Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0022870_Monitoring - 08-2024_20240924 (2)
Monitoring Report Submittal ..................................................... Permit Number#* WQ0022870 Name of Facility:* Chapel Ridge Month: * August Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address: * Name of Submitter: * Signature: Date of submittal: Initial Review Year:* 2024 Upload Document* DOC735.pdf 91.86KB PDF Only DOC736.pdf 1.16MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). eriggins@aquaamerica.com eric riggins 9/24/2024 This will be filled in automatically Reviewer: Wanda.Gerald Is the project number correct?* WQ0022870 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Reviewer: _anonymous Review Date: 10/23/2024 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ! of g Permit No.: W00022870 Did irrigation occur at this facility? _. YES NO Facility Name: Field Name: Area (acres): Cover Crop: Hourly Rate (in): Chapel Ridge WWTP F-1 Field Name: F-2 11.4 Area (arras): 5 56 Turf Cover Crop: Turf 0.1 Hourly Rate (in): Oil County: Chatham Month: August Field Name: F-213 Field Name: Area (acres): 4.22 Area (acres): Cover Crop: Turf Cover Crop: Hourly Rate (in): 0.1 Hourly Rate (in): Year: 2024 F 3 10 66 Turf 01 1 Weather Freeboard Annual Rate (in): Field Irrigated? 20.47 123 YES ❑ NO Annual Rate (in): Field Irrigated? 20 47 _�, YES ❑ NO Annual Rate (in): Field Irrigated? 7.43 21 YES © NO Annual Rate (in): Field Irrigated? 20.47 21 YES ❑ NO m U m r M 3 PC m i a m ~ °F C C m a o v� 5 m G mo V �, G m Q 0 R th E m E- 7 a c a > a aN Q1 E ?, C Q 8 5 C 'C x c 9 eo 2 1 m 'T m m« 7 G cu c a F m >a 0 Cl o o E O) }. C ` C x o p �_� Gf E '_ a o a >a I gal 1,800 O E� F- min 1 60 Ol �' C m� p ,a in 0.02 E to C S x o tea in 0.02 o� - 9 7 R la a p a >a t co 'O p '� � E E 3 a ie O �ox_j 75 in ft 3.5ft ft gal min in in gal min in in gal min in in 2 3 CL 73 3.5ft 1,800 60 0.01 0.01 - 1,800 60 0.02 0.02 4 - 5 6 7 CL 75 3.5ft 1,800 60 0.01 0.01 r 1,800 60 0.02 0.02 8 PC 74 3.5ft 1,800 60 0.01 0.01 - ; 1,800 60 0.02 0.02 g 1,800 60 0.02 0.02 10 PC 81 3.5ft 1,800 60 0.01 0.01 11 12 PC 72 3.5ft 1,800 60 0.01 0.01 1,800 60 0.02 0.02 13 - 14 16 17 - --- 18 19 - 20 0.21 - - 21 PC 61 16,200 120 0.05 0.03 32,400 240 0.05 23,400 240 0.08 0.02 22 23 24 PC CL PC 63 64 64 1,5ft "Sft Z.5ft 16,200 18,900 18,900 18,900 120 120 120 120 0.05 0.06 0.06 0.06 0.03 0.03 0.03 0.03 32 400 16.200 66,200 16,200 - 240 120 120 120 0.21 0,11 0 11 Oil 0.05 0.05 005 005 4,500 4,500 4,500 120 120 120 0.04 0.04 0.04 0.02 0.02 0.02 23,400 23,400 23 400 23,400 240 0.08 240 0.08 240 008 240 0.08 0.02 0.02 002 0.02 25 26 C 66 1:5ft 27 281 29 CL C 75 81 2,5ft 2.5ft 18,900 18,900 120 120 0.06 0.06 0.03 0.03 16,200 16,200 120 120 0.11 0.05 0.11 0.05 017 0.04 4,500 4,500 120 120 0.04 0.04 0.02 23,400 23,400 240 008 240 0 08 0.02 0.02 0.03 30 31 PC 73 i,Sft 26,100 120 0.08 0.04 24,975 240 6,300 120 0.05 ;3lr,M 30,600 240 0.11 - - Monthly