Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8931005_Historical File_20130502
ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John E. Skvarla, Ill Governor Director Secretary May 2, 2013 Christopher White, Director Albert J. Ellis Airport 264 Albert J. Ellis Airport Road Richlands, NC 28574 Subject: State Stormwater Management Permit No. SW8 931005 Albert J. Ellis Airport Deemed Permitted Stormwater Project/Session Law 2012-200 Onslow County Dear Mr. White: The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for Albert J. Ellis Airport on March 11, 2013. The applicant has certified that the project's built-upon areas have been designed to meet the requirements of Session Law 2012- 200. The applicant has indicated that all existing and proposed parking areas, roads, taxiways, terminal buildings, runways, aprons, etc., provide for overland flow that promotes infiltration and treatment of the stormwater into grassed buffers, shoulders and grass swales. As such, the project is deemed permitted pursuant to the State post-construction stormwater requirements. We are forwarding Permit No. SW8 931005 dated May 2, 2013, for the construction of the deemed permitted built-upon areas associated with the subject project. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. This modification covers the following items: 1. Converts the original low density permit to meet the deemed permitted requirements for Airports under Session Law 2012-200. 2. Combines 2 permits into one. High density permit#SW8 000810 for a sand filter is consolidated into the one SW8 931005 permit. 3. Eliminates the sand filter previously approved under SW8 000810 and incorporates the requirements of Session Law 2012-200. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per NCGS 143-215(e)the petition must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. Wilmington Regional Office 127 Cardinal Drive Extension,Wilmington,North Carolina 28405 One Phone:910-796-72151 FAX:910350-20041 DENR Assistance:1.877-623-6748 NO Carolina Internet www.ncwaterquality.org aturaIII An Gnial n.,nennitu A firmahun nre�m cmninuar State Stormwater Management Systems Permit Number SW8 931005 Mod. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7343. Sincerely, CharleslfVakild, P.E., Director Division of Water Quality GDS/arl: S:IWQS\Stormwater\Permits&Projects119931931005 LD12013 05 permit 931005 cc: Sean A. Brennan, P.E., RS&H Onslow County Inspections Wilmington Regional Office Stormwater File Page 2 of 6 State Stormwater Management Systems Permit Number SW8 931005 Mod. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Albert J. Ellis Airport Director Albert J. Ellis Airport 264 Albert J. Ellis Airport Road, Richlands, Onslow County FOR THE construction, operation and maintenance of a 30% low density development in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the requirements of Session Law 2012-200 for Airports. The approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality, are considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. This permit covers the construction of 129.40 acres of built-upon area within a 676.88 acre project area. 2. The overall tract built-upon area percentage for the project must be maintained at 30% or less, as required by Section .1005 of the stormwater rules. The tract is limited to a maximum of 203.06 acres of built-upon area. 3. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 4. Per Session Law 2012-200, runoff from built-upon areas of the project must be maintained via overland flow that promotes infiltration and treatment of stormwater runoff into grassed buffers, shoulders, and grass swales. Maximum side slopes shall be 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 5. No piping is allowed except that as shown on the approved plans. II. SCHEDULE OF COMPLIANCE 1. Projects covered by this permit will maintain a minimum 30-foot wide vegetative buffer between all impervious areas and surface waters. Page 3 of 6 State Stormwater Management Systems Permit Number SW8 931005 Mod. 2. The permittee is responsible for verifying that the proposed built-upon area does not exceed the allowable built-upon area. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The permittee shall not subdivide and/or sell any portion of the 676.88 acre project area, in whole or in part, unless and until the Division is notified of the sale and approval is granted. The new property owner shall be required to submit for and receive a permit to cover the development of that subdivided property. 5. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. 