HomeMy WebLinkAboutWQ0023310_Monitoring - 08-2024_20240917Monitoring Report Submittal
...................................................
Permit Number#* WQ0023310
Name of Facility:* Warsaw TW
Month: * August
Report Information
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Confirmation Email Address: *
Name of Submitter: *
Signature:
Date of submittal:
Initial Review
Year:* 2024
Upload Document*
WQ0023310 Warsaw TW Report Aug 24.pdf 343.49KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
mnorris@smithfield.com
Michael Norris
�usfa��i�u�a
Reviewer: Wanda.Gerald
9/17/2024
This will be filled in automatically
Is the project number correct?* WQ0023310
Is the monitoring report accepted?* Yes No
Regional Office* Wilmington
Reviewer: _anonymous
Review Date: 10/23/2024
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
Permit No.: WQ0023310
Facility Name: Warsaw Sanitation Trailer Wash
County: Duplin
Month: August
Year: 2024
Did irrigation
Field Name:
Field A
Field Name:
Field B
Field Name:
Field C
Field Name:
Field D
occur
Area (acres):
3.53
Area (acres):
3.38
Area (acres):
3.31
Area (acres):
3.48
at this facility?
Cover Crop:
Corn
Cover Crop:
Corn
Cover Crop:
Corn
Cover Crop:
Corn
0 YES ❑ No
Hourly Rate (in):
0.4
Hourly Rate (in):
0.4
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Annual Rate (in):
15
Annual Rate (in):
15
Annual Rate (in):
50
Annual Rate (in):
30
Weather
Freeboard
Field Irrigated?
0 YES ❑ No
Field Irrigated?
❑ YES 0 No
Field Irrigated?
0 YES ❑ No
Field Irrigated?
❑ YES 0 NO
>,
d
a
U
L
a)
�
fi
a)
CD
a
°
.�.
'Q
m
�._
d d
Q a1
U
LO
m a
E a)
7 Q.
a
a)
E
rn
>. C
'�
E
3 i C
E 7
m a
E ,a)
7 Q.
N
E
a>
>, C
'�
E a>
7 �' C
7 a
d a
E a)
7 Q.
a
N
E
rn
>. c
'R m
E rn
7> c
E 7
m a
E N
3 p.
a
N :;
E 4
vi
>+ C
'R
E rn
7` C
7
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
4.5
2
3
0.4
4
1
5
6
7
1
8
3.5
9
2
3.4
10
11
0.3
12
0.1
13
0.4
14
151
1
1 2.75
16
17
18
19
20
21
68,172
299
0.76
0.15
74,100
325
0.78
0.14
22
4.5
75,240
330
0.79
0.14
44,460
195
0.48
0.15
33,516
147
0.35
0.14
23
24
25
29,640
130
0.31
0.14
29,640
130
0.32
0.15
26
27
28
29
30
4.5
59,736
262
0.62
0.14
59,964
263
0.67
0.15
2.7Monthly
Loading:616
rt12
1.72
1.72
74,100
0.81
4.24
128136
1.43
6.26
107,616
1.14
4.67
Month Floating Total (in):
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
Permit No.: WQ0023310
Facility Name: Warsaw Sanitation Trailer Wash
County: Duplin
Month: August
Year: 2024
Did irrigation
Field Name:
Field E
Field Name:
Field F
Field Name:
Field G
Field Name:
Field H
occur
Area (acres):
3.18
Area (acres):
2.92
Area (acres):
2.93
Area (acres):
2.35
at this facility?
Cover Crop:Corn
Cover Crop:
p�
Corn
Cover Crop:
p�
Corn
Cover Crop:
p�
Corn
0 YES ❑ No
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Annual Rate (in):
30
Annual Rate (in):
30
Annual Rate (in):
50
Annual Rate (in):
50
Weather
Freeboard
Field Irrigated?
❑ YES 0 No
Field Irrigated?
❑ YES 0 No
Field Irrigated?
❑ YES 0 No
Field Irrigated?
❑ YES 0 No
a
cc
d
a
L°'
is
a)
-CD
Q-
F-
a
.2
U
i
a
CD
C
N
�._
d d
.'2 a
.
as
LO
m a
E a)
O
� Q
a
•
i
rn
a
p
E
E
=a
p
E .a)
O
� Q
E
_
O
E
=a
O
E a
O a
�
>c
O
E
R= aO
O
E
-a'
> Q
E cc
acc
O
E aC �
=a
=a
cc OE
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
4.5
2
3
0.4
4
1
5
6
7
1
8
3.5
9
2
3.4
10
11
0.3
12
0.1
13
0.4
14
151
1
1 2.75
16
17
18
19
20
21
36,480
160
0.42
0.16
60,420
265
0.76
0.17
44,232
194
0.56
0.17
22
4.5
65,436
287
0.83
0.17
23
24
25
26
27
28
29
30
4.5
2.7Monthly
Loading:
rt12
36,480
0.42
4.61
125,856
1.59
5.24
44,2
4.23
2.22
Month Floating Total (in):
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
Permit No.: WQ0023310
Facility Name: Warsaw Sanitation Trailer Wash
County: Duplin
Month: August
Year: 2024
Did irrigation
Field Name:
Zone 1
Field Name:
Zone 2
Field Name:
Zone 3
Field Name:
Zone 4
occur
Area (acres):
0.52
Area (acres):
2.03
Area (acres):
1.6
Area (acres):
2.39
at this facility?