Loading: 12 Month Floating Total (in}: 162,000 0.52 6.17 170,775 f. '' -: 1.13 39,600 14.96 ;; "si; 0.35194,400 3.38 0.67•• FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Z of $ Permit No.: WQ0022870 Facility Name: Chapel Ridge WWTP County: Chatham Month: August Year: 2024 Did irrigation occur Field Name: F-313 Field Name: F-4 Field Name: F-5 Field Name: F-6 at this facility? Area (acres): 3.01 Area (acres): 7.18 Area (acres): 13.22 Area (acres): 16.48 Cover Crop: Teri Cover Crop:Turf Cover Crop: Turf Cover Crop: Turf YES NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 7.43 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Weather Freeboard Field Irrigated? El YES ❑ NO Field Irrigated? C1 YES C NO Field Irrigated? p YES p NO Field irrigated? ; = YES No cTp m C U_ L �+ c m T m m Q R U m� E- y m m �. m ?. C E " im 7 .0 C m E m m y a1 �, C E C) ?` C m Yi m E- m Q7 a,c E C� � c m '!S m 'O mr C7 c E m Tc m m E a m ° ma W 3- oa E far a o a E xo9 ms -'a EoQ �= ion �O L ��� 3Q E� ~C � �� E�� xx°� E �� ca ER F-°1 } 00 E�� fl >< >°a `x°=� >Q =o °F in ft ft I gal min in in gal min in in gal min In in gal min in in 1 PC 75 3.511 2,250 120 0.03 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 2,250 60 0.01 0.01 2 3 CL 73 3.5ft 2,250 220 0.03 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 2,250 60 0.01 0.01 4 5 6 CL 75 3.511 2,250 120 0.03 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 2,250 60 0.01 0.01 7 8 PC 74 3.5ft 2,250 120 0.03 1 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 2,250 60 0.01 0,01 9 10 PC 81 3.5ft 2.250 120 0.03 0.01 1,800 1 60 0.01 0.01 1,800 60 0.01 0.01 2,250 60 0.01 0.01 11 12 PC 72 3.5ft 2,250 120 0.03 0.01 1,800 60 0.01 0,01 1,800 60 0.01 0.01 2,250 60 0.01 0.01 13 14 - 15 16 17 18 19 20 211 PC 61 7Sft 3,600 120 0.04 1 0.02 7,200 180 0.04 0.01 9,000 180 0.03 0.01 20,700 240 0.05 0.01 22 PC 63 <,Sft 3,600 120 0.04 1 0.02 7,200 180 0.04 0.01 9,000 180 0.03 0.01 20,700 240 0.05 0.01 23 CL 64 L3-ft 4,500 120 0.06 1 0.03 16,200 240 0.08 0.02 30,600 360 0.09 0.01 14,850 240 0.03 0.01 24 PC 64 2.5ft 4,500 1 120 0.06 0.03 16,200 240 0.08 0.02 30.600 360 0.09 0.01 14,850 240 0.03 0.01 25 C 66 LSft 4.500 1 120 0.06 0.03 16,200 240 0.08 0.02 30,600 360 0.09 0.01 14,850 240 0.03 0.01 26 27 CL 75 4,500 4,500 120 120 0.06 0.06 0,03 0.03 16,200 16,200 240 240 0.08 0.08 0.02 0.02 30,600 30,600 360 360 0.09 0,09 0.017 14,850 1 0.01 14,850 240 240 0.03 0.03 0.01 0.01 28 29 C 81 ?eft 30 PC 73 2t , 7,650 120 0.09 0.05 20,250 240 0.10 0.03 35,100 360 0.10 D.02 22,950 240 OA5 0.01 31 152,100 Monthly Loading: 50,850 0.62 126,450 0.65 = 216,900 0.60 12 Month Floating Total (in): 6.40 7.28 6.76 4.08 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of S Permit No.: W00022870 Facility Name: Chapel Ridge WWTP Did Irrigation occur Field Name: F-7 Field Name:" F-8 Area (acres): 16.48 Area (acres): 4.06 at this facility? County: Chatham Month: August Field Name: F-9 Field Name: Area (acres): 10.11 Area (acres): Year: 2024 F-10 5.76 Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf YES ❑ NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 20.47 0 Weather IV m U w E ' F i c O a v a Freeboard V1 °1 o >• a « c0 a N- h `p Field Irrigated? E a o a ? Q m$ E co H '- O YES > c m V ep O a J p NO ?