6. Prior to the development of any future BUA or additional built-upon area in excess of the currently proposed 129.40 acres, a permit modification must be submitted to and approved by the Division. The modification must demonstrate that the built-upon area does not exceed the maximum amount permitted under this permit and that it meets the intent of Session Law 2012-200. 7. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built-upon surface. 8. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 9. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size or scope. b. Redesign of the project's built-upon area or treatment. c. Further development, subdivision, acquisition, or sale of any, all or part of the project area. d. Filling in, altering or piping any vegetative conveyance shown on the approved plan. e. Development of the designated future development areas. f. Additional built-upon area over and above 129.40 acres. g. Changes that affect compliance with Session Law 2012-200. 11. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b Sediment removal. c. Mowing, and re-vegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. Page 4 of 6 State Stormwater Management Systems Permit Number SW8 931005 Mod. 12. The permittee shall submit all information requested by the Director or his representative within the time frame specified in any written information request. III. GENERAL CONDITIONS 1. Failure to abide by the conditions and limitations contained in this permit or in Session Law 2012-200, may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit issued shall continue in force and effect until modified, revoked or terminated. 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. 5. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Water Quality at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part; b. Bankruptcy; c. Foreclosure; d. Dissolution of the partnership or corporate entity; e. A name change of the current permittee; f. A name change of the project; g. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all permit conditions until the Director approves a transfer of ownership. Neither the sale of the project nor the conveyance of common area to a third party, constitutes an approved transfer of the stormwater permit. 7. The permittee grants permission to DENR Staff to enter the property during normal business hours, for the purpose of inspecting all components of the stormwater management facility. 8, The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state and federal), which have jurisdiction. 9. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 5 of 6 State Stormwater Management Systems Permit Number SW8 931005 Mod. Permit modified and reissued this the 2nd day of May 2013 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,c,Lit,,C-j) for CharlegWakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 6 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2011 SESSION LAW 2012-200 SENATE BILL 229 AN ACT TO AMEND CERTAIN ENVIRONMENTAL AND NATURAL RESOURCES LAWS TO (1) DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO REPORT ON THE INTEGRATION OF STORMWATER CAPTURE AND REUSE INTO STORMWATER REGULATORY PROGRAMS; (2) DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO STUDY THE ADVISABILITY AND FEASIBILITY OF REALLOCATING WATER SUPPLY IN JOHN H. KERR RESERVOIR FROM HYDROPOWER STORAGE TO WATER SUPPLY STORAGE; (3) DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO STUDY AND EVALUATE DEGRADABLE PLASTIC PRODUCTS AND THEIR POTENTIAL TO CONTAMINATE RECYCLED PLASTIC FEEDSTOCKS; (4) DIRECT THE DIVISION OF PUBLIC HEALTH IN THE DEPARTMENT OF HEALTH AND HUMAN SERVICES TO REPORT ON THE ADMINISTRATION AND IMPLEMENTATION OF THE LEAD-BASED PAINT HAZARD MANAGEMENT PROGRAM FOR RENOVATION, REPAIR, AND PAINTING; (5) PROVIDE THAT TYPE 1 SOLID WASTE COMPOST FACILITIES ARE NOT REQUIRED TO OBTAIN A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FOR DISCHARGE OF PROCESS WASTEWATER BASED SOLELY ON THE DISCHARGE OF STORMWATER THAT HAS COME INTO CONTACT WITH FEEDSTOCK, INTERMEDIATE PRODUCT, OR FINAL PRODUCT AT THE FACILITY; (6) DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO ACCEPT ALTERNATIVE MEASURES FOR STORMWATER CONTROL OTHER THAN PONDS THAT MEET CERTAIN CRITERIA AT AIRPORTS; (7) PROVIDE CONDITIONS TO ALLOW FOR TWO NONCONTIGUOUS PROPERTIES TO BE TREATED AS A SINGLE CONTIGUOUS PROPERTY FOR PURPOSES OF COMPLIANCE WITH LOCAL WATER SUPPLY WATERSHED PROGRAMS; (8) PROHIBIT TREATMENT OF LAND WITHIN RIPARIAN BUFFERS AS LAND OF THE STATE OR ITS SUBDIVISIONS; (8A) AMEND THE NEUSE AND TAR-PAMLICO RIVER BASIN BUFFER RULES TO ALLOW DEVELOPMENT ON EXISTING LOTS UNDER CERTAIN CONDITIONS; (9)PROVIDE FLEXIBILITY FOR THE DEVELOPMENT OF BASINWIDE WATER QUALITY MANAGEMENT PLANS FOR RIVER BASINS THAT HAVE WATERS DESIGNATED AS NUTRIENT SENSITIVE AND DELAY THE IMPLEMENTATION DEADLINE FOR LOCAL STORMWATER MANAGEMENT