Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4240907_Stormwater Report_20241015
Stormwater Report Project: Design Masters Displays — Building Expansion FEI Project: 02043.003 Submitted To: NCDEQ August 30th, 2024 Prepared For: H2PRO, LLC 4001 Brambletye Court Greensboro,NC 27407 (336) 884-5575 Prepared By: FEI Civil Engineers and Land Surveyors 8518 Triad Drive Colfax, North Carolina 27235 (336)-544-6438 Engineer: Andrew Christ, PE 11111 Civil Engineers and Land Surveyors CIVIL ENGINEERS AND LAND SURVEYORS 8518 Triad Drive Colfax, NC 27235 (336) 852-9797 License No. C-0950 Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com Table of Contents Introduction 5 Site Information 5 SITE DATA 5 WATERSHED DATA 5 Narrative 6 Site Description 6 DRAINAGE AREAS AND COMPOSITE CURVE NUMBERS 6 STORM WATER CONVEYANCE SYSTEMS 7 Stormwater Wet Pond Sizing 7 WATER QUALITY ANALYSIS 9 WATER QUANTITY ANALYSIS 9 Conclusion 10 Appendix 11 Table of Tables Table 1: Existing Site Drainage Areas 6 Table 2: Drainage Areas (Proposed) 7 Table 3: Wetland Design Parameters and Required Volume 8 Table 4: Proposed Wetland Design Volume and Surface Area 9 Table 5: NOAA ATLAS Precipitation Depth 10 Table 6: Summary of Water Quantity Analysis 10 Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com 4 Design Masters Display High Point Randolph County, North Carolina INTRODUCTION The proposed development is the construction of a Building Expansion located at 5657 Prospect St, High Point, NC 27260, falling under the jurisdiction of Trinity, NC. This 18.73-acre parcel contains 4.11 acres of existing built-upon area (BUA). A portion of the existing BUA will remain in a low-density application and where the improvements are being proposed, all BUA will be captured and treated using a Stormwater Wet Pond for both Water Quality and Quantity control. The site requires the removal of existing BUA, grading, and installation of new paved areas along with the new building. The project consists of a total 22,000 sf building expansion with an asphalt parking lot, storm sewer installation, and sanitary service relocation. The effective area is 18.50 acres after subtracting the 0.23 acres of surface water found from the total property (18.73acres) within the property lines resulting in 22.23% (4.11 acres) of existing built upon area. The new building will not to be served by new water/sewer services as the existing building, currently served by public water and private septic sewer will meet requirements. SITE INFORMATION Site Data Owner: H2PRO, LLC, 4001 Brambletye Court, Greensboro, NC 27407 PIN: 6798364174 Reference: D.B. 2110, PG. 940 Development Standard: City of Trinity, NCDOT, and NCDEQ Zoning: M2 Property Address: 5657 Prospect St, High Point, NC 27263 Permitting Jurisdiction: City of Trinity Watershed Data Watershed Classification: Non-water supply watershed River Basin: Yadkin-Pee-Dee Soil Types: WtC and MeB2 Average Slope: 4% Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com NARRATIVE The subject property has been delineated by a licensed Soil Scientist and verified by USACE. The Property consists of two Intermittent Streams with 50ft Riparian Buffers. The onsite drainage areas have been broken down into two drainage areas as well as an offsite area that drains through the property. The property has a hydrologic soil group D with a combination of heavy tree coverage within the buffer areas but within the project area, the ground is mostly gravel and pavement with light grass cover. The existing Pre-Construction drainage area has a 10-year flow rate of 17.67 cfs (CN=96, 110=5.60 (in/hr), Tc=10min). During initial construction, erosion control measures will be in place to control the disturbed area runoff. Upon completion of construction, the erosion control basin will be converted to a wet pond and perimeter measures will be removed. The Post-Construction Drainage area will be controlled by storm sewers, catch basins, and grate inlets collecting the water and directing it to the stormwater wet pond.The Wet Pond is proposed to discharge closer to the stream within the buffer areas to prevent scour and allow the depths required for the wet pond. SITE DESCRIPTION The site is not located within a designated Watershed. Drainage Areas and Composite Curve Numbers The existing site is 18.73 acres (Total Project Area of 18.50 acres)that is comprised of 2 preconstruction drainage areas, see Table 1 below for breakdown.The existing condition is most closely represented as grass, some areas of Woods and dense vegetation, and existing BUA in Soil Group C. A weighted Curve Number(CN) of 79 was used for the existing condition. See pre-construction drainage area summary for curve number summary in Table 2. Table 1: Existing Site Drainage Areas Description Onsite DA Offsite DA Total DA Pre-Construction Low Density DA 1 14.74 AC 0.00 AC 14.74 AC Pre-Construction DA 2 3.99 AC 0.00 AC 3.99 AC Total Site DA 18.73 AC 0.00 AC 18.73 AC The Pre-Construction Low Density DA is proposed to have no change and is not evaluated in routing or pre/post conditions. For the Preconstruction DA 2, a time of concentration (TO of 10 minutes was used for the existing conditions (sheet, shallow, and concentrated flow) and a Tc of 5 minutes was used for post development construction.The developed area is intended to be captured and conveyed to the Wet Pond using roof drains and storm sewer.The post-construction site has been analyzed to meet the pre & post condition as required by NCDEQ. See Table 2 for a summary of drainage areas and composite curve numbers used in the analysis. Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com 6 The post-construction drainage area to the Wet Pond is 3.99 acres and analyzed with a site built upon area of 3.16 acres. The proposed development will comprise of buildings, pavement (drive aisles, parking area, and sidewalk), and landscaped areas producing a weighted CN of 96 for the proposed development. Table 2: Drainage Areas(Proposed) Drainage Area Total Area Impervious Area Weighted CN Post-Construction Low N/A Density DA 1 14.74 Acres 1.58 Acres (10.72%) Post-Construction DA 2 3.99 Acres 3.16 Acres (79.20%) 96 Curve Numbers are referenced from SCS/NRCS TR-55 and NCDEQ Stormwater Design Manual Appendix B and is provided in the appendix. Stormwater Conveyance Systems The piped conveyance system and permanent drainage swales have been designed to capture the managed drainage area and convey the 10 and 25-year storm event.The HGL analysis and elevations are provided on the construction documents. STORMWATER WET POND SIZING The proposed stormwater Wet Pond has been designed to meet both water quality and quantity.The Wet Pond has a required design volume of 7,977 cubic feet using an impervious fraction of 0.55 and runoff coefficient of 0.55. The Proposed Wet Pond will provide a water quality volume of 8,908 cubic feet and a surface area of 7,814 square feet.The design parameters and the proposed stormwater wetland design are further outlined in Table 3 and Table 4, respectively. Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com Table 3: Wetland Design Parameters and Required Volume Wet Pond Design (SA/DA Method) Drainage Area to Wet Pond (ac) 3.99 Impervious Area to Wet Pond (ac) 3.16 Percent Impervious (%) 80% Permanent Pool Average Depth (ft) 3 Location (Mtn./Pied., or Coastal) Mtn./Pied. SA/DA Value from Table 2.92 Minimum Surface Area Required (sf) 5075 Minimum Main Pool Volume (cf) 15225 Minimum Forebay Volume (cf) 2284 Water Quality Volume Calculation Determine Runoff Volume (NCDENR BMP 3.3.1) Rv=0.05+0.9* IA Drainage Area 3.99 ac Impervious Area 2.22 ac Impervious Fraction 0.556 Rv 0.551 V=3630* RD * Rv *A(Volume to be controlled) RD 1 inch Required Volume to Treat, V= 7977 cf Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com 8 Table 4: Proposed Wetland Design Volume and Surface Area Total Wet Pond Dimensions and Volumes Description Design Main Pool Surface Area Required (sf) L5075 Main Pool Volume Required (cf) 15225 Forebay Volume Required (cf) 2284 Required Water Quality Volume to Treat(cf) 7977 Main Pool Surface Area Provided (sf) 7814.3 Main Pool Volume Provided (cf) _ 26341.65 Forebay Volume Provided (cf) 4427.35 l Water Quality Volume Provided (cf) 8908 Side Slope of Proposed Design 3 :1 Bottom of Sediment Storage Elevation (ft) 896.50 Bottom of Main Pool Elevation (ft) 897.50 Top of Main Pool Elevation (ft) 902.50 Top of Water Quality Elevation (ft) 903.30 _ Bottom of Vegetated Shelf Elevation (ft) 901.50 Max. Elevation for 1 yr Storm (ft) 903.62 _ Max. Elevation for 2 yr Storm (ft) 903.69 Max. Elevation for 10 yr Storm (ft) 903.83 Max. Elevation for 100 yr Storm (ft) 904.05 Bottom of Emergency Spillway Elevation (ft) 904.00 Top of Berm Elevation (ft) 905.50 Water Quality Analysis The first inch water quality volume is based on the post-construction drainage area of 3.99 acres and the runoff coefficient.The Wetland has been designed to detain the first inch below the riser elevation allowing the 1-inch orifice to control the drawdown rate for the provided volume of 8,908 cubic feet between the 2-5-day requirement. Water Quantity Analysis The SCS TR-20 Method using HydroCAD was used to determine the peak pre-construction and post- construction flows on the site per NCDEQ stormwater standards. The Wet Pond was sized for a water quality volume to provide adequate pollutant removal and discharge post construction runoff below the pre-construction runoff rates and ensure volume control for the identified rainfall events as described in the introduction paragraph. Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com 9 The 1, 2, 10, and 100-year, 24-hour rainfall events were analyzed for water quantity control.The 24- hour precipitation intensity using the SCS model was used in modeling the pre-existing site conditions versus post construction conditions. Rainfall values for the 24-hour rainfall event for Thomasville are based on data from NOAA and are listed below in Table 6 and provided in the appendix. Table 5: NOAA ATLAS Precipitation Depth 1-Yr 2-Yr 10—Yr 100—Yr TYPE II RAINFALL Return Return Return Return Period Period Period Period 24-hour Rainfall Sequence (in) 2.84 3.43 4.94 7.26 A summary of the pre and post construction flow rates are identified in table 6. Table 6: Summary of Water Quantity Analysis SCS Method-24 hr Rainfall 1-Yr 2-Yr 10—Yr 100—Yr Drainage Area Discharge Rates(cfs) Return Return Return Return Period Period Period Period Pre-Construction Runoff 10.30 12.80 17.67 22.58 II Post-Construction DA 13.96 16.91 22.33 27.53 Post-Construction Wet Pond Discharge 9.62 12.69 15.00 15.25 Peak Elevations 903.62 903.69 903.83 904.05 CONCLUSION The Wet Pond has been adequately sized to meet the NCDEQ's Post Construction Stormwater Ordinance and Design Manual as outlined below: 1. The Wet Pond will discharge the first inch water quality volume at a rate lower than the pre- construction 1-year, 24-hour runoff rate. 2. The Wet Pond will control the increased volume and discharge the post-construction condition at a lesser runoff rate compared to the pre-construction condition and runoff rates. Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com 10 APPENDIX • NOAA PRECIPITATION FREQUENCY • MAPS ➢ VICINITY MAP ➢ USDA SOILS MAP ➢ USGS QUAD MAP ➢ FLOOD MAPS • SWALE LINER SPECIFICATIONS • DEED REFERENCE Stormwater Report Design Master Displays High Point,North Carolina feiconsulting.com NOAA PRECIPITATION FREQUENCY NOAA Atlas 14,Volume 2,Version 3 eve,°``w,, Location name:Thomasville,North Carolina,USA* 1,..