+ C �� x N o O .� J field Irrigated? m F Q 0 a > Q i m m E 1- O YES ! °° a,a is 0 p J= ❑ NO E >, °' E» x o 0 J Field Irrigated? m g �_ m a E o a F > Q (2) YES p NO os E ao >.c � `c E o fl= O ep (pp J x J Field Irrigated? m' E E o a F =� > Q = p YES ❑ NO m E 0 E c a E v p x o J_ .J 1 PC °F 75 in ft 3.5ft ft gal 2,250 min 60 In 0.01 In 0.01 gal 2,250 min 60 in 0.02 in 0.02 I gal 1.800 min 60 in 0.01 in 0.01 gal _ min in in 2 3 4 CL 73 3.5ft 2,250 60 0.01 0.01 2,250 60 0.02 0.02 1,800 60 0.01 0.01 5 6 7 CL 75 3.5ft 2,250 60 0.01 0.01 2,250 i 60 60 0.02 0.02 1,800 60 0.01 0.01 8 PC 74 3.5ft 2,250 60 0.01 0.01 2,250 0.02 1 0.02 1,800 60 0.01 0.01 9 10 PC 81 3 5ft 2,250 60 0.01 0.01 2,250 60 0.02 0.02 1,800 60 0.01 0.01 11 - 12 PC 72 3.5ft 2,250 60 0.01 0.01 2,250 - fiO 0.02 0.02 1,800 60 0.01 0.01 13 14 - 15 16 17 18 19 20 21 PC fit 7 !ft 18,900 240 0.04 0.01 4,050 120 0.04 0.02 27,000 360 0.10 0.02 8,100 180 0.05 0.02 22 23 PC CL 63 64 ft Lift 18,900 17,100 240 240 0.04 0,04 0.01 0.01 4,050 2,925 120 120 0.04 a03 0.02 0.01 27,000 18,900 1 360 240 0.10 1 0.07 0.02 0.02 8,100 16,650 180 240 0.05 0.11 0.02 0.03 24 PC 64 1,y;ft 17,100 240 0.04 6-6-11 2,925 120 0.03 0.01 18,900 240 0.07 0.02 16,650 240 0,11 0.03 251 C 66 :L-5ft 17,100 240 0.04 O.D1 2,925 120 0.03 0.01 18,900 240 0.07 0.02 16,650 240 0.11 0.03 26 27 28 CL 75 1 s ft 17,100 240 0.04 0.01 2,925 120 0.03 0.01 18,900 240 0.07 0.02 16,650 240 0.11 0.03 29 C 81 1.>ft 17,1GO 240 0.04 0.01 2,925 120 120 0.03 0.01 18,900 240 0.07 0.02 16,650 240 0.11 0.03 0.03 ; 30 PC 73 ;ft 23,625 240 0.05 0.01 6,525 0.06 0.03 28,800 186,100 36D 0.10 1 0.69 8.45 0.02 19,350 f18,800 240 0.12 0.76 8.80 31 Monthly Loading: f60,425 12 Month Floating Total (in): 0.36 4.30 42,750 0.39 416 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1 ) Page 4 of 6 Permit No.: WQ0022870 Facility Name: Chapel Ridge WWTP County: Chatham Month: August Year: 2024 Did irrigation occur Field Name: F-10B Field Name: F-11 Field Name; F-11B Field Name: F-11C at this facility? Area (acres): 5.69 Area (acres): 4.79 Area (acres): 4.2 Area (acres): 9.37 Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: turf YES NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 7.43 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Weather Freeboard Field Irrigated? p YES p No Field irrigated? YES NO Field irrigated? p YES © NO Field Irrigated? [ , Yes FDM m ° m ° E� m ?,c �''� m m m °' E a°' m� m E ao m a a o> E m o a ° `o an m �a o a _ECb �� 0 Eoo 0 _3a E� �o� `ate `° �Q E a Ez-a 3Q E� �� Env t E u a 0 ° o- ►= . 