater collection system to evaluate compliance with the
subject permit. Walter Kenneth Wall, designated ORC at the time of the inspection, was present during the inspection. A
review of records, operations, maintenance, and system components was completed. This review reflected noncompliance
with the subject permit. Any permit violation(s), item(s) of concern, and/or general observations are listed below. Inspection
findings are detailed in the attached Compliance Inspection Report.
Permit Violation(s)
1. Contingency plans for pump failure were not present at any of the inspected pump stations and no written contingency
plan was available for review. Part I. 7. of the subject permit requires the permittee to maintain a contingency plan for pump
failure at each pump station.
2. No record of high priority line inspection was available, and Mr. Wall stated that there is no schedule for high priority line
inspection. Part V. 4. of the subject permit requires all high priority lines to be inspected at least once per every six-month
period.
Item(s) of Concern
3. Permittee staff did not have a current copy of the subject permit during the inspection. Version 3.0 of permit
WQCS00294 is attached to this letter for your convenience.
4. A copy of the Sewer Use Ordinance was not available for review during the inspection. Mr. Wall indicated that a Sewer
Use Ordinance does exist in the Town's ordinances. Part I. 3. of the subject permit requires the permittee to establish by
ordinance, inter -local agreement, or contract its legal authority to require new sewers be properly constructed; to ensure
proper inspection and testing of sewer mains and service laterals; to address flows from satellite systems and to take
enforcement action.
5. A written copy of the fats, oils, and grease (FOG) program rules for non-residential users was not available during the
inspection. The program was described orally by Mr. Wall. Part I. 4. of the subject permit requires the development and
implementation of an enforceable FOG program for non-residential users.
6. A copy of the Capital Improvement Plan (CIP) was not available during the inspection. Part I. 5. of the subject permit
requires the permittee to adopt and implement a CIP to designate funding for reinvestment into the wastewater collection
system infrastructure. The CIP should typically cover a three to five-year period and include a goal statement, description of
the project area, description of the existing facilities, known deficiencies, and forecasted future needs. Cost analysis is
integral to the CIP.
7. A record of reviewing inspection, maintenance, operational, and complaint logs was not provided during the inspection.
Part II. 2. of the subject permit requires the permittee to develop and adhere to a schedule for reviewing all inspection,
maintenance, operational, and complaint logs.
8. Written records of sewer line cleaning were not available during the inspection. Mr. Wall stated that 10% of the system
has been cleaned annually and a contractor cleaned the entire system during 2022-2023. Part II. 7. of the subject permit
requires the permittee to develop and implement a program for cleaning the collection system. At least 10 percent of the
gravity wastewater collection system shall be cleaned each year.
9. The sewer collection system comprehensive map does not include the following information, as required by Part III. 3. of
the subject permit: pipe material, pipe age, and pump station capacity.
10. A copy of the most recent Annual Performance Report was not available during the inspection. According to DWR's
Page 2 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
records, no Annual Performance Report for 2023 has been submitted. Section IV. 3. of the subject permit requires the
permittee to provide users, customers, and DWR an annual report that summarizes the performance of the collection
system and the extent to which the collection system has violated the permit or other regulations.
11. Each inspected pump station listed 911 as the emergency contact phone number on its signage. Part I. 8. of the
subject permit requires pump station signage to list an emergency contact telephone number at which an individual who can
initiate or perform emergency service for the wastewater collection system 24 hours per day, seven days per week can be
contacted.
12. The following high-water alarms were tested and found to be not operational during the inspection: pump station #7
audible and visual alarms, and pump station #12 audible alarm. All pump stations employ automatic polling via SCADA.
13. Excessive grease and debris were observed in pump station #9.
General Observation Items
14. Permit Details: Version 3.0 of the subject permit became effective January 10, 2024, and will expire December 31, 2031.
DWR records indicate the wastewater collection system consists of approximately 41 miles of gravity sewer, approximately
7.4 miles of force main, and 19 duplex pump stations. The system appeared to be as described in the permit.
15. Reported Sanitary Sewer Overflows (SSOs): During the 12-month period prior to the inspection, there were no SSOs
reported to DWR from this collection system.
16. Fats, Oils and Grease Program: The permittee has developed and implements an educational fats, oils, and grease
program that includes at least bi-annual distribution of educational material targeted at both residential and non-residential
users. See Item 5, above. Mr. Wall stated that FOG educational material is included on customers' monthly bills. Mr. Wall
stated that the permittee has developed and implements an enforceable FOG program for non-residential users, which is
established within the permittee's Sewer Use Ordinance. No formal enforcement actions had been taken within the previous
year.
