Loading...
HomeMy WebLinkAboutWQ0035749_Project Completion Report_20231221Initial Review Reviewer nathaniel.thornburg Is this submittal an application? (Excluding additional information.) * Yes No If not an application what is the submittal type?* Annual Report Residual Annual Report Additional Information Other Project Completion Report Permit Number (IR) * W00035749 Applicant/Permittee North Carolina Department of Transportation Email Notifications Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. ...................................................................................................................................................................................................................................................................................... ... ... ... ... ... .. ... ... ... ... .. Name* Justin Johnson Email Address* jtjohnson4@ncdot.gov Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other Project Completion Report Phone Number* 704-380-6050 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https:Hedocs.deq.nc.gov/Forms/NonDischarge Monitori ng_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Permit Number: * WQ0035749 Has Current Existing permit number Applicant/Permittee Address* 1536 Mail Service Center, Raleigh NC 27601 Facility Name * NCDOT DGS and HOS Class A Residuals Program Please provide comments/notes on your current submittal below. The Lane Construction Corporation is submitting the monitoring and reporting data for the Subject Project for 2023. Per the North Carolina Department of Transportation (NCDOT) Permit No. WQ0035749, this report is to be submitted at project completion for work accomplished by our firm on this project report using data gathered by our staff and/or contractors during the compliance year for diamond grinding slurry. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. (Application Form, Engineering Plans, Specifications, Calculations, Etc.) 2023 Project Completion Report - Lane Construction - 2.1 MB 13819B.pdf Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature C�JQir C�a%rJAY Submission Date 2023 Project Completion Report Prepared 12/20/2023 NC Department of Transportation Permit #WQ0035749 Prepared For: NC Department of Transportation 1536 Mail Service Center Raleigh, North Carolina 27601-1536 The Lane Construction Corporation 6125 Tyvola Centre Drive Charlotte, NC 28217 Project TIP # 1-3819B Project Contract # 204163 1-40 / 1-77 Interchange Project, Statesville, NC 12/20/2023 NCDEQ-DWR Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Information Processing Unit Reference Land Application Project Completion Report for Project TIP 1-3819B, C204163 NC Department of Transportation Permit No. WQ0035749 Non -Discharge Compliance Unit: The Lane Construction Corporation is submitting the monitoring and reporting data for the Subject Project for 2023. Per the North Carolina Department of Transportation (NCDOT) Permit No. WQ0035749, this report is to be submitted at project completion for work accomplished by our firm on this project report using data gathered by our staff and/or contractors during the compliance year for diamond grinding slurry. If additional information is required or if there are questions concerning this project status report, please contact my office for assistance at: CPHurley@Laneconstruct.com or 919-279-7264. Sincerely, CasePDigitally signed by Casey y, P. Hurley 023.12.21 11:03:23 Hurley 05'00' Casey P. Hurley, PE, PLS Project Manager Enclosures NC DEPARTMENT OF TRANSPORTATION LAND APPLICATION OF DIAMOND GRINDING AND HYDRODEMOLITION OPERATION SLURRY PERMIT NO. WQ0035749 2019 LAND APPLICATION SUMMARY CONTRACTOR DOT PROJECT PROJECT TYPE (DGS OR YEAR APPLIED NO. LOCATION HOS) The Lane TIP# 1-3819B Construction Contract # Statesville, NC DGS 2023 Corporation C204163 TABLE OF CONTENTS SECTION NO. TITLE Diamond Grinding Slurry (DGS) Analyses II. Diamond Grinding Slurry (DGS) pH and Land Application Logs SECTION I DIAMOND GRINDING SLURRY (DGS) ANALYSIS NC DEPARTMENT OF TRANSPORTATION DGS ANALYSIS Permit No.WQ0035749 The Lane Construction Corporation 140/177 Interchange, Statesville, NC Date Sampled Parameter Calcium Carbonate Eq. 07/11 /2022 Solids: 11.9% pH: 12.54 Mg/Kg Dry Weight (% x 10,000) 6.2 62,000 Pounds/Dry Ton (mg/Kg x 0.002) 124 SECTION II DIAMOND GRINDING SLURRY (DGS) pH AND LAND APPLICATION LOGS HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY Project Name (Source of HOS/DGS): Project Location: Project Description: Land Application Operator in Responsible Charge: Vo /11-77 Sf4esVrIlPo Th+tVC40.1-We- pH LOG Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) 71AS/z3 7/d(�d3 ���GkM i��G ld, � ` i"cic 067- 0076 � R� lu=SCAM 7� /a3 to 5'6 4M Flel � 1.71 T &-(jGK 0 C7 - 0 W� I 1-,VAj q 7/d5'�3 11-�-J �Aj PTCI� l (- Q TVa{K G U — 0 (3 � 7lxS/23 fa_3J M 7403 r . )� PIVI Ftelcl 1 [ . 