Loading...
HomeMy WebLinkAboutWQ0022870_Monitoring - 07-2024_20240828 (2)Monitoring Report Submittal ..................................................... Permit Number#* WQ0022870 Name of Facility:* CHAPEL RIDGE Month: * July Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2024 Upload Document* Chapel Ridge July 2024 NDMR.pdf 93.97KB PDF Only Chapel Ridge July 2024 NDAR.pdf 1015.02KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). ERiggins@aquaamerica.com Aaron Chambers (��tow C4e?0 rlf"-tJ 8/28/2024 This will be filled in automatically Reviewer: Wanda.Gerald Is the project number correct?* WQ0022870 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Reviewer: _anonymous Review Date: 10/23/2024 Chapel Ridge Spray Irrigation Fields 12 MONTH ROLLING TOTAL APPLICATION IN INCHES FIELD Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 12 MONTH TOTAL 1 0 0.01 0.73 1.31 0.48 1.33 0.23 0.87 0.57 0.61 0.36 0.02 6.52 2 0 0 1.54 3.67 1.79 3.76 0.63 1.34 0.87 0.99 0,58 0 15.17 2B 0 0.02 0.39 0.61 0.2 0.63 0.11 0.6 0.41 0.38 0.23 0.05 3.63 3 01 0 0.97 1.831 0.7 1.861 0.3 0.991 0.68 0.771 0.45 0 8.55 3B 0 0.03 0.67 1.39 0.36 1.461 0.28 0.95 0.62 0.56 0.33 0.08 6.73 4 0 0.01 0.88 1.48 0.49 1.51 0.26 1.11 0.73 0.78 0.46 0.03 7.74 5 0 0.01 0.85 1.36 0.4 1.38 0.23 1.07 0.7 0.76 0.45 0.02 7.23 6 0 0.01 0.44 0.92 0.41 0.94 0.16 0.49 0.32 0.33 0.2 0.01 4.23 7 0 0.01 0.46 0.98 0.43 1.01 0.17 0.49 0.32 0.34 0.2 0.02 4.43 8 0 0.02 0.41 0.84 0.46 0.89 0.18 0.59 0.38 0.33 0.2 0.06 4.36 9 0 0.01 0.92 1.92 0.85 1.97 0.33 0.98 0.64 0.69 0.41 0.02 8.74 10 0 0 1.12 1.83 0.53 1.84 0.3 1.32 0.86 0.98 0.58 0 9.36 10B 01 0.01 0.83 1.75 0.15 1.8 0.31 0.94 0.61 0.62 0.37 0.03 7.42 11 0 0.01 0.12 0.67 0.13 0.12 0.48 0.16 0.1 0.12 0.06 0.04 2.01 11113 0 0 1.7 3.47 1.4 3.54 0.58 1.72 1.12 1.27 0.75 0 15.55 11 C 0 0 0.88 1.57 0.12 1.52 0.03 1.02 0.66 0.75 0.44 0 6.99 12 0 0 2.52 4.12 2.64 5.8 0.23 2.33 1.52 1.72 1.01 0 21.89 128 0 0.04 0.9 0 1.05 2.21 0.46 1.24 0.81 0.66 0.37 0.13 7.87 13 0 0.01 0.99 2.01 0.84 2.06 0.35 1.08 0.7 0.75 0.45 0.02 9.26 13B 0 0 0.65 1.02 0.29 1.02 0.17 0.78 0.51 0.58 0.34 0 5.36 14 0 0.01 0.99 1.84 0.68 1.88 0.32 1.13 0.74 0.81 0.47 0.02 8.89 15 0 0.01 0.92 1.88 0.81 1.93 0.34 1.07 0.7 0.71 0.43 0.04 8.84 16 0 0.01 0.66 0.95 0.23 0.96 0.16 0.91 0.59 0.63 0.37 0.02 5.49 17 0 0.01 0.73 1.25 0.26 1.08 0.19 1.03 0.67 0.69 0.41 0.04 6.36 18 0 0.01 0.78 1.30 0.4 1.32 0.22 0.94 0.61 0.67 0.4 0.02 6.67 DR 0 0.01 0.24 0.57 0.27 0.46 0.1 0.54 0.35 0.41 0.24 0.02 3.21 CH 0 0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page j of Permit No.: W00022870 Facility Name: Chapel Ridge WWTP County: Chatham Month: July Year: 2024 Did irrigation occur Field Name: F-1 Field Name: F-2 Field Name: F-213 Field Name: F-3 at this facility? Area(acres): 11.4 Area (acres): 5.56 Area (acres): 4.22 Area (acres): 10.66 YES El NO Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Hourly Rate (In): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Annual Rate (in): 20.47 Weather Freeboard Field Irrigated? 