17. Capital Improvement Plan: See Item 6, above.
18. Contingency Plan for Pump Failure: See Item 1, above. The permittee maintains at least one (1) backup pump on hand
per pump station, for a total of nineteen (19).
19. Pump Stations Inspected: The following pump stations were inspected: #1, #7, #9, #12, and #16. See Items 12, 13, &
14, above. The inspector's observations noted in the next five items below refer to the five pump stations inspected. All
inspected pump stations were checked for general condition, proper operation and maintenance with appropriate
recordkeeping, presence of debris, evidence of spills, and operational standby power.
20. Pump Station Signage: Each pump station is required to have signage clearly and conspicuously posted that identifies
the pump station, provides an emergency 24-hour contact telephone number(s), and provides instructions for notification if
the visual alarm illuminates and/or the audible alarm sounds, or if an emergency is apparent. Item 11, above.
21. Pump Station Restricted Access: Each of the inspected pump station sites, equipment, and components were observed
to have restricted access via locked gated fences.
22. Pump Station High Water Alarms: All pump stations employ automatic polling via SCADA. The inspected pump stations
were equipped with audible and visual high-water alarms and were operable during the inspection except the following: #7
audible and visual alarm, and #12 audible alarm. See Item 12, above.
23. Pump Station Inspection Program: The permittee has developed and implements a routine inspection of each pump
station that includes the following maintenance activities: cleaning and removing debris from the pump station area and wet
Page 3 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
well; inspecting all valves; inspecting pumps and other mechanical equipment; and verifying the proper operation of the
alarms, telemetry system, and auxiliary equipment. Pump Stations are inspected weekly, and all pump stations employ
automatic polling via SCADA. See Item 7, above. The inspector reviewed the inspection logs of the pump stations visited and
observed adequate entries of the date and time of the operator's inspection, observations made, and any maintenance,
repairs, or corrective actions taken.
24. Designated Operators: The subject collection system is classified as a CS-2 system, and the designated certified
operators are as follows: Backup ORC Nicholas Hill (CS-2), Backup ORC Gary James (CS-2), and Backup ORC Guadalupe
Tarango (CS-2). The certification status for each operator is reflected as active in DWR's records. After the inspection, a
review of DWR records indicated that Mr. Wall is no longer listed as the facility ORC and no new ORC has been designated.
Part II. 1. of the subject permit requires the permittee to employ and designate one ORC and at least one back-up ORC. 154
NCAC 08G .0201(3)(b) requires the owner of classified water pollution control systems to designate an ORC within 120 days
following a vacancy in the position of ORC. Please use the attached ORC Designation Form to report updated operator
designations to DWR.
25. Cleaning Sewer Lines: The permittee has developed and implements a program for cleaning the sewer lines. Part II. 7. o
the subject permit requires at least 10% of the wastewater collection system to be cleaned each year. Preventative cleaning
is not required for sewer lines less than five years old, unless an inspection reveals the need for cleaning. Mr. Wall stated
that 100% of the system was cleaned by a contractor in 2022-2023. See Item 8, above.
26. Spill Response Action Plan: The permittee has developed and maintains a Spill Response Action Plan that includes
24-hour contact numbers, response time, access to cleaning equipment, access to construction crews, site sanitation and
cleanup materials, and post-SSO assessment.
27. SSO Records: The permittee has maintained adequate records pertaining to SSOs and sewer complaints for the
three-year period prior to the inspection. No unreported SSOs were present in the permittee's records. Complaints and
maintenance work orders have been documented on paper and were available for review during the inspection.
28. Comprehensive Sewer Map: The permittee maintains an up-to-date comprehensive map of its sewer collection system
digitally via ArcGIS. The map includes pipe size, pipe location, flow direction, and each pump station's identification and
location. An updated number of active service taps is also available. See Item 9, above.
29. Inspection of High Priority Lines: Part V. 4. of the subject permit requires an inspection of all high priority sewer lines
(HPLs) to be performed at least once every six months. See Item 2, above.
Required Action(s)
Within thirty (30) days of receipt of this report, please provide a written response with the following requested information:
• A copy of a contingency plan for pump failure, as required to be maintained at each pump station by Part I. 7. of the
subject permit.
• A copy of the Town's Sewer Use Ordinance, as required by Part I. 3. of the subject permit.
• A copy of the most recent Annual Performance Report for the wastewater collection system, as required by Part IV. 3. of
the subject permit.
• A copy of the Capital Improvement Plan for the wastewater collection system, as required by Part I. 5. of the subject
permit.
Additionally, corrective actions addressing each permit violation and item of concern above should be planned and
completed within a reasonable time.
