10-14-2024
LETTER OF APPROVAL WITH MODIFICATIONS
Jackie Investments INC
4916 Tigers Den Road
Randleman, NC 27317
RE: Project Name: Jess Ferree Ct Lot Development
Acres Approved: 1.04
Application ID: PA-007329
Permit Number: RANDO-2025-0129
Address: 108 Jess Ferree Court
City: Randleman
County: Randolph
River Basin: Cape Fear
Stream Classification: C:Aquatic Life, Secondary Contact Recreation, Fresh water
Plan Type: New Plan
Dear Jackie Investments INC,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this Letter of Approval with
Modifications. The Modifications Required for Approval are listed below. The Certificate of
Approval must be posted at the job site. Please see the attached Application Report (FRO
form), Letter of Approval(LOA) and the Certificate of Approval (COA), if applicable. This
plan approval shall expire three (3)years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
The attached, signed, digital copy of the letter may be used to submit with your electronic
Notice of Intent (eNOI) in order to receive your Certificate of Coverage (COC). As of April 1,
2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI)form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the $120 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, the erosion and sedimentation control plan is inadequate
to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan
and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility/Ownership Form, which you provided. You are requested to
file an amended form if there is any change in the information included on the form. This
permit allows for a land-disturbance, as called for on the application and plan, not to
exceed the approved acres. Exceeding the acreage can be a violation of this permit and
may require a revised plan and additional application fee. In addition, it would be helpful if
you notify this office of a change to the proposed starting date for this project.
Modifications Required for Approval:
1. A construction entrance should be provided and labeled where construction traffic
will access a paved surface. [G.S. 113A-57(3)]
2. Please provide location for the concrete washout station. This should not be located
within 50 feet of any storm drain, basin, or stream unless no alternative is feasible. [G.S.
143-215.1]
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of
Coverage application.
2. Please notify this office prior to your pre-construction conference for this project by
calling(336) 776-9800 and asking to speak with the Land Quality inspector for your county.
Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any
ESC measures. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4. Additional measures may be required -The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment
from leaving this site. [15A NCAC 4B .0115]
5. The NCG01 has a $120 yearly fee and our office often receives closure inspection
requests days prior to yearly NCG01 fee payment due dates. Be advised the project
requires a closure inspection report by DEMLR prior to filing the Notice of Termination
(NOT)to terminate NCG01 coverage. The closure inspection should not be requested until
after the site has achieved full vegetative stabilization and measures have been
removed. The removal of temporary ESC measures, including basins, requires prior
approval. Often, a full growing season is necessary between initial seeding/mulching and
removal of measures. Please plan your construction accordingly to avoid contacting our
office prematurely for a closure inspection. Also be advised you may be asked for
representative site pictures prior to a closure inspection. [General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57 G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
Your cooperation is appreciated.
Sincerely,
Ashley Vikara, El-Assistant Regional Engineer I
Winston-Salem Regional Office- 336-776-9800
North Carolina Department of Environmental Quality
Division of Energy, Mineral& Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Application Report
North Carolina Department of Environmental
Quality I Division of Energy, Mineral and Land Resources
DE Q o Winston-Salem Regional Office 1450 West Hanes Mill Road,
,.ofF;,, a,„� Suite 300 Winston-Salem NC, 27105
336-776-9800