21 YES ONO Field Irrigated? p Yes ❑ NO Field Irrigated? 171 YES ❑ No Feld Irrigated? C7 YEs ❑ NO a, R p m o U m m 3 n m F- c o a m o N m m n� n �a o CL 0 o� E 3a CL~ i s m E� c 2" � �t9p a•� t Eoqq J m m E �a > Q m m E ~ }.� �� J �,c t �» = J •� E �Q > a ro E ~� m �. c w�{p J E �,� -c c E�� K= m� E E m �Q > Q E� ~ L m ,staryg J E m Ewa rc = 0 OF in ft ft gal min In In gal min in in gal min In in gal min in in 1 2 3 PC 70 4 ft 17,100 240 0.06 0.01 23,625 240 0.16 0,04 3.160 120 0.03 0.01 22,050 240 0.08 0.02 4 5 6 7 8 9 PC 79 4ft 17,100 240 0.06 0.01 23,625 240 0.16 0.04 3,150 120 0.03 0.01 22,050 240 0.08 0.02 10 11 U 13 14 15 16 CL 79 3.5ft 18,000 240 0.06 0.01 23,625 240 0.16 0.04 3,150 120 0.03 1 0.01 22,050 1 240 0.08 0,02 171 CL 81 3.5ft 18,000 240 0.06 0.01 23,625 1 240 0.16 0.04 3.150 120 0.03 1 0.01 22,050 240 0.08 0.02 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly Loading: 70,200 0.23 94,500 0.63 12,600 0.11 88,200 0.30 :. 12 Month Floating Total (in): 6.52 15.17 3.63 8.55 FORM: NDAR-1 05-15 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 'Z- of 16 Permit No.: WQ0022870 Facility Name: Chapel Ridge WWTP County: Chatham Month: July Year: 2024 Did irrigation occur Field Name: F-313 Field Name: F-4 Field Name: F-5 Field Name: F-6 at this facility? Area (acres): 3.01 Area (acres): 7.18 Area (acres): 13.22 -7 Area (acres): 16.48 YES NO Cover Crop:Turf Cover Crop: P' Turf Cover Crop: p' Turf i Cover Crop: p: Turf Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 7.43 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Weather Freeboard Field Irrigated? (I YES El No Field Irrigated? Z YEs O NO Field Irrigated? p YES ❑ NO Field Irrigated? J YES NO r 0`0 m o U t 3 m a $ ~ c a m a m a' E « N ro m a is a 0 M m E_ fl o a % Q m E F ra ?,c Q a O J E� tm 3� c E a'o m 0 .� J ro n E 2 Q C Q i Q a mr E R i- L 0 y.c ro v E m �_ c a 2 J m E� es 9 Q m E �= ao a.c W G J E m �z a E x o a = J m y E m o a > Q V _ co o o J E o0 a K° o 2 z J °F in ft ft gal min in in gal min in in gal min in in gal min in I in 1 2 3 PC 70 4 ft 5,175 180 0.06 0.02 12,150 240 0.06 0.02 20,250 240 0.06 0.01 17,550 240 0.04 0.01 4 5 6 7 9 PC 79 4ft 1 5,175 180 0.06 0.02 12,150 240 0.06 0.02 20,250 240 0.06 0.01 17,550 240 0.04 0.01 10 11 12 13 14 15 16 CL 79 3.5ft 6,300 180 0.08 0.03 13,050 240 0.07 0.02 21,150 240 0.06 0.01 18,450 240 0.04 0.01 171 CL 81 3.5ft 6,300 180 0.08 0,03 13,050 240 0.07 0.02 21,150 240 0.06 0.01 18,450 240 0.04 0.01 1$ 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly Loading: 22,950 0.28 50,400 0.26 82,800 0.23 72,000 0.16 12 Month Floating Total (in): 6.73 7.74 7.23 