Cover Crop:Fescue
Cover Crop:
p�
Fescue
Cover Crop:
p�
Fescue
Cover Crop:
p�
Fescue
0 YES ❑ No
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Hourly Rate (in):
0.5
Annual Rate (in):
30
Annual Rate (in):
30
Annual Rate (in):
30
Annual Rate (in):
30
Weather
Freeboard
Field Irrigated?
❑ YES 0 No
Field Irrigated?
❑ YES 0 No
Field Irrigated?
❑ YES 0 No
Field Irrigated?
❑ YES 0 No
a
cc
d
a
L°'
is
a)
-CD
Q-
F-
a
.2
'
i
a
CD
C
N
�._
d d
.'2 a
.
as
LO
m a
E a)
O
� Q
a
•
i
rn
a
p
E
E
=a
p
E .a)
O
� Q
E
_
O
E
=a
O
E a
O a
�
>c
O
E
R= aO
O
E
Q
> Q
Ecc
a
O
�
E aCaaS
cc=U
cc ' OE
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
4.5
2
3
0.4
4
1
5
6
7
1
8
3.5
9
2
3.4
10
11
0.3
12
0.1
13
0.4
14
151
1
1 2.75
16
17
18
19
20
21
22
4.5
23
24
25
26
27
28
29
30
4.5
2.7Monthly
Loading:
rt12
0
0.00in
10.67
0
0.00
10.79
0
0.00
3.79
3.63
Month Floating Total (in):
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
•.: WQ0023310
•
•
August
1
irrigation
• occur
Area (acres):1:Area
(acres):
Area (acres):
Area (acres):
at this facility?
Cover..:
Cover Crop:.
..:
Cover Crop:
0 NO
. '.
1
• '.
. '.
. '.
Annual Rate (iny.1Annual
Rate (in):
0 Iff R 0T.T.- R rV
Annual Rate (in):
... .Field
Irrigated?
0 •
• • •
•Moninr.XM
..
Field Irrigated?•
Monthly Loading:
1 11
' "
1
1 11
1 11
1 11
12 Month Floating Total (in):
FORM: NDAR-1 08-11
NON -DISCHARGE APPLICATION REPORT (NDAR-1)
Page of
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
❑✓ compliant ❑ Non -compliant
❑✓ compliant ❑ Non -compliant
❑✓ compliant ❑ Non -compliant
❑✓ compliant ❑ Non -compliant
❑✓ compliant ❑ Non -compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Bradley Devone Herring
Permittee:
Murphy Brown LLC Warsaw TW
Certification No.: 988691
Signing Official: Gary Richard
Grade: SI Phone Number: (910) 289-7752
Signing Official's Title: Murphy brown East Transportation
Has the ORC changed since the previous NDAR-1? ❑ yes ❑✓ No
Phone Number: 910 293-3434 Permit Exp.: 11/30/24
9/ 17/24
9/17/24
Signature Date
Ignature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page
Permit No.: W00023310
Facility Name: Warsaw Sanitation Trailer
Wash
County: Duplin
Month: August
Year:
2024
Field Name:
Field A
Field Name:
Field B
Field Name:
Field C
Field Name:
Field D
Field Name:
Field E
Area (acres):
3.53
Area (acres):
3.38
Area (acres):
3.31
Area (acres):
3.48
Area (acres):
3.18
Cover Crop(s):
Corn/CC
Cover Crop(s):
Corn/CC
Cover Crop(s):
Corn/CC
Cover Crop(s):
Corn/CC
Cover Crop(s):
Corn/CC
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES ❑✓ NO
a
t
z
a
o
7
U
a
m
o
�
z
a
m
o
7
U
a
a (a
t o
�
z
a
m
;
7
U
a
a
m�
t
�
z
a
;
7
U
a
a
t o
�
z
a
m
;o o
7
U
Month
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
January
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
February
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
March
12.5
12.5
19.2
19.2
15.0
15.0
25.6
25.6
24.0
24.0
April
0.0
12.5
27.3
47.0
29.5
44.5
20.1
45.7
19.9
43.9
May
0.0
12.5
0.0
47.0
3.4
47.9
0.0
45.7
0.0
43.9
June
0.0
12.5
31.4
78.4
27.2
75.1
19.5
65.2
20.6
64.5
July
0.0
12.5
0.0
78.4
8.2
83.3
0.0
65.2
0.0
64.5
August
32.6
45.1
21.7
100.1
27.8
111.1
12.3
77.5
11.4
75.9
September
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
October
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
November
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
December
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page
Permit No.: W00023310
Facility Name: Warsaw Sanitation Trailer
Wash
County: Duplin
Month: August
Year:
2024
Field Name:
Field F
Field Name:
Field G
Field Name:
Field H
Field Name:
Zone 1
Field Name:
Zone 2
Area (acres):
2.92
Area (acres):
2.93
Area (acres):
2.35
Area (acres):
0.52
Area (acres):
2.03
Cover Crop(s):
Corn/CC