66 TVuc1C 0 (7- OC1 7 7/� 5� 3 q-q#p,0 44$43 gapm Fl-f0 + 1-q TYt,,cIc W- 60q( 1.31PM 2603 1:3 f PM Fefd 11.5-C '"v;,K 067- 0(�q 3 3:G PM 7%V�3 3,St( PA FTA t I- 5� 'TYt'('�- N 7- 0 (3 6 7/z/�S �:-g5-PM 7/�9a3 -[:qs em F.-c0 I [ rib TrULK (%7— 00 � ( 7A5/-z3 �=WM ?*/- a3 `f:N pIq F eft [,SS Tr,,ck 60 - o Uq 7%S%3 1:56PAA ?/1�fa3 4=�'f PM F;-ft� I"vLick 067- 0017 7/ZCe/2,S7(a: 33 7/to/43 <e:33 ,. Ft/c/ �[ . (oi VvcA o&7—oi(36 P:1TransportationlPrajects\Road\NC-DOT1201616480166142-Statewide 2019.doc Land Application PermitTelive rablMGuidelines\NCDOT comments 48191combine docs\Attachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY pH LOG Project Name (S ource of H o S/D G S): Project Location: Project Description: Land Application operator in Responsible Charge: 5?Rrle.,rs ller .. AIC v4ei r,�a *-. 4 -r- 4ag,e-eM Date H Sample Collected Date H Anal zed / Reported Lab or Field Sample pH Measurement Unit Sampled p P p Y p (Truck, Frac Tank, Dewatering Box, etc.) 71244 f �� r1 F i►f 71Z C0? ;F �� ��s d� O �� ff 76 6J (b 7— 0a J' 71-e&le 7 1'S.I✓�®t �!4 P�'A��i �" r F �i4� 0677- o Z V -2 z &1zS -?Iz&AZT 6>-%zGGc /;'uG C]�p�" c) 9f ?J • i J s 7 2 to/2 3 6 a 7/L6,/Z w :,.. A! ' Id � J to {' 3-• - Y i� �K'- YN '" 3 P:\Transportation\Projects\Road\NC-DOT\2016\6480168142-Statewide Land Application Perm itlDeiiverable\Guidol ines\NCDOT comments 4819\combine docs\Attachment C - forms\pH LOG - March 2019,doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY Project Name (Source of H 0 S/D G S); Project Location: Project Description: Land Application Operator in Responsible Charge: :::2=4yo /.. ' pH LOG Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dawatering Box, etc.) F-1 T 7: Z co m4 8z7 K vzz 7: Z -7 awx 00q(P 7/nbjr 8:ozak -217,1z3 6?,-oSe. 4h -7/z 7A 'S 6'- `2® arc, Fiwd go a- 7 - o 17, Y '7 ffs o &-7 013C. 7/Z -71-e3 12:va. 71z -7/-- ? 12: 3 i-,a,* Ic?O 11,57 Zice 7 - 00 1-7 2 71-2,? 71z7le-r 12.-MeAp q6? '7& 2 - 9 1:020ao* 71,e -;�12;; / �o&w rle-let oro 7 - 0 7/217/Z5 Z:S$W*t 71Z -7 A -9 2 : 54p 0 #VL A; -eolcy 17ve k 06 7 — 013 & P:1Transportation\Projects\Road\NC-DOT\2016\6480166142-Statewide Land 2019.doc Application Permit\Deliverable\Guidelines\NCDOT comments 48191combirie docs\AttachmentC -forms\pH LOG - March HYDRODEMOLITION OPERATION SLURRY/ DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS):T����tq�lQ�1 r - Project Location: Project Description: Tevr1AAq e Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck., Frac Tank, DeWatering Box, etc.) 7/2-7/z-1 5;c,8eo, -7,;:L&- 6 V - 38 ctl 4, 06-2 aley 212 71Z 3 gllap, ff %) 6 7— oo 97 717&3 Y% 2sph 712 713 Y: Z6 p� �G%C� ��� .S7J ��� d G 7-6 /2- V -7: 3gaM 7�2��'�3 `7: ler�► , 000an 7 Z6)r .71zellZ3 �E �a� ���"�z3 �',So�rh c� . �S �f.�& 067 I / (�c4 C*C' 71Z e i 4 d ` C% 4 s �-,• V __ {.Jos i •lt®� �4+. .,/U f/�i s f ��/ L ! /Z"/l A f • �� /1� if. + i � / �/ %}��r �_ P:1TransportattionlPrrojecttslRoadlNC-DOT1220 t616480166142-Statewide Land Application Permit0eliverable\Guidelines\NCDOT 2019.doc comments 48191combine docslA.tttachmlent C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0S/DGS): =q61-�777 _T,,4er Akeledi&A_?Z Project Location: Vd1& Ile Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected' Date pH Analyzed/ Reported 7/3/ 1;eS `7 : �S� �, 7131123 7 : Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) Feld' ct>Cf 7 7/5'A-3 8-',qVDa, Fc& 7; IC c_�, �131 �Z3 �.` (P4i lrR ?'7123 /0 .' 3,'a�, c (% -truce o Co7 - 0 -71s112.X 1J.n.C&r 7/,v I lr-.r �/ (/Z 7,�;UCle 6 C7 -009? SSS P:1Trlansportation\PrVojeciss\Road\NC-DOT1201616480166142-Statewide 2019Aoc Land Application Perm it)➢eliverable\Guidelinos\NCID OT comments 481 ftombine docs\A-tt✓achhment C - formslpH LOG -March HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0S/DGS): Project Location:Frcrrl Project Description: ; Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) ���1f23 �:���� �®`��� �./®per► �%e/� % �� �% ���-��9� ���r �23 2 .' 33,E '7/3 c A3 .' 3.i'aO vCo 7 — 0I 7/31AJ? 3.'5Wp. L -3= Vo* r�1� �` .* � 77/vc,le ck;i, -7 - o /z q 7�3���3�Cr'iZ ��e d67 -0/a/ 91ollZ5 -7"z a /a 112,'7:2�� 616(/23 -7'..