Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6240804_Design Calculations_20241015 (5)
4D Site Solutions, Inc. PIPE CALCULATIONS NOTE:sheet only set up to handle Tc from 5 min to 30 min A. Cross-pipes to use 25-yr storm inensity 2041-Drake Landing Subdivision Rainfall Intensity Storm Event 5Win 15-min 10-yr 7.88 6.31 5.32 3.85 25-yr 8.86 7.05 5.96 4.41 50-yr 9.50 7.57 6.39 4.82 100-yr 10.10 8.06 6.79 5.20 Tc Drainage Storm Rainfall Pipe No. C Kerby Kirpich Intensity Q(cfs) Area(ac) Event(yr) Total Tc Tc Used (in/hr) L(ft) n s Toy, L(ft) S Tch 1 20.48 0.23 n/a 2220.0 0.017 14.27 14.27 15 25-yr 5.96 28.07 2 1.99 0.45 n/a 500.0 0.008 5.94 5.94 5 25-yr 8.86 7.93 printed: 8/27/2024 4:28 PM Page 1 of 1