�„ r Latitude:35.8832°,Longitude: -80.0818° norm , % Elevation:855 ft** 'e rEs.,*" *source:ESRI Maps "w,, yam''s, **source:USGS " POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration - 1 2 5 10 25 50 100 200 _ 500 1000 _ 5-min 4.63 5.50 6.40 7.00 7.64 8.04 8.38 8.64 8.89 9.04 (4.26-5.04) (5.06-5.99) (5.88-6.96) (6.42-7.60) (6.97-8.28) (7.31-8.72) (7.58-9.10) (7.79-9.38) (7.94-9.66) (8.02-9.82) 10-min 3.70 4.40 5.12 I 5.60 II 6.08 6.40 6.66 6.85 7.03 7.11 (3.40-4.02) (4.05-4.79) (4.71-5.58) I (5.14-6.07) I (5.56-6.60) (5.82-6.95) (6.02-7.22) (6.17-7.44) (6.29-7.64) (6.31-7.73) 15-min 3.08 3.68 4.32 4.72 5.14 5.40 5.61 5.76 5.90 5.95 (2.83-3.35) (3.39-4.01)_ (3.97-4.70) (4.33-5.12) (4.70-5.58) (4.91-5.86) (5.08-6.09) (5.20-6.26) (5.28-6.41) (5.28-6.47) 30-min 2.11 2.54 3.07 3.42 3.81 4.07 4.30 4.49 4.70 4.82 (1.94-2.30) (2.34-2.77) (2.82-3.34) (3.14-3.71) (3.48-4.13)) (3.70-4.41) (3.89-4.66) (4.04-4.87) (4.20-5.10) (4.27-5.24) 60-min 1.32 1.60 1.97 2.23 2.54 2.76 2.96 3.15 3.37 3.52 (1.21-1.43) (1.47-1.74) (1.81-2.14) (2.04-2.42) (2.32-2.75) (2.51-2.99) (2.68-3.21) (2.84-3.42) (3.01-3.66) (3.12-3.82) 2-hr 0.772 0.936 1.16 1.33 1.53 1.69 1.83 1.97 2.15 2.27 (0.712-0.838) (0.864-1.02) (1.07-1.26) (1.22-1.44) (1.40-1.66) (1.53-1.82) (1.66-1.98) (1.77-2.14) (1.90-2.33) (2.00-2.47) 3-hr 0.550 0.666 0.830 0.949 1.10 1.22 1.33 1.43 1 1.57 1.67 (0.507-0.597) (0.617-0.725) (0.766-0.901) (0.873-1.03) (1.01-1.19) (1.11-1.31) (1.20-1.43) (1.28-1.55) (1.39-1.70) (1.46-1.80) 6-hr 0.335 0.404 0.503 0.578 0.677 0.754 0.830 0.906 1.01 1.08 (0.309-0.364) (0.374-0.440),(0.464-0.548) (0.531-0.627) (0.618-0.732) (0.682-0.814) (0.745-0.895)1(0.805-0.976) (0.882-1.09) (0.937-1.17) 12-hr 0.197 0.238 0.298 0.345 0.408 0.459 0.510 0.564 0.637 0.694 (0.181-0.215) (0.219-0.260) (0.274-0.325) (0.316-0.375) (0.370-0.443) (0.413-0.496) (0.455-0.551) (0.497-0.608)I(0.551-0.686) (0.591-0.748) 24-hr 0.118 0.142 0.178 0.205 0.243 0.272 0.302 0.333 1 0.375 0.408 (0.110-0.127) (0.133-0.153) (0.165-0.192) (0.190-0.221) (0.224-0.262) (0.251-0.293) (0.278-0.326) (0.304-0.360) (0.341-0.406) (0.369-0.444) 2-day 0.068 0.082 0.102 0.117 0.137 0.153 0.169 0.185 0.207 0.224 (0.064-0.073) (0.077-0.088) (0.095-0.109) (0.109-0.126) (0.127-0.147) (0.141-0.164) (0.155-0.182) (0.170-0.199) (0.189-0.224) (0.203-0.243) 3-day 0.048 0.058 0.072 0.082 0.096 0.107 0.118 0.130 0.145 0.157 (0.045-0.052) (0.054-0.062) (0.067-0.077) (0.077-0.088) (0.089-0.103) (0.099-0.115) (0.109-0.127) (0.119-0.140) (0.133-0.157) (0.143-0.171) 4-day 0.038 0.046 0.056 0.064 0.076 0.084 0.093 0.102 0.115 0.124 (0.036-0.041) (0.043-0.049) (0.053-0.060) (0.060-0.069) (0.070-0.081) (0.078-0.091) (0.086-0.100) (0.094-0.110)1(0.105-0.124)1 (0.113-0.135) 7-day 0.025 0.030 0.036 0.041 0.048 0.053 0.059 0.064 0.072 0.078 (0.023-0.026) (0.028-0.032) (0.034-0.038) (0.038-0.044) (0.045-0.051) (0.049-0.057) (0.054-0.063) (0.059-0.069) (0.066-0.077) (0.071-0.084) 10-day 0.020 0.023 0.028 0.032 0.037 0.041 0.045 0.049 0.054 0.059 (0.018-0.021) (0.022-0.025) (0.026-0.030) (0.030-0.034) (0.035-0.039) (0.038-0.043) (0.042-0.048) (0.045-0.052) (0.050-0.058) (0.054-0.063) 20-day 0.013 0.015 0.018 0.021 0.024 0.026 0.029 I 0.031 0.035 0.037 (0.012-0.014) (0.015-0.016),(0.017-0.019) (0.019-0.022) (0.022-0.025) (0.025-0.028) (0.027-0.030)1(0.029-0.033) (0.032-0.037) (0.034-0.040) 30-day 0.011 0.013 0.015 0.016 0.018 0.020 0.022 0.023 0.026 0.027 (0.010-0.011) (0.012-0.013) (0.014-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.023) (0.022-0.025) (0.024-0.027) (0.025-0.029) 45-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.020 0.021 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.019-0.021) (0.020-0.022) 60-day 0.008 0.009 0.010 0.011 0.013 0.014 0.014 0.015 0.016 0.017 (0.008-0.008) (0.009-0.010) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.015-0.016) (0.016-0.017),(0.016-0.018) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.8832°, Longitude: -80.0818° 101 - I- I Average recurrence = mterral (years) L. I I �� — t 10° - L �� _ — 2 — 5 cu — 25 o 1 \� — 50 4 10-1 ._ \`` `� — 100 a �, •t — 200 d \ \\ 500 a �. I \_\ — 1000 10-Z - fI t i I I I I C C_ c_ C_ _ _ t i >., >,>, >, >, T T >,>, E E E E E N nti 6 r 4 v -o v 7 ii3 'o v 77 LA .-1 N Aln fdt 4 O� m $ Duration o N m •ko 101 - - - c 10° -- Duration lifilitillillill a5-man — 2-day — 10 min — 3-day o 15-min — 4-day 0 10-1 - - — 30-min — 7-day •a — 60-nin — 10-day — 2-hr — 20-day a 1 — 3-hr — 30-day — 6-hr — 45-day 10-Z —— C — — 12-hr — 60-day I I f I f 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Aug 28 18:36:05 2024 Back to Top Maps & aerials Small scale terrain r l F �� _ y�;` _ -_ 7 ,1Vntty S, + T4 rnpu _Lel(inntonqtee �U€-> sect! 0 3km 2mi r Large scale terrain Blacksburg koanoke • Bristol D 0 .!' Winston-Sal em • • Durham Gre,nsboro • r:u raio-I-II _Ir* Raleigh• ieville NORTH CAROLINA r •Charl otte + Fayetteville• — 100km i. IIII-611)mi li Large scale map Bri .I - o - - lohnson City ' inston6 lem 0 Greensboro D rham Raleigh ;, eville IIvP '- IIi ---) Fayett o r 100km li0mi �. Large scale aerial ..Bristol ohnson Ci>'y Winston-Salem • • Greensboro Durham• Raleigh ille North Carolina Charlotte • Fayett • 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions(o),noaa.gov Disclaimer MAPS David Brame From: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Sent: Thursday,July 25, 2024 6:18 PM To: David Brame; Michael Brame Subject: RE: SAW-2024-00703 (5657 Prospect Street/Archdale NC/ Randolph County) Attachments: Wetland Map.pdf ALCON, Reference is made to ORM ID SAW-2024-00703, please reference this number on any correspondence regarding this action. We received information from you requesting the Wilmington District, Regulatory Division review and concur with the boundaries of an aquatic resource delineation. We have reviewed the information provided by you concerning the aquatic resources, and by copy of this e-mail, are confirming that the aquatic resources delineation has been verified by the Corps to be a sufficiently accurate and reliable representation of the location and extent of aquatic resources within the identified Site Boundary.The location and extent of these aquatic resources are shown on the delineation map, Wetland Map. Regulatory Guidance Letter(RGL) 16-01 https://usace.contentdm.ocic.org/utils/getfile/collection/p16021co119/id/1256 provides guidance for Jurisdictional Determinations (JD) and states "The Corps generally does not issue a JD of any type where no JD has been requested". At this time we are only verifying the delineation. This delineation may be relied upon for use in the permit evaluation process, including determining compensatory mitigation. "This verification does not address nor include any consideration for geographic jurisdiction on aquatic resources and shall not be interpreted as such. This delineation verification is not an Approved Jurisdictional Determination (AJD) and is not an appealable action under the Regulatory Program Administrative Appeal Process (33 CFR Part 331). However,you may request an AJD,which is an appealable action. If you wish to receive a Preliminary Jurisdictional Determination (PJD), or an Approved Jurisdictional Determination (AJD) please respond accordingly, otherwise nothing further is required and we will not provide any additional documentation. The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this request.This delineation may not be valid for the Wetland Conservation Provisions of the Food Security Act of 1985, as amended. If you or your tenant are USDA program participants, or anticipate participation in USDA programs,you should discuss the applicability of a certified wetland determination with the local USDA service center, prior to starting work. Lyle Phillips Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive,Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 588-9200 1 Fax: (919) 562-0421 Email: George.L.Phillips@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at https://regulatory.ops.usace.army.mil/customer-service-survey/.Thank you for taking the time to visit this site and complete the survey. From: RaleighNCREG<RaleighNCREG@usace.army.mil> Sent:Thursday,April 4, 2024 3:01 PM To: David Brame<dbrame@pilotenviro.com> Cc: Phillips, George L CIV USARMY CESAW (USA) <George.L.Phillips@usace.army.mil> Subject: SAW-2024-00703 (5657 Prospect Street/Archdale NC/ Randolph County) Good afternoon, Your JD request has been received, assigned action IDSAW-2024-00703 and forwarded to Lyle Phillips for further processing. Please refer to the action ID in all correspondence. Thank you, Josephine Schaffer From: David Brame<dbrame@pilotenviro.com> Sent:Thursday,April 4, 2024 10:23 AM To: RaleighNCREG<RaleighNCREG@usace.army.mil> Subject: [Non-DoD Source] 10742 - Prospect Street, Stokesdale, Guilford County, NC- USACE JD Request Please see attached. Sincerely, David Brame, PWS PILOT "" PILOT I N V I I O N Y I N T A l . I N C 336.708.4617(c) 336.310.4527(o) www.pitotenviro.com dbrame@pilotenviro.com 2 ,, l - '' r .' JJJ- a I • i - Ai SD SC 100 LF 4` 107 LF N N , i{, . 0 .. . ND2ON WB 1-12 WD 1 SB 0.112 Ac. 0.002 Ac. 208 LF - , - - • -- ti WA 1-7 0.037 Ac. •11:111. I ------"N ' DP30 S - Y�1 ,e ":t' 750LF 1 Fa I �w► t. < �. i 00\ . 4iN ' . . , ,._ ,. . _._ . '}'� ^'M 441 • /j ; �. ., W WC 1-7 k • ,', ' .` Ili t0.013 Ac 1 •• ' * 111 + 4 r • ..... fik,4iik a i, - p4 -,.. Jed" -it. , - . , :-,.. 4 ... /. ' • • A *41. S••\ / , - 741"19." WI . :k _ 4 -,pi. LEGEND41 _AditI. ailli �, Site Boundary s ±' Potential Jurisdictional Non-Wetland Water(Perennial Stream) y THE LOCATIONS OF FEATURES SHOWN ON THIS MAP Potential Jurisdictional Non-Wetland Water(Intermittent Stream) le ARE APPROXIMATE. THEY WERE VERIFIED BY MR. LYLE Potential Jurisdictional Wetland-Water 4 PHILLIPS WITH THE USACE ON JULY 25, 2024 (SAW- SA1-5 Flag Number 2024-00703). THIS MAP INCLUDES GPS LOCATIONS OF DP-1 O Data Point DELINEATED FEATURES. DELINEATED BY PILOT ON 3.20.2024. • Culvert Drawing 5 t Wetland Map Aerial Imagery from ESRI `''` f\- �i ' ,�?x- -{ Approximate 17.2-Acre Tract and Pilot GPS Data __ :r' y. Prospect Street Scale: 1" = 200' PIL01". Archdale, Randolph County, NC Date: 3.25.2024 PIS T !NVIR0 \ M!NTAL,INC Pilot Project10742 Soil Map—Randolph County, North Carolina N V 586860 586940 587020 587100 587180 587260 587340 35°54'33"N 35°54'33"N ■ J a._ lr , . , ,v,,,o N O c.,,, N- MeB2 WtC c7i r. __ , gii MeC2 R g P l sr t jIMP •*le MeB2 l r `MeB2' .k ✓_ ;^ / 1 o 1 ' ... .,/ e 5Q 4,- / / MaC w`9........----- Li ( '5f5000 5' p Trua1 1oil ItX daUod TA aGhoO. �(.M04° 35°54'11"N 35°54'11"N 586860 586940 587020 587100 587180 587260 587340 3 3 Map Scale:1:3,290 if printed on A portrait(8.5"x 11")sheet. Meters °' N 0 45 90 180 270 Feet 0 150 300 600 900 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 8/22/2024 dila Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Randolph County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soils Very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet Spot Enlargement of maps beyond the scale of mapping can cause .�� Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil Other line placement.The maps do not show the small areas of p Soil Map Unit Points contrasting soils that could have been shown at a more detailed Special Line Features Special Point Features scale. (o, Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map cs Borrow Pit measurements. Transportation I Clay Spot Rails Source of Map: Natural Resources Conservation Service 0 Closed Depression Web Soil Survey URL: ti Interstate Highways Coordinate System: Web Mercator(EPSG:3857) X Gravel Pit US Routes 04,00 Maps from the Web Soil Survey are based on the Web Mercator ,. Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 0 Landfill Local Roads Albers equal-area conic projection,should be used if more Lava Flow accurate calculations of distance or area are required. Background 46 Marsh or swamp Aerial Photography This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. iRk Mine or Quarry Soil Survey Area: Randolph County,North Carolina O Miscellaneous Water Survey Area Data: Version 29,Sep 13,2023 Q Perennial Water Soil map units are labeled(as space allows)for map scales v Rock Outcrop 1:50,000 or larger. ▪ Saline Spot Date(s)aerial images were photographed: Apr 23,2022—Apr 27,2022 Sandy Spot The orthophoto or other base map on which the soil lines were Severely Eroded Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor • Sinkhole shifting of map unit boundaries may be evident. 3) Slide or Slip oa Sodic Spot i\ Natural Resources Web Soil Survey 8/22/2024 001. Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Randolph County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI MaC Mecklenburg loam,8 to 15 5.2 9.2% percent slopes MeB2 Mecklenburg clay loam,2 to 8 22.0 38.8% percent slopes,moderately eroded MeC2 Mecklenburg clay loam,8 to 15 5.6 9.8% percent slopes,moderately eroded W Water 2.0 3.5% WtC Wynott-Enon complex,8 to 15 22.0 38.7% percent slopes Totals for Area of Interest 56.8 100.0% usi)n Natural Resources Web Soil Survey 8/22/2024 Conservation Service National Cooperative Soil Survey Page 3 of 3 Map Unit Description:Wynott-Enon complex,8 to 15 percent slopes---Randolph County, North Carolina Randolph County, North Carolina WtC—Wynott-Enon complex, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3y7k Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Wynott and similar soils: 55 percent Enon and similar soils: 35 percent Minor components: 7 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Wynott Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile A -0 to 4 inches: sandy loam E-4 to 14 inches: sandy loam Bt- 14 to 24 inches: clay BC-24 to 28 inches: sandy clay loam Cr-28 to 80 inches: weathered bedrock Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: 20 to 40 inches to paralithic bedrock Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat):Very low to moderately high (0.00 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Low(about 4.