- T -5bck o6�� -odgq `61 0 12-3 12-3 S, � -, 12 2-5 Tit_)c_k- c) coy oo %10 2 - ,0 7�rQ)C-1 axo-1 0 13 6 P:1TransportationlProjects\Road\NC-DOT1201616480166142-Statewide 2019.doc Land Application Permit\DeliverablelGuidolines\NCDOT comments 48191combine docslAttachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY pH LOG Project [dame (Source of HOS/DGS): Project Location: Project Description; Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tani, Dewatering Box, etc.) F,/Ct/2-3 12, ZO 0cr,—I— 0 1 ®t (C)i Z' Li —I- 0t �Z c 0 11,93 3/©1 %z', 'Z'S(Cqw, -S �, /z3 °Z:S� A-- �F, —rp�C-t a�i`-���� �102z1 �� SIC)z 1 z� , o�� icy ca ��-ULt� ®�,� —� �31®-z � 23 I0 r 106- '81 r)2-17-2 1 z s 71ru, C- o-1 P:\Transportation\Projects\Road\NC-DOT\2016\6480166142-Statewide 2019.doc Land Application Permit\DeliverabielGuidelines\NCDOT comments 48191combine docslAttachment C - forms\pH LOG - March HYDRODEMOLITION OPERATION SLURRY / DIAMOND (- pH LOG Project Name �- (Source of H0SIDG5): �� /17 �s1, ��� � � \\-\ --' Project Location: � p��j�,M e 1� Project Description:���.� Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed I Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) Z. -�"t E�c� • A+Ct'�Gk- Vi poop P:1Transportation\Projects\RoadlNC-DOT120 1616480166142-Statewide Land Appfication Perm itTeliverabie\GuidelineslNGDOT comments 48191combine docslAttachment C - formslpH LOG, - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HQS/DGS): Project Location: Project Description: Land Application operator in Responsible Charge: C'-k 6e- o' Date pH Sample Collected hate pH Analyzed / Reported Lab or Field Sample pH Measurement clog z3 q:g7o- Vf0S.45 11: �g/oq/Z5 12'03esa+- VC-1h 5 `4/4q!"Z3 Z:G5�'W- I/oq1 'Z :�� «v"` ie1d !�a 0 Unit Sampled (Truck, Frac Tank, Dewatering Sox, etc,) 'noll 9 P:1Transportation\Projects\Road\NC-DOT1201616480166142-Statewide Land Application Permit\Deliverable\Guidelines\NCDOT comments 48191combine docs\Attachment C - formslpH LOG - March 2019.doc Project Dame (Source of HOS/DGS): Project Location: HYDRODEMOLITION OPERATION SLURRY/ DIAMOND GRINDING SLURRY pH LOG IqO' /-77 +- & � %" k1 Project Description: njey'c e— Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) IT/10f23 S"141loo- 3 !"-4of " 'peke `%tIL 0('-1 - 00q9 1,--lee- q; Bay- rbo4-3 y, r (4da-- rt fId i�� OV, '01 Di f 1-0 v! Zopn& '8 j10123 11 : i F7fe Trt)c 6(6-1 - 60'� v /ei l 3 i : [� a� `'s(t r ° d Z cti,�.- elci 1 L� °r►� I� 4--7 - 0 114 a I/lt 3`7 %f o /Z3 /.`3� `eIcl �� , rvoc.k- 010i LA 1/rl1?-3 ��i�.� 9/li/2 ". l0 �w� �(��� 013L S/rr/23 q= MAP- 1/1, /Z3 q , 20 Z'J'a Tr'oC' o,111/e-3 CJ ° Z Z c�A-- q to -ry 1 _ L VC -1 m P:1Transportation\ProjectslRoadlNC-DOT1201616480166142-Statewide 2019.doc Land Application Permit\Deliverable\Gu€delineslNCDOT comments 48191combine docs\Attachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS): Eli Project Location: Project Description:-�2"�L�. Land Application g V Operator in Responsible Charge: P- Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) a�''57— 643 rl° ���-1-050q� 11q 12, 3 1 2 ,' 5 e- &— iy l 7, 3 dz ` Cj r Z . 7 T uc�k. g%Litx3 z `. 39-f" :{-i0ae��S►� )�. �1"�� Off- y ®�i- -6/ie4l 3 2: g l y a+w 5'r,412.3 •' `I rt,� .@ l eA t `2 0 �. �i'U i1J141Z3 3: ?-SrLw`-- IS/fLIA3 0. e- 12. 31Tv- 0r-k o(O'A - a 8J1LjJ23 :yIa, -9�JrgJz3 3?42,a,"- peka q TV-0c'k- oc,-1_ 00cicA 4,4/2l 10 s q 3pov, 514%23 ® Q per` 4 t 1-19 L, cod S JH /13 L4 0 12,36 Tv�ct 06-1 � � � 151,0 IZ 33 c.\A- e 1 Z e 32 'rvv j/d6/`3 1 i l ®®® 6%®5�6I ( 1, LA %`L l 9 r i Tru C 4r 6dt ®®q @ P:1TransportationlProjectslRoad\NC-DOT1201616480166142-Statewide Land Application PermitlDeiiverablelGuidelines\NCDOT comments 48191combine docs\Attachment C - formslpH LOG - March 2019.doo HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS): Project Location: Project Description: Land Application Operator in Responsible Charge: 1 \e yn�n 3 C Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) Z- 11519 3 e 1,,� 12,33 'lir Uc e� � � -- ► � � : I3 et d S/IS/23 C�: 33aYM- S115123 w 3uoiv- T �'eId VoCr D(01- oa9 9 _o Sldle3 y'52 a$- g�i3123 .:�. i'cld /2. 3 3 Truck. 04.'►- otz4 t1:,sVaax f/lf/x3 y%59a die ld !2- Za Trutt �^ 2'37a ��d���3 g % 3a2p d I . a rv- 'iR ci rl r { & 49 � G✓vl- a<1 7 ti . g�t1,�23 ; llo►sw- I ��Eto�23 : JZ°t eld 10,17 -CYUCG� db�_p 13 b ft 3 " i C Ti` C� 92.E L ® Tf od, 7 - 0 ff i@ Flf� Bf� /21 4q �I �ii`lJt�l 60-7-b'IC1 Y(01Z3 lk.`L1to -Iod P:1TransportationlProjectslRoad\NC-DOT1201616480166142-Statewide 2019.doc Land Application Permit\Deliverable\Guidelines\NCDOT comments 48191combine docs\Attachment C - formslpH LOG -March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS): Project Location: Project Description: Land Application Operator in Responsible Charge: 11/0 l '7 7 lfi &CAO�ge <Va �:11,e /n •7em-c_k a- � Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) IW Z3 LI-,50� �` P'-ek �z 02 ��C.