Loading...
HomeMy WebLinkAboutNC0027006_Historical information_20071231Michael F. Easley, Governor June 28, 2007 Subject: Dear Mr. Rhode: Raleigh Regional Office 1628 Mail Service Center William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Phone (919) 791.4200 FAX (919) 788.7159 Surface Water Protection Raleigh, NC 27699-1628 Coieen H. Sullins, Director Division of Water Quality Compliance Evaluation Inspection ExxonMobile Selma Terminal NPDES Permit NC0027006 Johnston County The subject inspection was performed June 20, 2007. Your assistance and cooperation with this inspection was greatly appreciated. Attached is a Basinwide Information Management System (BIMS) inspection checklist summarizing the inspection. Below is a list of and findings and recommendations developed from the inspection: Mr. Ray Rhode, Terminal Superintendent ExxonMobile Selma Terminal 2555 West Oak Street Selma, NC 27576 3. The BIMS computer currently lists the classification of the subject facility as a Physical Chemical 1 (PC-1) facility. You are currently listed as the Operator in Responsible Charge (ORC) Physical Chemical - 1 (PC-1) with Gary Simcox as PC-1 back-up ORC. 2. The treatment facility consists of two oil/water separators in series with an aerated storage pond. Stormwater runoff and associated washwater from the loading rack, pump manifold, rack manifold, additive pump off, truck pump off containment area and the vapor recovery unit containment area flow into oil/water separator #1. This oil/water separator is a 10,000-gallon Enquip separator with a design capacity of 400 gallons/minute and is double-walled with an interstitial probe. A hydrocarbon sensor is located in the water compartment to sound an alarm if oil enters the water compartment. Rainwater that collects in the containment area for the Above Ground Storage Tanks (AST’s) and parking area are routed through oil/water separator #2. The combined flows from the oil/water separators discharge into the aerated pond. Flow from the pond is measured with an ultrasonic flow meter as water flows over a v-notch weir to valve-controlled basin. Discharge occurs when the valve is open. At the time of inspection, both aerators were in operation. Water in the pond appeared clear with no sheen detected. There was no discharge. The unnamed creek upstream of the discharge point was silty, muddy due to a recent heavy rain shower. 1. NPDES Permit NC0027006 was issued March 01, 2004 and will expire March 31, 2008. You are required to apply for permit renewal 180 days before pennit expiration date to avoid penalty assessment. The permit was modified October 05, 2005 to reduce MTBE monitoring from monthly to quarterly. co fl > L oe North Carolina Division of Water Quality Internet: www.ncwateriiuality.org An Equal Opportunity/Affirmative Action Employer-50% Recycled/10% Post Consumer Paper r Customer Service 1-877.623.6748 NorthCarolina Naturally 4. 5. 6. Vinnie Bryant with Johnson Inc. calibrated the ultra-sonic effluent flow meter July 19, 2006.7. Cc: Permit Files Central Files Commercial lab results, chain of custody records, and bench sheets were compared with data submitted on the DMR for the month of March 2007. No discrepancies were noted. All permit parameters, except toxicity, are analyzed by Test America in Nashville, TN. Advent Environ in Brentwood TN analyzes toxicity. Toxicity for March 2007 was recorded as >100%. Sincerely, Mitch Hayes Environmental Specialist Discharge Monitoring Reports (DMR’s) for the period March 2006 through March 2007 were reviewed for compliance with permit limit and monitoring requirements. The BIMS computer is flagging monitoring violation for EPA 625 because the code for EPA Method 625, 76028, is not written in the column at the top of the DMR. Please begin using the code “76028” for EPA Method 625 and record “see attached sheet” on the DMR in the EPA Method 625 column. Monitoring violations for Acute Toxicity are being reported. There were no other violations for the period. ExxonMobile - Selma Terminal CEI Page 2 I would like to thank you again for your assistance with this inspection. If you have any questions or concerns about the inspection or this report, please contact me at 919.791.4261. EPA NPDES NC0027006 21| | | | | | || | | | | | || | | | |I INI66 Entry Time/Date Permit Effective Date 05/05/0107/06/2003:00 PMSelma terminal Exit Time/Date Permit Expiration Date2555 W Oak St Selma NC 27576 08/03/3107/06/2003:50 PM Other Facility Data Raymond Oliver Rhode//919-965-3201 / Raymond Oliver Rhode/ORC/919-965-3201/ Name, Address of Responsible Offidal/Title/Phone