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e USDA Natural Resources Web Soil Survey 8/22/2024 Conservation Service National Cooperative Soil Survey Page 1 of 3 Map Unit Description:Wynott-Enon complex,8 to 15 percent slopes---Randolph County, North Carolina Hydrologic Soil Group: D Ecological site: F136XY730SC- Basic upland forest, depth restriction, dry Hydric soil rating: No Description of Enon Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: fine sandy loam BA - 7 to 10 inches: sandy clay loam Bt- 10 to 27 inches: clay BC-27 to 33 inches: clay loam C-33 to 80 inches: loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No Minor Components Wilkes Percent of map unit: 5 percent Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Hydric soil rating: No USDA Natural Resources Web Soil Survey 8/22/2024 Conservation Service National Cooperative Soil Survey Page 2 of 3 Map Unit Description:Wynott-Enon complex,8 to 15 percent slopes---Randolph County, North Carolina Sedgefield Percent of map unit:2 percent Landform: Ridges Landform position (two-dimensional): Summit, footslope Down-slope shape: Concave Across-slope shape: Concave Hydric soil rating: No Data Source Information Soil Survey Area: Randolph County, North Carolina Survey Area Data: Version 29, Sep 13, 2023 USDA Natural Resources Web Soil Survey 8/22/2024 alli Conservation Service National Cooperative Soil Survey Page 3 of 3 Map Unit Description: Mecklenburg clay loam,2 to 8 percent slopes,moderately eroded--- Randolph County, North Carolina Randolph County, North Carolina MeB2—Mecklenburg clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 3y6v Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Mecklenburg, moderately eroded, and similar soils: 85 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Mecklenburg, Moderately Eroded Setting Landform: lnterfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: clay loam Bt- 7 to 30 inches: clay BC-30 to 38 inches: clay loam C-38 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e USDA Natural Resources Web Soil Survey 8/22/2024 Conservation Service National Cooperative Soil Survey Page 1 of 2 Map Unit Description: Mecklenburg clay loam,2 to 8 percent slopes,moderately eroded--- Randolph County, North Carolina Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No Minor Components Lloyd, moderately eroded Percent of map unit: 5 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Pacolet, moderately eroded Percent of map unit: 3 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Enon Percent of map unit:2 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Data Source Information Soil Survey Area: Randolph County, North Carolina Survey Area Data: Version 29, Sep 13, 2023 USDA Natural Resources Web Soil Survey 8/22/2024 alli Conservation Service National Cooperative Soil Survey Page 2 of 2 USG$ U.S.DEPARTMENT OF THE INTERIOR The National Map HIGH POINT WEST QUADRANGLE NORTH Ju U.S.GEOLOGICAL SURVEY US Topo 7.5-MINUTE S LINA science for a changing worldSERIES -80.1250' -80.0000 36.0000' 5790.E 80 81 82 83 84 85 86 87 88 89 90 36.0000 may, =7f:AP 8 .84000, Pm1uPII3mxi N7m _m �T %: �, t�j 0 ^� 01' 84 Q e l0� E amanwm ii 1. • o. e Q • ©° @ U ' t � 6A $* �9 % a 44 g 0a � TA: 9383 i. sv �3u o a > - L'ra.p�m a --_0.1 m c°%1 45gsd^ 1 4e �g ^,• S.e z nve �—_�,=m-:•%�'"" 82 as @� Se 5 % c3 m_ . i Qua ��V iv,82 c7 , p ® amzraaa Pee tis 0 5 ©81£ as 800 020 p50 0 U % e �0 a . %Roam 1 81 ?,`4a'9 R40D� `'" g CSC `4„-- i g L g " ©dim g� ga6 9 U © ' •a1 �° ` ,q 9p 4, dm m1ra \O$ ø250i e1'y"o3 rd�, Cv" q,�( ��J�9j J AD t © 8 m amm A ©� PA`O4G ©819LI'A ki 80 A �e © nd ,°°° ©d nd�nfo� so wag. co g om \ 8 0 p 9 p ©� '; aa¢a ,„, e9 8 11 m d. e P %� o m � 0 � { 79 �` o �� � t t - 8 �i c 'c4�' degm as ., IP. \ © b �0 %® � m a II 0 GULIMma ©a z mail r 79 (2 are0400p0D� m d �� ® wLfl a I �. t is u. a. V t o Q ie e I1li 3 \ veer,.m ig 8 U p.�,,_ p PRE 78 ' � '''4• g • ,• �� :."", �i 937s to •gl 1 78 its B t gI % - ,I < T i ® 3 ©Ll�S0 mail m I as 8 ssI I o © P, S% 63 e qlm 1 77 wiu°.�° p�4.,M,uw, ©® ,S' �� m I Y g O �� i � flc �cII 1 �� 77 a � � Y� :c�rzm I .a ,�'n''• 'T S�.P! 0 �m 9 ppp % C7 gunmen cp pq8 m3 ©�(4eE3 © ti¢©aA �'�@ cv tl �0 8Le L ..- t wawa/ 76 -vp cy°O • 49 ® 8 E3 447® cp B At .vt ® Se00e0ID 76 ��e 8 III ,01 c , °ddu"7 © z `gym I 1 m�m� Im M — --cmmcolA / e ��'4 RThyN,, PH - �pA 75 ��80 91888 W' N R� EY 4. \.�/ fi5 C�°¢'.80813d903 75 rIttreotgottateroto. „.„5-4 442 ee� 8 ., rI ��N ¢ m 6 Site,Pond no � Z<C `- 6 8 �Rca •�, 0 Monger exists and 'confirmed by 03 5 80 74 0 0m m a�°�§ USACE da 41 R 8 8 d"2 `y9 &o � to Lv' �� 0 7a ,� © mom m p ¢�ncmtca e9 `" 4 m rsT 44 -„\,_ U Ixr�sm 8 B�IpryII,6 e 1 73 4 ID� a' ' '�. , # II �'" 63. 1 r V 1 be e k H 80 '0 ,,,0 «.. � � s \% q � 1 72 `Q0 8 g \ pD� a' B cw CIl.p jm C p `^e 72 At may@ e . 1 < ® \ 6 64(4/° °�' T( �7 020921'.C'A2v r r..'o y _ (w4plCvo .+.', a�� r ALF Cip 03 0 A* 71 Srs , y' \2 00 5\'LuzA3 eaaa , 't p a © w¢a 1 r�ppWt�6 Ct9P ,. o 761 502 a.s, ' j 15 €3 1971°°m'N 35.8750• 79 80 81 82 83 84 85 86 87 88 89 590°00"E 80.1250° .80.0000°35.8750° Produced by the United States Geological Survey 1*'' SCALE 1:24 000 ROAD CLASSIFICATIONWorld Geodetic 5ytem o!1984(WOW).Projection and 1 0.5 0 NILFE ETERS 1 i / bmx ✓/ Secondary Hwy Local Road �_ TM1 Os map iz not a legal document.Boundaries may be tw NIL$ 1000 500 0 S 0 M T0ERS 1000 2000 Ramp 4WD CAROLINA generalized for IM1is map xale.Private lands within government 1 1 of be shown.Obtain permission before 10 MILS MILES •Interstate R(u[e 0US Route 0 State Route en eNng priv teykndz. 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 wnolux¢te tocnnw Imagery NAIP, June T,, June 2020 Roads U.S. Cemus Bureau, IT, �� Names GNIS'1980-2022 DECLINATION ATDEN,=571EET 1 WinxtOmSalem Eazt f° Nydrography National Hydrography D0set,2002-2018 1 2 3 2Nemersvilk onal Elevation Dataset, 2008 CONTOUR INTERVAL IO FEET 3 Guilford =,o 5' Bounda�r es Mul[ipk sources, see metadata file 3019 2021 ,moon q ID NORTH AMERICAN VERTICAL DATUM OF 1988 4 Midwa 4 5 y Wetlands FW8 National Wetlands Inventory Not Available This map was prnducetl to conform with the $High Point East K NV National...p.m Program US Tap(Product Standard. 6 Lexington Easl i Q 6 7 8 lenola 8 G HIGH POINT WEST, NC —„' 8 lenoU `M nil III ADJOINING 000050NLIES 2022 WET POND CALCULATIONS Pre-Construction Analysis Project Design Master Display Date 8/30/2024 Location Prospect Street,Archdale Checked By AC Runoff Curve Number Soil Group Cover Description CN Area(AC) CN xA D Paved parking lots,roofs,driveways,etc.(excluding right-of-way) 98 2.53 247.94 Open space:Fair condition(grass cover 50%to 75%) 84 1.46 122.64 Total 3.99 370.58 ICN(Weighted)= I 92.881 CN= 93 la= 0.151 'Runoff Storm#1 Storm#2 Storm#3 Storm#4 Frequency(yr) 1 2 10 100 Duration 24-hr: 24-hr: 24-hr: 24-hr: Rainfall Depth,P(in) 2.84 3.43 4.94 7.26 Renter Depth 2.84 3.43 4.94 7.26 S=1000/CN-10 0.75 0.75 0.75 0.75 la 0.151 0.151 0.151 0.151 Runoff,Q(in) 2.101 2.667 4.139 6.428 'Sheet Flow Surface Description Smooth Surfaces Mannings Roughness Coefficient,n 0.011 Flow Length,L(L<300ft)(ft) 300 Two-year 24-hour rainfall,p2(in) 3.38 Land Slope,S(ft/ft) 0.02 Tt1(hr)= 0.047 0.047 hr Tt� 0.007("a Ttl(min)= 2.839 2.839 min pi OS#Da 'Shallow Concentrated Flow ' Surface Description(Paved or Unpaved) Paved Unpaved Kv(ft/s) 20.3 16.1 Flow Length,L(ft) 147 220 Two-year 24-hour rainfall,p2(in) 2.84 3.43 Watercourse Slope,S(ft/ft) 0.02 0.04 Average Velocity,V(ft/s) 2.87 3.22 Tt2(hr)= 0.014 0.019 0.033 hr Tt l 3000 V Tt2(min)= 0.853 1.139 1.992 min Total Ttl+Tt2= 0.081 hr ' 4.831 min 'Channel Flow Cross Sectional Flow Area,a(ft^2) Wetted Perimeter,Pw(ft0 Hydraulic Radius,R(ft)(Wet P./Cross A.) 1.00 Channel Slope,S(ft/ft) 1 Mannings Roughness Coefficient,n 1 Flow Length,L(ft) 0 Velocity,V(ft/s) 1.49 Tt3(hr)= 0.000 0.000 hr Tt3(min)= 0.000 0.000 min Total Ttl+Tt2+Tt3= 0.081 hr 4.831 min Time of Concentration,Tc(hr)Used For Min Design hr 'Data Summary Drainage Area,A(mio2)(Acres/640) 0.006 mi^2 Runoff Curve Number,CN 93 Time of Concentration,Tc(hr) 0.083 hr Rainfall Type II Pond and/or Swamp Area in Watershed 0.97 Average Velocity,V(ft/s) 3.05 Flow Length,L(ft) 667 Storm#1 Storm#2 Storm#3 Storm#4 Frequency(yr) 1 2 10 100 Rainfall Depth,P(in)(24-hr) _ 2.84 3.43 4.94 7.26 Initial Abstraction,la(in) 0.151 0.151 0.151 0.151 Compute,la/P 0.05 0.04 0.03 0.02 Design,Ia/P 0.10 0.10 0.10 0.10 CO 2.55323 2.55323 2.55323 2.55323 Cl -0.61512 -0.61512 -0.61512 -0.61512 C2 -0.16403 -0.16403 -0.16403 -0.16403 Unit Peak Discharge,qu(csm/in) 1061.75 1061.75 1061.75 1061.75 Runoff,Q(in) 2.101 2.667 4.139 6.428 Pond and Swap adjustment factor,Fp 0.970 0.970 0.970 0.970 Peak Discharge,Op(ft03/s) 13.49 17.12 26.57 41.28 Wet Pond #1 Design Project: Design Masters Pond #: 1 FEI #: 02043.003 Date: 8/28/2024 Location: Randolph County Wet Pond Design (SA/DA Method) Drainage Area to Wet Pond (ac) 3.99 Impervious Area to Wet Pond (ac) 3.16 Percent Impervious (%) 80% Permanent Pool Average Depth (ft) 3 Location (Mtn./Pied., or Coastal) Mtn./Pied. SA/DA Value from Table 2.92 Minimum Surface Area Required (sf) 5075 Minimum Main Pool Volume (cf) 15225 Minimum Forebay Volume (cf) 2284 Water Quality Volume Calculation Determine Runoff Volume (NCDENR BMP 3.3.1) R�=0.05 +0.9 * IA Drainage Area 3.99 ac Impervious Area 2.22 ac Impervious Fraction 0.556 Rv 0.551 V= 3630 * RD * Rv * A (Volume to be controlled) RD 1 inch Required Volume to Treat, V= 7977 cf Total Wet Pond Dimensions and Volumes Description Design Asbuilt Main Pool Surface Area Required (sf) 5075 Main Pool Volume Required (cf) 15225 Forebay Volume Required (cf) 2284 Required Water Quality Volume to Treat (cf) 7977 Main Pool Surface Area Provided (sf) 7814.3 • Main Pool Volume Provided (cf) 26341.65 Forebay Volume Provided (cf) 4427.35 • Water Quality Volume Provided (cf) 8908 Side Slope of Proposed Design 3 :1 Bottom of Sediment Storage Elevation (ft) 896.50 Bottom of Main Pool Elevation (ft) 897.50 Top of Main Pool Elevation (ft) 902.50 • Top of Water Quality Elevation (ft) 903.30 Bottom of Vegetated Shelf Elevation (ft) 901.50 • Max. Elevation for 1 yr Storm (ft) 903.62 Max. Elevation for 2 yr Storm (ft) 903.69 • Max. Elevation for 10 yr Storm (ft) 903.83 Max. Elevation for 100 yr Storm (ft) 904.05 • Bottom of Emergency Spillway Elevation (ft) 904.00 Top of Berm Elevation (ft) 905.50 Wet Pond#1 Water Quality Drawdown Project: Design Masters Pond#: 1 FEI#: 02043.003 Date: 8/28/2024 Location: Randolph County Calculate Water Quality Drawdown Time: Q= CdAV(2gh) Q= (Basin Volume/Target Drawdown Time)x(1 Hr/3,600 sec.) Target Drawdown Time= 72 hr *Between 48 hrs and 72 hrs)Allowable 2-5 Days Provided BMP Volume= 8,908 cu.Ft (See Water Quality Vol.Cal.) Target Q= 0.03436728 cfs Cd= 0.6 (NCDENR BMP Table 3-8) g= 32.2 ft/sec2 (NCDENR BMP 3.5.2) Ho= (Water Elev.-Centroid of Orifice) Water Elev.= 903.3 ft (NCDENR BMP 3.5.2) Orifice Elev.= 902.5 ft Ho= 0.80 ft Ho/3= 0.27 ft A= 0.008 ft2 Od= 1.21 " Diameter Therefore Min Orifice to be Used= 1.25 " Diameter 1 1/4 "Diameter Design Orifice 1.5 " Diameter 1 1/2 "Diameter Check Draw Down Time: A= 0.0123 ft2 Q= 0.0305 cfs Time= Total Basin Volume/Q Actual Drawdown Time= 81.1 Hrs. O.K. 3.38 Days Wet Pond #1 Emergency Spillway Design Project: Design Masters Pond#: 1 FEI #: 02043.003 Date: 8/28/2024 Location: Randolph County Calculate Emergency Spillway Design: 0.566L1.9 Q= 3.247LH1.48 — 1+2L1.8 Hl 9+0.609H2 5 *For cipoletti (trapezoidal)weir Qioo= 0.26 cfs *Calculated from Hydraflow Hydrographs Length = 25 ft Height= 0.05 ft Qweir= 0.96 OK Wet Pond #1 Anti-Flotation Slab Design Project: Design Masters Pond #: 1 FEI #: 02043.003 Date: 8/28/2024 Location: Randolph County Anti-Flotation Slab Design Outlet Structure Top Elev. 903.3 ft Outlet Pipe Inv. Elev. 896.76 ft Outlet Structure Outside Box Width 5 ft Outlet Structure Wall Thickness 0.5 ft Density of Water 62.43 lb/ft3 Density of Concrete 150 Ib/ft3 Volume Being Displaced by Box 163.5 ft3 Buoyant Force Created 10207.3 lb Weight of Outlet Structure 8829 lb Difference in Buoyant Force and Weight 1378.305 lb Depth of Concrete Needed in Bottom 0.57 ft Factor of Safety 2 Total Depth Needed 1.15 !ft Check Volume Displaced by Box (Adjusted) 204.71 ft3 Buoyant Force Created (Adjusted) 12780.34 lb Weight of Outlet Structure (Adjusted) 12254.59 lb Weight of Anti-Flotation Slab 2756.61 lb Total Weight of Outlet Structure 15011.20 lb Difference in Buoyant Force and Weight 2230.87 lb Outlet Structure Design Outlet Structure Top Elev. 903.30 ft Outlet Pipe Inv. Elev. 896.76 ft Top of Anti-Flotation Slab 896.76 ft Bottom Of Box Elev. 895.11 ft Design Masters Table of Contents Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 1-yr Event 3 Subcat 1S: Pre-Construction DA 5 Subcat 2S: Post-Construction DA 7 Pond 3P: Wet Pond 2-yr Event 13 Subcat 1S: Pre-Construction DA 15 Subcat 2S: Post-Construction DA 17 Pond 3P: Wet Pond 10-yr Event 23 Subcat 1S: Pre-Construction DA 25 Subcat 2S: Post-Construction DA 27 Pond 3P: Wet Pond 100-yr Event 33 Subcat 1S: Pre-Construction DA 35 Subcat 2S: Post-Construction DA 37 Pond 3P: Wet Pond Multi-Event Tables 43 Subcat 1S: Pre-Construction DA 44 Subcat 2S: Post-Construction DA 45 Pond 3P: Wet Pond 1S Pre-Construction DA 2S > 3P Post-Construction DA Wet Pond (Subct Reach Pon Link Routing Diagram for Design Masters Prepared by FEI, Printed 8/29/2024 HydroCAD®10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Design Masters Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-yr NC-Thomasville 24-hr S1 1-yr Default 24.00 1 2.84 2 2 2-yr NC-Thomasville 24-hr S1 2-yr Default 24.00 1 3.43 2 3 10-yr NC-Thomasville 24-hr S1 10-yr Default 24.00 1 4.94 2 4 100-yr NC-Thomasville 24-hr S1 100-yr Default 24.00 1 7.26 2 Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre-Construction DA Runoff = 10.30 cfs @ 12.09 hrs, Volume= 30,384 cf, Depth> 2.