4.23 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of 0 Permit No.: W00022870 Facility Name: Chapel Ridge WWTP County: Chatham Month: July Year: 2024 Did irrigation occur Field Name: F-7 Field Name: F-8 Field Name: F-9 Field Name: F-10 at this facility? Area (acres): 16.48 Area (acres): 4.06 Area (acres): 10.11 Area (acres): 5.76 Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf YFS No Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (In): 20.47 Annual Rate (in): 20.47 T Weather Freeboard Field Irrigated? 0 YEs ❑ NO Field Irrigated? CD 'a V O m m E_ .. 3o E� >°a r - 1 YES L No Field Irrigated? l7 YES 0 NO Field Irrigated? 2 YES ❑ No C U !6 L E F ro a m C7 rn CL (a n o m �O v E_ >°a m _E ~ C 2�__- �V �.°r E m 7 3' C z E�� 'fix g ca ?. C ;,v o J E m 7 ?` C E�� m= o J m E_ 3a o a Q m E� F-� a+ y.c T,a o J= E ar !` o c c Esc x o J m E m 3Q o a Q a m� E� °' m a,= ;�v c� o J= E m >. 3- c E5� x o v J OF in ft ft gal min In in gal min in in gal min In in gal min in in 1 2 3 PC 70 4 ft 18,900 240 0.04 0.01 4,275 120 0.04 0.02 22,500 240 0.08 0.02 11,700 120 0.07 0,04 4 5 s 7 8 9 1 PC 79 4ft 1 18,900 240 0.04 0.01 4,275 120 0.04 0,02 22,500 240 0.08 0.02 11,700 120 0.07 0,04 10 11 12 13 14 15 161 CL 79 1 3.5ft 19,800 240 0.04 0.01 5,400 120 0.05 0.02 23,400 240 0.09 0.02 11,700 120 0.07 0.04 171 CL 81 3.5ft 19,800 240 0.04 0.01 5,400 120 0.05 0.02 23,400 240 0.09 0.02 11,700 120 0,07 0.04 18 19 20 21 22 23 24 25 28 27 28 29 30 31 Monthly Loading: 77,400 0.17 19,350 0.18 11 91,800 0.33 46,800 0.30 12 Month Floating Total (in): 4.43 4.36 8.74 9.36 FORM. NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 4 of � Permit No.: WQ0022870 Facility Name: Chapel Ridge WWTP County: Chatham IMonth: July Year: 2024 Did irrigation occur Field Name: F-108 Field Name: F-11 Field Name: F-118 Field Name: F-11C this facility? Area (acres): 5.69 Area (acres): 4,79 Area (acres): 4.2 Area (acres): 9.37 at Cover Cro• p• Turf Cover Crop: p� Turf Cover Crop: p' Turf p• Cover Crop: turf YES NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 7.43 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Weather Freeboard I Field Irrigated? Q YES El NO Field Irrigated? P] YES El NO Field Irrigated? E) Yes p NO Field Irrigated? 7 Yes F❑IdID o v r ma ° io `m a 4�- m c' L° a�i n o �r m E� 3g >°a m _E ~'E m > c �� °a E m 3`c E» "_� m'D E m �a >°a V mr EM ~ CD > c roa °� CDm 3 Tc E'D �_� E� 3a >°a m E ~E w iw•c W� °� � E CD � m y �t c E m Earl, �a � � o� 1 >a � E� ~°f co o� E a� E3a �_� n ft ft gal min in in gal min in in gal min In in gal min in in 1 _ 2 3 PC 70 4 ft 11,700 120 0.08 0.04 15,750 240 0.12 0.03 16,650 240 0.15 0.04 1,800 60 0.01 0.01 4 5 6 7 8 9 PC 79 1 4ft 11,700 120 0.08 0.04 15,750 240 0.12 0.03 16,650 240 0.15 0.04 1,800 60 0.01 0.01 10 11 12 13 14 15 16 CL 79 3.5ft 12,600 120 0.08 0.04 15,750 1 240 0.12 0.03 16,650 240 0.15 0.04 1,800 60 0.01 0.01 17 CL 81 3.5ft 12.600 120 0.08 0,04 15,750 240 0.12 0.03 16,650 240 0.15 0.04 1,800 60 0,01 0.01 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly I d-ing-11 48.600 0.31 63,000 -:; :'- 0.48 "` .