and Fax Number Permit Self-Monitoring Program Facility Site Review Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date RRO WQ//919-791-4200/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page #1 ’2,3t United States Environmental Protection Agency Washington, D C. 20460 Records/Reports Storm Water Contacted Yes yr/mo/day 07/06/20 Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Facility Self-Monitoring Evaluation Rating 70LU Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Mitchell S Hayes j" Inspection Type 18U Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Section C: Areas Evaluated During Inspection (Check only those areas evaluated) ■ Flow Measurement Fac Type20 uJ17 Inspector 19liJ Transaction Code 1 a 2 u 73l I I74 QA 72 LJ Inspection Work Days 671 I 69 Remarks I I I I I I I I I I I I I I I I I I I I I I I -—Reserved------------------------ 75| I I I I I I I80 B171 u Water Compliance Inspection Report Section A: National Data System Coding (i.e., PCS) Raymond Oliver Rhode,2555 W Oak St Selma NC 27576/Superintendent/919-965-8448/ NPDES NC0027006 There were no permit compliance issues for the review period March 2006 - March 2007. yr/mo/day 07/06/203l Inspection Type I11 12i , i 17 18. .J | 07/06/20 I |C| Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) The treatment facility consists of two oil/water sepa rators in series with an aerated storage pond. Stormwater runoff and associated washwater from the loading rack, pump manifold, rack manifold, additive pump off, truck pump off containment area and the vapor recovery unit containment area flow into oil/water separator #1. This oil/water separator is a 10,000-gallon Enquip separator with a design capacity of 400 gallons/minute and is double-walled with an inte rstitial probe. A hydrocarbon sensor is located in the water compartment to sound an alarm if oil enters the water compartment. Rainwater that collects in the containment area for the Above Ground Storage Tanks (AST's) and parking area are routed through oil/water separator #2. The combined flows from the oil/water sepa rators discharge into the aerated pond. Flow from the pond is measured with an ultrasonic flow meter as water flows over a v-notch weir to valve-controlled basin. Discharge occurs when the valve is open. At the time of inspection, both aerators were in operation. Water in the pond appeared clear with no sheen detected. There was no discharge. The unnamed creek upstream of the discharge point was silty, muddy due to a recent heavy rain shower. (cont.) 1 Page # 2 Permit: NC0027006 Inspection Date: 06/20/2007 Yes No NA NEPermit ■ (If the present permit expires in 6 months or less). Has the permittee submitted a new application? ■ oIs the facility as described in the permit? o ■ o# Are there any special conditions for the permit? ■ Is access to the plant site restricted to the general public? ■ o Is the inspector granted access to all areas for inspection? Yes No NA NERecord Keeping ■ Are records kept and maintained as required by the permit? ■ Is all required information readily available, complete and current? ■ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ Are analytical results consistent with data reported on DMRs? ■ oIs the chain-of-custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs ■ 0 Are DMRs complete: do they include all permit parameters? ■ oHas the facility submitted its annual compliance report to users and DWQ? ■ o(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? ■ Is the ORC visitation log available and current? ■ o o Is the ORC certified at grade equal to or higher than the facility classification? ■ Is the backup operator certified at one grade less or greater than the facility classification? ■ □00Is a copy of the current NPDES permit available on site? D ■ OFacility has copy of previous year's Annual Report on file for review? Comment:Facility is classified as PC-1. Yes No NA NEEffluent Pipe ■ ODOIs right of way to the outfall properly maintained? Page #3 Owner - Facility: Selma terminal Inspection Type: Compliance Evaluation Comment: NPDES Permit NC0027006 was issued March 01, 2004 and will expire March 31,2008. Permit: NC0027006 Inspection Date: 06/20/2007 Yes No NA NEEffluen£Pipe ■ Are the receiving water free of foam other than trace amounts and other debris? ■ If effluent (diffuser pipes are required) are they operating properly? Yes No NA NEFlow Measurement - Effluent ■ 0 o# Is flow meter used for reporting? ■ oIs flow meter calibrated annually? ■ 0 0Is the flow meter operational? ■ 0 (If units are separated) Does the chart