� otc'-7_ 0e5g19 �//7/2 3 10: 7- � - r Ji -7/ 23 i :P e l 8 12.30 Tr oc do �li -7 /13 aL ool Is) E3 2A,� /4/2 Z Tor4) r /4/13 L I 4-P— Thslf-s -' `- "L-r-- -P e- t d Z - 7- -1 T4-,vJi- c, (,v-7 -0 ct -7 P:1TransportationlProjectslRoad,NC-DOT1201616480166142-Statewide 2019.doc Land Application Permit\Deliverable\Guidelines\NCDOT comments 48191combine docs\Attachment C - formslpH LOG - March Project Name (Source of HOS/DGS): Project Location: HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY /77 S4,4 sv1- tie. Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported pH LOG klereh&Aye PC - Lab or Field Sample ir/NA3 Pie-14 q//C/2.3 Vs t(a d-r-- retch it .• o 3 r?A- '84 0 3 I'D q P" Fe id /: dye 4Jt1/z3 I : o5a.0.1 :+c.1d ! : 4sA.,L- 'T/Z! Al 3 1: s(v*.,A. � , e I ,4( ............ pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) / J. o t� 0(07, 01 Z 40 12. 3® Iru�-k- 0(al- 010 1 12 , I5 7r-ctd ®C,77 _ 009'7 1 Z. Z Z -rW ct o(o-) - 010 A 1L. 23 vrvLt 0(01- cstzq d 1941 l Z-3 3: 5 6dLv'- 112-1 l ZS I: 510-0 g;-C�4 ! Z. L4 Tirtie-L a (,°I - 0 C- i I $ nnit Z t f 'L 3 55: f Z 4 r- . -i'c l d r 2 .18 o 10 l 94 ��2y �Z3 r,:5ga+� g/z� /ZS �;5gott+�- elc) 11 . �) 9 T� JL, bio�- o 1 214 °°sit, ®r°a71 �f �� J � r�=asp - ��d e �. r� -,��L ool-0aar ��-et � t z..� ����� oa-1 -o�� . b'Z-L( P:ITransportation\Projects\Road\NC-DOT1201616480166142-Statewide Land Application Permit\Deliverable\Guidel ines\NCDOT comments 48191combine docslAttachment 2019.doc C - formslpH LOG - March -7 0 HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0SIDGS): Project Location: SA&A es J���� ��- Project Description: t,.Aer� Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported / Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) ! = 7-40 - ��22�2� `.13 ate- , ��ue�v— 0%0 1 r» ?z%�3 s�ls* s;1�& Vn I/z.Vz3 /Z: It oo►- ]Fge\[ I�• -� ue_� tS��Z- �1® ` Sl I: oo I :of cow :9z1dt 12A 3c� 'CCt � I's q �23afo' �I�31�� #4',24��- d1.�� T � 04a�- 0 10 1 I fll: IL n � �0 9 2 lZ,3 24 IZZ . Tru 6 f P:1TransportationlProjectslRoadlNC-DOT1201616480166142-Statewide Land Application Permit%DeliverablelGuidelineslNCDOT comments 4819\oomhine docsWtaehment C - formsipH LOG - March 2019Aoc HYDRODEMOLITION OPERATION SLURRY/ DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HDS/DGS): lqo 111-1 Project Location: A0� �'e\ C� Project Description: Land Application Operator in Responsible Charge: d 8 v Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Sox, etc,) ®@ -6/ZS/ 3 V054 P!/��1��7 ®� �100- e ®Z . 33 0077-0 t ZLI TroCk • %12'5I23 50 010 I%Sfz3 g:d1 �, old ��, 3 I -TVve.k- CIVI-col®e leg 12'.; 12 -'2ook 6/W 1Z,3 8leg,lu /:/r,04 vh�'O/Z'- fz� _77V.1. 0 Co -7 — ci V ( 1Z91Z5 q, 00 U e it Y 1'v13 9 V' �� i/�S/. � 4ko" 12. 34? 7I 'C f. t V 6 7— 0 f V A S-';rd ah- t?1L9! 4-r 5W 4A, eld 12e 0-f- 0 c 7 - e1j, 96 8�3&011-3 crupp- g/80/t3 p geld if.19 T�rucl� o�oi- ��tia Z!Z('50-4"- .®0 tot 3�1Z3 0soa,*- 3d1y3 W�0-7�•�- �1 lZ.t� Trot oola 04=5ck4o 9/,l VV6 /0 7-1Z3 00-D Mq P:1Transportation\Projects\Road\NC-DOT1201616480166142-Statewide 2019.doc Land Application Perm it\Deliverabl6Guidelines\NCDOT comments 48191combine docs`Attachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0S/DGS): 1% 72 —5 . Project Location: rE Q o Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample G /0:71 fl°6 11-1 : r q I1014-3 910�6!3 Ll., 6/ff 0;r/is 104H-g /Oyh 3 I% ArX Ll65 -ra �! Fred 3 : cya..,. rla eJal S:`Cf r® pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) 17,.ak, Tr 0\�'!r -aIri\ Z 6 ® 0L.I- or-096 ast -Tru 4r 04j - 01 0 10.20 ! ram v, 061-0/ZY kZLa'A O le -r- 01 O 910��2s 1�;ZLp�,,gjobl23 c vp 'F,G� o, 3b t�ewOG 9/09 /z,:s t 1 Z " mwh,gl a'1Z 3 1 Z.. 1 qr, _ QG �- O0 9 G 91oM 3 Z: `CZ �,,, ���%%�Z, T : Li U, 01e.&A 17,25 1 rack at, -X - 0 10 t 7109A 3' 3 glj9r�3 3 'y'0 Tr 'o 01 Z- 9�09/�� $ s 3q � lz3 3 S S 14S4, t .q I P:\Transportation\PrcjectslRoadlNC-DOn2Cl616480166142-Statowide 2019.doc Land Application Perm itTeliverable\Guidelines\NCDOT comments 48191combine doc5Wtachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY Project Name (Source of H0S/DGS): Project Location:ry aster Project Description: A Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported pH LOG I-Zh C— Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) "thI A 1/ ; 0 4 -- d� � � ) 2. 1 � Tr e-V- et'O'l ®®c ® 1 ,111gIgq,, Z/ dew'' 1 /1 / Lt 111212 t5 /I ,3qy I /rl/23 iv, 31 p*- p, t4 ) 2. 1 7-rve 14 °� � 009%0 41/5/e. #3 J: /5.,..- 9/► s%3 ! 