� 66,f 0.58 7,200 0.03 12 Month Floating Total (in): 7.42 ;, -.�. :_ 'a¢ ' 2.01 ='r 15.55 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 5 of 9 Permit No.: W00022870 Facility Name: Chapel Ridge WWTP County: Chatham IMonth: July Year: 2024 Did irrigation occur Field Name: F-12 Field Name: F-12B Field Name: F-13 Field Name: F-13B this facility? Area (acres): 2.62 Area (acres): 1.54 Area (acres): 8.49 Area (acres): 2.2 at Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf ,'YES ; No Hourly state (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Weather Freeboard Field Irrigated? ❑ YES ❑ NO Field Irrigated? ^ YES p No Field Irrigated? p YES ❑ No Field Irrigated? 7 YES ❑ No o 3 m L a a` r y go v m� E_ a m _E ro tM �,c a v E y,ca �z c E mD E m a 0.a v m� E a rA y,c 16 e6 E Ttm c E a i ro� E� p �q m$ E a a� a.c v E �m �t c E _= -a m� E m a 'D m2 E a a.c E y ao _ °F in ft ft gal min In In gal min in in gal min in in gal min in in 1 2 3 PC 70 4 ft 4,050 120 0.06 0.03 4,750 120 0.11 0.06 19,800 240 0.09 0.02 2,475 60 0.04 0.04 4 5 6 7 8 91 PC 79 4ft 4,050 120 0.06 0.03 4,750 120 0.11 0.06 19,800 1 240 0.09 0.02 2,475 60 0.04 0.04 10 11 12 13 14 15 161 CL 79 3.5ft 4,050 120 0.06 0.03 4,950 120 0.12 0.06 20,700 240 0.09 0.02 2,475 60 0.04 1 0.04 171 CL 81 3.511 4,050 120 0.06 0.03 4,950 120 0.12 0.06 20,700 240 0.09 0.02 2,475 60 0.04 0.04 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly Loading: 12 Month Floating Total (in): 16,200 0.23 21.89 19,400 0.46 7.87 tmmbddm 81,000 0.35 9.2fi 9,900 0.17 5.36 „ '_' FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page /,,, ofj- Permit No.: WQ0022870 Facility Name: Chape Ridge VWViP County: Chatham Month: July Year: 2024 Did irrigation occur Field Name: F-14 Field Name: F-15 Field Name: F-16 Field Name: F-17 at this facility? Area (acres): 9.91 Area (acres): 4.79 Area (acres): 9.05 Area (acres): 5.37 Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf YES NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Weather Freeboard Field Irrigated? E YES p NO Field irrigated? ^ YES NO Field Irrigated? O YES Cl No Field Irrigated? , YES 71 NO p o (� _ m 3 (L m ° E m r- a ;, m a m c.