HomeMy WebLinkAbout2024-10-07 SAW-2015-01815 Lowlands Site-Credit Release Request (MY-5) & Support Docs October 7, 2024 US Army Corps of Engineers: Wilmington District Mitigation Branch Attn: Ms. Casey Haywood 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 RE: Lowlands Site SAW #2015-01815- (MY 5) Credit Release Request Dear Ms. Haywood: Clearwater Mitigation Solutions respectfully request the Monitoring Year -5 credit release for the Lowlands Mitigation Site pursuant to the Clearwater Neuse 01 UMBI and approved mitigation plan for 5% of the total wetland credits. This credit release amount would be 1.33 riparian wetland credits and 0.157 non-riparian wetland credits. Also included in this letter is the bank credit release schedule per the USACE- Wilmington template, the Lowlands Wetland Mitigation Site wetland credit ledgers, and Year-5 Monitoring Report. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Clearwater Neuse 01 Umbrella Mitigation Banking Instrument, 65 % of the mitigation site’s total riparian wetland credits and non-riparian wetland credits were released on October 31, 2023, per the attached credit release schedule template. Subsequent credit release request will follow the traditional credit release schedule beginning with the Year 5 Monitoring Report. Let me know if you have any questions. Please do not hesitate to contact me with any questions at (919) 624-6901. Sincerely, Kevin Yates Clearwater Mitigation Solutions 604 Macon Place, Raleigh, NC 27609 919-624-6901 clearwatermitigation@gmail.com _____________________________________________________________________________________________ Page 21 Lowlands Mitigation Site Clearwater Mitigation Solutions Amended Mitigation Plan July 2023 Neuse 01 - Johnston County, North Carolina Table 8. Proposed Wetland Credit Release Schedule Milestones Tasks Mitigation Bank Release (%) Riparian Credits Non- Riparian Credits Completion /Anticipated Release Date Original Site Establishment 1)Approval of the final Mitigation Plan; 2)Mitigation Site secured; 3)Delivery of the financial assurances; 4)Long-term protection mechanism and title opinion accepted by the USACE 5)Issuance of the 404 permit. 15% (15%) --- Original Mitigation Plan Implementation 1)Completion of earthwork, if required; 2)Completion of riparian plantings; 3)Approval of As-Built Survey by the Corps. 15% (30%) --- MY 1 – MY 4 Monitoring 1)Interim Performance Standards met; 2)Approval of Monitoring Report by the Corps. 10% (40%) --- 10% (50%) --- Conversion to Mitigation Bank 1) Execution of UMBI 2) Approval of Amended Mit. Plan 3) Approval of most recent Monitoring Report by the Corps. 4) Complete Planting of ACP ROW 5) Transfer of CE to LTM Steward and fully fund endowment. 15% (65%)17.23*2.041*2023 Year (5) - 2023 Monitoring 1)Visual Assessment; 2)Interim Performance Standards met; 3)Approval of Monitoring Report by the Corps. 5 % (70%) 1.33 (18.56) 0.157 (2.198) April-24 Year (6) - 2024 Monitoring 1 Visual Assessment; 2) Interim Performance Standards met; 3) Approval of Monitoring Report by the Corps. 15% (85%) 3.97 (22.53) 0.471 (2.669)April-25 Year (7) - 2025 Monitoring 1)Visual Assessment; 2)Interim Performance Standards met; 3)Approval of Monitoring Report by the Corps. 5% (90%) 1.33 (23.86) 0.157 (2.826) April-26 Year (8) - 2026 Monitoring 1) Final Performance Standards met; 2) Approval of Monitoring Report by the Corps 10% (100%) 2.65 (26.51) 0.314 (3.14) April-27 Totals 100%26.51 3.14 *Agreed to Credit Release upon approval of UMBI and Mitigation Plan per discussions with IRT on 12/09/20 and 02/2022. Bank Name/Site Name:Clearwater Neuse 01 UMBI - Lowlands Site Sponsor Name:Clearwater Mitigaiton Solutions USACE Action ID:SAW-2015-01815 Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal Potential Credits from Mitigation Plan 26.510 3.140 Potential Credits From As-Built 26.510 3.140 1 (Bank/Site Establishment)1, 2 