0 o x° C a r= G x° m m 7c o ns �. J r{ J °F in ft ft gal min in in gal min in in I gal min in in gal min in in 1 1 PC 75 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 2 3 CL 73 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 4 5 6 CL 75 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 7 8 PC 74 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 9 101 PC 81 1 3.5ft 1,800 60 0.01 1 6.01 1,800 60 0.01 0.01 11 12 PC 72 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 13 14 15 161 17 18 19 20 21 PC 61 ),Sft 10,800 180 007 0.02 1 16,200 240 0.14 0.04 12,600 240 0.05 0.01 22 PC 63 L5 ft 10,800 180 0.07 0.02 16,200 240 0.14 0.04 12,600 240 0,05 0.01 231 CL 64 j, S ft 10,800 180 0.07 0.02 17,100 240 0.15 0.04 20,700 240 0.08 0.02 24 PC 64 l.S-ft 10,800 180 0.07 0.02 17,100 240 0.15 0.04 20,700 240 0.08 0.02 25 C 66 1,5 ft 10,800 180 0.07 0.02 17,100 240 0.15 0.04 20,700 240 0.08 0.02 26 27 28 CL 75 �, j ft 10,800 180 0.07 0.02 17,100 240 0.15 0.04 20,700 240 0.08 0.02 29 C 81 y 5 ft 10,800 180 1 0.07 0.02 17,100 240 0.15 0.04 20,700 240 0.08 0.02 30 PC 73 l,jft 15,300 180 1 0.10 0.03 1,800 60 0.01 1 0.01 21,150 240 0.19 0,05 24,750 240 0.10 0,02 31 Monthly Loading: 101,700 0.66 12,600 0.10 139,050 1.22 153,450 0.60 12 Month Floating Total (in): 7,14 1.95 - 15.05 6.57 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 7 of Cb Permit No.: WQ0022870 Facility Name: Chapel Ridge WWTP County: Chatham f Month; August Year: 2024 Did irrigation occur Field Name: F-12 Field Name: F-12B Field Name: F-13 Field Name: F-13B at this facility? Area (acres): 2.62 Area (acres): 1.54 Area (acres): 8.49 Area (acres): 2.2 Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf YFs _ NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (In): 0.1 Hourly Rate (in): 0.1 Annual Rate (In): 20.47 Annual Rate (in): 7,43 Annual Rate (in): 20.47 Annual Rate (in): 7.43 Weather Freeboard Field Irrigated? O YES ❑ NO Field Irrigated? [0 YFs 0 NO Field Irrigated? O yE$ 0 NO Field Irrigated? -e: Yes No �. m o 1 o U io 3 PC o 2 a r- o g a m W c m � a ea �c� an �` m Em a �f mS E� m e^S �,v E m �C� E av m M E2 3 Q m E co �,c a:8 E � � c E �v m �- _E C0 E m E �� m y �= CL Cb E a J E E �rJ °F 75 in ft 3.5ft ft gal min In in gal 1,800 min 60 in 0.04 in 0.04 gal min 60' In 0.01 In 0,01 gal min in in 2 3 CL 73 3.5ft 1,800 60 0.04 0.04 1,800 60 0.01 0.01 4 5 0.04 fi CL 75 3.5ft 1,800 60 0.04 1,800 60 1 0.01 0.01 7 8 PC 74 3.5ft 1,800 60 0.04 0.04 1,800 60 0.01 0.01 9 0.04 10 PC 81 3.5ft 1800 60 0.04 1,800 60 0.01 0.01 11 12 PC 72 3.5ft 1,800 60 0.04 0.04 1 1,800 60 0.01 0.01 13 - 14 15 16 17 18 I - - 19 20 120 21 PC 61 2-5ft 22,500 300 0.32 0.06 3,600 0.09 0.04 19,350 300 0.08 0.02 1,800 60 0.03 0.03 22 PC 63 4.S7 22,500 300 0.32 0.06 3,600 120 0.09 0.04 19,350 300 0.08 0.02 1,800 60 0.03 0.03 23 241 CL PC 64 64 2,5ft 2,5ft 13,050 13,050 180 180 0.18 0.18 0.06 0.06 2,700 2,700 120 120 0.06 0.06 0.03 0.03 0.03 4 19,125 19,125 300 300 0.06 0.08 0.02 0.02 3,600 3,600 120 120 0.06 0.06 1 0.03 