Cover Crop(s):
Corn/CC
Cover Crop(s):
Corn/CC
Cover Crop(s):
Fescue
Cover Crop(s):
Fescue
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES ❑✓ NO
a
t
z
a
(a
o
7
U
a
a m
o
�
z
a
> m
o
7
U
a
a (a
t o
�
z
a
m
;
7
U
a
a
m�
t
�
z
a
;
7
U
a
a
t o
�
z
a
m
;o o
7
U
Month
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
January
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
February
0.0
0.0
0.0
0.0
0.0
0.0
15.9
15.9
19.3
19.3
March
0.0
0.0
0.0
0.0
23.4
23.4
49.3
65.2
58.4
77.7
April
43.8
43.8
16.2
16.2
0.0
23.4
78.8
144.0
95.2
172.9
May
3.9
47.7
0.0
16.2
4.6
28.0
43.6
187.6
50.3
123.2
June
19.7
67.4
0.0
16.2
0.0
28.0
35.4
223.0
0.0
123.2
July
0.0
67.4
0.0
16.2
0.0
28.0
0.0
223.0
0.0
123.0
August
42.7
110.1
15.0
31.2
0.0
28.0
0.0
223.0
0.0
123.0
September
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
October
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
November
0.0
0.0
0.0
0.0
0.0
1 0.0
0.0
1 0.0
0.0
1 0.0
December
0.0
0.0
0.0
0.0
0.0
1 0.0
0.0
1 0.0
0.0
1 0.0
FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page
Permit No.: W00023310
Facility Name: Warsaw Sanitation Trailer
Wash
County: Duplin
Month: August
Year:
2024
Field Name:
Zone 3
Field Name:
Zone 4
Field Name:
Zone 5
Field Name:
Field Name:
Area (acres):
1.6
Area (acres):
2.39
Area (acres):
1.28
Area (acres):
Area (acres):
Cover Crop(s):
Fescue
Cover Crop(s):
Fescue
Cover Crop(s):
Fescue
Cover Crop(s):
Cover Crop(s):
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
PAN
Load Type:
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES 0 No
Field Loaded? ❑ YES ❑ No
Field Loaded? ❑ YES ❑ NO
•�-
a
>` l�4
J
C
z
a
l�4
J
7
U
a
�` l�4
J
C
z
a
> l�0
J
7
U
a
�` l�4
J
C
z
a
> l�4l�4
J
7
U
aCL
Y J
C
z
>
J
7
U
21
s
C
E J
7
Month
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
Ibs/ac
January
0.0
0.0
0.0
0.0
0.0
0.0
February
0.0
0.0
0.0
0.0
0.0
0.0
March
0.0
0.0
0.0
0.0
0.0
0.0
April
0.0
0.0
0.0
0.0
0.0
0.0
May
38.4
38.4
40.4
40.4
49.1
49.1
June
32.9
71.3
32.8
73.2
51.6
100.7
July
0.0
71.3
0.0
73.2
0.0
100.7
August
0.0
71.3
0.0
73.2
0.0
100.7
September
0.0
0.0
0.0
0.0
0.0
0.0
October
0.0
0.0 1
0.0
0.0
0.0
0.0
November
0.0
0.0
0.0
0.0
0.0
0.0
December
0.0
0.0
0.0
0.0
0.0
0.0
FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of
Did the mass loading rates exceed the limits in Attachment B of your permit?
❑✓ compliant ❑ Non -compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Bradley Devone Herring
Permittee:
Murphy Brown LLC Warsaw TW
Certification Number: 988691
Signing Official:
Gary Richard
Grade: SI Phone Number: (910) 289-7752
Signing Officials Title: Murphy Brown East Transportation
Has the ORC changed since the previous NDMLR? ❑ Yes 0 No
Phone No.: (910) 293-3434 Permit Exp.: 11 /30/24
9/17/24
9/17/24
Signature Date
Signature VDate
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines
and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Flow Measuring •. ■ Influent o Effluent ■
■ Influent o Effluent ■ Groundwater LoweringSurface Water
FORM: NDMR 10-13
NON -DISCHARGE MONITORING REPORT (NDMR)
Page of
Sampling Person(s) Certified Laboratories
Name: Bradley Devane Herring Name: NCDA Agronomic Division Sampling Department
Name: Enviro Chem Rep Name: Enviro Chem
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑� Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Bradley Devone Herring
Permittee: Murphy Brown LLC Warsaw TW
Certification No.: 988691
Signing Official: Gary Richard
Grade: SI Phone Number: (910) 289-7752
Signing Official's Title: Murphy Brown East Transportation
Has the ORC changed since the previous NDMR? ❑ Yes 0 No
Phone Number: (910) 293-3434 Permit Expiration: 11 /30/2024
9/17/24
9/17/24
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617