� O1 U E ° in o LO._ = m� E- =a oa >a m E °r rA - Ts o E �m 7.0 c E my E m a oa >a 01� E }=°f a, }.0 oo a 6 am 7 ` C E °a x0o m� £r c. oa >a m E f- as rC as o �_ E Tai J= C E 3a °`� m� E � ma oa >a Of r E �•°' _ w !,L Ra oc E nor E °v X°c Mz� °F in ft ft gal min In I in gal min in in gal min In to gal min in I in 2 3 PC 70 4 ft 20,925 240 0.08 0.02 10,575 120 0.08 0.04 9,675 120 0.04 0.02 6,525 120 0.04 0.02 4 5 6 7 8 9 PC 79 4ft 20,925 240 0.08 0.02 10,575 120 0.08 0.04 9,675 1 120 0.04 0.02 6,525 120 0.04 0.02 10 11 12 13 14 15 0.03 0,03 16 CL 79 r 3.5ft 21,825 240 0.08 0.02 11,475 120 0.09 0.04 10,575 120 0.04 1 0.02 7,425 120 0.05 17 CL 81 3.5ft 1 21.825 240 0.08 0.02 11,475 120 0.09 0.04 10,575 120 0.04 1 0.02 7,425 120 0.05 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly Loading: �85,500 0.32 44,100 0.34 40,500 0.16 12 Month Floating Total (in)- 8.89 8,84 FORM. NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 7 of � Permit No.: W00022870 Facility Name: : Chapel Ridge WWTP County: Chatham Month: July Year: 2024 Did irrigation occur at this facility? Field Name: F-18 Field Name: DR Field !dame: CH Field Name: Area (acres): 17.8 Area (acres): 14.9 Area (acres): 1.34 Area (acres): Yes No Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.5 Hourly Rate (in): Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 17.58 Annual Rate (in): Weather Freeboard Field irrigated? U YES ❑ NO Field Irrigated? p YES ❑ NO Field Irrigated? ❑ YES p No Field Irrigated? ]YES NO p o i 3 E m a m a N � O cQs 16 m� CL Q E I' m �a m J E gy m) E $ e� a +� J m y O aCL o a > Q E is aD = rn a� m O o= J E} a+ E v o J I in m E �- o a iQ m E i= co �,c G o .axJ E tx �c E �� °$ m� E �= o a > Q 'a ,ai w p o J E ao x° o �=J °F in ft ft gal min t In in gal min in gal min In in 4 gal min in in 1 2 3 PC 70 4 ft 26,100 240 0.05 0.01 10,125 120 0.03 0.01 4 5 6 7 8 91 PC 79 4ft 26,100 240 0.05 0.01 10,125 120 0.03 0.01 10 11 12 13 14 15 16 CL 79 3.5ft 27,000 240 0.06 0.01 10,125 120 0.03 0.01 17 CL 81 3.5ft 27,000 240 0.06 0.01 10,125 120 0.03 0.01 18 19 20 21 22 23 24 25 26 27 28 , 29 30 31 Monthly Loading: 106,200 0.22 40,500 0.10 3.21 0 0.00 0.00 0 0 00 12 Month Floating Total (in}: 6.67 FORM: NDAR-1 0516 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _ of V Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? ❑ compliant 0 Non -Compliant 0 Compliant ❑ Non -Compliant 0 compliant ❑ NonCompliant 9 Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ® Compliant 0 Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary, t &G05 (-'I T, Ms'> (17, $ Rft cAAz6--/ o v ETC- I?- k�cu AAWP -4 rr TbTA1,5 WC Ntea n "1J_17 rJU 6_ iV 77-y tN A �4T`lET-- ,Vc.,rJi i 07b (+- ,Wu Er+D o t= Y frriR . Di, c�u►.l oivLk tits CiGono,J bv6 'rD �r��sfU�(t�rrl Ig TULy. 64 OTe 10414 960"f N r5 Z / 0.3 5- / NG*6!j WtyAMI�P•CVM (off Pi7t '_o c q,b 14446-S Wy�►� Cs>t-vrlr-+ . co,s1 6,*- G,77-S8&xo = g,e 1�GKES. Operator in Responsible Charge (ORC) Certification ORC: William Brian Peters Certification No.: 987582 Grade: SI Phone Number: 919-545-2201 Has the ORC changed since the pr vious NDAR-1? ❑ yg No piQ - 111) - 24 Permittee Certification Permittee: AQUA NC Signing Official: Signing Officials Title: Field Supervisor