0.03 25 C 66 2.Sft 13,050 180 0.18 0.06 2,700 120 0.06 19,125 300 0.08 0.02 3,600 120 0.06 0.03 25 �._ 27 28 29 CL C 75 81 z,yftL 2 Sfti3,050 13,050 180 180 0.18 0.18 0.06 0.06 2,700 2,700 120 120 0.06 0.06 I 0.03 19,125 0.03 19,125 300 300 0.08 0.08 0.02 0.02 31600 3,600 120 120 0.06 0.06 0.03 0,03 30 PC 73 ,.5It19,350 300 0.27 0.05 5,400 120 0.13 0.06 26,100 300 0.11 0.02 4,275 120 0.07 0.04 31 J" Monthly 12 Month Floating Total (in): 129,600 1.82 21.38 36,900 - may= �". ..,.- .. .f �,� ' 0.88 7.51 171,226 m8.92 0.74 25,875 0.43 5.01 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 6 of S Permit No.: W00022870 Facility Name: Chapel Ridge WWTP County: Chatham Month: August Year: 2024 Did irrigation occur at this facility? Field Name: F-14 Field Name: F-15 Field Name: F-16 Field Name: F-17 Area (acres): 9.91 Area (acres): 4,79 Area (acres): 9.05 Area (acres): 5.37 Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf YES NO Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Annual Rate (in): 20.47 Weather Freeboard Field Irrigated? p YES O NO Field Irrigated? 2 YES ! l NO Field Irrigated? O YES p NO Field Irrigated? YES ^ NO s ❑ c `m m m io a E m H c o a a mrn C am a n o R w:= m m n � a E p �'E °' E },rs �_ W E a a a o =$ J J ma E_ 3 a o a Q E �= c _ w v ❑ o J E Tco E = = o J m E� -p o c > Q m E F- vi a,e ;� fl a$ J E c c E 7 o = J my E m o o a � Q a m� E `° � m a, ac v o R J E w c_ c E o m 2 J °F in ft ft gal min In in gal min in in gal min in I In gal min in in 1 PC 75 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 1 0.01 2 3 CL 73 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 4 5 , 6 CL 75 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 7 8 PC 74 3.5ft 1,800 60 0.01 0.01 11800 60 0.01 0,01 1,800 60 0.01 0.01 1,800 60 0.01 1 0.01 9 101 PC 81 1 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 1 60 0.01 0.01 1,800 60 0.01 0,01 11 12 PC 72 3.5ft 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 1,800 60 0.01 0.01 13 14 15 { 16 17 18 19 20 211 PC 61 ft 1 18,000 240 0.07 0.02 10,800 1 180 0.08 1 0,03 1,800 60 0,01 0.01 1,800 60 0.01 0.01 22 PC 63 2-3ft 18,000 240 0.07 0.02 10,800 180 0.08 0.03 1,600 60 0.01 0.01 1,800 60 0.01 0,01 23 CL 64 1 5ft 23,400 300 0,09 0.02 9,450 180 0.07 0.02 16,650 240 0.07 0.02 10,350 180 0.07 0.02 24 PC 64 15ft 23,400 300 0.09 0.02 9,450 180 0.07 0.02 16,650 1 240 0.07 1 0.02 10,350 180 0.07 0.02 25 C 66 Z.Sft 23,400 300 0.09 1 0.02 9.450 180 0.07 0.02 16,650 240 0.07 0.02 10,350 180 0.07 0.02 26 27 281 CL 75 '2, j ft 23,400 300 0.09 0.02 9,450 180 0.07 0.02 16,650 240 0.07 0.02 10,350 180 0.07 0.02 29 C 81 7..Sft 23,400 300 0.09 0.02 9,450 180 0.07 0.02 16,650 240 1 0.07 0.02 10,350 180 0.07 0.02 30 PC 73 •ft 30,375 300 0.11 0.02 14,400 240 0.11 0.03 19,350 1 240 1 0.08 0.02 13,050 180 0.09 0.03 31 Monthly Loading:1, 12 Month Floating Total (in): 194,175 0.72 8.48 7050 1 INS 0.72 8.49 _ 117,000 0.48 5.06 79,200 0.54 5.87 FORM NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 7 of g Permit No.: W00022870 Did irrigation occur Facility Name: Chapel Ridge WWTP Field Name: F-18 Field Name: DR County: Chatham Month: August Field Name: CH Field Name: Year: 2024 at this facility? Area (acres): 178 Area (acres): 14.9 Area (acres): 1.34 Area (acres): YES No Cover Crop: Turf Cover Crop: Turf Cover Crop: Turf Cover Crop: Hourly Rate (in): 0.1 hourly Rate (in): 0.1 Hourly Rate (in). 0.5 Hourly Rate (in): Annual state (in): 20.47 Annual Rate (in): 20.47 Annual Rate (In): 1758 Annual Rate (in): Weather Freeboard Field Irrigated? O YES El No Field Irrigated? YES 2 NO Field Irrigated? ; ' YES C NO Field Irrigated? Yes ,^., No a m 0 m o U M m 2 m E H c a m d w m o N Z m c.R u a a 4 l0 b m� E_ g o a % 4 m E F- a' ,LDS m is 0 J E >. c c E a = a � J m1 E m a c a 4 v m E ea c' rn y.c is ° 0 0 J 1= m ' c E ;c o 0 = J E� a o a � 4 m E H I �,c p �'c E x o i m o a 4 mom. E m a ~ 2 >.c M m J 3} c E x o M M= O 2 J 1 PC OF 75 in ft 3.5ft ft gal 2,750 min 60 in 0.01 in 0.01 gal 2,250 min 60 I in 0.01 in 0.01 gal min In in gal min in in 2 3 CL 73 3.5ft 2,750 60 0.01 0.01 2,250 60 0.01 0,01 4 5 6 1 CL 75 3.5ft 2,750 60 0.01 0.01 2,250 60 0,01 0.01 7 8 PC 74 3.6ft 1 2,750 60 0.01 0.01 2,250 60 0,01 0.01 9 10 PC 81 3.56 2,750 60 0.01 0.01 2,250 60 0.01 0.01 11 121 PC 72 3.5ft 2,750 60 0.01 0.01 2,250 60 0.01 0,01 13 14 15 16 17 18 19 20 21 PC 61 Z rft 15,300 240 0.03 0.01 12,600 180 0,03 0.01 22 PC 63 'i,$ ft 15,300 240 0.03 0.01 12,600 180 0.03 0.01 231 CL 64 1,5 ft 36,450 300 0.08 0.02 1 6,300 120 0.02 0.01 241 PC 64 2.5 1 36,450 300 0.08 0.02 6,300 1 120 0.02 0.01 261 C 66 1jft 36,450 300 0.08 0.02 6,300 1 120 0.02 0.01 26 27 28 CL 75 2,51 36,450 300 0.08 0.02 6,300 120 0.02 0.01 29 C 81 !,i ft 36,450 300 0.08 0.02 6,300 120 0.02 0.01 30 PC 73 1.5 R 42,750 300 0.09 0.02 12,150 180 0.03 0.01 31 Monthly Loading: 12 Month Floating Total (in): 272,100 0.56 6.29 82,350 020 2.87 0 0.00 0.00 0 7777777w 'Y` FORM. NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 4? ofy Did the application rates exceed the limits in Attachment B of your permit? ❑ Compliant 2 Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? El Compliant ❑ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? p Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? ❑ Compliant ❑ NonCornpliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of action(s) taken_ Attach additinnal chaolc if nar acc the non-compliance and descrit>e the corrective 7d IS E 8i t1 q�y N HS -M wEm W * e_e D 0 6 t-Il tJ . �C tG a fir DIPS 'r`M *" r hl D, l . t2 rAni ft-0A"nnib— -rVr44_!5. Operator in Responsible Charge (ORC) Certification Penmittee Certification ORC: William Brian Peters Permittee: AQUA NC Certification No.: 987582 Signing Official: Grade: SI Phone Number: 919-545-2201 Signing Official's Title: Field Supervisor Has the ORC changed anceps NDAR-1? 