Loading...
HomeMy WebLinkAboutSW3241001_Supplement-EZ Form_20241022 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name _ MarshvMNe Lake Park 2 Project Area(ac) _ 59.83 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 14.48 5 Is this project High or Low Density? Low 6 Does this project use an off-site SCM? No COMPUANCE WITH 02H.1003(4) 7 'Width of vegetated setbacks provided(feet) 30 8 I Will the vegetated setback remain vegetated? Yes 9 I If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? 10 Its streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: I Morgan Woolner,Project Manager 28 Organization: l Beneath 29 Street address: 2359 Perimeter Pointe Parkway 30 City,State,Zip: Charlotte,NC 28208 31 Phone number(s): 704-943-3172 32 Email: mwoolner@benesch.com Certification Stalcment I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Desianor Q, oFss�6 14g. ,��, /, '` Signature o esigner SEAL 053444 iCe F'vGIN Rs O . e�NO ..��` Date 'rrrrrl l 13iitt.... DRAINAGE AREAS 1 Is this a high density project? _ No 2 If so,number of drainage areas/SCMs 0 . 3 Does this project have low density areas? Yes 4 If so,number of low density drainage area: 1 Is alUpart of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Endre Site LD 1 4 Type of SCM WA NIA 5 Total drainage area(sq ft) 3236943.6 3336943.6 6 Onsite drainage area(sq ft) 3236943.6 3236943.6 7 Offsite drainage area(sq ft) 0 0 8_Total BUA in project(sq ft) 49837 sf 49837 sf New BUA on subdivided lots(subject to permitting) 9 (sq ft) New BUA not on subdivided lots(subject to 10 permitting)ID 49837 sf 49837 sf 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots -Parking(sq ft) 20735 at 20735 sf -Sidewalk(sq ft) 4904 Si 4904 sf -Roof(sq ft) 1330 sf 1330 sf -Roadway(sq ft) 7896 sf 7896 sf -Future(sq ft) sf sf -Other,please specify in the comment box below (sq ft) 11208 sf 11208 sf New infiltrating permeable pavement on subdivided 13 lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf Existing BUA that will remain(not subject to 15 ,permitting)(sq ft) 3764 sf 3764 sf 16 Existing BUA that is already permitted(sq ft; 14148 st 14148 sf 17 Existing BUA that will be removed(so ft) 10384 VI 10384 sf 18 Percent BUA 211. 2% 19 Design storm(inches) N/A N/A 20 Design volume of SCM(cu ft) N/A N/A 21 Calculation method for design volume NIA N/A ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): "Other BUA"refers to asphalt multi use path throughout the park LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003 1 is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per.1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances(H:V) 3:1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 2.03 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s)(%) 8 Bottom width of curb outlet swale(s)(feet) 9 Maximum side slope of curb outlet swale(s)(H:V) 10 Minimum length of curb outlet swale(s)(feet) 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule.1003 proposed? No ,ADDITIONAL INFORMATION 15 Please use this space to provide any additional information about this low density project Curb outlets from parking lot and storm conveyance system discharge to rip rap aprons which in turn discharge to an exislting vegetated swale along the property line.The existing vegetated swale will be used as the"curb outlet swale"for the project. Drainage Pervious Swale BUA Q Slope Vui, V. Flow depth Are� (ac) area(ae) (�) (%) (ha) (Vs) (ft) (ac1 2 0.31 0.00 0.21 0.43 1.04 1.80 4.50 1.55 0.31 3 0.14 0.00 0.14 0.30 0.33 2.93 4.50 1.63 0.26 4 0.13 0.00 I 0.13 0.30 0.30 1.37 4.50 1.28 0.28 5 0.13 0.00 0.13 0.30 0.30 1.37 4.50 1.28 0.28 6 0.07 0.00 0.07 0.29 0.16 1.99 4.50 1.21 0.21 7 0.25 0.00 0.21 0.40 0.79 2.05 4.50 2.03 I 0.41 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 2