Loading...
HomeMy WebLinkAboutWQ0045832_More Information (Received)_20241002 Hi sand, hh,f.1—mg up...he--L I aft,little bit age....have some qm,sIm1a al—ine info y.',.looking for: Please clarify/correct the folbbIlialla- 1.PI....Il the owners name of the receiving downstream sewer. Would this just be CI-TWzt...I,,,we are discharging to the dual lcsystem? 2.PI....Idmi that this project does NOT require coverage made,a 404/401 permit as noted In the application.I noticed a—and an the location map and want to ensure that the me—sz,authorizations are In II before I-I forward.If 1404/4(0 neunril is needed, pill,,111mani It your earliest coll-1111. This p,.jal does not require.401/404 permit,We are not disturbing any streams of wetlands that are or the property, 3.Theflow—apt....letter refers to the project as"Mal Iml Creek Tm—ll but the a ppliczi list,the project name as"011 T—h—es." We typically apply for the flow acceptance let,,before the d.ci.p.Iht has be,n named,so we g—It a place holder name.0..e the ell chooses a recras,for the land dr,del.poem,plan set,we put that name.n the private sewer permit(add III other utility PI11b applications)so it,al what's oa the approved plan set.Will we need t,,et this updated oa the flow acceptance letter.That's d—,been requested before,and there's I chatce the d—lbprdadt will change dame,.,in when the developer hand,he project over to the hundelmildel. Thanks, Landworks Design Group,PA KhistmMmh1mzdm,S,mimr Civil Designer 1230 W M—lacarl S-ch Smile 3104 Clacall NC28208 703-927-6233(-R)/7M-841-16N(f-) From:I..thl,.Ini... —Tuesday,Oct.-1,2024 2 45 PM Michael mr,Md,,h..d —-ifel-chis.l. =Ird.aaI ­JZ:F—Chi= Mich-VIKI-isdid, See attac had.Can you provide the answers to he,meatier.? Begin forwarded.....g.: From:"F..,,Karl."lka�' Date:October 1,2024 at 2:41:03 PM EDT T.:Ieon ch'solmlagma I co Sala—Chlia,b,a T—oh—sair —d afternoon, hope all is well.1 am currently processing the application referenced in the bl-line above.During the technical review denied,additional information regarding y..Fast Track Sewer Extension permit application is warranted.As of the date of this email,the drimucal review penned(45 day,)is paused until we receive the additional information requested.Add,ional information must be received within 30 days,orthe application willreturned to the applicant. he MI,a,- 1.P�,:,,provide the owners name us.,of the receivingdownstream 2.Please'n oundiond that this p,,j,d do,,NOT require coverage under a 404/401 permit as noted in the application.I handed a stream on the location map and want to ensure that the necessary authorizations are in all before moving forward.If a 404/401 permit I,needed,please submit it at you r earliest convenience. 3.The,flow acceptance letter nai to the project as"Mallard Creek Td.nhrrI but the application list,the project name sa"Chis,ind Td.rhmmi Pleas,not,that you do NOT have to mail the requested items.You may respond directly to me Oil email. Thank you, Karl.F.".(pronounced fo In y.) 17—omm,dral5'echoll 11 Mdd—"Ue Regional off- D11111-of—Resources Department 'Em-11-1 Quality Ofte:(704)235-2196 D77 E NORTH CAROLINA am Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.