0 Yes [] No Phone Number- 919-653-5773 Permit Exp.: 2/28/25 Signature Date Signature Date By this signature, I Certify that this report is accurrate and complete to the best of my knowledge. I certify, under penatty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that an qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware (hat there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page -L of Permit No.: W00022870 Facility Name: Buck Mountain Development County: Chatham Monti,: August Year. 2024 Did irrigation occur Reid Name: OS-1 Field Name: OS-2 Meld Name: OS-3 Field Name: OS-&OS-7 at this facility? Arw(acr"); , 7.4 Area (acres): 2.3 i Area (acres): 0,7 Area (acres): 5.6 cover Crop: Turf Grass Cover Crop: Turf Grass Cover Crop: Turf Gass Cover Crop: Turf Grass 0 YES p NO -Hourly Rate (In): 0.1 Hourly Rate (In): 0.1 i Hourly Rate (In): 0.1 Hourly Rate (in): 0.1 Apuel, Oift (In): 20a4a Annual Rate (In): 20.4 Annual Rate (In): 20.4 Annual Rate (in): 20.4 Weather Freeboard Fleid Irrigated? E YES ❑ NO Field Irrigated? ' YES ❑ No Field Irrigated';" -' trEi O No Field IrMgated? 21 YES ❑ No ttbAft >Q J J iQ 'E J J >a E J J of in ft OW mlrf In in gal min in in 9w min In I In gal min In in 1 PC 82 0 5.5 '�o 0 0.00, 0.00, 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 PC 87 0 5.5 32,000 640 0.16 0.0'1 10,000 170 0.16 0.06 1,800 30 0.09 0.09 14.160 460 0.09 0.01 CL 87 1.98 5.5 0. 0 0.00 -7-6.-A003 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 CL 75 0 5.5 0 0 0.00 "0*00�i 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 PC 69 0 5.5 32;000 j 640 0.16 "?0:G1t:: 10,000 1 170 0.16 0.06 1,800 30 0.09, 0.09 14.160 1 460 0.09 0.01 6 CL 75 1 0.9 5.5 -0 0 0.00 0.00': 0 0 0.00 0.00 0 -a '0.W 0.00' 0 0 0.00 0.00 7 CL 84 1 0.23 5.5 ,32,000 640 0.16 0.01 10,000 170 0.16 0.06 1,800 30 0;09 0.09, 14,160 460 0.09 0.01 8 R 85 1 4.481 5.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00, 0 0 0.00 0.00 9 CL 78 0.5 5.5 0 1J 0.00 0.00 0 0 0.00 0.00 0 Q._ 0.00 0.1w 0 0 0.00 0,00 10 PC 80 0 5.5 0 0 0,00 1,00 1 0 0 0.00 0.00 0 0. 0.00 0.00 0 0 0.00 0.00 III PC 73 0 5.5 0 110 0.00 0.00 0 0 0.00 0.00 0 0 .0.00 0.00 0 0 0.00 0.00 12 PC 84 0 5.5 32.000 -W -. 0,16 0.01 10,000 170 0.16 0.06 1,800 30 0 09 0.09 14,160 460 0.09 0.01 13 PC 78 0.5 5.5 0 -0 0.00 .0:00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 PC 84 0 5.5 9- 0 _ 4M 0.18 0,61 10,000 170 0.16 0.06 1,800 30 0.09 _ 0.09 14,160 460 0.09 0.01 15 C 84 0 5.5 0 0 0:00 0:00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 18 PC 87 0 5.5 32,000 640 018.zsu 0.01 10,000 170 0.16 0.08 1,800 30 0.09 0.09 14,160 460 0.09 0.01 17 PC 87 0 5.5 0 '0 -0:00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 18 PC 87 0.15 5.5 0 , _;iQd _ ;.:;0'.0v,. --;0:00.'- 0 0 0.00 0.00 0 -aA' 0.00 0.00 0 0 0.00 0.00 18 PC 85 0 5.5 32,000 : " ' '._0 ' 10,000 170 0.16 0.06 4,8W --30 -30 a.09." 0.09 14,160 460 0.09 0.01 20 PC 78 0 5.5 0 -'t3'.�. om 0:00 0 0 0.00 0.00 0 V 0' _A 0.00' . 