Loading...
HomeMy WebLinkAboutSW6240805_Design Calculations (Riprap)_20241016 OUTLET PROTECTION IIM DATE DESIGN PHASE DESIGN 08-07-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Mcqueen Farms Subdivision 2051 REVISION / / LOCATION BY RECORD / / Antioch, North Carolina CJP OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PO 12 Qio/Qfull = 0.48 Pipe Dia= 15 in V/Vfull = 0.99 Q10= 4.40 cfs V= 7.3 fps Qfull = 9.10 cfs Vfull = 7.40 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in !.Ii:i;PStItIi; : Riprap Class = B • Apron Thickness = 18 in , _� Apron Length 7.5 ft • Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft Length Storm Outlet Structure FES No.= PO 11 Q1o/Qfull = 0.97 Pipe Dia= 15 in V/Vfull = 1.14 Qio= 5.98 cfs V= 5.7 fps Qfull = 6.20 cfs Vfull = 5.04 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft Length 2051 Storm.xlsx LATEST REVISION:8/29/2024 12:59 PM PAGE 1 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 08-07-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Mcqueen Farms Subdivision 2051 REVISION / / LOCATION BY RECORD / / Antioch, North Carolina CJP OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PO 10 Q1o/Qfull = 0.64 Pipe Dia= 15 in V/Vfull = 1.06 Qio= 2.93 cfs V= 3.9 fps Qfull = 4.56 cfs Vfull = 3.71 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft L Length Storm Outlet Structure FES No.= PO 15 Q1o/Qfull = 0.94 Pipe Dia= 15 in V/Vfull = 1.14 Q10= 5.81 cfs V= 5.7 fps Qfull = 6.17 cfs Vfull = 5.02 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in �:�:�•�•�•�•�• Riprap Class = B �•�i�•�i�i�•�• s Apron Thickness = 18 in 0 = .,Mat•�•�,�• -0 Apron Length7.5 ft ��������:1:1:1 3 Apron Width @ Outlet = 3.75 ft 004 Apron Width @ End = 8.8 ft Length 2051 Storm.xlsx LATEST REVISION:8/29/2024 12:59 PM PAGE 2 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 08-07-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Mcqueen Farms Subdivision 2051 REVISION / / LOCATION BY RECORD / / Antioch, North Carolina CJP OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PO 18 Q1o/Qfull = 0.07 Pipe Dia= 15 in V/Vfull = 0.52 Qio= 0.31 cfs V= 2.0 fps Qfull = 4.61 cfs Vfull = 3.75 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft L Length 1 Storm Outlet Structure FES No.= PO 27 Q1o/Qfull = 0.96 Pipe Dia= 18 in V/Vfull = 1.14 Q10= 7.48 cfs V= 5.0 fps Qfull = 7.79 cfs Vfull = 4.40 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Length 2051 Storm.xlsx LATEST REVISION:8/29/2024 12:59 PM PAGE 3 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 08-07-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Mcqueen Farms Subdivision 2051 REVISION / X / LOCATION BY RECORD / X / Antioch, North Carolina CJP OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PO 22 Q1o/Qfull = 0.94 Pipe Dia= 15 in V/Vfull = 1.14 Q10= 4.23 cfs V= 4.2 fps Qfull = 4.51 cfs Vfull = 3.67 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in gorgorgorgq Riprap Class = B L Apron Thickness = 18 in Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft Length 2051 Storm.xlsx LATEST REVISION:8/29/2024 12:59 PM PAGE 4 OF 4