15% 2 (Year 0/As-Built)3 15% 3 (Year 1 Monitoring)10% 4 (Year 2 Monitoring)15% 5 (Year 3 Monitoring)20% 6 (Year 4 Monitoring)10% 7 (Year 5 Monitoring)15% 8 (Year 6 Monitoring)NA 9 (Year 7 Monitoring)NA Stream Bankfull Standard4 NA Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 1 (Bank/Site Establishment)1, 2 2 (Year 0/As-Built)3 3 (Year 1 Monitoring) 4 (Year 2 Monitoring) 5 (Year 3 Monitoring) 6 (Year 4 Monitoring)17.230 2.041 10/31/2023 7 (Year 5 Monitoring)1.330 0.157 8 (Year 6 Monitoring)NA 9 (Year 7 Monitoring)NA Stream Bankfull Standard4 NA NA NA NA Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal Current Credit Release Request Approved Credit Release Credits Not Released (if any)6 Total Credits Released to Date Signature of Wilmington District Official Approving Credit Release Date Johnston Neuse 03020201 MY-5 County: Geographic Service Area: Monitoring Year: 3 - The second credit release is based on the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Any discrepancy (either positive or negative) is accounted for during the second credit release. 4 - A 10% reserve of credits to be held back until the bankfull event performance standard has been met. Signature above confirms that the sponsor has satisfied the monitoring requirements as provided in the mitigaiton plan, and constitues USACE approval of credit release per Section 3332.8(0)(9) of the Mitigation Rule. Once signed, these credits are available for sale and should be updated on the credit ledger for the site. Comments and/or Conditions of Release: 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 7) Documentation of the establishment of the long-term endowment/escrow account. Annual Credit Release Approval (to be completed by USACE Project Manager) Stream Credits Wetand Credits Credit Classification Stream Credits Wetland Credits 10% 5% 10% 10% 5% 10% NA 15% 15% 10% 10% 15% Wilmington District Mitigation Bank Annual Credit Release Schedule and Approval Total Potential Credits & Approved Release Schedule Credit Classification 15% Date of Credit Release5 Stream Credits Credit Classification Wetland Credits Scheduled Credit Release Amounts and Approval Dates 15% 10% 10% 10% 5% 5% 15% Sale/ Release Date Transaction Type Released Credits Debited Credits Available Credits Permittee Project Name Permit (SAW#) Impact HUC Comments 10/31/2023 Credit Release 17.230 17.230 Initial Credit Release - Bank Establishment 65% 2/9/2024 Withdrawl 0.854 16.376 JMS Investment GroupLLC JMS Storage SAW-2023-01351 3020201 3/20/2024 Withdrawl 0.64 15.736 Meritage Homes Marshburn Manor SAW-2023-02104 3020201 9/19/2024 Withdrawl 2.261 13.475 South Granville Water and Sewer Authority I-85 Sewer Improvements SAW-2023-00464 3020201 9/19/2024 Withdrawl 2.16 11.315 Raleigh-Durham Airport Authority Runway 5L/23R Replacement Project SAW-2022-01559 3020201 9/19/2024 Withdrawl 2.83 8.485 Raleigh-Durham Airport Authority Runway 5L/23R Replacement Project SAW-2022-01559 3020201 Executive Order 11990 and FAA FONSI & ROD issued August 31, 2023 10/1/2024 Withdrawl 1.43 7.055 BCUS Acquisitions LLC Ammons Property Phase 1 of 4 SAW-2022-00367 3020201 Total:10.175 7.055 Clearwater Neuse 01 UMBI -Lowlands Wetland Mitigation Site Neuse River Basin HUC 03020201 USACE AID#: 2015-1815 Riparian Wetland Ledger Date Last Updated: 09/19/2024 Sale/ Release Date Transaction Type Released Credits Debited Credits Available Credits Permittee Project Name Permit (SAW#) Impact HUC Comments 10/31/2023 Credit Release 2.040 2.040 Initial Credit Release - Bank Establishment 65% Total:0 2.040 Clearwater Neuse 01 UMBI -Lowlands Wetland Mitigation Site Neuse River Basin HUC 03020201 USACE AID#: 2015-1815 Non-Riparian Wetland Ledger Date Last Updated: 07/09/2024 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 October 31, 2023 Regulatory Division SUBJECT: Initial Credit Release for the Clearwater Neuse 01 Umbrella Mitigation Bank