5 av-- =� 1 l t • �' Vork- oc®�t - o I z y �(�(3lZ3 2:Zl{a, l31z3 Z'.ZS a0'.. �e1d 12.z Trvc.0 061 3pytl3=q5,t � /Z.33 e-AI14IS-3 ®ayA.Q 13 1 ,73 Lla (P 4w,' (+� I � a � ��v V(' sp 0I-LL IN43 s: -q jl l��0 °®S dt�1 mid !Z. Z� u owl - ®, 01 P:\Transportation\Projects\RoaMNC-DOT1201616480166142-Statewide 2019.doc Land Application Perm MDeliverable\GuidelineslNCDOT comments 481 Moombine docslAttachment C - formslpH LOG - March d HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY Project Name (Source of H0S/DGS): Project Location: Project Description: Land Application Operator in Responsible Charge: pH LOG 11011-7-7 In4erA�a r J VIA r Date pH Sample Collected Date pH Analyzed / Reported I/13/t0J ?/131vs 9/A&/leb OfJ/ qA% ?//4/Z5 Lab or Field Sample Pam" 2. e. ,11114/Z 3 2- z5a fe I A pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) � Z.1 '7 TrJr e OCR 40 ir.) ck 000-1.. are- o t Z1q Z• 0 T r+v C k- ® (0`7 °1�%WIZ 3 /I: u 7Pfi-.. Jbvh s rl : gtpo--- p a lei / . 2.5 Ti!v e-k o(O ?- 0 t o 1 /S 7 ^,o- -'�/ ` r•C 14( i • o V Tr ve-k- q: ofa"L� 9/ ,���� �: �-raW 471 ell 12_. Ns Trude.- WA 06'to �s z3� P:1TransportationlProjectslRoadlNC-DOT1201616480166142-Statewide Land Application Permit\Deliverable\Gui del ines\NCDOT comments 48191combine docslAttachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOS/DGS): J L1r)1/ n-7 Infq�- 5\cxv--ey 1nAey\,� Project Location:Q��esU+ Project Description: 1 VA-�ev-clkaxn4-7 Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) q/ '�" / 1®:2 -7!®S/ Z .3 %o: z 7eft �R e-! (:A / Z . 18 -`ru ck- ®tv `s - '0a Z I O, z3 cr/110523 12 43 d�1d Z• 17 Truce �J�1(e�Z3 334o.w 0�'J u1s3 S'.15 -Fi,i d 1 Z. 2 3 -Truc L ow DC Zy g�1g�Z3 .c.Jgr 9J23 11.yS�� ��Ic1 ! Z. a ti True o�o-t-aa9� Q 12 : 3/a r 9 f 1 e,y 3 JZ : 32aw�i £1 ca l Z • 3 1 �rucrlc. o e" Sf ��- �tglZ3 Z 32 °""� -fie lc� r �. �- T�u�� ®tea— b ! -2-1 qI IRi '5:octw 0o1a1Z'--S :Re`A Oki-l- ®"C> I ci ) ,Z �;; 3 3 o 9 / Z'3 S".• S If -- i -\4 !� Z • � � �`r -tom vC>1 - '* C5 at 6 P:1Transportation\Projects\Road�NC-DOT12016\e480166142-Statewide 2019.doc Land Application Perm it\Deliverabl e\Guid elines\N CD OT comments 48191combine docs`Attachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG r Project Name ) t (Source of HOS(DGS): f1 — -71 l A ev-c� e Cat i an6ZAce-. Project Location. .�4 Q,+esv N Project Description: 1 iL` P—Y-Ckay. qe Land Application �l Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) C1 I C � -�i e-1 dA m ; rUc.�-- C>�-t zo/r-a voomm C1 /Zo/es kA 1 Z .1Z ck Okol 4C::P®6t'v a' 20/t3 !l : q1 p*- C 1 Jev/2,3 ��' ya p,w : ��� / 2. Z`7 7 rvt- o 46-7 o z� 7/z s: ri 11/Z -`°tom F-eiej; �Z ®� 7plrek- ����- o1V4 3Sav- dv/z I Is a 5: 3Ro',lv►. p ,eI 12. 2 e TrveJC' o �-t - C tb1 0t2.4 of ����3 .���. �1�J 2 . Z� - ru C-\L �'-o I -'� sh, '3 6.2-1 1 Z - Troc.V- e>ke-T— P:1Transportafion\Projects\Road\NC-DOT12016!6480166142-Statewide land Application PermitlDeliverable\Guidelines\NCDOT comments 48191cornbine docslAttachment C - forms\pH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project ]Name (Source of HOS/DGS): Ig01 1-77 /aloc6nqP, we�v Project Location: & �G Project Description:kk�ojne Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement (Truck, Frac unit Sampled Tank, Dewatering Box, etc.) 1I$2JZ3 q; l2- 7! ZZ/Z3 1p -p-eld /Z. aLf 'j�tX-)a' Vol- ®c7Ct g7 "A Z/Z -S Rem T I q/y-7ez 3 Vly -9: ®S r,�eof/aAs r-y /?.-X/z Cw C�l old T g1ZZ/Z3 %�/ P� a 22/23 //+ %� r R etd Troc v-_ atnx- Oativ 043/Z3 /= 5�ar- q f 2.343 1:52' 0"*'' F ��r% 1Z. 3 z Trvc. b, 2- 3 1495 Z i °MIZ3/Z3 Z �� f �d TVuc.v- ot-% of U11's Jrf00 ^- of Z.3/t3 �'�® F&-W } J' e-V, C)L;.—Cn='9 (30 I J'Z'5/t 5 9/2-3/9-3 Fi el d i Z it-uc.k P:1Transportation\Projects\RoadlNC-DOT1201616480166142-Statewide 2019.doc Land Application Permit\Deifverable\GuideiineslNCDOT comments 48191combine docs\Attachment C - tormslpH LOG - March HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0S/DGS): I 1 _1 NA12N6\rkrC(e, Project Location: teS07d�i �C' �j Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, ❑ewatering Box, etc.) 3/Z3 12. 31 o-7- e. kz,4o)23 iz zto, (4h\o)23 lZ'.z Field a Ct��tZ �.� ��Z�/Z "�� �e� �2. 2� Tr e�coZ i o a 'f�'�j 1'��� / II�'�/}�y ,p�� ` ��, �+V Q,r' �J 1 r �%�y yl (�r//` J /t r /y� ! e 1 p � p l ! C _�� j s� 3 .l 4 . ` S �y �.1 T lRll� o t o t PIS110 t2• gIZI A5 /Z�4[ �iQ\A ti.71 irucl' T -�� eld �. o Fi e� A z - C P:1TransportationlProjectslRoadlNC-DOT1201616480166142-Statewide Land Application Permit\DeliverablelGuidelinesINCDOT comments 48Mcombina docs\Attachment C - formslpN LOG -March 2019_doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY Project Name (Saurce of HO S/D G S): Project Location: Project Description: Land Application Operator in Responsible Charge: vi* lie/aefagive pH LOG r,"a,ncer4en_ Unit Sampled Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement (Truck, Frac Tank, Dewatering Box, etc.) ot View �1f2`723 1l'�5p 9l2-7'L� V 1�•�S ���� ®(v'Z ®!