recorder match the flow meter? Flow meter was calibrated 07/19/2006 by Johnson Inc.Comment: Yes No NA NEEffluent Samp I ing o ■ Is composite sampling flow proportional? ■ □OOIs sample collected below all treatment units? ■ ODDIs proper volume collected? D D ■ DIs the tubing clean? ■ ODOIs proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? ■ ODDIs the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment:Sampling is done by "grab". Page #4 Owner ■ Facility: Selma terminal Inspection Type: Compliance Evaluation Comment: Receiving water was silty, cloudy fro m a recent heavy rain shower. There was no discharge of effluent. Michael F. Easley, Governor August 22, 2007 28208 Dear Permittee: Sincerely, An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper cc: Central Files Raleigh Regional Office, Surface Water Protection NPDES File If all wastewater discharge has ceased at your facility and you wish to rescind this permit, contact me at the telephone number or address listed below. Harold Cramer ExxonMobil Refining and Supply Company 6801 Freedom Dr Charlotte, NC To satisfy this requirement, your renewal package must be sent to the Division postmarked no later than October 3, 2007. Failure to request renewal by this date may result in a civil assessment of at least $500.00. Larger penalties may be assessed depending upon the delinquency of the request. 1617 Mail Service Center. Raleigh, North Carolina 27699-1617 512 North Salisbury Street, Raleigh, North Carolina 27604 Phone: 919 733-5083, extension 511 / FAX 919 733-0719 / charles.weaver@ncmail.net William G. Ross, Jr., Secretary Coleen H. Sullins, Director If any wastewater discharge will occur after March 31, 2008, the current permit must be renewed. Discharge of wastewater without a valid permit would violate North Carolina General Statute 143-215.1; unpermitted discharges of wastewater may be assessed civil penalties of up to $25,000 per day. Charles H. Weaver, Jr. NPDES Unit Your NPDES permit expires on March 31, 2008. Federal (40 CFR 122.41) and North Carolina (15A NCAC 2H.0105(e)) regulations require that permit renewal applications must be filed at least 180 days prior to expiration of the current permit. If you have already mailed your renewal application, you may disregard this notice. Use the enclosed checklist to complete your renewal package. The checklist identifies the items you must submit with the permit renewal application. If you have any questions, please contact me at the telephone number or e-mail address listed below. Subject: Renewal Notice NPDES Permit NC0027006 Selma terminal Johnston County NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality NorthCarolinaNaturally o o o o WS PERMIT NC00270 1SELMA TERMINAL JOHNSTON COUNTY The above requirement does NOT apply to privately owned facilities treating 100% domestic wastewater, or facilities which discharge non-process wastewater (cooling water, filter backwash, etc.) Send the completed renewal package to: Mrs. Frances Candelaria NC DENR / DWQ / Point Source Branch 1617 Mail Service Center Raleigh, NC 27699-1617 PLEASE NOTE: Due to a change in fees effective January7 1, 1999, there is no renewal fee required with your application package. an Authorized The following items are REQUIRED for all renewal packages: A cover letter requesting renewal of the permit and documenting any changes at the facility since issuance of the last permit. Submit one signed original and two copies. The completed application form (copy attached), signed by the permittee or Representative. Submit one signed original and two copies. If an Authorized Representative (such as a consulting engineer or environmental consultant) prepares the renewal package, written documentation must be provided showing the authority delegated to any such Authorized Representative (see Part II.B.ll.b of the existing NPDES permit). A narrative description of the sludge management plan for the facility. Describe how sludge (or other solids) generated during wastewater treatment are handled and disposed. If your facility has no such plan (or the permitted facility does not generate any solids), explain this in writing. Submit one signed original and two copies. The following items must be submitted by any Municipal or Industrial facilities discharging process wastewater: Industrial facilities classified as Primary Industries (see Appendices A-D to Title 40 of the Code of Federal Regulations, Part 122) and ALL Municipal facilities with a permitted flow >1.0 MGD must submit a Priority Pollutant Analysis (PPA) in accordance with 40 CFR Part 122.21.