Instrument and Lowlands Wetland Site, Action ID SAW-2015-01815 Mr. Kevin Yates Clearwater Mitigation 604 Macon Place Raleigh, NC 27609 Dear Mr. Yates: Please reference your correspondence of October 30, 2023, regarding the Clearwater Neuse 01 Umbrella Mitigation Bank (UMB) and Lowlands Wetland Mitigation Site, Action ID SAW-2015-01815. Your letter requested the initial release of credits for this bank and transmitted documents required for our review. The approved UMBI for the Clearwater Neuse 01 Umbrella Mitigation Bank included the following requirements associated with the initial release of credits: 1. Execution of this UMBI by the Sponsor, the DE, and other agencies eligible for membership in the IRT who choose to execute this agreement, to include the approval of any modifications to this agreement when new sites are added to it; 2. Approval of a final Mitigation Plan; 3. Confirmation that the mitigation bank site has been secured; 4. Delivery of executed financial assurances as specified in the site-specific Mitigation Plan; 5. Delivery of a copy of the recorded long-term protection mechanism as described in as specified in the site-specific Mitigation Plan, as well as a title opinion covering the property acceptable to the DE; and 6. Issuance of any DA permits necessary for construction of the mitigation site (if necessary); 7. Documentation of the establishment of the long-term endowment/escrow account. With this correspondence, we confirm that you have provided the necessary documentation to demonstrate that you have successfully met the above requirements. -2- Additionally, because the Lowlands Wetland Mitigation Site was converted from an existing permittee-responsible mitigation site to a mitigation bank site, the initial credit release associated with this site does not follow the standard release schedule. The site has already been constructed and monitored for four years, so the Final Approved Mitigation Plan providers for an initial credit release of 65% of the total credits from the site upon completion of the following additional milestones: 1. Execution of UMBI; 2. Approval of Amended Mitigation Plan; 3. Approval of most recent Monitoring Report by the Corps; 4. Complete Planting of ACP ROW; and 5. Transfer of the conservation easement to the long-term steward and fully funding the endowment. With this correspondence, we also confirm that you have provided the necessary documentation to demonstrate that you have successfully completed these additional actions. Accordingly, we confirm that 17.230 Riparian Wetland Credits and 2.041 Non- Riparian Wetland Credits, constituting 65% of the site’s total credits, are now released and available for sale. Please remember that as the bank sponsor you accept all risk, liability, and responsibility for the success of all mitigation activities associated with the approved mitigation bank site. Additionally, you must submit annual monitoring reports in accordance with the approved mitigation plan to demonstrate that the site is meeting the approved performance standards to receive future releases of credits. Further, it is your responsibility as the bank sponsor to provide the Corps with signed Mitigation Responsibility Transfer Forms promptly following all credit sales, and to update the ledger for the bank site on the Regulatory In-lieu Fee and Bank Information Tracking System (RIBITS). When all wetland credits have been consumed, no more credits may be sold from this mitigation site. Please note that this electronic copy provided to you via email is your official copy. Should you wish to receive a paper copy of this correspondence, please contact us. Thank you for your time and cooperation. If you have any questions, please contact me by email at todd.j.tugwell@usace.army.mil or by phone at (919) 210-6265. Sincerely, Todd Tugwell Chief, Mitigation Branch cc (by email): NCIRT Distribution List