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Area (ac) CN Description 2.530 98 Unconnected pavement, HSG D 1.460 84 50-75% Grass cover, Fair, HSG D 3.990 93 Weighted Average 1.460 36.59% Pervious Area 2.530 63.41% Impervious Area 2.530 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Pre-Construction DA Hydrograph t 11- ❑Runoff 110.30 cfs 10- NC-Thomasville 24-hr 11-yr fainfahf=2.84" gunoff Araea=3.99d-ac 8_ Runoff�'�Volume=30 384 cf 7- Runoff' Depth>2.1 b" 6- T6=1O11 min 3 LL 5- 4- 3- 2= 0- _�����.. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 4 Hydrograph for Subcatchment 1S: Pre-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 2.20 1.50 0.79 0.25 0.01 0.00 0.00 13.25 2.25 1.54 0.65 0.50 0.01 0.00 0.00 13.50 2.28 1.58 0.56 0.75 0.02 0.00 0.00 13.75 2.32 1.61 0.49 1.00 0.03 0.00 0.00 14.00 2.34 1.63 0.44 1.25 0.04 0.00 0.00 14.25 2.37 1.66 0.40 1.50 0.05 0.00 0.00 14.50 2.39 1.68 0.37 1.75 0.05 0.00 0.00 14.75 2.42 1.70 0.34 2.00 0.06 0.00 0.00 15.00 2.44 1.72 0.32 2.25 0.07 0.00 0.00 15.25 2.46 1.74 0.30 2.50 0.08 0.00 0.00 15.50 2.48 1.76 0.28 2.75 0.09 0.00 0.00 15.75 2.49 1.77 0.27 3.00 0.10 0.00 0.00 16.00 2.51 1.79 0.25 3.25 0.10 0.00 0.00 16.25 2.53 1.80 0.24 3.50 0.11 0.00 0.00 16.50 2.54 1.82 0.23 3.75 0.12 0.00 0.00 16.75 2.56 1.83 0.22 4.00 0.13 0.00 0.00 17.00 2.57 1.85 0.21 4.25 0.14 0.00 0.00 17.25 2.58 1.86 0.21 4.50 0.15 0.00 0.00 17.50 2.60 1.87 0.20 4.75 0.16 0.00 0.00 17.75 2.61 1.88 0.19 5.00 0.17 0.00 0.01 18.00 2.62 1.89 0.19 5.25 0.18 0.00 0.01 18.25 2.63 1.91 0.18 5.50 0.20 0.00 0.02 18.50 2.65 1.92 0.18 5.75 0.21 0.00 0.02 18.75 2.66 1.93 0.17 6.00 0.22 0.01 0.03 19.00 2.67 1.94 0.17 6.25 0.23 0.01 0.03 19.25 2.68 1.95 0.16 6.50 0.24 0.01 0.04 19.50 2.69 1.96 0.16 6.75 0.26 0.01 0.05 19.75 2.70 1.97 0.15 7.00 0.27 0.02 0.05 20.00 2.71 1.98 0.15 7.25 0.29 0.02 0.06 20.25 2.72 1.99 0.15 7.50 0.30 0.02 0.07 20.50 2.73 1.99 0.14 7.75 0.32 0.03 0.08 20.75 2.74 2.00 0.14 8.00 0.33 0.04 0.09 21.00 2.75 2.01 0.14 8.25 0.35 0.04 0.10 21.25 2.75 2.02 0.13 8.50 0.37 0.05 0.11 21.50 2.76 2.03 0.13 8.75 0.38 0.06 0.12 21.75 2.77 2.04 0.13 9.00 0.40 0.06 0.14 22.00 2.78 2.04 0.13 9.25 0.43 0.07 0.15 22.25 2.79 2.05 0.12 9.50 0.45 0.08 0.17 22.50 2.80 2.06 0.12 9.75 0.47 0.10 0.19 22.75 2.80 2.07 0.12 10.00 0.50 0.11 0.22 23.00 2.81 2.07 0.12 10.25 0.53 0.13 0.25 23.25 2.82 2.08 0.12 10.50 0.56 0.15 0.30 23.50 2.83 2.09 0.11 10.75 0.60 0.17 0.35 23.75 2.83 2.09 0.11 11.00 0.64 0.20 0.43 24.00 2.84 2.10 0.11 11.25 0.70 0.23 0.54 11.50 0.77 0.28 0.74 11.75 0.97 0.43 2.14 12.00 1.57 0.93 6.31 12.25 1.90 1.22 5.60 12.50 2.09 1.39 2.89 12.75 2.15 1.46 1.15 Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2S: Post-Construction DA [49] Hint: Tc<2dt may require smaller dt Runoff = 13.96 cfs @ 12.02 hrs, Volume= 34,663 cf, Depth> 2.39" Routed to Pond 3P : Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Area (ac) CN Description 3.160 98 Paved Area and Roofs 0.830 89 <50% Grass cover, Poor, HSG D 3.990 96 Weighted Average 0.830 20.80% Pervious Area 3.160 79.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post-Construction DA Hydrograph 15 ❑Runoff 113.96 cfs I 14= NC- hamasviIle 24-hr_Si1-1-yr_ 13_ ! Rainfa61=2.84" 12 Area=3.990-ac f2rmOff Vtiiume=34;61f~i3 cf 10= Runoff Depth>2.39" Tic Tic=5.0min 3 13 CN 96 _ J z 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 6 Hydrograph for Subcatchment 2S: Post-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 2.20 1.77 0.77 0.25 0.01 0.00 0.00 13.25 2.25 1.81 0.64 0.50 0.01 0.00 0.00 13.50 2.28 1.85 0.56 0.75 0.02 0.00 0.00 13.75 2.32 1.88 0.49 1.00 0.03 0.00 0.00 14.00 2.34 1.91 0.44 1.25 0.04 0.00 0.00 14.25 2.37 1.93 0.41 1.50 0.05 0.00 0.00 14.50 2.39 1.96 0.37 1.75 0.05 0.00 0.00 14.75 2.42 1.98 0.35 2.00 0.06 0.00 0.00 15.00 2.44 2.00 0.33 2.25 0.07 0.00 0.00 15.25 2.46 2.02 0.31 2.50 0.08 0.00 0.00 15.50 2.48 2.04 0.29 2.75 0.09 0.00 0.00 15.75 2.49 2.06 0.27 3.00 0.10 0.00 0.01 16.00 2.51 2.07 0.26 3.25 0.10 0.00 0.01 16.25 2.53 2.09 0.25 3.50 0.11 0.00 0.02 16.50 2.54 2.10 0.24 3.75 0.12 0.00 0.02 16.75 2.56 2.12 0.23 4.00 0.13 0.01 0.03 17.00 2.57 2.13 0.22 4.25 0.14 0.01 0.04 17.25 2.58 2.14 0.21 4.50 0.15 0.01 0.04 17.50 2.60 2.16 0.20 4.75 0.16 0.01 0.05 17.75 2.61 2.17 0.20 5.00 0.17 0.02 0.05 18.00 2.62 2.18 0.19 5.25 0.18 0.02 0.06 18.25 2.63 2.19 0.19 5.50 0.20 0.02 0.07 18.50 2.65 2.20 0.18 5.75 0.21 0.03 0.07 18.75 2.66 2.21 0.18 6.00 0.22 0.03 0.08 19.00 2.67 2.23 0.17 6.25 0.23 0.04 0.09 19.25 2.68 2.24 0.17 6.50 0.24 0.04 0.10 19.50 2.69 2.25 0.16 6.75 0.26 0.05 0.11 19.75 2.70 2.26 0.16 7.00 0.27 0.06 0.11 20.00 2.71 2.27 0.15 7.25 0.29 0.07 0.12 20.25 2.72 2.27 0.15 7.50 0.30 0.07 0.13 20.50 2.73 2.28 0.15 7.75 0.32 0.08 0.15 20.75 2.74 2.29 0.14 8.00 0.33 0.09 0.16 21.00 2.75 2.30 0.14 8.25 0.35 0.10 0.17 21.25 2.75 2.31 0.14 8.50 0.37 0.11 0.18 21.50 2.76 2.32 0.14 8.75 0.38 0.13 0.20 21.75 2.77 2.33 0.13 9.00 0.40 0.14 0.22 22.00 2.78 2.33 0.13 9.25 0.43 0.15 0.24 22.25 2.79 2.34 0.13 9.50 0.45 0.17 0.26 22.50 2.80 2.35 0.13 9.75 0.47 0.19 0.29 22.75 2.80 2.36 0.12 10.00 0.50 0.21 0.33 23.00 2.81 2.37 0.12 10.25 0.53 0.23 0.37 23.25 2.82 2.37 0.12 10.50 0.56 0.26 0.42 23.50 2.83 2.38 0.12 10.75 0.60 0.29 0.49 23.75 2.83 2.39 0.12 11.00 0.64 0.32 0.59 24.00 2.84 2.39 0.11 11.25 0.70 0.37 0.74 11.50 0.77 0.42 1.02 11.75 0.97 0.60 3.02 12.00 1.57 1.16 13.31 12.25 1.90 1.48 4.23 12.50 2.09 1.66 2.69 12.75 2.15 1.72 0.98 Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 7 Summary for Pond 3P: Wet Pond Inflow Area = 173,804 sf, 79.20% Impervious, Inflow Depth > 2.39" for 1-yr event Inflow = 13.96 cfs @ 12.02 hrs, Volume= 34,663 cf Outflow = 9.62 cfs @ 12.10 hrs, Volume= 25,614 cf, Atten= 31%, Lag= 4.7 min Primary = 9.62 cfs @ 12.10 hrs, Volume= 25,614 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Starting Elev= 902.50' Surf.Area= 10,053 sf Storage= 30,769 cf Peak Elev= 903.62' @ 12.10 hrs Surf.Area= 12,939 sf Storage= 43,744 cf (12,975 cf above start) Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= 64.2 min ( 839.9 - 775.7 ) Volume Invert Avail.Storage Storage Description #1 897.50' 70,593 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 897.50 2,985 0 0 898.00 3,372 1,589 1,589 898.50 3,781 1,788 3,378 899.00 4,611 2,098 5,476 899.50 5,273 2,471 7,947 900.00 5,997 2,818 10,764 900.50 6,725 3,181 13,945 901.00 7,515 3,560 17,505 901.50 8,348 3,966 21,470 902.00 9,396 4,436 25,906 902.50 10,053 4,862 30,769 903.00 11,405 5,365 36,133 903.50 12,764 6,042 42,175 904.00 13,479 6,561 48,736 904.50 14,203 6,921 55,657 905.00 14,934 7,284 62,941 905.50 15,673 7,652 70,593 Device Routing Invert Outlet Devices #1 Primary 896.76' 15.0" Round Culvert L= 103.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 896.76' /894.09' S= 0.0259 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 902.50' 1.5"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 903.30' 48.0"x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #4 Secondary 904.00' 10.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 8 Primary OutFlow Max=9.58 cfs @ 12.10 hrs HW=903.62' (Free Discharge) 4-1=Culvert (Passes 9.58 cfs of 14.76 cfs potential flow) AL2=Orifice/Grate (Orifice Controls 0.06 cfs @ 4.95 fps) 3=Riser (Weir Controls 9.52 cfs @ 1.85 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=902.50' (Free Discharge) 4-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Broad-Crested Rectangular Pond 3P: Wet Pond Orifice/ u ver Pond 3P: Wet Pond Hydrograph 0 Inflow 1 tssscfs Outflow --fin low-Area#173;804 a Primary E Secondary 14 -- Peak E ev=9O3.62# 13 - S#cage=43,74c 12E 1 s.9 cfs 11- 4 T 9.62cfs r , 10_ 9_ / } 0 8= / 1 , 1 = i ., / , 1 , i 1 3- � !/ ,, „ : r f,/ 10-K/ ���i���i����������i���������������������������� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 9 Pond 3P: Wet Pond Stage-Discharge ���� ��� _ � -- ❑Total 905 �A���� _❑Secondary / Broad-Crested Rectangular Weir 904 i// Riser %� Orifice/Grate %903 / w 902 o > 901 w 900 899 898 /0 0 10 20 30 40 50 60 70 80 Discharge (cfs) Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 10 Hydrograph for Pond 3P: Wet Pond Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 30,769 902.50 0.00 0.00 0.00 0.50 0.00 30,769 902.50 0.00 0.00 0.00 1.00 0.00 30,769 902.50 0.00 0.00 0.00 1.50 0.00 30,769 902.50 0.00 0.00 0.00 2.00 0.00 30,769 902.50 0.00 0.00 0.00 2.50 0.00 30,769 902.50 0.00 0.00 0.00 3.00 0.01 30,771 902.50 0.00 0.00 0.00 3.50 0.02 30,793 902.50 0.00 0.00 0.00 4.00 0.03 30,835 902.51 0.00 0.00 0.00 4.50 0.04 30,899 902.51 0.00 0.00 0.00 5.00 0.05 30,984 902.52 0.00 0.00 0.00 5.50 0.07 31,091 902.53 0.00 0.00 0.00 6.00 0.08 31,221 902.54 0.00 0.00 0.00 6.50 0.10 31,375 902.56 0.00 0.00 0.00 7.00 0.11 31,555 902.58 0.01 0.01 0.00 7.50 0.13 31,762 902.60 0.01 0.01 0.00 8.00 0.16 32,001 902.62 0.01 0.01 0.00 8.50 0.18 32,279 902.65 0.02 0.02 0.00 9.00 0.22 32,608 902.68 0.02 0.02 0.00 9.50 0.26 33,002 902.72 0.02 0.02 0.00 10.00 0.33 33,486 902.76 0.03 0.03 0.00 10.50 0.42 34,103 902.82 0.03 0.03 0.00 11.00 0.59 34,942 902.89 0.03 0.03 0.00 11.50 1.02 36,252 903.01 0.04 0.04 0.00 12.00 13.31 42,242 903.51 4.92 4.92 0.00 12.50 2.69 41,634 903.46 3.32 3.32 0.00 13.00 0.77 40,518 903.37 0.99 0.99 0.00 13.50 0.56 40,289 903.35 0.63 0.63 0.00 14.00 0.44 40,183 903.34 0.49 0.49 0.00 14.50 0.37 40,116 903.34 0.41 0.41 0.00 15.00 0.33 40,067 903.33 0.35 0.35 0.00 15.50 0.29 40,030 903.33 0.31 0.31 0.00 16.00 0.26 40,000 903.33 0.28 0.28 0.00 16.50 0.24 39,976 903.32 0.25 0.25 0.00 17.00 0.22 39,955 903.32 0.23 0.23 0.00 17.50 0.20 39,938 903.32 0.21 0.21 0.00 18.00 0.19 39,922 903.32 0.20 0.20 0.00 18.50 0.18 39,908 903.32 0.19 0.19 0.00 19.00 0.17 39,896 903.32 0.18 0.18 0.00 19.50 0.16 39,885 903.32 0.17 0.17 0.00 20.00 0.15 39,875 903.32 0.16 0.16 0.00 20.50 0.15 39,866 903.32 0.15 0.15 0.00 21.00 0.14 39,858 903.31 0.15 0.15 0.00 21.50 0.14 39,850 903.31 0.14 0.14 0.00 22.00 0.13 39,843 903.31 0.13 0.13 0.00 22.50 0.13 39,836 903.31 0.13 0.13 0.00 23.00 0.12 39,830 903.31 0.12 0.12 0.00 23.50 0.12 39,824 903.31 0.12 0.12 0.00 24.00 0.11 39,818 903.31 0.12 0.12 0.00 Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 11 Stage-Discharge for Pond 3P: Wet Pond Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 897.50 0.00 0.00 0.00 902.70 0.02 0.02 0.00 897.60 0.00 0.00 0.00 902.80 0.03 0.03 0.00 897.70 0.00 0.00 0.00 902.90 0.03 0.03 0.00 897.80 0.00 0.00 0.00 903.00 0.04 0.04 0.00 897.90 0.00 0.00 0.00 903.10 0.04 0.04 0.00 898.00 0.00 0.00 0.00 903.20 0.05 0.05 0.00 898.10 0.00 0.00 0.00 903.30 0.05 0.05 0.00 898.20 0.00 0.00 0.00 903.40 1.71 1.71 0.00 898.30 0.00 0.00 0.00 903.50 4.74 4.74 0.00 898.40 0.00 0.00 0.00 903.60 8.66 8.66 0.00 898.50 0.00 0.00 0.00 903.70 13.30 13.30 0.00 898.60 0.00 0.00 0.00 903.80 14.97 14.97 0.00 898.70 0.00 0.00 0.00 903.90 15.08 15.08 0.00 898.80 0.00 0.00 0.00 904.00 15.20 15.20 0.00 898.90 0.00 0.00 0.00 904.10 16.12 15.31 0.81 899.00 0.00 0.00 0.00 904.20 17.76 15.43 2.33 899.10 0.00 0.00 0.00 904.30 19.99 15.54 4.45 899.20 0.00 0.00 0.00 904.40 22.75 15.65 7.10 899.30 0.00 0.00 0.00 904.50 26.18 15.76 10.41 899.40 0.00 0.00 0.00 904.60 30.23 15.87 14.36 899.50 0.00 0.00 0.00 904.70 34.42 15.98 18.44 899.60 0.00 0.00 0.00 904.80 39.03 16.08 22.94 899.70 0.00 0.00 0.00 904.90 44.05 16.17 27.88 899.80 0.00 0.00 0.00 905.00 49.49 16.25 33.23 899.90 0.00 0.00 0.00 905.10 55.49 16.34 39.15 900.00 0.00 0.00 0.00 905.20 61.97 16.42 45.54 900.10 0.00 0.00 0.00 905.30 68.62 16.50 52.12 900.20 0.00 0.00 0.00 905.40 75.68 16.59 59.09 900.30 0.00 0.00 0.00 905.50 83.00 16.67 66.33 900.40 0.00 0.00 0.00 900.50 0.00 0.00 0.00 900.60 0.00 0.00 0.00 900.70 0.00 0.00 0.00 900.80 0.00 0.00 0.00 900.90 0.00 0.00 0.00 901.00 0.00 0.00 0.00 901.10 0.00 0.00 0.00 901.20 0.00 0.00 0.00 901.30 0.00 0.00 0.00 901.40 0.00 0.00 0.00 901.50 0.00 0.00 0.00 901.60 0.00 0.00 0.00 901.70 0.00 0.00 0.00 901.80 0.00 0.00 0.00 901.90 0.00 0.00 0.00 902.00 