Loading...
HomeMy WebLinkAbout20241417 Ver 1_ePCN Application_20241015DW R DHlsloo of Water Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) October 2, 2023 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process? Yes No Is this project a public transportation project?* Yes No Change only If needed. Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund, electric generation projects located at an existing or former electric generating facility, or involve the distribution or transmission of energy or fuel, including natural gas, diesel, petroleum, or electricity? Yes No BIMS # Assigned Version# * 20241417 1 Is a payment required for this project?* No payment required Fee received Fee needed - send electronic notification Reviewing Office* Raleigh Regional Office - (919) 791-4200 Information for Initial Review 1a. Name of project: Green Level Industrial 1a. Who is the Primary Contact?* Danielle Clark, PWS 1b. Primary Contact Email:* dclark@harthickman.com Date Submitted 10/15/2024 Nearest Body of Water Unnamed tributary of Northeast Creek Basin Cape Fear Water Classification WS-IV;NSW (Northeast Creek classification) Site Coordinates Latitude: 35.371497 A. Processing Information Longitude: -80.81959 What amount is owed?* $240.00 $323.00 Select Project Reviewer* Kristine Morales: Kristine. Morales 1c. Primary Contact Phone:* (518)598-2862 Is this application for a project associated with emergency response/repairs from Hurricane Helene impacts to your project or property? Yes No Is this project connected with ARPA funding? Yes No County (or Counties) where the project is located: Wake $570.00 $767.00 Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No 1a.Type(s)of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No 1b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 39 - Commercial/Institutional Developments NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is this an after -the -fact permit application? * Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: GGP PARK OVERLOOK WEST LLC 2b. Deed book and page no.: 019698/02575 2c. Contact Person: Drew Thigpen 2d. Address Street Address 3094 BOSTON ST STE 401 Address Line 2 City Baltimore Postal / Zip Code 21224 2e. Telephone Number: (843)469-2517 2g. Email Address:* dthigpen@ggcommercial.com 4. Agent/Consultant (if applicable) 4a. Name: Danielle Clark, PWS 4b. Business Name: Hart & Hickman 4c.Address Street Address 3921 Sunset Ridge Road, Ste 301 Address Line 2 city Raleigh Postal / Zip Code 27607 4d. Telephone Number: (518)598-2862 4f. Email Address:* dclark@harthickman.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) N/A 1c. Nearest municipality / town: Cary 2. Project Identification 2a. Property Identification Number: 0727909386 2c. Project Address Street Address 0 Green Level Church Road Address Line 2 city Cary Postal / Zip Code 27713 3. Surface Waters 3a. Name of the nearest body of water to proposed project: Unnamed tributary of Northeast Creek 3b. Water Resources Classification of nearest receiving water: WS-IV;NSW (Northeast Creek classification) 3c. What river basin(s) is your project located in? Cape Fear State / Province / Region Maryland Country United States 2f. Fax Number: State / Province / Region NC Country United States 4e. Fax Number: 2b. Property size: 30.88 State / Province / Region NC Country United States 3d. Please provide the 12-digit HUC in which the project is located. 030300020605 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: * The Site consists of one parcel of land located at 0 Green Level Church Road in Cary, Wake County, North Carolina. The Site exists as undeveloped wooded land. General land use in the vicinity of the Site is residential, light industrial, and undeveloped land. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown 4f. List the total estimated acreage of all existing wetlands on the property: 0.518 4g. List the total estimated linear feet of all existing streams on the property: 170 4h. Explain the purpose of the proposed project:* The developer plans to build an industrial warehouse development to serve the Town of Cary and the surrounding areas. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The planned development area will be graded with heavy equipment to prepare level building pads. Stormwater BMPs are included. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made? Preliminary Approved Not Verified Unknown N/A Corps AID Number: SAW-2024-00112 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Dan McCauley, PWS Agency/Consultant Company: Hart & Hickman Other: 6. Future Project Plans O Unknown 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts O Reason (?) 2b. Impact type* (?) 2c. Type of W. * 2d. W. name 2e. Forested * 2f. Type of Jurisdicition * (?) 2g. Impact area * W1 Grading/Fill P Headwater Forest WAA f=C.rlps 0.345 (acres) 2g. Total Temporary Wetland Impact 2g. Total Permanent Wetland Impact 0.000 0.345 2g. Total Wetland Impact 0.345 2i. Comments: The permanent wetland impact involves fill and grading required to facilitate the construction of roadways and a level building pad associated with the warehouse development. E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: See attached 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: See attached 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): D W R Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Cape Fear 02 Umbrella Mitigation Bank: Flat Rock Mitigation Site 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland 0.69 3c. Comments The developer proposes a 2:1 ratio for the 0.345 acre of wetland impact. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: The site is not subject to state regulated buffer rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? Yes No 2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program? Yes No N/A - project disturbs < 1 acre 2d. Which of the following stormwater management program(s) apply: Local Government State Local Government Stormwater Programs Phase II NSW USMP Water Supply Please identify which local government stormwater program you are using. Town of Cary Comments: Two wet ponds to provide water quality and water quantity control for the development G. Supplementary Information L O 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. The proposed Site plan will develop the majority of the Site and additional development is not anticipated. Additional phases and/or impacts to Waters of the U.S. are not planned or proposed. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? Yes No N/A 4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Wastewater will enter Town of Cary sanitary sewer infrastructure and will be piped to an off -site Town of Cary wastewater treatment plant. 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No Unknown 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?' Yes No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish & Wildlife Service IPaC database, NC Natural Heritage Program databases, and on -Site reconnaissance 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat? http://www.habitat.noaa.gov/protection/efh/efhmapper/ 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? National Registry of Historic Places, NC State Historic Preservation Office GIS viewer, and on -Site reconnaissance 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8c. What source(s) did you use to make the floodplain determination?* Reviewed FEMA Flood Insurance Rate Map ID #3710455900K Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document NWP #39 Application - Green Level Industrial.pdf 7.76MB File must be PDF or KMZ Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Dan McCauley Signature Date 10/15/2024 U