Failure to provide a response with the above -requested information within thirty (30) days of receipt of this report and/or
failure to plan and complete corrective actions addressing each above -listed permit violation and item of concern within a
reasonable time may result in enforcement action.
Page 4 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine
General Yes No NA NE
Is there a properly designated primary ORC and at least one back-up of proper grade? ❑ ❑ ❑
Are logs being reviewed by the system management or owner on a regular basis? ❑ ❑ ❑
# What is that frequency?
# Are there any issues being addressed currently or any in the planning stages? ❑ ❑ ❑
Is there a specific pump failure plan available for all pump stations? ❑ ❑ ❑
Does plan indicate if pump parts/new pumps are in spare parts/equipment inventory? ❑ ❑ ❑
Are new/significantly upgraded pump stations equipped with anti -corrosion materials? ❑ ❑ ❑
Does the permittee have a copy of their permit? ❑ ❑ ❑
# Is permit expiring within the next 6 months? ❑ ❑ ❑
If Yes, has the Permittee applied for renewal? ❑ ❑ ❑
Comment: No primary ORC designated, no review of maintenance/inspection loqs by ORC or owner, no
pump failure contingency plans at pump stations or otherwise, no copy of permit.
Sewer and FOG Ordinances Yes No NA NE
Is Sewer Use Ordinance (SUO) or other Legal Authority available? ❑ 0 ❑ ❑
Does it appear that the Sewer Use Ordinance is enforced? ❑ ❑ 0 ❑
Is there a Grease Control Program that legally requires grease control devices? ❑ 0 ❑ ❑
What is the standard grease trap cleaning requirement in the FOG ordinance?
Is Grease Control Program enforced via periodic inspections/records review?
Is action taken against violators?
# Have satellite systems adopted an equivalent or more stringent ordinance?
Is grease/sewer education program documented with req'd customer distribution?
# Are other types of education tools used like websites, booths, special meetings, etc?
If Yes, what are they? (This can reduce mailing to annual.)
Comment: No SUO, no copy of FOG program.
Capital Improvement Plan
Has a Capital (CIP) or System Improvement Plan been developed and adopted?
Is it designated for wastewater only or does it have a dedicated section?
Does CIP cover three to five year period of earmarked improvements?
Does CIP include description of project area?
Does CIP include description of existing facilities?
Does CIP include known deficiencies?
Does CIP include forecasted future needs?
Comment: No copy of CIP.
Yes No NA NE
Map Yes No NA NE
Page 5 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling
Reason for Visit: Routine
Is there a overall sewer system map?
0
❑ ❑ ❑
Does the map include:
Pipe Type (GS/FM)
0
❑ ❑ ❑
Pipe sizes
0
❑ ❑ ❑
Pipe materials (PVC, DIP, etc)
❑
0 ❑ ❑
Pipe location
0
❑ ❑ ❑
Flow direction
0
❑ ❑ ❑
Approximate pipe age
❑
0 ❑ ❑
Pump station ID, location and capacity
❑
0 ❑ ❑
# Force main air release valve location & type
❑
❑ ❑
# Location of satellite connections
❑
❑ ❑
Is the map being updated for changes/additions within 1 year of activation?
❑
❑ ❑
Comment: No pipe apes, pipe materials, or pump station capacities on map.
Reporting Requirements Yes No NA NE
# Have there been any sewer spills in the past 3 years? ❑ ❑ ❑
If Yes, were they reported to the Division if meeting the reportable criteria? ❑ ❑ ❑
If applicable, is there documentation of press releases and public notices issued? ❑ ❑ ❑
Is an Annual Wastewater Performance Report being filed with the Division, if required? ❑ ❑ ❑
Is the report being made available to all its sewer customers? ❑ ❑ ❑
# How is it being made available?
Comment: No annual report.
Inspections
Yes No NA NE
Are adequate maintenance records maintained?
❑ ❑ ❑
Are pump stations being inspected at the required frequency?
❑ ❑ ❑
# Is at least one complete functionality test conducted weekly per pump station?
❑ ❑ ❑
Is there a system or plan in place to observe the entire system annually?
❑ ❑ ❑
Is the annual inspection documented?
❑
❑ ❑
# Does the system have any high -priority lines/locations?
❑ ❑ ❑
Are inspections of HPL documented at least every 6 months?
❑
❑ ❑
Are new lines being added to the HPL list when found or created?