Phone Number: 919-653-5773 Permit Exp.: 2/28/25 WIV, Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my krxWedge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 S6'8 48'0 Q44'LZL £O'O S8'0 OOZ 9L SELL 44't OOo'06 ZZ-91 £4't lul) IOPI BURROW 4l"ZL 0WOR :Bullmi ►1 WON LO'0 60'0 094 091'4L 60.0 60'0 o£ o09't 90'0 9L'0 OLt 000'ol t0'0 9t'O 04$ 0001a S-S 0 69 Od t£ 00'0 00'0 0 0 1 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 S'S 0 L9 Od 0£ DO'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 NO 00'0 0 0 S'S 4Z' L £L iO 6Z 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'o 0 0 00'0 60'o 0 0 S'S 0 59 O 9Z 00'0 00'0 0 0 00'0 00*0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 S'S 0 09 Od LZ LO'0 60b 09► 09t'4L 60.0 60'a 0£ 009't 90'0 9L'0 OLL 000'Ot �',t0`0lf' 96'0 -,049 oo0'Z£, 9.9 0 91 Od 9Z 00'0 00'0 0 0 00'0 00*0 0 0 00'O 00'0 0 0 00'0 00'0 0 0 9'S 99'0 9L Id 4Z 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'ff`' 0 0 9'S VO L9 Od 4Z 00'0 00'0 0 0 00'0 00-0 0 0 00'0 00'0 0 0 00 o Iwo 0 0 S'S LS"0 L6 Od £Z 00-0 00"O 0 0 00'0 00,0 0 0 00'0 00'0 0 0 00'0 00:0 0 0 9.9 6t�t 48 Od ZZ 00"0 00'0 0 0 00,0 00'0 0 0 00'0 00'0 0 0 0O'o 00'0 0 0 S'S 0 99 Od 1,9 00"0 OO'O 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0- 0 S'S 4Z'0 S8 Od OZ LO'o 60'0 o94 09L'4L 5010 60'0 O£ '0091L 90'0 9L'O DLL 000,0E 10'0 9L'0 049 000'LS 5-9 Lt'0 Z8 Od U 00'0 00'0 0 0 00'0 00'0 0 0: 00'0 00'0 0 0 00:0 00'0 0 0 S'S Z£'0 69 Od 9L t0'0 60'0 094 09t'4t 60'0 60'0 o£ 009'L 90'0 99VO 01L. 000'0L LO'/0{ 9t'0 on 000'Z£ 591 0 O^dJ !� 00,0 00 0 0 0 00,0 0010 0 0 00,0 00,0 0 I 0 '00'0'^ o0'0 0 0 S S 0 (Lp6 W Od 9$ LO'0 60'0 o9v 09L'4L 6010 60'0 OS 009'1 90'0 9t'o ott 000,0E LOV, 91'0 049 000'zc 9-9 0 96 O 9t NO 00'0 0 0 00'0 00'0 0 0 oo'a 00,0 0 0 00'0 00'0 0 0 9'9 0 46 O 4t 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 S'S 0 t6 lO £t 00,0 00'0 0 o 00'0 00'0 o a 00'0 oo,o 0 0 00'0 00'o 0 0 5'S 4C L 51 a Z L 00'0 00'0 o o 00.0 00,0 o a 00'0 00'0 0 0 00'0 00'0 0 0 9'9 0 L9 3d LL to,o 60'0 094 09L'4t 60.0 60-0 Or 009'L 90'0 9t'o OLL 000'0L Wo 91'0 049 000'ZE 9'9 a 46 Od of 00,0 00'0 0 0 00'0 00'0 0 0 00'0 00,0 0 0 00`0 00'0 0 0 S'9 0 46 a 6 00'O 00'0 0 0 00'0 00'0 0 6 00'0 00'0 0 0 00'0 00'0 0 0 S'S 0 69 Od a OTT 000 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 S'S z0'L Z9 Od L 00-0 000 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00'0 0010 0 0 9'9 L5'L 46 a 9 L0"0 60'0 O94 o9t'4t 60'0 60'0 o£ 009't 900 Wo Ott 000'0L i t0:0 9L'o 049 .000a 5'S 8L'0 96 lO 5 OTT o0'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00'0 00'0 0 0 9'9 0 96 10 4 10,0 600 09V 09L'4t 60'0 60'0 Osr ON'L 90'0 9t'O 01l 000'Ot t0'0 9L'0 049 000'Z£ S'S 0 69 10 £ 00'O 000 0 0 00'0 00'0 0 0 00'0 00'0 0 0 00;0 00'0 0 0 S'S 0 99 O Z to'0 60'0 094 09t'4t 60'0 60'O O£ 009'L 90'0 9L'0 Ul. 000'OL 