0.00 0.00 0.00 902.10 0.00 0.00 0.00 902.20 0.00 0.00 0.00 902.30 0.00 0.00 0.00 902.40 0.00 0.00 0.00 902.50 0.00 0.00 0.00 902.60 0.01 0.01 0.00 Design Masters NC-Thomasville 24-hr S1 1-yr Rainfall=2.84" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 12 Stage-Area-Storage for Pond 3P: Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 897.50 2,985 0 902.70 10,594 32,833 897.60 3,062 302 902.80 10,864 33,906 897.70 3,140 612 902.90 11,135 35,006 897.80 3,217 930 903.00 11,405 36,133 897.90 3,295 1,256 903.10 11,677 37,287 898.00 3,372 1,589 903.20 11,949 38,468 898.10 3,454 1,931 903.30 12,220 39,677 898.20 3,536 2,280 903.40 12,492 40,912 898.30 3,617 2,638 903.50 12,764 42,175 898.40 3,699 3,003 903.60 12,907 43,459 898.50 3,781 3,378 903.70 13,050 44,757 898.60 3,947 3,764 903.80 13,193 46,069 898.70 4,113 4,167 903.90 13,336 47,395 898.80 4,279 4,586 904.00 13,479 48,736 898.90 4,445 5,023 904.10 13,624 50,091 899.00 4,611 5,476 904.20 13,769 51,461 899.10 4,743 5,943 904.30 13,913 52,845 899.20 4,876 6,424 904.40 14,058 54,243 899.30 5,008 6,918 904.50 14,203 55,657 899.40 5,141 7,426 904.60 14,349 57,084 899.50 5,273 7,947 904.70 14,495 58,526 899.60 5,418 8,481 904.80 14,642 59,983 899.70 5,563 9,030 904.90 14,788 61,455 899.80 5,707 9,594 905.00 14,934 62,941 899.90 5,852 10,172 905.10 15,082 64,442 900.00 5,997 10,764 905.20 15,230 65,957 900.10 6,143 11,371 905.30 15,377 67,487 900.20 6,288 11,993 905.40 15,525 69,033 900.30 6,434 12,629 905.50 15,673 70,593 900.40 6,579 13,279 900.50 6,725 13,945 900.60 6,883 14,625 900.70 7,041 15,321 900.80 7,199 16,033 900.90 7,357 16,761 901.00 7,515 17,505 901.10 7,682 18,264 901.20 7,848 19,041 901.30 8,015 19,834 901.40 8,181 20,644 901.50 8,348 21,470 901.60 8,558 22,316 901.70 8,767 23,182 901.80 8,977 24,069 901.90 9,186 24,977 902.00 9,396 25,906 902.10 9,527 26,852 902.20 9,659 27,812 902.30 9,790 28,784 902.40 9,922 29,770 902.50 10,053 30,769 902.60 10,323 31,787 Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 1S: Pre-Construction DA Runoff = 12.80 cfs @ 12.09 hrs, Volume= 38,570 cf, Depth> 2.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Area (ac) CN Description 2.530 98 Unconnected pavement, HSG D 1.460 84 50-75% Grass cover, Fair, HSG D 3.990 93 Weighted Average 1.460 36.59% Pervious Area 2.530 63.41% Impervious Area 2.530 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Pre-Construction DA Hydrograph 14- ■Runoff I 1z.aocfs I -r 12s ,!-Ralnfa6E= :4 " ! , 11 Runoff Area=3.990 ae / 10_ - Runoff Volume=3$,S10-Ef 9= Runoff Depth>2.66" / 8= Tic= 7 GN93� t LL 6- 5- t 4- 1- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 1S: Pre-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 2.66 1.93 0.97 0.25 0.01 0.00 0.00 13.25 2.72 1.98 0.80 0.50 0.02 0.00 0.00 13.50 2.76 2.02 0.68 0.75 0.03 0.00 0.00 13.75 2.80 2.06 0.60 1.00 0.04 0.00 0.00 14.00 2.83 2.09 0.54 1.25 0.04 0.00 0.00 14.25 2.86 2.13 0.49 1.50 0.05 0.00 0.00 14.50 2.89 2.15 0.45 1.75 0.06 0.00 0.00 14.75 2.92 2.18 0.42 2.00 0.07 0.00 0.00 15.00 2.95 2.20 0.39 2.25 0.08 0.00 0.00 15.25 2.97 2.23 0.37 2.50 0.09 0.00 0.00 15.50 2.99 2.25 0.35 2.75 0.10 0.00 0.00 15.75 3.01 2.27 0.33 3.00 0.11 0.00 0.00 16.00 3.03 2.29 0.31 3.25 0.13 0.00 0.00 16.25 3.05 2.30 0.30 3.50 0.14 0.00 0.00 16.50 3.07 2.32 0.28 3.75 0.15 0.00 0.00 16.75 3.09 2.34 0.27 4.00 0.16 0.00 0.00 17.00 3.11 2.36 0.26 4.25 0.17 0.00 0.01 17.25 3.12 2.37 0.25 4.50 0.18 0.00 0.01 17.50 3.14 2.39 0.24 4.75 0.20 0.00 0.02 17.75 3.15 2.40 0.24 5.00 0.21 0.00 0.02 18.00 3.17 2.41 0.23 5.25 0.22 0.01 0.03 18.25 3.18 2.43 0.22 5.50 0.24 0.01 0.04 18.50 3.20 2.44 0.21 5.75 0.25 0.01 0.05 18.75 3.21 2.45 0.21 6.00 0.26 0.01 0.05 19.00 3.22 2.47 0.20 6.25 0.28 0.02 0.06 19.25 3.24 2.48 0.20 6.50 0.29 0.02 0.07 19.50 3.25 2.49 0.19 6.75 0.31 0.03 0.08 19.75 3.26 2.50 0.19 7.00 0.33 0.03 0.09 20.00 3.27 2.51 0.18 7.25 0.34 0.04 0.10 20.25 3.28 2.53 0.18 7.50 0.36 0.05 0.11 20.50 3.29 2.54 0.17 7.75 0.38 0.05 0.12 20.75 3.31 2.55 0.17 8.00 0.40 0.06 0.13 21.00 3.32 2.56 0.17 8.25 0.42 0.07 0.14 21.25 3.33 2.57 0.16 8.50 0.44 0.08 0.16 21.50 3.34 2.58 0.16 8.75 0.46 0.09 0.18 21.75 3.35 2.59 0.16 9.00 0.49 0.10 0.20 22.00 3.36 2.60 0.15 9.25 0.51 0.12 0.22 22.25 3.37 2.61 0.15 9.50 0.54 0.13 0.24 22.50 3.38 2.62 0.15 9.75 0.57 0.15 0.27 22.75 3.39 2.62 0.15 10.00 0.60 0.17 0.31 23.00 3.39 2.63 0.14 10.25 0.64 0.19 0.35 23.25 3.40 2.64 0.14 10.50 0.68 0.22 0.40 23.50 3.41 2.65 0.14 10.75 0.72 0.25 0.47 23.75 3.42 2.66 0.14 11.00 0.78 0.28 0.57 24.00 3.43 2.67 0.13 11.25 0.84 0.33 0.72 11.50 0.92 0.39 0.97 11.75 1.17 0.59 2.83 12.00 1.89 1.22 7.98 12.25 2.29 1.59 7.00 12.50 2.52 1.80 3.63 12.75 2.60 1.88 1.42 Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 2S: Post-Construction DA [49] Hint: Tc<2dt may require smaller dt Runoff = 16.91 cfs @ 12.02 hrs, Volume= 43,080 cf, Depth> 2.97" Routed to Pond 3P : Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Area (ac) CN Description * 3.160 98 Paved Area and Roofs 0.830 89 <50% Grass cover, Poor, HSG D 3.990 96 Weighted Average 0.830 20.80% Pervious Area 3.160 79.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post-Construction DA Hydrograph t 18 ' 0 Runoff 16.91 cfs I 1 17_ ' -f £-Th©mps,i1l0-24-hrS1-2-yr 16_ 1 ainfaff= .43" 15= 14= __Runoff Ar_i a=3.99O_ac 13 - -ftaribff Volume=4 ;0$0 of ;;= , ` } unoff`Depth>2.97 10= "}_Tic=5.O min i i G-fV 96 1 3 g 7 ' 5 4= o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 16 Hydrograph for Subcatchment 2S: Post-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 2.66 2.22 0.93 0.25 0.01 0.00 0.00 13.25 2.72 2.27 0.78 0.50 0.02 0.00 0.00 13.50 2.76 2.32 0.68 0.75 0.03 0.00 0.00 13.75 2.80 2.35 0.60 1.00 0.04 0.00 0.00 14.00 2.83 2.39 0.54 1.25 0.04 0.00 0.00 14.25 2.86 2.42 0.49 1.50 0.05 0.00 0.00 14.50 2.89 2.45 0.45 1.75 0.06 0.00 0.00 14.75 2.92 2.47 0.42 2.00 0.07 0.00 0.00 15.00 2.95 2.50 0.39 2.25 0.08 0.00 0.00 15.25 2.97 2.52 0.37 2.50 0.09 0.00 0.01 15.50 2.99 2.54 0.35 2.75 0.10 0.00 0.01 15.75 3.01 2.57 0.33 3.00 0.11 0.00 0.02 16.00 3.03 2.59 0.32 3.25 0.13 0.00 0.03 16.25 3.05 2.60 0.30 3.50 0.14 0.01 0.04 16.50 3.07 2.62 0.29 3.75 0.15 0.01 0.04 16.75 3.09 2.64 0.28 4.00 0.16 0.01 0.05 17.00 3.11 2.66 0.27 4.25 0.17 0.02 0.06 17.25 3.12 2.67 0.26 4.50 0.18 0.02 0.07 17.50 3.14 2.69 0.25 4.75 0.20 0.02 0.07 17.75 3.15 2.70 0.24 5.00 0.21 0.03 0.08 18.00 3.17 2.72 0.23 5.25 0.22 0.03 0.09 18.25 3.18 2.73 0.22 5.50 0.24 0.04 0.10 18.50 3.20 2.75 0.22 5.75 0.25 0.05 0.11 18.75 3.21 2.76 0.21 6.00 0.26 0.05 0.12 19.00 3.22 2.77 0.21 6.25 0.28 0.06 0.13 19.25 3.24 2.78 0.20 6.50 0.29 0.07 0.14 19.50 3.25 2.80 0.20 6.75 0.31 0.08 0.15 19.75 3.26 2.81 0.19 7.00 0.33 0.09 0.16 20.00 3.27 2.82 0.19 7.25 0.34 0.10 0.17 20.25 3.28 2.83 0.18 7.50 0.36 0.11 0.18 20.50 3.29 2.84 0.18 7.75 0.38 0.12 0.20 20.75 3.31 2.85 0.17 8.00 0.40 0.14 0.21 21.00 3.32 2.86 0.17 8.25 0.42 0.15 0.23 21.25 3.33 2.87 0.17 8.50 0.44 0.16 0.25 21.50 3.34 2.88 0.16 8.75 0.46 0.18 0.27 21.75 3.35 2.89 0.16 9.00 0.49 0.20 0.29 22.00 3.36 2.90 0.16 9.25 0.51 0.22 0.31 22.25 3.37 2.91 0.15 9.50 0.54 0.24 0.34 22.50 3.38 2.92 0.15 9.75 0.57 0.26 0.38 22.75 3.39 2.93 0.15 10.00 0.60 0.29 0.42 23.00 3.39 2.94 0.15 10.25 0.64 0.32 0.47 23.25 3.40 2.95 0.14 10.50 0.68 0.35 0.54 23.50 3.41 2.96 0.14 10.75 0.72 0.39 0.63 23.75 3.42 2.97 0.14 11.00 0.78 0.43 0.75 24.00 3.43 2.98 0.14 11.25 0.84 0.49 0.94 11.50 0.92 0.56 1.28 11.75 1.17 0.79 3.83 12.00 1.89 1.47 16.15 12.25 2.29 1.86 5.22 12.50 2.52 2.08 3.35 12.75 2.60 2.16 1.19 Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 17 Summary for Pond 3P: Wet Pond Inflow Area = 173,804 sf, 79.20% Impervious, Inflow Depth > 2.97" for 2-yr event Inflow = 16.91 cfs @ 12.02 hrs, Volume= 43,080 cf Outflow = 12.69 cfs @ 12.09 hrs, Volume= 33,998 cf, Atten= 25%, Lag= 3.9 min Primary = 12.69 cfs @ 12.09 hrs, Volume= 33,998 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Starting Elev= 902.50' Surf.Area= 10,053 sf Storage= 30,769 cf Peak Elev= 903.69' @ 12.09 hrs Surf.Area= 13,032 sf Storage= 44,597 cf (13,829 cf above start) Plug-Flow detention time= 839.9 min calculated for 3,222 cf(7% of inflow) Center-of-Mass det. time= 57.9 min ( 828.2 - 770.2 ) Volume Invert Avail.Storage Storage Description #1 897.50' 70,593 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 897.50 2,985 0 0 898.00 3,372 1,589 1,589 898.50 3,781 1,788 3,378 899.00 4,611 2,098 5,476 899.50 5,273 2,471 7,947 900.00 5,997 2,818 10,764 900.50 6,725 3,181 13,945 901.00 7,515 3,560 17,505 901.50 8,348 3,966 21,470 902.00 9,396 4,436 25,906 902.50 10,053 4,862 30,769 903.00 11,405 5,365 36,133 903.50 12,764 6,042 42,175 904.00 13,479 6,561 48,736 904.50 14,203 6,921 55,657 905.00 14,934 7,284 62,941 905.50 15,673 7,652 70,593 Device Routing Invert Outlet Devices #1 Primary 896.76' 15.0" Round Culvert L= 103.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 896.76' /894.09' S= 0.0259 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 902.50' 1.5"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 903.30' 48.0"x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #4 Secondary 904.00' 10.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 18 Primary OutFlow Max=12.49 cfs @ 12.09 hrs HW=903.68' (Free Discharge) 4-1=Culvert (Passes 12.49 cfs of 14.83 cfs potential flow) 4L2=Orifice/Grate (Orifice Controls 0.06 cfs @ 5.10 fps) 3=Riser (Weir Controls 12.43 cfs @ 2.03 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=902.50' (Free Discharge) 4-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Broad-Crested Rectangular Pond 3P: Wet Pond Orifice/ u ver Pond 3P: Wet Pond Hydrograph ❑Inflow 1691 cfs r ___ ___ ___ __ ___ ___ ❑Outflow Inflow Area=173,804 s 0 rimary o se ondar y 17 - --Peal Ele+00-9 16 Storage=44,597 cf 15 1269 cfss 14 12 69 cfs 11 13 w 11 10 c 5 1 2 �� i ff i i 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 19 Pond 3P: Wet Pond Stage-Discharge ���� ��� _ � -- ❑Total 905Primary '�����A� ❑Secondary Broad-Crested Rectangular Weir 904 i// Riser Orifice/Grate % ::: �ru o > 901 900 899 898 0 10 20 30 40 50 60 70 80 Discharge (cfs) Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 20 Hydrograph for Pond 3P: Wet Pond Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 30,769 902.50 0.00 0.00 0.00 0.50 0.00 30,769 902.50 0.00 0.00 0.00 1.00 0.00 30,769 902.50 0.00 0.00 0.00 1.50 0.00 30,769 902.50 0.00 0.00 0.00 2.00 0.00 30,769 902.50 0.00 0.00 0.00 2.50 0.01 30,770 902.50 0.00 0.00 0.00 3.00 0.02 30,794 902.50 0.00 0.00 0.00 3.50 0.04 30,845 902.51 0.00 0.00 0.00 4.00 0.05 30,923 902.52 0.00 0.00 0.00 4.50 0.07 31,028 902.53 0.00 0.00 0.00 5.00 0.08 31,160 902.54 0.00 0.00 0.00 5.50 0.10 31,318 902.55 0.00 0.00 0.00 6.00 0.12 31,503 902.57 0.01 0.01 0.00 6.50 0.14 31,716 902.59 0.01 0.01 0.00 7.00 0.16 31,959 902.62 0.01 0.01 0.00 7.50 0.18 32,238 902.64 0.02 0.02 0.00 8.00 0.21 32,559 902.67 0.02 0.02 0.00 8.50 0.25 32,930 902.71 0.02 0.02 0.00 9.00 0.29 33,365 902.75 0.03 0.03 0.00 9.50 0.34 33,883 902.80 0.03 0.03 0.00 10.00 0.42 34,512 902.86 0.03 0.03 0.00 10.50 0.54 35,307 902.93 0.04 0.04 0.00 11.00 0.75 36,379 903.02 0.04 0.04 0.00 11.50 1.28 38,037 903.16 0.05 0.05 0.00 12.00 16.15 43,370 903.59 8.36 8.36 0.00 12.50 3.35 41,921 903.48 4.05 4.05 0.00 13.00 0.93 40,628 903.38 1.17 1.17 0.00 13.50 0.68 40,376 903.36 0.76 0.76 0.00 14.00 0.54 40,258 903.35 0.59 0.59 0.00 14.50 0.45 40,182 903.34 0.49 0.49 0.00 15.00 0.39 40,128 903.34 0.42 0.42 0.00 15.50 0.35 40,086 903.33 0.37 0.37 0.00 16.00 0.32 40,053 903.33 0.33 0.33 0.00 16.50 0.29 40,026 903.33 0.30 0.30 0.00 17.00 0.27 40,003 903.33 0.28 0.28 0.00 17.50 0.25 39,983 903.32 0.26 0.26 0.00 18.00 0.23 39,966 903.32 0.24 0.24 0.00 18.50 0.22 39,950 903.32 0.23 0.23 0.00 19.00 0.21 39,937 903.32 0.21 0.21 0.00 19.50 0.20 39,925 903.32 0.20 0.20 0.00 20.00 0.19 39,914 903.32 0.19 0.19 0.00 20.50 0.18 39,903 903.32 0.18 0.18 0.00 21.00 0.17 39,894 903.32 0.18 0.18 0.00 21.50 0.16 39,886 903.32 0.17 0.17 0.00 22.00 0.16 39,878 903.32 0.16 0.16 0.00 22.50 0.15 39,870 903.32 0.16 0.16 0.00 23.00 0.15 39,863 903.32 0.15 0.15 0.00 23.50 0.14 39,857 903.31 0.14 0.14 0.00 24.00 0.14 39,851 903.31 0.14 0.14 0.00 Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 21 Stage-Discharge for Pond 3P: Wet Pond Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 897.50 0.00 0.00 0.00 902.70 0.02 0.02 0.00 897.60 0.00 0.00 0.00 902.80 0.03 0.03 0.00 897.70 0.00 0.00 0.00 902.90 0.03 0.03 0.00 897.80 0.00 0.00 0.00 903.00 0.04 0.04 0.00 897.90 0.00 0.00 0.00 903.10 0.04 0.04 0.00 898.00 0.00 0.00 0.00 903.20 0.05 0.05 0.00 898.10 0.00 0.00 0.00 903.30 0.05 0.05 0.00 898.20 0.00 0.00 0.00 903.40 1.71 1.71 0.00 898.30 0.00 0.00 0.00 903.50 4.74 4.74 0.00 898.40 0.00 0.00 0.00 903.60 8.66 8.66 0.00 898.50 0.00 0.00 0.00 903.70 13.30 13.30 0.00 898.60 0.00 0.00 0.00 903.80 14.97 14.97 0.00 898.70 0.00 0.00 0.00 903.90 