❑
❑ ❑
Comment: No documentation of HPL inspections/schedule
Spill Response Action Plan Yes No NA NE
Is a Spill Response Action Plan available? ❑ ❑ ❑
Is a Spill Response Action Plan available for all personnel? ❑ ❑ ❑
Does the plan include:
Page 6 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling
Reason for Visit: Routine
24-hour contact numbers
0
❑ ❑ ❑
Response time
0
❑ ❑ ❑
Equipment list and spare parts inventory
0
❑ ❑ ❑
Access to cleaning equipment
0
❑ ❑ ❑
Access to construction crews, contractors, and/or engineers
0
❑ ❑ ❑
Source of emergency funds
0
❑ ❑ ❑
Site sanitation and cleanup materials
0
❑ ❑ ❑
Post-overflow/spill assessment
0
❑ ❑ ❑
Does the Permittee appear to respond within 2 hours of first knowledge of a spill?
0
❑ ❑ ❑
Comment:
Spllls Yes No NA NE
Is system free of known points of bypass? 0 ❑ ❑ ❑
If No, describe type of bypass and location
Are all spills or sewer related issues/complaints documented? 0 ❑ ❑ ❑
# Are there repeated overflows/problems (2 or more in 12 months) at same location? ❑ 0 ❑ ❑
# If Yes, is there a corrective action plan? ❑ ❑ 0 ❑
Comment:
Lines/Right-of-Ways/Aerial Lines Yes No NA NE
Please list the Lines/Right of Ways/Aerial Lines Inspected:
None
Are right-of-ways/easements maintained for full width for access by staff/equipment? 0 ❑ ❑ ❑
If No, give details on temporary access:
Is maintenance documented? ❑ ❑ ❑
Are gravity sewer cleaning records available? ❑ ❑ ❑
Has at least 10% of lines older than 5 yrs been cleaned annually? ❑ ❑ ❑
Were all areas/lines inspected free of issues? ❑ ❑ ❑
Comment: No RoW maintenance records, no sewer cleaning records
Pump Stations Yes No NA NE
Please list the Pump Stations Inspected:
#1, #7, #9, #12, and #16
# Number of duplex or larger pump stations in system 19
# Number of vacuum stations in system
# Number of simplex pump stations in system
# Number of simplex pump stations in system serving more than one building
How many pump/vacuum stations have:
# A two-way "auto polling" communication system (SCADA) installed? 19
Page 7 of 8
Docusign Envelope ID: BCFAF318-OA1D-4D6B-9A79-488FAD3FD326
Permit: WQCS00294 Owner - Facility: Town of Selma
Inspection Date: 09/23/2024 Inspection Type : Collection System Inspect Non Sampling
Reason for Visit: Routine
# A simple one-way telemetry/communication system (auto -dialer) installed?
For pump stations inspected:
Are they secure with restricted access?
0
❑ ❑ ❑
Were they free of by-pass structures/pipes?
0
❑ ❑ ❑
Were wet wells free of excessive grease/debris?
❑
0 ❑ ❑
# Do they all have telemetry installed?
❑
❑ ❑
Is the communication system functional?
❑
❑ ❑
Is a 24-hour notification sign posted ?
0
❑ ❑ ❑
Does the sign include:
Owner Name?
0
❑ ❑ ❑
Pump station identifier?
0
❑ ❑ ❑
# Address?
❑
0 ❑ ❑
Instructions for notification?
0
❑ ❑ ❑
24-hour emergency contact numbers?
❑
0 ❑ ❑
Are audio and visual alarms present?
0
❑ ❑ ❑
Are audio and visual alarms operable?
❑
0 ❑ ❑
# Is there a backup generator or bypass pump connected?
0
❑ ❑ ❑
If tested during inspection, did it function properly?
0
❑ ❑ ❑
Is the back-up system tested at least bi-annually under normal operating conditions?
0
❑ ❑ ❑
# Does it have a dedicated connection for a portable generator?
0
❑ ❑ ❑
# Is the owner relying on portable units in the event of a power outage?
0
❑ ❑ ❑
# If Yes, is there a distribution plan?
❑
❑ ❑
If Yes, what resources (Units/StaffNehicles/etc) are included in Plan?
# Does Permittee have the approved percentage of replacement simplex pumps?
0
❑ ❑ ❑
Is recordkeeping of pump station inspection and maintenance program adequate?
0
❑ ❑ ❑
Do pump station logs include at a minimum
Inside and outside cleaning and debris removal? 0 ❑ ❑ ❑
Inspecting and exercising all valves? 0 ❑ ❑ ❑
Inspecting and lubricating pumps and other equipment? 0 ❑ ❑ ❑
Inspecting alarms, telemetry and auxiliary equipment? 0 ❑ ❑ ❑
Comment: 911 listed as emergency contact number- number needs to reach individual who can perform
emergency maintenance, #7 audible and visual alarms not operational, #12 audible alarm not
operational, excessive grease and debris in wet well of #9.
Page 8 of 8