/2"1�Z3 l ;eaip&. q'/27/23 st��� �"` a�l� 1i•�°f rrvc� � �'0 1z 14 q1tc61jS �� s9�� 1-n 2.00a&k r1d I/z2/za S'.o2ato- T-ie[C It ch 6 1; "om auw— c&PZ-ool& 012$ 2°� ��" �ltg]Z'6 i/:P am-r / 00 (a leLS , ZS I Z.J �f e I C) 2. q57 lei�2�25 �;OQ�a� �I��12 9'®�� ��vG ��z��3�c� C1lin In em �'e�i� !2- �i' �(�clG 04l,('- P:1TranspartationlProjectslRoad\NC-DOT1201616480166142-Statewide Land Application Permitll)eliverablelGuidelines\NCDOT comments 48191combine dots\Attachrnent C-formslpH LOG -March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY Project Name (Source of H O S/D G S): Project Location: Project Description: ) Mer6 e- Land Application Operator in Responsible Charge. Date pH Sample Collected Date pH Analyzed / Reported pH LOG M ,Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) / Truck. 0(02 —01 1Z• �7 �U� � � t TrvdL 04oz- 012.q / 9. L1o 7rVC_t 0 72 - 5 3'10 AZ• 20 Ty- uc,L ow- 103 q /3a/ 1-% 9 /So/Z3 3 �:i-eA 02. 2-5 �`��c- 2-c--,+z14 9 /3c/ 2S q:95 t c, /ao/ _Z3 =��'� F'i el d i 2.3 irlXI� /S0/2S ;rl. ` .e1C! 19. 2,0 ruc 07Z 5 3 - ( /O / Z- / Z� a 0.5c* b /x / In oem, Fi,6 r2. 3v-Ty uc-1c ? Z -Y ?C P:1Transportation\ProjectslRoadlNC-DOT1201616480166142-Statewide 2019.doc Land Application Perm it\Del iverabl e\Guid elines\N CD OT comments 48191combine docsLAttachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY Project Name (Source of HOS/DGS): Project Location: Project Description: Land Application Operator in Responsible Charge: 4341:Ile- pH LOG Date pH Sample Collected Date pH Analyzed / Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) /'O/Z /v5 /0 /Z . 3 d 67--- vv ?(0 16A5 145 l .' a., 1a1113 l2(, ,,- 141-1-1-Tac' b-1-:7F qd a 7? - 5770 lD1rAV Z''3Ja, `61514f Z,�5 T /�i/L: l � Jb/ -5 ,3,36a_t., � es G� �N/T' �2 �� 06I 7 —U /U/ 1013 /�01 -5.° Zoft' s : ZZatt. Ae/d 06 7 -Uo ?o �U� 3 5 , 3zea ��A3�.r S.",.�ya *c , "P� �2�� p '%Z — J3?r1 /a � � ���� Ale `� ��/.� s /-f a 'y' z2 4,T5-- 07Z P- 5 3-1 �5y 1®131L-; /®ot d - o 7 ® 5 3, 6 /,6/Z3 10 rr-oppm IV/023 111'-0-7 pA4. Pi-e 1 /Z• 3o 6r02-0(01 P:ITransportation\Projects\Road %NC-DOT201616480166142-Statewide Land Application Perm MDeliverable\Gaidelines\NCDOT comments 48191combine docsWttachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY Project Name (Source of HOS/DGS) Project Location: Project Description: Land Application Operator in Responsible Charge: 117 Date pH Sample Collected Date pH Analyzed / Reported pH LOG /kevp ka.ng e �C— i f s -! ' li. ,; Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) 1 J e l c 12. Z'S I„ �V( 0107-- 60Jb (0. Igglt3 via ID/q/13 I g30L eta 12. 3�9 Trvc.V— C-1z- S311 10A/Z3 3' cy 4Lv'_ 10141-3 . I E5 0. ; @Id1 Z.. 2 0 T 10/11'1-9 3, Zga0- ID%143 3: 30am p jei Il. �55 7Tr11LL N(P- Ib$3 la/ylt3 y: olds to/gJzs q.,o5 eId 12. yD 1d 12. -Truc,IL of �1f Z3 s� 3o� IDIgf 23 s: 3S LV— ,z. 2� -r uc,ic,. a&Z-60 qh 101g1t3 ,►,oq tn/glz3 io,loplu irk /Z.UP TrucL OW- 1309,0 1 ajSl� 3 IZf al ual5l2 3 ez: �® Tj-, � z • � � i'�v'::'v _ 01 lo�f/Z 1:Fop t%/? isI�� �r� ® i�„ 07Z-5371 t4/s;/23 _Z :03,vL m li,/gI2. Z:04oL ie:IC1 it, Z15 ivvc.� 72- 3`70 P:1TransportationlProjects\RoadlNC-DOT1201616480166142-Statewide Land Application Perm it0eliverablelGuidelines\NCDOT comments 2019.doc 4819lcombine docslAttachment C - formslpH LOG - March HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY pH LOG Project Name (Source of H0S/DGS): Project Location: Project Description: Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Box, etc.) 1D /6' L e � 70Wd( ! 2 . 2 l ro � J,.C6 `b%S�Z d �' ®fib mw. r ,rieW ' g . s� �1ri1G� Clio Z � to%6 A '61 11w%x -Meld j-Z. sLA %k- 01 Z �- �37 fi-e,c 12. TV -VC -7 2- t i! F64 1-2. 0 Trutt- 0(02 - 01 o t 101(plO 12:Y7et �Df ��23 /Z:1 4OLrw, Ftl 92• Z4t T'rLX-lc- 0-12- 53, Z Ib�loI23 'WA �p�b�Z3 Z.S�a," _7 FJ�e.1I (�)OCKO qq 0,72 C41 'fa/40/23 3:Ni` Vd OWO 5'.o2- p�3 S:a3 Field I ®-7Z P:ITransportationlProjeCts\RoadlNC-DOT1201616480166142-Statewide Land Application Permit\DeliverablelGuidelineslNCDOT comments 48191combine docs\Attachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY/DIAMOND GRINDING SLURRY pH LOG Project Dame (S o urce of H 0 SID G S): 77 1A41rAAMC1e- Project Location:,t,e-Salt Project Description: �r1,�-,�*j� Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed/ Reported Lab or Field Sample pH Measurement(Truck, Unit Sampled Frac Tank, Dewatering Box, etc.) t9V?-3 5�cq W/4/ 2-3 1� r✓t�G 0,02-0 %01 100123 S:U� la�t�f�� �•�� ��/� f Truck 0bZ 10/7i23 ? � a► Z : 3� f i6A I�.3� �,rve% ©�7�L3 : �3 �► 10/1/23 I.. zt4 et h 1.4 12. 2-17 TrV C � t,bf Tl23 {®/7IZ3 2: 3clm1� �ecet Z . a7- -True L 0(a2-- a09 (P to/?its ]oil 1 3 3""' " F'e,Id 1Z.