1 0.00 0 0 0.00 0.00 21 22 23 PC C PC 76 78 80 0 0 0 5-1 5.5 5.5 32,000 0 ,32,000 00- KOn; 540 0l0 oa10 0,16 0.01 0:00 0.01 10,000 0 10,000 170 0 170 0.16 0.00 0.16 0.06 0.00 0.06 1,800 0 1,800 30 0 .30 V09 0.00 0.09 0.09 0.00 0.09 14,160 , 0 14,160 460 0.09 0 0.00 460 0.09 0.01 0.00 0.01 24 C 82 0 5.5 Q 0 0.00 0.00 0 0 0.00 0.00 0 -0 O.OQ 0.00 0 0 I 0.00 0.00 25 26 27 C C C 85 87 91 0 0 0 5.5 5.5 5.5 0 32,000 0 0. 640 0 0,00 0A6 0.00 0.00 0.01 OW 0 10.000 0 0 170 0 0.00 0.16 0.00 0.00 0.06 0.00 0 1,800 0 --0 30 -0 40.00 09 +0., 0.00 0.00 0.09 0.00 0 14,1W 0 0 0.00 460 0.09 0 0.00 0.00 0.01 0.00 281993 0 5.5 32,000 640 016 0.01 10,000 170 0.16 0.06 1,8W -30 0.09 0A9 14.160 460 0.09 0.01 0 5.5 0 0 0:00 0.00 0 0 0.00 0.00 0 0 0.00 Q00 0 0 0.00 0.00 301.08 5.5 32,000 646 011A 0.01 10,000 170 016 006 1,800 30 0.09 EO-9 14,160 460 0.09 0.01 31 0 5.5 0 O 0;00 0;00 0 0 0.00 0.00 0 0 am 0,00 0 0 0.00 0.00 Monthly Loading: 12 Month Floating Total (in): 384,000 1,91 15.61 120,000 1.92 17.86 21,600 1.14 t.17 169,920 1.12 9.43 FORM: NDAR-t 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? o Caro" ❑ x Were adequate measures taken to prevent effluent ponding in or runoff from the sites? o CarTO rht ❑ NbrrCarnpGartt Was a suitable vegetative cover maintained on all sites as specified in your permit? o ❑ Nor_Carttptlant Were all setbacks listed in your permit maintained for every application to each permitted site? o cer rant ❑ � Were all freeboards maintained in accordance with the specified freeboard heights in your permit? o cornowt ❑ Morl� If the facility Is non-comphant, please explain in the space below the reason(s) the facility was not In compliance. Provide in your explanation the dates) of the non-oompliance and describe the corrective taKen. Attach additional sheets rt necessary. I Operator In Responsible Charge (ORC) Certif€catlon 11 Permittee Certification ORC: Avery Stone Cerflfication No.: 1015348 Grade: SI Phone Number: 919-548-2827 Has the ORC changed since the previous NDAR-1? Q yes ❑ No Signing Official: Were I Signing Officlaft Title: F,-c r& s" pc,-,r SVi Phone Number. '-'r(9 —6S 3 —176 D Pwmtt F-xp.: z 12g jz S 9/4/24 ( / S / , Signature Date Signature Date By Cds signrrue, t certify OW this report Is eoaxrete and complete to tee boss or my knowledge- t GertdY, under Penaky or law, hurt thm doarnent and as attar awft were prepared aroma my arrrtkw or s pervisim in acmreante with a system deagned to aaaure that am qus8lled personnel prop" gattiered and eraknited n+e rgonnabon u0nvDed. Based on my inquiry of the Pawn or persom who manage the system, or novas persons 6 ectly respo tAft for g ill's I g do ietpmafiom tM irdamabon submitted Is. to tin best of my larw� and b", hve, soarate, and oompkte. I am mere timl More are sign6card psn Om for aibrrd" tame rbamuWon, r,rlt,dlrq the poasaay a tr,.s and rnprbomrnt for krorwq r+oI " . Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mall Service Center Raleigh, North Carolina 27699-1617