Loading...
HomeMy WebLinkAboutSW6240905_Design Calculations (Riprap)_20241016 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 7-22-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Boone Trail Farms Subdivision 2000 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 1 OUT Qio/Qfull = 0.26 Pipe Dia= 24 in V/Vfull = 0.83 Q10= 11.68 cfs V= 12.0 fps Qfull = 45.24 cfs Vfull = 14.38 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in III �•�•�•�•�•� Riprap Class = 1 i•••••i•••• L Apron Thickness = 22.5 in ••••••••••• _•�•������••�� 3 Apron Length 16.0 ft 1•�•�•�•1•1•�• Apron Width @ Outlet = 6 ft •• •• ••• Apron Width @ End = 18.0 ft Length Storm Outlet Structure FES No.= PIPE 2 OUT Q1o/Qfull = 0.91 Pipe Dia= 30 in V/Vfull = 1.13 Qio= 26.46 cfs V= 6.7 fps Qfull = 29.00 cfs Vfull = 5.90 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 20.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 22.5 ft Length 2084-Storm drainage.xlsx LATEST REVISION:10/16/2024 8:33 AM PAGE 1 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 7-22-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Boone Trail Farms Subdivision 2000 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 3 OUT Q1o/Qfull = 0.37 Pipe Dia= 24 in V/Vfull = 0.91 Q10= 12.65 cfs V= 10.0 fps Qfull = 34.42 cfs Vfull = 10.94 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 16.0 ft Apron Width @ Outlet = 6 ft Apron Width @ End = 18.0 ft Length 1 Storm Outlet Structure FES No.= PIPE 4 OUT Q1o/Qfull = 0.16 Pipe Dia= 18 in V/Vfull = 0.72 Q10= 2.72 cfs V= 6.9 fps Qfull = 16.94 cfs Vfull = 9.57 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in �••••••••••••• Riprap Class = B •••••••••••••• s Apron Thickness = 18 in MINIM* '8 Apron Length 9.0 ft �������������i 3 Apron Width @ Outlet = 4.5 ft 004 Apron Width @ End = 10.5 ft Length 2084-Storm drainage.xlsx LATEST REVISION:10/16/2024 8:33 AM PAGE 2 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 7-22-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Boone Trail Farms Subdivision 2000 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 5 OUT Q1o/Qfull = 0.68 Pipe Dia= 18 in V/Vfull = 1.07 Q10= 5.40 cfs V= 4.8 fps Qfull = 7.92 cfs Vfull = 4.47 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft L Length Storm Outlet Structure FES No.= PIPE 6 OUT Q1o/Qfull = 0.95 Pipe Dia= 30 in V/Vfull = 1.14 Q10= 27.51 cfs V= 6.7 fps Qfull = 29.00 cfs Vfull = 5.90 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 15.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 17.5 ft Length 2084-Storm drainage.xlsx LATEST REVISION:10/16/2024 8:33 AM PAGE 3 OF 4 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 7-22-24 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Boone Trail Farms Subdivision 2000 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina CEK OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 7 OUT Q1o/Qfull = 0.66 Pipe Dia= 18 in V/Vfull = 1.07 Q10= 5.19 cfs V= 4.8 fps Qfull = 7.92 cfs Vfull = 4.47 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAX = 12 in gorgorgorgq Riprap Class = B L Apron Thickness = 18 in Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Length 2084-Storm drainage.xlsx LATEST REVISION:10/16/2024 8:33 AM PAGE 4 OF 4