-3'? o6,ro -- tc�p-q 16/7/43 1/: Z/Am 01,7 JZ3 t(: Z2aLp— -P—%A j2. ZC7 T'L)C, Ocoz- 0104 r"o 0 0,11 i® 4�Z j�� t-,1. a►�. 1� � �2� �' 30 tie'14 12.3 q c'k oiv 0-7 2-� � 2 P:17ransportationlProjects\RoadlNC-DOT1201616480166142-Statewide Land Application PemiitlDeliwerablelGuidelines\NCDOT comments 48191combine docs\Attachment C - formslpH LOG - March 2019.doc HYDRODEMOLITION OPERATION SLURRY 1 DIAMOND GRINDING SLURRY pH LOG Project Name (Source of HOSIDGS): 401 7 f /tpy�P_ Project Location: Project Description:���, 0 Land Application Operator in Responsible Charge: Date pH Sample Collected Date pH Analyzed 1 Reported Lab or Field Sample pH Measurement Unit Sampled (Truck, Frac Tank, Dewatering Sox, etc.) r_1. e.`a 11-3 ��°�� j�J�� Z3 0" F1 aIJ 12. 7rock- 0(2-at�� to 23 �.�b�.�r1��3 �ti1- t��j2�2� t ID(& - 10/1Z%Z3 1102 XYL- ,°ele$ AZ. 3e5 -rr0e- ®AZ. —en. g a i p y P:1Transportaticn\Projects\Road\NC-DOT1201616480166142-Statew6de Land Application Permit\Deliverable\Guidelines\NCDOT comments 48191combine docslAttachment C - formslpH LOG -March 2019.doc lane 1-40 / 1-77 Interchange Enhancement redell County, NC NCDOT C204263 The lane Construction Corporation Project Name: 3gp_1 Contract: (A v 1-0 b 3 Date: pH Monitorin; Date Truck Number pH Before ��( Adjustment S� 1 �.7�, S^ . aag il. / 37X_ ctl_ -f7o I f Vey /2�/2 3 c�C�7 -� T • 70 -00 2V/93 vsro7-uio9? tl. &o I�Z&,G�E tz I7/271Z3 pro?-�o9� i f .S 17/?7/Z3 067-00 7 I t- &O 17/Z7 (23 2(n7-o (Z V [Z._V 17/t7 ZS Ocid-0t 4 U. _T 7le7lZ3 067- /!- T 5 7/d7/LY - o /- 71071z3_Q(07-012 I L3 Et 7 Z 7-o 3 il. S-q 7 /27 /Z3 940 q1 i!. S'7 7/Z7 23 2 1l �v 17A? 13 0(Y ii. I-zt? /�3 �� � Cxr' Q It. /zg 3 o -urzci I{ . S' %l9 ,�)4-013(p //. CFI Amount of Muriatic pH After Time Acid Added (Gal) Adjustment44 d7•ddPWI {IrI. Q4; f --!. 4vv W S r7cti i /f•s2 3:dS�are /{ t C/o yfllo� si ((.s7 T�r(r.�. Il • 58 .v w; Comments Verified By ) U, I x J I I �• I � 1 I >4 1 n I-40 / 1-77 Interchange Enhancement leedell County, NC NCDOT C204263 The Lane Construction Corporation Project Name: 3T 3Y— 51 &4 1l4 t Contract: Cz o q /7— (0 Date: 9 /�G S dw pH Monitoring Date Truck Number pH Before Amount of Muriatic pH After Time Adjustment Acid Added (Gal) Adjustment 7 Zf3 Z � 6G - tl 6-7 so WIN� I LA z CIN It s., =C' 7 � �Z � ��.i/ car d • l [� ��� I�EO v �9t3� "7-or2v 1'j � l..�o f.lunai. ple of z i. 17 �r z -- I /®j 2_ 013 "�2s to t^ n(01-41ZA.®� tad i �tao —OO 12, JQ01 t I ia�s 23 ®'t312 i,a'3 ® I z.� ®tp7•OCgq tZ. Zq — 12 • q Comments Verified By Lane 1-40 / 1-77 Interchange Enhancement Iredell County, NC NCDOT C204263 The lane Construction Corporation Project Name: Contract: Date: pH Monitorin r Date Truck Number pH Before Adjustment 1-91&?.1?. 3 1No) KO 9 MgO '01310 2 ,O � l � tcl: 1' I� 0�1 JZ 3 0(0--01 ►Z.� {� I19eq Z3 -0o t 2_.b I-9 � z W-11 1'l 23 60,7�-043ty JL.04 � I toy s 00 �-a s a t r� IT/2-S c�1-01W i�.44 IT110 ft1 `7-cis(c uz, 05 9ia1-0 Vol-OM1 1Z0Z,2- I fit0 {2 3 9PW -0og� /O L3 �ZI 7-ar0i ��, AIP`l 1� /2.3 :a(0i-6CP9 /rr Z bi7 o bd ra 1 Z c�q I t1-3 00-013ic j) 4a 13h) Az3 MP-1-0134- 2• b > `1-OiZA t-- to 04il - 001" 11 . q 10 /►31�.� -�C�ci IiL_ -0101 17.W7 tad 13 11-v} zq a I. 3 b I f Z �� p010 1 .- �1 [�[ Amount of Muriatic AcidAdded(Gal} pH After Adjustment It . GS 'IS Time Comments Verified By 3 •. p I 2 LPSOAOm 1-1 .- [�.03 CS `" ��• 3Ca 3- ate. L/''w //"zf" ` 1 e 5,R 2" t am I 1*� y: �: 55 - I 11. 4-1 12:5 # 1 . 7 . 7.--- 2, : Woo- 1 Lane �e- 1-40/ €-77 Interchange Enhancement Iredell County, NC NCDOT C204263 The Lane Construction Corporation Project Name: Contract: Date: pH Monitorin I Date Truck Number pH Before Amount of Muriatic pH After Time Adjustment Acid Added (Gal) Adjustment i1144 421, 60-6101 12• Z il,.. �- �I�•1 q a I OSI� OU7-010' e? l WIN Ci0-00e °7 0 g tlAit .") h6l• A IC 17 ►i�1 i�i ��� •�� Ord 1i�,, 1 r O123 i9Ee� O1310 1" l b Z I � -009q 2. q'L 0 ? f Il OV7 '012q 1-Z 1 Z. t 2 AA'4' �s- — 12 0 a Z /t.Oo � 2� � o �oa®4 �. a 21 Z5 Ofv _w ZI o1d1-012II !2. Z 3 12, Z3 1S."OL Z �.3 Ob'i•ooml l 12.2q /2, Zt! 3: '1Am. 12..A2• 5•PZ&W- 9' r (gy0144 !J- A l�. 5.54 7*0097 12. zO 17.20 2*)q&l % Z. -01 to � 2Z Z3 � T 2 ZJ2 0io?•d 0140 1/. W _ 1� �� Is:11� Comments Verified By FIE Lane pe- 1-40 / 1-77 Interchange Enhancement Iredell County, NC N CDOT C204263 The Lane Construction Corporation Project Name: Contract: Date: pH Monitorin ; Date Truck Number pH Before Adjustment P*---CsJ7. �.da FDiv1 1, 'tAD IS', z.Lt Z" OVO-OZ4 !; ' .1 UCH-1-o1®! 1 Z . y axo?-Df�J . 3 r z i rs�o7 _t2q i ZG r l ptr'l- orol 1 0 �.'7-eo�� l�•/3 RXM-22. 