10'a 9t7o 049 000'Zs< S�S 0 Z8 Od t ul ul ulw l ul ul ulw F ul ul ulw le ul W WW l u 8 ul �. _; a g 0'�3 $ a —_ 0� d 3 gg c 30 o ss 3 �' a� _ 3� $� a c 0' 3 � m a— a�� �� c �m a g m 3 i - _� � �' c m M� i21 w cr o aa Q T 3 c 7 g j m ON Cl SRA o 4pa9 awl PMJ ON su © Lpemapil you ON c 53A o L mmtul P1e1:1 ON ❑ MA O amgd Wl Pleld lWeogow i 1etpeem 4"OZ -(ul) am lenuur 4 OZ Sul) emit lenuud 4,OZ Aul) GWH lenuuy 419 :(Ud ffrd *uuV vo :lul) awd ApnOH L 0 lul) emu ApnoH L'o :lul) %vW AVnOH L'0 :luo WU-4inOH ON 13 53A o LEI 1i:)el Si 43 3e sswo Vnl :dojo AoO j ssenO pnl :doiO 1a o3 sse10 pnl :dojo J"03 sse,0 yni :dojo 1anoO 9'S :(S,*e) my L 0 :(nne) eery c z :(Sa1Oe) v w 4'1 Owe) my AMN Plald E-SO :OUMN Pleld Z-SO MWON NOW t-SO :OMN Pfeld an000 uoileBi-ul PML-SO&SO IrZOZ J"A I4nr :mow weyleyo :kunoo luawdolenea uielunow )pne :aweN Alllned OL9ZZOo0M :'ON 11Ui1ed -to � abed (VUMN) "Od3W N011dondclV 3ONYHOSIa-NON EL-Ol L-VVON MOd FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of_ Did the application rates exceed the limits in Attachment 8 of your permit? a canvi" O raW<"r %Nt Were adequate measures taken to prevent effluent ponding in or runoff from the sites? a caapiartt o Norrc� Was a suitable vegetative cover maintained on all sites as specified in your permit? ocompw L NmCar,piara Were all setbacks listed in your permit maintained for every application to each permitted site? a Caro" 0 NvKorrpiarit Were all freeboards maintained in accordance with the specified freeboard heights in your permit? aCWnput F Non1canoamIt tf the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective dl,uull�bj Lanni. Mtdul duumviml 31R=Li 11 Operator in Responsible Charge (ORC) Certification Pei.. hire Certification ORC: Avery Stone Perrnittee: A CzG, C Cerbiication No.* 1015348 Signing Official: Wes lei sdS vp Grade: SI Phone Number: 919-548-2827 Signing Official's Tide: P-cfd Sl.�uy Svr Has the ORC changed since the previous NDAR-1? ® Yes O No Phone Number: 911 -613 S 76 o Permit Exp.. 2 f 18 f - AV,, 8h/24 -2 Signature Date Signature Date By this atpnah", I m* mo r" report is aoarrate and complete to the bast of my Iotovriedge. t cer*. under per -my of law, that ft dowmerit and ai aitednnaus wars preparee Irder my drectim a mpengm in aanrdwoe vAth a system desto assure tMl al gLLa'M peraorrLel propery gamered and evatffied Me idamation stbmiisd Based on rrrf WQft of the person or per— vwtw manage the system, or nlase persons directly resporsible for gaC-1 Cie irftmab ri, the Irft.,Qbn sLbrllttted is, to the bast of my kr aAbdge and Deist Mo, sl aaale, and wmpiete. i am aware M Clare are Mgt it r N penakies for stbra brq fatm lriforrnation, k1U11 N n the poet—) offim s*d Yr4ri=.rw for lularl V vlalabom. Mail Original and Two Copies to: Dhftlon of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617