HomeMy WebLinkAbout040008_routine_202410070 Division of Water Resources
❑ Division of Soil and Water Conservation
❑ Other Agency
Facility Number: 040008 Facility Status: Active Permit: AWSO40008 ❑ Denied Access
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine County: Anson Region: Fayetteville
Date of Visit: 10/07/2024 Entry Time: 09:50 am Exit Time: 10:45 am Incident #:
Farm Name: 52 Farm Owner Email: zactarlton@gmail.com
Owner: 52 Farms LLC Phone: 704-695-2185
Mailing Address: 2443 Pinkston River Rd Wadesboro NC 28170
Physical Address: 1024 Old Hwy 52 W Wadesboro NC 28170
Facility Status: 0 Compliant ❑ Not Compliant Integrator: Murphy -Brown LLC
Location of Farm: Latitude: 35' 09' Longitude: 80' 06' 59"
From Hwy 52/SR 1627 Int., take SR1627 N. 1 mile, farm on right.
Question Areas:
Dischrge & Stream Impacts Waste Col, Stor, & Treat Waste Application
Records and Documents Other Issues
Certified Operator: Zachary Philp Tarlton Operator Certification Number: 1012012
Secondary OIC(s):
On -Site Representative(s): Name Title Phone
24 hour contact name Zachary Tarlton
On -site representative Zachary Tarlton
Primary Inspector: Katie Fontenot Phone:
Inspector Signature: Date:
Secondary Inspector(s):
Inspection Summary:
15. army worms hit the sprayfields pretty bad, farmis going to resprig the fescue and the oats at the apporpite time for crop growth
Note: Soil samples due by 12/31/24.
Page 1 of 5
Permit: AWSO4000E Owner: 52 Farms LLC Facility Number:040008
Inspection Date:10/07/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Regulated Operations
Swine
Design Capacity Current promotions
Swine - Wean to Feeder 3,552 I 3,200
Total Design Capacity: 3,552
Total SSLW: 106,560
Waste Structures
Effective Built Closed Designated Observed
Type Identifier Date Date Date Freeboard Freeboard
Lagoon
04-0008
02/14/2005
A/01/1995
19.00
Lagoon
1
02/21/2006
10/01/2019
19.00
30.00
Page 2 of 5
Permit: AWS04000E Owner: 52 Farms LLC Facility Number:040008
Inspection Date:10/07/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Discharges & Stream Impacts
Yes
No NA NE
1. Is any discharge observed from any part of the operation?
❑
MEIEI
Discharge originated at:
Structure
❑
Application Field
❑
Other
❑
a. Was conveyance man-made?
❑
0 ❑
❑
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
❑
0 ❑
❑
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
❑
0 ❑
❑
2. Is there evidence of a past discharge from any part of the operation?
❑
0 ❑
❑
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
❑
0 ❑
❑
State other than from a discharge?
Waste Collection, Storage & Treatment
Yes
No NA NE
4. Is storage capacity less than adequate?
❑
0 ❑
❑
If yes, is waste level into structural freeboard?
❑
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
❑
0 ❑
❑
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
❑
MEI
❑
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
❑
MEI
❑
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
❑
0 ❑
❑
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑
❑
❑
maintenance or improvement?
Waste Application
Yes No NA NE
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ 0 ❑ ❑
maintenance or improvement?
11. Is there evidence of incorrect application?
❑ 0 ❑ ❑
If yes, check the appropriate box below.
Excessive Ponding?
❑
Hydraulic Overload?
❑
Frozen Ground?
❑
Heavy metals (Cu, Zn, etc)?
❑
PAN?
❑
Is PAN > 10%/10 lbs.?
❑
Total Phosphorus?
❑
Failure to incorporate manure/sludge into bare soil?
❑
Outside of acceptable crop window?
❑
Evidence of wind drift?
❑
Application outside of application area?
❑
Crop Type 1
Fescue (Hay)
Page 3 of 5
Permit: AWSO4000E Owner: 52 Farms LLC Facility Number:040008
Inspection Date:10/07/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Waste Application
Yes No NA NE
Crop Type 2
Small Grain (Wheat, Barley,
Oats)
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Badin channery silt loam, 2
to 8% slopes
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
❑
0 ❑
❑
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
0
❑ ❑
❑
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
❑
0 ❑
❑
determination?
17. Does the facility lack adequate acreage for land application?
❑
0 ❑
❑
18. Is there a lack of properly operating waste application equipment?
❑
0 ❑
❑
Records and Documents
Yes
No NA NE
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
❑
0 ❑ ❑
20. Does the facility fail to have all components of the CAWMP readily available?
❑
0 ❑ ❑
If yes, check the appropriate box below.
WUP?
❑
Checklists?
❑
Design?
❑
Maps?
❑
Lease Agreements?
❑
Other?
❑
If Other, please specify
21. Does record keeping need improvement?
❑
0 ❑ ❑
If yes, check the appropriate box below.
Waste Application?
❑
Weekly Freeboard?
❑
Waste Analysis?
❑
Soil analysis?
❑
Waste Transfers?
❑
Weather code?
❑
Rainfall?
❑
Page 4 of 5
Permit: AWS04000E Owner: 52 Farms LLC Facility Number:040008
Inspection Date:10/07/24 Inspection TypeCompliance Inspection Reason for Visit:Routine
Records and Documents
Yes
No NA NE
Stocking?
❑
Crop yields?
❑
120 Minute inspections?
❑
Monthly and 1" Rainfall Inspections
❑
Sludge Survey
❑
22. Did the facility fail to install and maintain a rain gauge?
❑
❑ ❑
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen
❑
0 ❑ ❑
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑
0 ❑ ❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the
❑
0 ❑ ❑
appropriate box(es) below:
Failure to complete annual sludge survey
❑
Failure to develop a POA for sludge levels
❑
Non -compliant sludge levels in any lagoon
❑
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑
0 ❑ ❑
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification?
❑
0 ❑ ❑
Other Issues
Yes
No NA NE
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document
❑
0 ❑ ❑
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes,
❑
0 ❑ ❑
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit,
❑
0 ❑ ❑
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility?
❑
0 ❑ ❑
If yes, check the appropriate box below.
Application Field
❑
Lagoon / Storage Pond
❑
Other
❑
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or
❑
0 ❑ ❑
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative?
❑
0 ❑ ❑
34. Does the facility require a follow-up visit by same agency?
❑
0 ❑ ❑
Page 5 of 5