2 3 0 -otiy 0, b �! _. �i 1 �y3 -0�Z 0 1 PY 2 ® . arL 1 i . ofol-0101 t . l 1 O "7-d 1 t .Oto z. cot' -vial 12— Iq OW7-oagw 12.2 3 12. Z3 (jam -mini 12 , 0-1 rZ 1� !3/2S Ow-calrs f Z o(07-0r211 /1, iy W 23 Dta7-0l01 /Z-2$ Amount of Muriatic pH After Time Acid Added (Gal) Adjustment 8Z• 2 AZT. 1, 1 ®74 'r S2 P reaw. 3Y -- i .mod �+ no .-10 1 IL, 30 Ot 1 t t2,.23 a 2.Ot Comments Verified By E 1-40 / 1-77 Interchange Enhancement Iredell County, NC NCDOT C204263 The Lane Construction Corporation Project Name: Contract: Date: pH Monitorin ; Date WIS ga a 1 W I OS � �! A. Of d9 Z15 Truck Number pH Before Adjustment �IV7-C ibl S ff�► t-o1f56 �� � OiQT-0161 i . o �. 667-4°1l. /. m �6-01ilsa . Z 6W7-0&Jt&0 12, g a01 12. �'► ,aw"aOaa 1 uq netl�. os Obi"nror-1 .3 olp-7 0101 12.6) 0O1O1 d .1 ab7-oeM16, 12. am�- auq lima -aM 1 1ld O 407- OOZY 17. o S AV) -airo 12. Lop �tdl of I II . JrD A*"1+000110 .04 &tz-%31C / �7-oadO l Z O`? WSS'll -12. V5 rO101 owl•00410 12. z e2w,-6 41 l2- 3v 5.40 c e Amount of Muriatic pH+f"r Time Comments Verified By Acid Added (Gal) Adjustment /2. 0Z A t2 cp ov •A 1Z. o d are. A- dan1,= 3 2.�� ; 3Z �,a� n►.ntieu ne ec4 w t 22.o f _ 5'/fie �vr. a ^e-,W Atcl -- 3 g2.44 il t>"Q-A ^AeAf /./7 /� . rw'- s§&o«s /Z . J_L ;: as Manaun 1 "1 1� . d1Onvon* oe i d o rdd ecd ( 5 :s,. feriwac �5r ae-1'c4 oLddde r 3 -17 j rtua r�,ev�aaur�►r Ltd mde� _.S ��: nn�. at.a+�e�u xds ati d_ ' 3 -- A. $ Id •' POI' tiKo�- • ' wry. 12. O419 9 W�Sw�' atallo�ri} f zq e.,00esaw vr►fi O I . ba . 7Jr4w iE� = d 2. d � JP etivoof l- &1d nAded:± 3 I Z. Z t a J 0h% afflburrk tld ek added c -- d 3 Z PS aK q�prnk aLad r�ddert. Lane 1-40 / 1-77 Interchange Enhancement Iredel! County, NC NCDDT C204263 The Lane Construction Corporation Project Name: Contract: Date: 1 d 4 pH Monitorin ; Date Truck Number pH Before Amount of Muriatic pH Afteff Time Comments / Verified By Adjustment Acid Added (Gal) Adjustment I� p(0POPZ77 e 0 , a 1 B. S/ amount Oo d a�i �. Z e Z-00� /�.. �z f id10U Qt 127 TV9 r k ee at �dl ZS g7t•53� 02. s 2a wOL Z 2 6a. C10l P d ?A fA'11fLOUAi- "ICA c1 PCA v •obi I®. 1. 122-1. 1 btmauos A41 -A z � �i 2 i2-5u70 12. f ! 5f� M23 �.'LtipZ_� i }. / i ��AA9et e1tXd1,DUY► �Gi �d. 2l 2 3 - t10�fo5 amewau�n4r d = 3 L Olo - 5 �" It. s NV rj�*1 rAlRaval- Oxci A � 3 -®t 11.®fR — a}.q9 II- �pMOW00A4-A61d A e� = + 7- lz-, P- 2: ®® -Aral 3 : ®Zdalv%. _ - - [ 11D: Slatel i 2 / / N.3 ►ems I S O . � `� 1 �• = I -ate /Z. zb - 7 Y2 04 OWL 2a 7— l� Z z.-r53 10 d 40 Z v I l.•l / �� p I - I Lane 1-40/t-77Interchange Enhancement Iredell County, NC NCDOTC204753 The Lane Construction Corporation Project Name: Contract: Date: PH Monitorin; Date Truck Number pH Before Ad- stment (p Z l z (Va 7'-1)/ z �( �, o A) l,R /11 _06'-a49& �2. � 0 3 Z3 o 2--51,-b /? . y� 1p 3- Z 3 a �- Otr2- to i It.10 1 ob.titi� Jf�,10 b 10dr ZS -S C i 4�& )v 23 072-S3'11 rL-. ic Z3 AA. 00ft J - -os�i 2til VS S 6U.-Salt, I I Z14 S . sn 10 O 7- O 12. ZIY 1101ul 93 aw- 0q 12. S 6 vo� O - 1% o t.! 61? -S 1 ?. 5 IP '1-°J Jb tz.51 01 wlt'�-010I3_ _ _Q AAd Amount of Muriatic pH After Time Comments Verified By Acid Added [Gal] Adjustment /�. 3,5 /&,'if3 gam! v w a A. �- 17 �3v :�or►. � rr�� vim, d /. Z .d J � B Ch, � ed 'r t Ll C6& C�.CA�lG'if / S% 41ar% .2, a. �GieU I Z, ZT S.' aVA -- I �. Z�! / �►� 3added an' d ssc1 .. 1 Ell �"57woe. 3 S 0-e, &-so sox ..'i ailed J2.2-q S'17v.aa. _ �ggL. CLdclo� 12. q, 5 11: 03pok -1, _ . li cxd decA 12. I a 1�: SJs pw . t ad d e_ct -- 12. 9 / 1Lllaj_a 1z.516 2.5la. 2 �d . 40 3 % If 4a6ww-. � .-A 3,4rgLv,- -A / 7.3 5 : ®3'0. t14 l,T. 3 faa �62 ®► 9� OF to eZ. n ;SSS0%oh. �J'kA l� 1 40/ 1-77Interchange Enhancement Iredell County, NC NCDOT C204263 The Lane Construction Corporation Project Name: Contract: Date: pH Monitoring PH Before Date I Truck Number Adjustment 2. .tit 0 Amount of Wriatic pH After Acid Added (Gal) Adjustment -- B2.3Y ! . 2& 6 %.t'a� Verified By HYDRODEMOLITION OPERATION SLURRY / DIAMOND GRINDING SLURRY LAND APPLICATION LOG Project Name (Source of HOS/DGS): I40/I77 Interchange Project. I-3819B C204163 Project Location: Statesville, NC Project Description: I40/I77 Interchange Reconstruction & Improvements Land Application Operator in Responsible Charge. Lane Construction Date of Land Location of Receiving Site Application (Land Owner Name) Casey Hurley - Project Manager Receiving Site Address or Quantity Applied % Solids Latitude / Longitude (Gallons or Dry Weight) There was no land application on this project. All slurry generated was processed by Lane's DGS Management System which was approved via permit modification issued on July 13, 2023. P:\Transportation\Projects\Road\NC-DOT\2016\6480166142-Statewide Land Application Perm it\Del iverable\Guideli nes\NCDOT comments 4819\combine docs\Attachment C - forms\LAND APPLICATION LOG - March 2019.doc