15.08 15.08 0.00 898.80 0.00 0.00 0.00 904.00 15.20 15.20 0.00 898.90 0.00 0.00 0.00 904.10 16.12 15.31 0.81 899.00 0.00 0.00 0.00 904.20 17.76 15.43 2.33 899.10 0.00 0.00 0.00 904.30 19.99 15.54 4.45 899.20 0.00 0.00 0.00 904.40 22.75 15.65 7.10 899.30 0.00 0.00 0.00 904.50 26.18 15.76 10.41 899.40 0.00 0.00 0.00 904.60 30.23 15.87 14.36 899.50 0.00 0.00 0.00 904.70 34.42 15.98 18.44 899.60 0.00 0.00 0.00 904.80 39.03 16.08 22.94 899.70 0.00 0.00 0.00 904.90 44.05 16.17 27.88 899.80 0.00 0.00 0.00 905.00 49.49 16.25 33.23 899.90 0.00 0.00 0.00 905.10 55.49 16.34 39.15 900.00 0.00 0.00 0.00 905.20 61.97 16.42 45.54 900.10 0.00 0.00 0.00 905.30 68.62 16.50 52.12 900.20 0.00 0.00 0.00 905.40 75.68 16.59 59.09 900.30 0.00 0.00 0.00 905.50 83.00 16.67 66.33 900.40 0.00 0.00 0.00 900.50 0.00 0.00 0.00 900.60 0.00 0.00 0.00 900.70 0.00 0.00 0.00 900.80 0.00 0.00 0.00 900.90 0.00 0.00 0.00 901.00 0.00 0.00 0.00 901.10 0.00 0.00 0.00 901.20 0.00 0.00 0.00 901.30 0.00 0.00 0.00 901.40 0.00 0.00 0.00 901.50 0.00 0.00 0.00 901.60 0.00 0.00 0.00 901.70 0.00 0.00 0.00 901.80 0.00 0.00 0.00 901.90 0.00 0.00 0.00 902.00 0.00 0.00 0.00 902.10 0.00 0.00 0.00 902.20 0.00 0.00 0.00 902.30 0.00 0.00 0.00 902.40 0.00 0.00 0.00 902.50 0.00 0.00 0.00 902.60 0.01 0.01 0.00 Design Masters NC-Thomasville 24-hr S1 2-yr Rainfall=3.43" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 22 Stage-Area-Storage for Pond 3P: Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 897.50 2,985 0 902.70 10,594 32,833 897.60 3,062 302 902.80 10,864 33,906 897.70 3,140 612 902.90 11,135 35,006 897.80 3,217 930 903.00 11,405 36,133 897.90 3,295 1,256 903.10 11,677 37,287 898.00 3,372 1,589 903.20 11,949 38,468 898.10 3,454 1,931 903.30 12,220 39,677 898.20 3,536 2,280 903.40 12,492 40,912 898.30 3,617 2,638 903.50 12,764 42,175 898.40 3,699 3,003 903.60 12,907 43,459 898.50 3,781 3,378 903.70 13,050 44,757 898.60 3,947 3,764 903.80 13,193 46,069 898.70 4,113 4,167 903.90 13,336 47,395 898.80 4,279 4,586 904.00 13,479 48,736 898.90 4,445 5,023 904.10 13,624 50,091 899.00 4,611 5,476 904.20 13,769 51,461 899.10 4,743 5,943 904.30 13,913 52,845 899.20 4,876 6,424 904.40 14,058 54,243 899.30 5,008 6,918 904.50 14,203 55,657 899.40 5,141 7,426 904.60 14,349 57,084 899.50 5,273 7,947 904.70 14,495 58,526 899.60 5,418 8,481 904.80 14,642 59,983 899.70 5,563 9,030 904.90 14,788 61,455 899.80 5,707 9,594 905.00 14,934 62,941 899.90 5,852 10,172 905.10 15,082 64,442 900.00 5,997 10,764 905.20 15,230 65,957 900.10 6,143 11,371 905.30 15,377 67,487 900.20 6,288 11,993 905.40 15,525 69,033 900.30 6,434 12,629 905.50 15,673 70,593 900.40 6,579 13,279 900.50 6,725 13,945 900.60 6,883 14,625 900.70 7,041 15,321 900.80 7,199 16,033 900.90 7,357 16,761 901.00 7,515 17,505 901.10 7,682 18,264 901.20 7,848 19,041 901.30 8,015 19,834 901.40 8,181 20,644 901.50 8,348 21,470 901.60 8,558 22,316 901.70 8,767 23,182 901.80 8,977 24,069 901.90 9,186 24,977 902.00 9,396 25,906 902.10 9,527 26,852 902.20 9,659 27,812 902.30 9,790 28,784 902.40 9,922 29,770 902.50 10,053 30,769 902.60 10,323 31,787 Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 1S: Pre-Construction DA Runoff = 17.67 cfs @ 12.09 hrs, Volume= 59,853 cf, Depth> 4.13" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Area (ac) CN Description 2.530 98 Unconnected pavement, HSG D 1.460 84 50-75% Grass cover, Fair, HSG D 3.990 93 Weighted Average 1.460 36.59% Pervious Area 2.530 63.41% Impervious Area 2.530 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Pre-Construction DA Hydrograph 19= •Runoff T ,' 117.67 cfs I 18- -T-1VCThomasville-24, r S1 I0-yr 17' 16= Rainfall=494" 15 - )--RunbfflAr0a=1990 ac 14= 1Ullbff tiolurre-59,853 cf 13= / r , F 12 Runoff Depth>4.13" w 11 TIc= U.-O-min- / 10= `_-Gist=93 ' L L L 1 o LL 9 / 8- ' 1- 1 r 5 2� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 24 Hydrograph for Subcatchment 1S: Pre-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 3.80 3.03 1.45 0.25 0.01 0.00 0.00 13.25 3.88 3.10 1.20 0.50 0.03 0.00 0.00 13.50 3.94 3.16 1.03 0.75 0.04 0.00 0.00 13.75 4.00 3.22 0.91 1.00 0.05 0.00 0.00 14.00 4.05 3.27 0.81 1.25 0.07 0.00 0.00 14.25 4.10 3.32 0.74 1.50 0.08 0.00 0.00 14.50 4.14 3.36 0.68 1.75 0.10 0.00 0.00 14.75 4.18 3.40 0.63 2.00 0.11 0.00 0.00 15.00 4.22 3.43 0.59 2.25 0.13 0.00 0.00 15.25 4.25 3.47 0.56 2.50 0.14 0.00 0.00 15.50 4.29 3.50 0.52 2.75 0.16 0.00 0.00 15.75 4.32 3.53 0.50 3.00 0.17 0.00 0.01 16.00 4.35 3.56 0.47 3.25 0.19 0.00 0.02 16.25 4.38 3.59 0.45 3.50 0.20 0.00 0.03 16.50 4.40 3.61 0.43 3.75 0.22 0.01 0.04 16.75 4.43 3.64 0.41 4.00 0.24 0.01 0.05 17.00 4.46 3.66 0.40 4.25 0.26 0.01 0.06 17.25 4.48 3.69 0.38 4.50 0.27 0.02 0.07 17.50 4.50 3.71 0.37 4.75 0.29 0.02 0.08 17.75 4.53 3.73 0.36 5.00 0.31 0.03 0.09 18.00 4.55 3.75 0.35 5.25 0.33 0.04 0.10 18.25 4.57 3.78 0.34 5.50 0.35 0.04 0.12 18.50 4.59 3.80 0.33 5.75 0.37 0.05 0.13 18.75 4.61 3.81 0.32 6.00 0.39 0.06 0.14 19.00 4.63 3.83 0.31 6.25 0.42 0.07 0.16 19.25 4.65 3.85 0.30 6.50 0.44 0.08 0.17 19.50 4.67 3.87 0.29 6.75 0.46 0.09 0.18 19.75 4.68 3.89 0.29 7.00 0.49 0.10 0.20 20.00 4.70 3.91 0.28 7.25 0.51 0.12 0.22 20.25 4.72 3.92 0.27 7.50 0.54 0.13 0.23 20.50 4.74 3.94 0.27 7.75 0.57 0.15 0.25 20.75 4.75 3.96 0.26 8.00 0.60 0.17 0.27 21.00 4.77 3.97 0.25 8.25 0.63 0.18 0.30 21.25 4.78 3.99 0.25 8.50 0.66 0.20 0.32 21.50 4.80 4.00 0.24 8.75 0.69 0.23 0.35 21.75 4.82 4.02 0.24 9.00 0.73 0.25 0.38 22.00 4.83 4.03 0.24 9.25 0.76 0.28 0.41 22.25 4.84 4.05 0.23 9.50 0.80 0.30 0.46 22.50 4.86 4.06 0.23 9.75 0.85 0.34 0.50 22.75 4.87 4.07 0.22 10.00 0.90 0.37 0.56 23.00 4.89 4.09 0.22 10.25 0.95 0.41 0.63 23.25 4.90 4.10 0.22 10.50 1.01 0.46 0.72 23.50 4.91 4.11 0.21 10.75 1.07 0.51 0.83 23.75 4.93 4.13 0.21 11.00 1.15 0.57 0.98 24.00 4.94 4.14 0.21 11.25 1.25 0.65 1.22 11.50 1.37 0.75 1.61 11.75 1.73 1.07 4.64 12.00 2.69 1.96 11.56 12.25 3.26 2.50 10.11 12.50 3.60 2.83 5.51 12.75 3.71 2.94 2.14 Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 2S: Post-Construction DA [49] Hint: Tc<2dt may require smaller dt Runoff = 22.33 cfs @ 12.02 hrs, Volume= 64,746 cf, Depth> 4.47" Routed to Pond 3P : Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Area (ac) CN Description * 3.160 98 Paved Area and Roofs 0.830 89 <50% Grass cover, Poor, HSG D 3.990 96 Weighted Average 0.830 20.80% Pervious Area 3.160 79.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post-Construction DA Hydrograph 25= r- 2 ---� 24- El Runoff 23� -- 122.33 cfs I 22_ NC--Thomasville 244hr�S1�'-Ayr, r }-Riainfall=4 20' 4,94" 19= ; -Runoff-Area=;3.990 ac- 18 T 17_ ';" Runoff Vollunte=64,740 c 16 } 15- ,L_R-unoff Depth>4,47" w 14 -T6=6:O min o 12" r_CN=961 r a ii 1 9: 4 - i # 0 1. _' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 26 Hydrograph for Subcatchment 2S: Post-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 3.80 3.35 1.37 0.25 0.01 0.00 0.00 13.25 3.88 3.42 1.16 0.50 0.03 0.00 0.00 13.50 3.94 3.48 1.00 0.75 0.04 0.00 0.00 13.75 4.00 3.54 0.89 1.00 0.05 0.00 0.00 14.00 4.05 3.59 0.80 1.25 0.07 0.00 0.00 14.25 4.10 3.64 0.73 1.50 0.08 0.00 0.00 14.50 4.14 3.68 0.68 1.75 0.10 0.00 0.01 14.75 4.18 3.72 0.63 2.00 0.11 0.00 0.02 15.00 4.22 3.76 0.59 2.25 0.13 0.00 0.04 15.25 4.25 3.79 0.55 2.50 0.14 0.01 0.05 15.50 4.29 3.82 0.52 2.75 0.16 0.01 0.07 15.75 4.32 3.86 0.50 3.00 0.17 0.02 0.08 16.00 4.35 3.88 0.47 3.25 0.19 0.02 0.09 16.25 4.38 3.91 0.45 3.50 0.20 0.03 0.10 16.50 4.40 3.94 0.43 3.75 0.22 0.03 0.12 16.75 4.43 3.97 0.42 4.00 0.24 0.04 0.13 17.00 4.46 3.99 0.40 4.25 0.26 0.05 0.14 17.25 4.48 4.02 0.39 4.50 0.27 0.06 0.15 17.50 4.50 4.04 0.37 4.75 0.29 0.07 0.17 17.75 4.53 4.06 0.36 5.00 0.31 0.08 0.18 18.00 4.55 4.08 0.35 5.25 0.33 0.09 0.19 18.25 4.57 4.10 0.34 5.50 0.35 0.11 0.20 18.50 4.59 4.12 0.33 5.75 0.37 0.12 0.22 18.75 4.61 4.14 0.32 6.00 0.39 0.13 0.23 19.00 4.63 4.16 0.31 6.25 0.42 0.15 0.24 19.25 4.65 4.18 0.30 6.50 0.44 0.16 0.26 19.50 4.67 4.20 0.29 6.75 0.46 0.18 0.28 19.75 4.68 4.22 0.29 7.00 0.49 0.20 0.29 20.00 4.70 4.24 0.28 7.25 0.51 0.22 0.31 20.25 4.72 4.25 0.27 7.50 0.54 0.24 0.33 20.50 4.74 4.27 0.27 7.75 0.57 0.26 0.35 20.75 4.75 4.29 0.26 8.00 0.60 0.28 0.37 21.00 4.77 4.30 0.26 8.25 0.63 0.31 0.40 21.25 4.78 4.32 0.25 8.50 0.66 0.33 0.42 21.50 4.80 4.33 0.25 8.75 0.69 0.36 0.45 21.75 4.82 4.35 0.24 9.00 0.73 0.39 0.49 22.00 4.83 4.36 0.24 9.25 0.76 0.42 0.53 22.25 4.84 4.38 0.23 9.50 0.80 0.46 0.57 22.50 4.86 4.39 0.23 9.75 0.85 0.50 0.62 22.75 4.87 4.41 0.22 10.00 0.90 0.54 0.69 23.00 4.89 4.42 0.22 10.25 0.95 0.58 0.76 23.25 4.90 4.43 0.22 10.50 1.01 0.64 0.87 23.50 4.91 4.45 0.21 10.75 1.07 0.70 1.00 23.75 4.93 4.46 0.21 11.00 1.15 0.77 1.18 24.00 4.94 4.47 0.21 11.25 1.25 0.86 1.46 11.50 1.37 0.97 1.98 11.75 1.73 1.32 5.86 12.00 2.69 2.25 21.39 12.25 3.26 2.81 7.61 12.50 3.60 3.14 5.04 12.75 3.71 3.26 1.75 Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 27 Summary for Pond 3P: Wet Pond Inflow Area = 173,804 sf, 79.20% Impervious, Inflow Depth > 4.47" for 10-yr event Inflow = 22.33 cfs @ 12.02 hrs, Volume= 64,746 cf Outflow = 15.00 cfs @ 12.10 hrs, Volume= 55,581 cf, Atten= 33%, Lag= 4.6 min Primary = 15.00 cfs @ 12.10 hrs, Volume= 55,581 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Starting Elev= 902.50' Surf.Area= 10,053 sf Storage= 30,769 cf Peak Elev= 903.83' @ 12.10 hrs Surf.Area= 13,231 sf Storage= 46,422 cf (15,653 cf above start) Plug-Flow detention time= 323.6 min calculated for 24,812 cf(38% of inflow) Center-of-Mass det. time= 52.8 min ( 814.2 - 761.4 ) Volume Invert Avail.Storage Storage Description #1 897.50' 70,593 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 897.50 2,985 0 0 898.00 3,372 1,589 1,589 898.50 3,781 1,788 3,378 899.00 4,611 2,098 5,476 899.50 5,273 2,471 7,947 900.00 5,997 2,818 10,764 900.50 6,725 3,181 13,945 901.00 7,515 3,560 17,505 901.50 8,348 3,966 21,470 902.00 9,396 4,436 25,906 902.50 10,053 4,862 30,769 903.00 11,405 5,365 36,133 903.50 12,764 6,042 42,175 904.00 13,479 6,561 48,736 904.50 14,203 6,921 55,657 905.00 14,934 7,284 62,941 905.50 15,673 7,652 70,593 Device Routing Invert Outlet Devices #1 Primary 896.76' 15.0" Round Culvert L= 103.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 896.76' /894.09' S= 0.0259 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 902.50' 1.5"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 903.30' 48.0"x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #4 Secondary 904.00' 10.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 28 Primary OutFlow Max=15.00 cfs © 12.10 hrs HW=903.83' (Free Discharge) 4-1=Culvert (Inlet Controls 15.00 cfs © 12.22 fps) AL2=Orifice/Grate (Passes < 0.07 cfs potential flow) 3=Riser (Passes < 19.99 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=902.50' (Free Discharge) 4-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Broad-Crested Rectangulara�// Pond 3P: Wet Pond Orifice/Gt u ver Pond 3P: Wet Pond Hydrograph ❑Inflow 1 22.33 cfs I r r r r Outflow Inflow Area=173,8'04 s 2242�� ❑Secondary rY - ', Peak-Ee-W=9a&83-a11 , -Stage=46,422cf 20 15.00 cfs 15.00 cfs 16- 14- I _ 1 , 3 12 J, ' t 18J I .4 -_ ', ,,/,' / / AO - ' . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 29 Pond 3P: Wet Pond Stage-Discharge ���� ��� _ � -- ❑Total 905Primary rZ '4����A�� ❑Secondary Broad-Crested Rectangular Weir 904 i// Riser Orifice/Grate % ::: �ru o > 901 900 899 898 0 10 20 30 40 50 60 70 80 Discharge (cfs) Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 30 Hydrograph for Pond 3P: Wet Pond Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 30,769 902.50 0.00 0.00 0.00 0.50 0.00 30,769 902.50 0.00 0.00 0.00 1.00 0.00 30,769 902.50 0.00 0.00 0.00 1.50 0.00 30,769 902.50 0.00 0.00 0.00 2.00 0.02 30,785 902.50 0.00 0.00 0.00 2.50 0.05 30,854 902.51 0.00 0.00 0.00 3.00 0.08 30,971 902.52 0.00 0.00 0.00 3.50 0.10 31,133 902.54 0.00 0.00 0.00 4.00 0.13 31,336 902.56 0.00 0.00 0.00 4.50 0.15 31,579 902.58 0.01 0.01 0.00 5.00 0.18 31,858 902.61 0.01 0.01 0.00 5.50 0.20 32,175 902.64 0.02 0.02 0.00 6.00 0.23 32,533 902.67 0.02 0.02 0.00 6.50 0.26 32,936 902.71 0.02 0.02 0.00 7.00 0.29 33,389 902.75 0.03 0.03 0.00 7.50 0.33 33,898 902.80 0.03 0.03 0.00 8.00 0.37 34,474 902.85 0.03 0.03 0.00 8.50 0.42 35,127 902.91 0.03 0.03 0.00 9.00 0.49 35,879 902.98 0.04 0.04 0.00 9.50 0.57 36,756 903.05 0.04 0.04 0.00 10.00 0.69 37,804 903.14 0.05 0.05 0.00 10.50 0.87 39,105 903.25 0.05 0.05 0.00 11.00 1.18 40,407 903.36 0.81 0.81 0.00 11.50 1.98 40,889 903.40 1.66 1.66 0.00 12.00 21.39 44,580 903.69 12.63 12.63 0.00 12.50 5.04 42,581 903.53 5.90 5.90 0.00 13.00 1.37 40,890 903.40 1.66 1.66 0.00 13.50 1.00 40,590 903.37 1.11 1.11 0.00 14.00 0.80 40,443 903.36 0.87 0.87 0.00 14.50 0.68 40,349 903.35 0.72 0.72 0.00 15.00 0.59 40,280 903.35 0.62 0.62 0.00 15.50 0.52 40,228 903.34 0.55 0.55 0.00 16.00 0.47 40,186 903.34 0.49 0.49 0.00 16.50 0.43 40,152 903.34 0.45 0.45 0.00 17.00 0.40 40,123 903.34 0.41 0.41 0.00 17.50 0.37 40,098 903.33 0.38 0.38 0.00 18.00 0.35 40,076 903.33 0.36 0.36 0.00 18.50 0.33 40,057 903.33 0.34 0.34 0.00 19.00 0.31 40,040 903.33 0.32 0.32 0.00 19.50 0.29 40,025 903.33 0.30 0.30 0.00 20.00 0.28 40,011 903.33 0.29 0.29 0.00 20.50 0.27 39,999 903.33 0.27 0.27 0.00 21.00 0.26 39,987 903.33 0.26 0.26 0.00 21.50 0.25 39,977 903.32 0.25 0.25 0.00 22.00 0.24 39,967 903.32 0.24 0.24 0.00 22.50 0.23 39,958 903.32 0.23 0.23 0.00 23.00 0.22 39,949 903.32 0.23 0.23 0.00 23.50 0.21 39,941 903.32 0.22 0.22 0.00 24.00 0.21 39,934 903.32 0.21 0.21 0.00 Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 31 Stage-Discharge for Pond 3P: Wet Pond Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 897.50 0.00 0.00 0.00 902.70 0.02 0.02 0.00 897.60 0.00 0.00 0.00 902.80 0.03 0.03 0.00 897.70 0.00 0.00 0.00 902.90 0.03 0.03 0.00 897.80 0.00 0.00 0.00 903.00 0.04 0.04 0.00 897.90 0.00 0.00 0.00 903.10 0.04 0.04 0.00 898.00 0.00 0.00 0.00 903.20 0.05 0.05 0.00 898.10 0.00 0.00 0.00 903.30 0.05 0.05 0.00 898.20 0.00 0.00 0.00 903.40 1.71 1.71 0.00 898.30 0.00 0.00 0.00 903.50 4.74 4.74 0.00 898.40 0.00 0.00 0.00 903.60 8.66 8.66 0.00 898.50 0.00 0.00 0.00 903.70 13.30 13.30 0.00 898.60 0.00 0.00 0.00 903.80 14.97 14.97 0.00 898.70 0.00 0.00 0.00 903.90 15.08 15.08 0.00 898.80 0.00 0.00 0.00 904.00 15.20 15.20 0.00 898.90 0.00 0.00 0.00 904.10 16.12 15.31 0.81 899.00 0.00 0.00 0.00 904.20 17.76 15.43 2.33 899.10 0.00 0.00 0.00 904.30 19.99 15.54 4.45 899.20 0.00 0.00 0.00 904.40 22.75 15.65 7.10 899.30 0.00 0.00 0.00 904.50 26.18 15.76 10.41 899.40 0.00 0.00 0.00 904.60 30.23 15.87 14.36 899.50 0.00 0.00 0.00 904.70 34.42 15.98 18.44 899.60 0.00 0.00 0.00 904.80 39.03 16.08 22.94 899.70 0.00 0.00 0.00 904.90 44.05 16.17 27.88 899.80 0.00 0.00 0.00 905.00 49.49 16.25 33.23 899.90 0.00 0.00 0.00 905.10 55.49 16.34 39.15 900.00 0.00 0.00 0.00 905.20 61.97 16.42 45.54 900.10 0.00 0.00 0.00 905.30 68.62 16.50 52.12 900.20 0.00 0.00 0.00 905.40 75.68 16.59 59.09 900.30 0.00 0.00 0.00 905.50 83.00 16.67 66.33 900.40 0.00 0.00 0.00 900.50 0.00 0.00 0.00 900.60 0.00 0.00 0.00 900.70 0.00 0.00 0.00 900.80 0.00 0.00 0.00 900.90 0.00 0.00 0.00 901.00 0.00 0.00 0.00 901.10 0.00 0.00 0.00 901.20 0.00 0.00 0.00 901.30 0.00 0.00 0.00 901.40 0.00 0.00 0.00 901.50 0.00 0.00 0.00 901.60 0.00 0.00 0.00 901.70 0.00 0.00 0.00 901.80 0.00 0.00 0.00 901.90 0.00 0.00 0.00 902.00 0.00 0.00 0.00 902.10 0.00 0.00 0.00 902.20 0.00 0.00 0.00 902.30 0.00 0.00 0.00 902.40 0.00 0.00 0.00 902.50 0.00 0.00 0.00 902.60 0.01 0.01 0.00 Design Masters NC-Thomasville 24-hr S1 10-yr Rainfall=4.94" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 32 Stage-Area-Storage for Pond 3P: Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 897.50 2,985 0 902.70 10,594 32,833 897.60 3,062 302 902.80 10,864 33,906 897.70 3,140 612 902.90 11,135 35,006 897.80 3,217 930 903.00 11,405 36,133 897.90 3,295 1,256 903.10 11,677 37,287 898.00 3,372 1,589 903.20 11,949 38,468 898.10 3,454 1,931 903.30 12,220 39,677 898.20 3,536 2,280 903.40 12,492 40,912 898.30 3,617 2,638 903.50 12,764 42,175 898.40 3,699 3,003 903.60 12,907 43,459 898.50 3,781 3,378 903.70 13,050 44,757 898.60 3,947 3,764 903.80 13,193 46,069 898.70 4,113 4,167 903.90 13,336 47,395 898.80 4,279 4,586 904.00 13,479 48,736 898.90 4,445 5,023 904.10 13,624 50,091 899.00 4,611 5,476 904.20 13,769 51,461 899.10 4,743 5,943 904.30 13,913 52,845 899.20 4,876 6,424 904.40 14,058 54,243 899.30 5,008 6,918 904.50 14,203 55,657 899.40 5,141 7,426 904.60 14,349 57,084 899.50 5,273 7,947 904.70 14,495 58,526 899.60 5,418 8,481 904.80 14,642 59,983 899.70 5,563 9,030 904.90 14,788 61,455 899.80 5,707 9,594 905.00 14,934 62,941 899.90 5,852 10,172 905.10 15,082 64,442 900.00 5,997 10,764 905.20 15,230 65,957 900.10 6,143 11,371 905.30 15,377 67,487 900.20 6,288 11,993 905.40 15,525 69,033 900.30 6,434 12,629 905.50 15,673 70,593 900.40 6,579 13,279 900.50 6,725 13,945 900.60 6,883 14,625 900.70 7,041 15,321 900.80 7,199 16,033 900.90 7,357 16,761 901.00 7,515 17,505 901.10 7,682 18,264 901.20 7,848 19,041 901.30 8,015 19,834 901.40 8,181 20,644 901.50 8,348 21,470 901.60 8,558 22,316 901.70 8,767 23,182 901.80 8,977 24,069 901.90 9,186 24,977 902.00 9,396 25,906 902.10 9,527 26,852 902.20 9,659 27,812 902.30 9,790 28,784 902.40 9,922 29,770 902.50 10,053 30,769 902.60 10,323 31,787 Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment 1S: Pre-Construction DA Runoff = 22.58 cfs @ 12.09 hrs, Volume= 92,954 cf, Depth> 6.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Area (ac) CN Description 2.530 98 Unconnected pavement, HSG D 1.460 84 50-75% Grass cover, Fair, HSG D 3.990 93 Weighted Average 1.460 36.59% Pervious Area 2.530 63.41% Impervious Area 2.530 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 1S: Pre-Construction DA Hydrograph 25 - •Runoff 24° T T r 22- ,,L-HC-Thomasville24,hr:S1 100,yr 23= r 21 Rainfall=r:26'' 20= ' T 19= ';r-gunoff-Area-=3-.990-ac, r ' 17 /H--RiunOffYolunitot92,,954-ct---i---,- r - i 15 T Runoff'�Deptti>6 42" 1 14 ' x-Tc=1 U.0 min- 12_ C1a a 11i- 8- ,_ L 1 1 _IL L 1 � L L 1 1 L J ----, ,- I / ,_ 4 r 1 L L L 1= 0- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 34 Hydrograph for Subcatchment 1S: Pre-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 5.44 4.63 2.24 0.25 0.02 0.00 0.00 13.25 5.56 4.74 1.86 0.50 0.04 0.00 0.00 13.50 5.66 4.84 1.61 0.75 0.07 0.00 0.00 13.75 5.74 4.93 1.43 1.00 0.09 0.00 0.00 14.00 5.82 5.01 1.29 1.25 0.11 0.00 0.00 14.25 5.90 5.08 1.18 1.50 0.13 0.00 0.00 14.50 5.97 5.15 1.09 1.75 0.16 0.00 0.00 14.75 6.03 5.21 1.01 2.00 0.18 0.00 0.02 15.00 6.09 5.27 0.95 2.25 0.21 0.00 0.04 15.25 6.14 5.32 0.89 2.50 0.23 0.01 0.06 15.50 6.20 5.38 0.84 2.75 0.26 0.01 0.08 15.75 6.25 5.43 0.80 3.00 0.28 0.02 0.10 16.00 6.29 5.47 0.76 3.25 0.31 0.03 0.13 16.25 6.34 5.52 0.73 3.50 0.34 0.04 0.15 16.50 6.38 5.56 0.70 3.75 0.37 0.05 0.17 16.75 6.43 5.60 0.67 4.00 0.39 0.06 0.19 17.00 6.47 5.64 0.65 4.25 0.42 0.07 0.20 17.25 6.51 5.68 0.63 4.50 0.45 0.09 0.22 17.50 6.54 5.72 0.61 4.75 0.48 0.10 0.24 17.75 6.58 5.76 0.59 5.00 0.51 0.12 0.26 18.00 6.62 5.79 0.57 5.25 0.55 0.14 0.28 18.25 6.65 5.83 0.55 5.50 0.58 0.15 0.30 18.50 6.68 5.86 0.54 5.75 0.61 0.18 0.33 18.75 6.72 5.89 0.52 6.00 0.65 0.20 0.35 19.00 6.75 5.92 0.51 6.25 0.68 0.22 0.37 19.25 6.78 5.95 0.49 6.50 0.72 0.24 0.39 19.50 6.81 5.98 0.48 6.75 0.76 0.27 0.42 19.75 6.84 6.01 0.47 7.00 0.80 0.30 0.44 20.00 6.87 6.04 0.46 7.25 0.84 0.33 0.47 20.25 6.90 6.07 0.45 7.50 0.88 0.36 0.50 20.50 6.92 6.10 0.44 7.75 0.92 0.39 0.53 20.75 6.95 6.12 0.43 8.00 0.97 0.43 0.56 21.00 6.98 6.15 0.42 8.25 1.02 0.47 0.60 21.25 7.00 6.17 0.41 8.50 1.07 0.51 0.64 21.50 7.03 6.20 0.41 8.75 1.12 0.55 0.68 21.75 7.05 6.22 0.40 9.00 1.18 0.59 0.73 22.00 7.08 6.25 0.39 9.25 1.24 0.64 0.79 22.25 7.10 6.27 0.38 9.50 1.30 0.70 0.86 22.50 7.13 6.30 0.38 9.75 1.37 0.76 0.93 22.75 7.15 6.32 0.37 10.00 1.45 0.82 1.02 23.00 7.17 6.34 0.37 10.25 1.53 0.89 1.13 23.25 7.19 6.36 0.36 10.50 1.62 0.97 1.27 23.50 7.22 6.39 0.35 10.75 1.72 1.06 1.45 23.75 7.24 6.41 0.35 11.00 1.84 1.17 1.69 24.00 7.26 6.43 0.34 11.25 1.98 1.30 2.05 11.50 2.17 1.47 2.65 11.75 2.68 1.95 7.03 12.00 3.88 3.11 15.49 12.25 4.65 3.85 13.65 12.50 5.13 4.32 7.89 12.75 5.30 4.49 3.24 Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 2S: Post-Construction DA [49] Hint: Tc<2dt may require smaller dt Runoff = 27.53 cfs @ 12.02 hrs, Volume= 98,176 cf, Depth> 6.78" Routed to Pond 3P : Wet Pond Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Area (ac) CN Description 3.160 98 Paved Area and Roofs 0.830 89 <50% Grass cover, Poor, HSG D 3.990 96 Weighted Average 0.830 20.80% Pervious Area 3.160 79.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post-Construction DA Hydrograph 30= 0 Runoff --- --- ---* 127.53 cfs 213 H -NC Thomasville 24.hr-S1-4OO-yr 26_ -Rainfall=7:26" 24- ' -Rtun off-Are=3.999-ac---- 22 213 -f unoff tfojume=98,1716 c# = ` RunOff'Depth>6.78" 18 T6=6:0 m i n C 14- -lily=r76 01 8= 44' jer 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 36 Hydrograph for Subcatchment 2S: Post-Construction DA Time Precip. Excess Runoff Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 13.00 5.44 4.97 2.11 0.25 0.02 0.00 0.00 13.25 5.56 5.08 1.79 0.50 0.04 0.00 0.00 13.50 5.66 5.18 1.56 0.75 0.07 0.00 0.00 13.75 5.74 5.27 1.39 1.00 0.09 0.00 0.00 14.00 5.82 5.35 1.26 1.25 0.11 0.00 0.03 14.25 5.90 5.43 1.16 1.50 0.13 0.01 0.07 14.50 5.97 5.49 1.07 1.75 0.16 0.01 0.10 14.75 6.03 5.56 1.00 2.00 0.18 0.02 0.13 15.00 6.09 5.62 0.94 2.25 0.21 0.03 0.15 15.25 6.14 5.67 0.88 2.50 0.23 0.04 0.18 15.50 6.20 5.72 0.84 2.75 0.26 0.05 0.20 15.75 6.25 5.77 0.80 3.00 0.28 0.07 0.22 16.00 6.29 5.82 0.76 3.25 0.31 0.08 0.24 16.25 6.34 5.87 0.73 3.50 0.34 0.10 0.26 16.50 6.38 5.91 0.70 3.75 0.37 0.11 0.28 16.75 6.43 5.95 0.67 4.00 0.39 0.13 0.30 17.00 6.47 5.99 0.65 4.25 0.42 0.15 0.32 17.25 6.51 6.03 0.62 4.50 0.45 0.17 0.34 17.50 6.54 6.07 0.60 4.75 0.48 0.20 0.36 17.75 6.58 6.11 0.58 5.00 0.51 0.22 0.38 18.00 6.62 6.14 0.57 5.25 0.55 0.24 0.40 18.25 6.65 6.18 0.55 5.50 0.58 0.27 0.42 18.50 6.68 6.21 0.53 5.75 0.61 0.30 0.44 18.75 6.72 6.24 0.52 6.00 0.65 0.32 0.46 19.00 6.75 6.27 0.51 6.25 0.68 0.35 0.48 19.25 6.78 6.30 0.49 6.50 0.72 0.38 0.50 19.50 6.81 6.33 0.48 6.75 0.76 0.42 0.53 19.75 6.84 6.36 0.47 7.00 0.80 0.45 0.55 20.00 6.87 6.39 0.46 7.25 0.84 0.49 0.58 20.25 6.90 6.42 0.45 7.50 0.88 0.52 0.61 20.50 6.92 6.45 0.44 7.75 0.92 0.56 0.64 20.75 6.95 6.47 0.43 8.00 0.97 0.60 0.67 21.00 6.98 6.50 0.42 8.25 1.02 0.65 0.71 21.25 7.00 6.53 0.41 8.50 1.07 0.69 0.75 21.50 7.03 6.55 0.41 8.75 1.12 0.74 0.79 21.75 7.05 6.58 0.40 9.00 1.18 0.79 0.85 22.00 7.08 6.60 0.39 9.25 1.24 0.85 0.91 22.25 7.10 6.63 0.39 9.50 1.30 0.91 0.98 22.50 7.13 6.65 0.38 9.75 1.37 0.97 1.05 22.75 7.15 6.67 0.37 10.00 1.45 1.04 1.15 23.00 7.17 6.70 0.37 10.25 1.53 1.12 1.27 23.25 7.19 6.72 0.36 10.50 1.62 1.21 1.42 23.50 7.22 6.74 0.35 10.75 1.72 1.31 1.62 23.75 7.24 6.76 0.35 11.00 1.84 1.42 1.90 24.00 7.26 6.78 0.34 11.25 1.98 1.56 2.31 11.50 2.17 1.74 3.07 11.75 2.68 2.24 8.40 12.00 3.88 3.43 26.46 12.25 4.65 4.18 10.49 12.50 5.13 4.66 7.20 12.75 5.30 4.83 2.66 Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 37 Summary for Pond 3P: Wet Pond Inflow Area = 173,804 sf, 79.20% Impervious, Inflow Depth > 6.78" for 100-yr event Inflow = 27.53 cfs @ 12.02 hrs, Volume= 98,176 cf Outflow = 15.53 cfs @ 12.15 hrs, Volume= 88,878 cf, Atten= 44%, Lag= 7.4 min Primary = 15.25 cfs @ 12.15 hrs, Volume= 88,790 cf Secondary = 0.27 cfs @ 12.15 hrs, Volume= 88 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Starting Elev= 902.50' Surf.Area= 10,053 sf Storage= 30,769 cf Peak Elev= 904.05' @ 12.15 hrs Surf.Area= 13,550 sf Storage= 49,400 cf (18,631 cf above start) Plug-Flow detention time= 242.2 min calculated for 57,989 cf(59% of inflow) Center-of-Mass det. time= 48.8 min ( 802.6 - 753.8 ) Volume Invert Avail.Storage Storage Description #1 897.50' 70,593 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 897.50 2,985 0 0 898.00 3,372 1,589 1,589 898.50 3,781 1,788 3,378 899.00 4,611 2,098 5,476 899.50 5,273 2,471 7,947 900.00 5,997 2,818 10,764 900.50 6,725 3,181 13,945 901.00 7,515 3,560 17,505 901.50 8,348 3,966 21,470 902.00 9,396 4,436 25,906 902.50 10,053 4,862 30,769 903.00 11,405 5,365 36,133 903.50 12,764 6,042 42,175 904.00 13,479 6,561 48,736 904.50 14,203 6,921 55,657 905.00 14,934 7,284 62,941 905.50 15,673 7,652 70,593 Device Routing Invert Outlet Devices #1 Primary 896.76' 15.0" Round Culvert L= 103.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 896.76' /894.09' S= 0.0259 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 902.50' 1.5"Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 903.30' 48.0"x 48.0" Horiz. Riser C= 0.600 Limited to weir flow at low heads #4 Secondary 904.00' 10.0' long + 3.0 '/' SideZ x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 38 Primary OutFlow Max=15.25 cfs © 12.15 hrs HW=904.05' (Free Discharge) 4-1=Culvert (Inlet Controls 15.25 cfs © 12.43 fps) AL2=Orifice/Grate (Passes < 0.07 cfs potential flow) 3=Riser (Passes < 33.81 cfs potential flow) Secondary OutFlow Max=0.26 cfs @ 12.15 hrs HW=904.05' (Free Discharge) 4-4=Broad-Crested Rectangular Weir (Weir Controls 0.26 cfs @ 0.54 fps) Broad-Crested Rectangularag Pond 3P: Wet Pond Orifice/GM u ver minumni Pond 3P: Wet Pond Hydrograph / ! 