Division .,; Water Flow Tracking/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: Town of Grimesland
Project Name for which flow is being requested: Grimesland 8 Lot Minor Subdivision
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Greenville Utilities Commission
b. WWTP Facility Permit #: NC0023931
All flows are in MGD
c. WWTP facility's permitted flow 17.5
d. Estimated obligated flow not yet tributary to the WWTP 2.870
e. WWTP facility's actual avg. flow 10.426
f. Total flow for this specific request .0024
g. Total actual and obligated flows to the facility 13.299
h. Percent of permitted flow used 75.992
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / p fl, Daily Flow, Daily Flow, Obligated Available
Number) MGD MGD MGD MGD Flow Capacity***
Southside 30.259 12.104 5.791 1.598 7.389 4.715
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Unknown
Downstream Permit Number: Unknown
Page 1 of 6
FTSE 04-16
III. Certification Statement:
I Clifton H. Cahoon, PE certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the
receiving wastewater treatment facility and that the flow from this project is not anticipated to
cause any capacity related sanitary sewer overflows or overburden any downstream pump station
en route to the receiving treatment plant under normal circumstances, given the implementation
of the planned improvements identified in the planning assessment where applicable. This
analysis has been performed in accordance with local established policies and procedures using
the best available data. This certification applies to those items listed above in Sections I and II
plus all attached planning assessment addendums for which I am the responsible party.
Signature of this form indicates acceptance of this wastewater flow.
Signi*g Official Signature
Date