Loading...
HomeMy WebLinkAboutNCC243252_ESC Approval Submitted_20241023 Dennis Gilbert From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov> Sent: Monday, October 21, 2024 12:45 PM To: DFH, LLC Cc: Dennis Gilbert; Michael Naylor Subject: NCDEQ Erosion & Sedimentation Control Letter of Plan Approval CRM:0177195 Attachments: Certificate of Approval - Monday, October 21, 2024 1241 PM.docx; Application Report - Monday, October 21, 2024 1241 PM.pdf; Letter of Approval - Monday, October 21, 2024 1241 PM.docx 7,,, r),, • ,,,,‘,;:.0, ,. `�AM V, North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Land Quality Section Roy Cooper Governor Mary Penny Kelley Secretary William Vinson Jr. (Acting) Director 10-21-2024 LETTER OF APPROVAL DFH, LLC 3709 Raeford Road Fayetteville, NC 28304 RE: Project Name: Appleton South—Lots 14, 19, 20, 23,26,33,34&36 Acres Approved: 2.51 Application ID: PA-00761 I Permit Number: CUMBE-2025-0279 Address: Cresswell Moor Way City: Carvers Creek Township County: Cumberland River Basin: Cape Fear 1 Stream Classification: WS-IV: Water Supply IV Plan Type: New Plan Dear DFH, LLC, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Please see the attached Application Report (FRO form), Letter of Approval (LOA) and the Certificate of Approval (COA), if applicable. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. The attached, signed, digital copy of the letter may be used to submit with your electronic Notice of Intent (eNOI) in order to receive your Certificate of Coverage (COC). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a COC under the NCG010000 Construction Stormwater General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of a change to the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Chris Baker, Assistant Regional Engineer cc: Dennis Gilbert, P. E., Moorman, Kizer& Reitzel, Inc. 2 Michael Naylor, Cumberland County Inspection Office Fayetteville Regional Office North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources D.E Fayetteville Regional Office 225 Green Street,Suite 714 Fayetteville NC,28301-5095 QJ 910-433-3300 Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may he disclosed to third parties by an authorized state official. 3