1 ' 1 1- 1 1 , D Inflow � 127.53 cfs I '� Outflow Inflow Area= 1,{73,804 S " 0 Primary E Se oncar y 28 leak Elev=_90,4 05 26_ Storage=49',,400 cf 24= 22= 20= 115.53 cfs -7,-, 18 )15.25 cfs w _ , 16- 0 14= i 4 , 10� - 4, . , ,______,..,„„ ..,,,,,,„ 0=/ iii , 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 39 Pond 3P: Wet Pond Stage-Discharge ���� ��� _ � -- ❑Total Primary 905 Z '� �� _❑Se ondary Broad-Crested Rectangular Weir 904 i// Riser Orifice/Grate % ::: �ru o > 901 900 899 898 0 10 20 30 40 50 60 70 80 Discharge (cfs) Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 40 Hydrograph for Pond 3P: Wet Pond Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 30,769 902.50 0.00 0.00 0.00 0.50 0.00 30,769 902.50 0.00 0.00 0.00 1.00 0.00 30,769 902.50 0.00 0.00 0.00 1.50 0.07 30,830 902.51 0.00 0.00 0.00 2.00 0.13 31,007 902.52 0.00 0.00 0.00 2.50 0.18 31,281 902.55 0.00 0.00 0.00 3.00 0.22 31,633 902.58 0.01 0.01 0.00 3.50 0.26 32,051 902.63 0.01 0.01 0.00 4.00 0.30 32,531 902.67 0.02 0.02 0.00 4.50 0.34 33,073 902.72 0.02 0.02 0.00 5.00 0.38 33,674 902.78 0.03 0.03 0.00 5.50 0.42 34,337 902.84 0.03 0.03 0.00 6.00 0.46 35,065 902.91 0.03 0.03 0.00 6.50 0.50 35,862 902.98 0.04 0.04 0.00 7.00 0.55 36,737 903.05 0.04 0.04 0.00 7.50 0.61 37,699 903.14 0.04 0.04 0.00 8.00 0.67 38,763 903.22 0.05 0.05 0.00 8.50 0.75 39,923 903.32 0.20 0.20 0.00 9.00 0.85 40,375 903.36 0.76 0.76 0.00 9.50 0.98 40,480 903.37 0.92 0.92 0.00 10.00 1.15 40,579 903.37 1.09 1.09 0.00 10.50 1.42 40,715 903.38 1.33 1.33 0.00 11.00 1.90 40,929 903.40 1.74 1.74 0.00 11.50 3.07 41,363 903.44 2.68 2.68 0.00 12.00 26.46 45,840 903.78 14.95 14.95 0.00 12.50 7.20 43,679 903.62 9.40 9.40 0.00 13.00 2.11 41,263 903.43 2.45 2.45 0.00 13.50 1.56 40,904 903.40 1.69 1.69 0.00 14.00 1.26 40,721 903.38 1.34 1.34 0.00 14.50 1.07 40,600 903.37 1.13 1.13 0.00 15.00 0.94 40,513 903.37 0.98 0.98 0.00 15.50 0.84 40,446 903.36 0.87 0.87 0.00 16.00 0.76 40,392 903.36 0.79 0.79 0.00 16.50 0.70 40,348 903.35 0.72 0.72 0.00 17.00 0.65 40,311 903.35 0.67 0.67 0.00 17.50 0.60 40,279 903.35 0.62 0.62 0.00 18.00 0.57 40,251 903.35 0.58 0.58 0.00 18.50 0.53 40,226 903.34 0.55 0.55 0.00 19.00 0.51 40,204 903.34 0.52 0.52 0.00 19.50 0.48 40,185 903.34 0.49 0.49 0.00 20.00 0.46 40,167 903.34 0.47 0.47 0.00 20.50 0.44 40,151 903.34 0.45 0.45 0.00 21.00 0.42 40,136 903.34 0.43 0.43 0.00 21.50 0.41 40,122 903.34 0.41 0.41 0.00 22.00 0.39 40,110 903.34 0.40 0.40 0.00 22.50 0.38 40,098 903.33 0.38 0.38 0.00 23.00 0.37 40,087 903.33 0.37 0.37 0.00 23.50 0.35 40,077 903.33 0.36 0.36 0.00 24.00 0.34 40,067 903.33 0.35 0.35 0.00 Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 41 Stage-Discharge for Pond 3P: Wet Pond Elevation Discharge Primary Secondary Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) (feet) (cfs) (cfs) (cfs) 897.50 0.00 0.00 0.00 902.70 0.02 0.02 0.00 897.60 0.00 0.00 0.00 902.80 0.03 0.03 0.00 897.70 0.00 0.00 0.00 902.90 0.03 0.03 0.00 897.80 0.00 0.00 0.00 903.00 0.04 0.04 0.00 897.90 0.00 0.00 0.00 903.10 0.04 0.04 0.00 898.00 0.00 0.00 0.00 903.20 0.05 0.05 0.00 898.10 0.00 0.00 0.00 903.30 0.05 0.05 0.00 898.20 0.00 0.00 0.00 903.40 1.71 1.71 0.00 898.30 0.00 0.00 0.00 903.50 4.74 4.74 0.00 898.40 0.00 0.00 0.00 903.60 8.66 8.66 0.00 898.50 0.00 0.00 0.00 903.70 13.30 13.30 0.00 898.60 0.00 0.00 0.00 903.80 14.97 14.97 0.00 898.70 0.00 0.00 0.00 903.90 15.08 15.08 0.00 898.80 0.00 0.00 0.00 904.00 15.20 15.20 0.00 898.90 0.00 0.00 0.00 904.10 16.12 15.31 0.81 899.00 0.00 0.00 0.00 904.20 17.76 15.43 2.33 899.10 0.00 0.00 0.00 904.30 19.99 15.54 4.45 899.20 0.00 0.00 0.00 904.40 22.75 15.65 7.10 899.30 0.00 0.00 0.00 904.50 26.18 15.76 10.41 899.40 0.00 0.00 0.00 904.60 30.23 15.87 14.36 899.50 0.00 0.00 0.00 904.70 34.42 15.98 18.44 899.60 0.00 0.00 0.00 904.80 39.03 16.08 22.94 899.70 0.00 0.00 0.00 904.90 44.05 16.17 27.88 899.80 0.00 0.00 0.00 905.00 49.49 16.25 33.23 899.90 0.00 0.00 0.00 905.10 55.49 16.34 39.15 900.00 0.00 0.00 0.00 905.20 61.97 16.42 45.54 900.10 0.00 0.00 0.00 905.30 68.62 16.50 52.12 900.20 0.00 0.00 0.00 905.40 75.68 16.59 59.09 900.30 0.00 0.00 0.00 905.50 83.00 16.67 66.33 900.40 0.00 0.00 0.00 900.50 0.00 0.00 0.00 900.60 0.00 0.00 0.00 900.70 0.00 0.00 0.00 900.80 0.00 0.00 0.00 900.90 0.00 0.00 0.00 901.00 0.00 0.00 0.00 901.10 0.00 0.00 0.00 901.20 0.00 0.00 0.00 901.30 0.00 0.00 0.00 901.40 0.00 0.00 0.00 901.50 0.00 0.00 0.00 901.60 0.00 0.00 0.00 901.70 0.00 0.00 0.00 901.80 0.00 0.00 0.00 901.90 0.00 0.00 0.00 902.00 0.00 0.00 0.00 902.10 0.00 0.00 0.00 902.20 0.00 0.00 0.00 902.30 0.00 0.00 0.00 902.40 0.00 0.00 0.00 902.50 0.00 0.00 0.00 902.60 0.01 0.01 0.00 Design Masters NC-Thomasville 24-hr S1 100-yr Rainfall=7.26" Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 42 Stage-Area-Storage for Pond 3P: Wet Pond Elevation Surface Storage Elevation Surface Storage (feet) (sq-ft) (cubic-feet) (feet) (sq-ft) (cubic-feet) 897.50 2,985 0 902.70 10,594 32,833 897.60 3,062 302 902.80 10,864 33,906 897.70 3,140 612 902.90 11,135 35,006 897.80 3,217 930 903.00 11,405 36,133 897.90 3,295 1,256 903.10 11,677 37,287 898.00 3,372 1,589 903.20 11,949 38,468 898.10 3,454 1,931 903.30 12,220 39,677 898.20 3,536 2,280 903.40 12,492 40,912 898.30 3,617 2,638 903.50 12,764 42,175 898.40 3,699 3,003 903.60 12,907 43,459 898.50 3,781 3,378 903.70 13,050 44,757 898.60 3,947 3,764 903.80 13,193 46,069 898.70 4,113 4,167 903.90 13,336 47,395 898.80 4,279 4,586 904.00 13,479 48,736 898.90 4,445 5,023 904.10 13,624 50,091 899.00 4,611 5,476 904.20 13,769 51,461 899.10 4,743 5,943 904.30 13,913 52,845 899.20 4,876 6,424 904.40 14,058 54,243 899.30 5,008 6,918 904.50 14,203 55,657 899.40 5,141 7,426 904.60 14,349 57,084 899.50 5,273 7,947 904.70 14,495 58,526 899.60 5,418 8,481 904.80 14,642 59,983 899.70 5,563 9,030 904.90 14,788 61,455 899.80 5,707 9,594 905.00 14,934 62,941 899.90 5,852 10,172 905.10 15,082 64,442 900.00 5,997 10,764 905.20 15,230 65,957 900.10 6,143 11,371 905.30 15,377 67,487 900.20 6,288 11,993 905.40 15,525 69,033 900.30 6,434 12,629 905.50 15,673 70,593 900.40 6,579 13,279 900.50 6,725 13,945 900.60 6,883 14,625 900.70 7,041 15,321 900.80 7,199 16,033 900.90 7,357 16,761 901.00 7,515 17,505 901.10 7,682 18,264 901.20 7,848 19,041 901.30 8,015 19,834 901.40 8,181 20,644 901.50 8,348 21,470 901.60 8,558 22,316 901.70 8,767 23,182 901.80 8,977 24,069 901.90 9,186 24,977 902.00 9,396 25,906 902.10 9,527 26,852 902.20 9,659 27,812 902.30 9,790 28,784 902.40 9,922 29,770 902.50 10,053 30,769 902.60 10,323 31,787 Design Masters Multi-Event Tables Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 43 Events for Subcatchment 1S: Pre-Construction DA Event Rainfall Runoff Volume Depth (inches) (cfs) (cubic-feet) (inches) 1-yr 2.84 10.30 30,384 2.10 2-yr 3.43 12.80 38,570 2.66 10-yr 4.94 17.67 59,853 4.13 100-yr 7.26 22.58 92,954 6.42 Design Masters Multi-Event Tables Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 44 Events for Subcatchment 2S: Post-Construction DA Event Rainfall Runoff Volume Depth (inches) (cfs) (cubic-feet) (inches) 1-yr 2.84 13.96 34,663 2.39 2-yr 3.43 16.91 43,080 2.97 10-yr 4.94 22.33 64,746 4.47 100-yr 7.26 27.53 98,176 6.78 Design Masters Multi-Event Tables Prepared by FEI Printed 8/29/2024 HydroCAD® 10.20-4b s/n 11463 ©2023 HydroCAD Software Solutions LLC Page 45 Events for Pond 3P: Wet Pond Event Inflow Outflow Primary Secondary Elevation Storage (cfs) (cfs) (cfs) (cfs) (feet) (cubic-feet) 1-yr 13.96 9.62 9.62 0.00 903.62 43,744 2-yr 16.91 12.69 12.69 0.00 903.69 44,597 10-yr 22.33 15.00 15.00 0.00 903.83 46,422 100-yr 27.53 15.53 15.25 0.27 904.05 49,400 DEED REFERENCE FILED Krista M Lowe Register of Deeds, Randolph Co,NC _— Recording Fee: $23.00 NC Real Estate Ex Tx:$.00 20081230000231970 DEED Bk:RE2110 Pg:940 12/30/2008 04:32:55 PM 1/4 II 111111III ill 11111 IIIIIIIIIIIIII 111 20081230000231970 1/4 Excise Tax: NTC Prepared by: /Clristopher J. Vaughn, Esq. Carruthers & Roth, P.A. 235 North Edgeworth Street Greensboro, North Carolina 27401 STATE OF NORTH CAROLINA SPECIAL WARRANTY DEED COUNTY OF RANDOLPH THIS SPECIAL WARRANTY DEED (this "Deed") is made as of the_7° day of December, 2008, by and between JERRY L. HARDY, and wife, NANCY S. HARDY, (collectively "Grantor"), and H2PRO, LLC, a North Carolina limited liability company ("Grantee"), whose address is 5657 Prospect Street, High Point, North Carolina 27263. The designation Grantor and Grantee, as used herein, shall include heirs, successors and assigns. WITNESSETH: That the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Randolph County, North Carolina and more particularly described on Exhibit A attached hereto and made a part hereof ("Property"). TO HAVE AND TO HOLD the above-described property and all privileges and appurtenances thereto belonging to Grantee in fee simple. And the Grantor covenants with the Grantee, that the Grantor has done nothing to impair such title as Grantor received, and Grantor will warrant and defend said title against the lawful claims of all persons claiming by, under or through Grantor, except for the exceptions hereinafter stated. Title to the Property is subject to the exceptions set forth on Exhibit B, which is attached hereto and incorporated by this reference. 111111111111 11111111/i III RE2110 941 2/4 IN WITNESS WHEREOF, the Grantor has executed this instrument as of the day and year first above written. GRANTORS: /71,4 (SEAL) eiry L. Hardy /incicmk ' _(SEAL) Nancy S. Hard STATE OF NORTH CAROLINA COUNTY OF G .....itportp I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she signed the foregoing document: JERRY L. HARDY Date: December 30 , 2008 Q. Q. �..oa µ.A.) Print ame: Ina DONNA A. ELA.0 s (Official Seal) Notary Public My Commission expires: 3-1&-Zoi3 STATE OF NORTH CAROLINA MADNA A EVAN�S FORN MUNN NC COUNTY OF ( I,.►ksee o c********N:eay****************pultic*** proamiBrimsAAiscl,18,20**13***** I certify that the following person(s) personally appeared before me this day, each acknowledging to me that he or she signed the foregoing document: NANCY S. HARDY Date: December 30 , 2008 I�1c�d Q. �tJ Print ame: m o i i)p (Official Seal) Notary Public My Commission expires: 3- 8-Zoa Eillrir**********1 UN C A Evws N1,,NC s March 18,2013 2 itILilhJLI&J1iuIllhIIiiiilluii,iii111111 !4 EXHIBIT A • • • . Being all of that certain lot, parcel or tract of land located in Randolph County, North Carolina as described below: BEGINNING at an existing iron pin in the northern margin of Prospect Street Extension..at the southeastern corner with property of Mrs : A. H. Ragan, said existing iron pin being located northeastwardly 29.52 feet•from the center line of Prospect Street Extension; and running thence from said beginning point along the eastern property line of Mrs . A. H. Ragan, .North 06° 10 ' 10" mast 1193.55 feet to an existing iron pin at the southwestern corner of property of R. R. Mendenhall; thence along the southern property line of R. R. Mendenhall, South 87° 36 ' 43" East 765 .52 feet to a point; thence South 87° 35' 43" East 30 .52 feet to a point in the western right of way of the High Point, Thomasville, Denton Railroad; thence South 87° 36 ' 43" East 27.47 feet to an existing p .k. nail in the centerline of .the existing main railroad tract; thence along the centerline of the said existing main railroad tract, the following courses and distances : South 12° 59 ' 04" West 316 .29 feet to a point; South 13° 50 ' 02" West 99 .98 feet to a point; South 16° 03 ' 25" West 99 .99 feet to a point; South 19° 57 ' 13" West 99.99 feet to a point; South 23° 59 ' 19" West 99 .96 feet to a point; South 28° 19 ' 14 " West 99.98 feet to a point; South 32° 21' 02" West 99 . 99 feet to a point; South 35° 52 ' 12" West 99.99 feet to a point; South 40° 03 ' 20" West 99 . 98 feet to a point; South 44° '02 ' 19" West 99 .95 feet to a point; South 46° 36 ' 51" West 41.53 feet to a point in the northern margin of Prospect Street Extension; thence along the northern margin of . Prospect Street Extension the following courses. and distances r, South. 85' 19 ' 50" West 43.17 feet to a pointy South 8.5'°' 19" 50" West47. .9'6.- feet to a point and South 85° 19 ' 5:0-" West. 3.4a.3.6 feet. ;to•;an existing iron pin, the point and place ' of BEGXL3WING;•. - ::.This- : • description taken from survey, prepared: by, pavis„ Ma.rtiur owe7.� . ' Assoc. , Inc. , dated October 2.2., 1985 and d.es..i•9.ne.ted ,aq', jaJ ..-: '�7 22514 . '�; kIJIIffiJ1g1IiiJLVUIIIIIIII1111111111 RE2110 943 4/4 EXHIBIT B 1. Right(s) of Way to Southern Power Company recorded in Book 134, Page 111, Randolph County Registry. 2. Right(s) of Way to Carolina & Yadkin River Railway Company recorded in Book 144, Page 465, Randolph County Registry. 3. Easement(s) to Duke Power Company recorded in Book 596, Page 35, Randolph County Registry. 4. Title to that portion, if any, of the land lying within the right of way of High Point, Thomasville and Denton Railroad. 5. All matters that would be reflected by a current survey. 6. Deed of Trust between Jerry L. Hardy and wife, Nancy S. Hardy, Grantor to Southland Associates, Inc., Trustee for Central Carolina Bank and Trust Company, Beneficiary, recorded in Book 1718, Page 1501, Randolph County Registry. 7. Easement to the Department of Transportation recorded in Book 2083, Page 1309, Randolph County Registry. 4 COMPANY INFORMATION