PROGRAMS UNDER THE JORDAN LAKE NEW DEVELOPMENT RULE; (10) AMEND THE DEFINITION OF COMMUNITY WATER SYSTEM; (11) ESTABLISH A VARIANCE PROCESS FOR CERTAIN SETBACK REQUIREMENTS FOR EXISTING PRIVATE DRINKING WATER WELLS; (12) REPEAL THE AUTHORITY OF THE ENVIRONMENTAL MANAGEMENT COMMISSION TO ADD COUNTIES TO THE MOTOR VEHICLE EMISSIONS INSPECTION PROGRAM; (13) ALLOW THE COMMERCIAL LEAKING PETROLEUM UNDERGROUND STORAGE TANK CLEANUP FUND TO BE USED FOR THE REMOVAL OF ABANDONED UNDERGROUND STORAGE TANKS THAT HAVE NOT LEAKED BUT POSE AN IMMINENT HAZARD; (14) REQUIRE SCRAP TIRE COLLECTORS TO VERIFY ACCESS TO A PERMITTED SCRAP TIRE DISPOSAL SITE BEFORE CONTRACTING WITH ANY SCRAP TIRE PROCESSOR; (15) REQUIRE SEPTAGE MANAGEMENT FIRMS TO PROVIDE IDENTIFICATION OF AND NOTICE TO THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES BEFORE PLACING A PUMPER TRUCK NOT PREVIOUSLY INCLUDED IN A PERMIT INTO 11111 * S 2 2 9 - - 6 * thereof. PART VI. DIRECT THE DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TO ACCEPT ALTERNATIVE MEASURES OF STORMWATER CONTROL AT PUBLIC AIRPORTS SECTION 6. G.S. 143-214.7 is amended by adding two new subsections to read: "(c31 In accordance with the Federal Aviation Administration August 28, 2007, Advisory Circular No. 150/5200-33B (Hazardous Wildlife Attractants on or Near Airports), the Department shall not require the use of stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water in order to comply with this section at public airports that support commercial air carriers or general aviation services. Development projects located within five statute miles from the farthest edge of an airport air operations area, as that term is defined in 14 C.F.R. & 153.3 (July 2011 Edition), shall not be required to use stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water in order to comply with this section. Existing stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water in order to comply with this section located at public airports or that are within five statute miles from the farthest edge of an airport operations area may be replaced with alternative measures included in the Division of Water Quality's Best Management Practice Manual chapter on airports. In order to be approved by the Department, alternative measures or management designs that are not expressly included in the Division of Water Ouality's Best Management Practice Manual shall provide for equal or better stormwater control based on the pre- and post-development hydrograph. Any replacement of existing stormwater retention ponds, stormwater detention ponds, or any other stormwater control measure that promotes standing water shall be considered a minor modification to the State general stormwater permit. (c4) The Department shall deem runways, taxiways, and any other areas that provide for overland stormwater flow that promote infiltration and treatment of stormwater into grassed buffers, shoulders, and grass swales permitted pursuant to the State post-construction stormwater requirements." PART VII. PROVIDE CONDITIONS TO ALLOW FOR TWO NONCONTIGUOUS PROPERTIES TO BE TREATED AS A SINGLE CONTIGUOUS PROPERTY FOR PURPOSES OF COMPLIANCE WITH LOCAL WATER SUPPLY WATERSHED PROGRAMS SECTION 7. G.S. 143-214.5 is amended by adding a new subsection to read: "(d2) A local government implementing a water supply watershed program shall allow an applicant to average development density on up to two noncontiguous properties for purposes of achieving compliance with the water supply watershed development standards if all of the following circumstances exist: a) The properties are within the same water supply watershed. If one of the properties is located in the critical area of the watershed, the critical area property shall not be developed beyond the applicable density requirements for its classification. ( Overall project density meets applicable density or stormwater control requirements under 15A NCAC 2B .0200. (3I Vegetated buffers on both properties meet the minimum statewide water supply watershed protection requirements. O41 Built upon areas are designed and located to minimize stormwater runoff impact to the receiving waters, minimize concentrated stormwater flow, maximize the use of sheet flow through vegetated areas, and maximize the flow length through vegetated areas. f5j Areas of concentrated density development are located in upland areas and, to the maximum extent practicable, away from surface waters and drainageways. (6) The property or portions of the properties that are not being developed will remain in a vegetated or natural state and will be managed by a homeowners' association as common area, conveyed to a local government as a park or Page 4 Session Law 2012-200 SL2012-200 —r DWQ USE ONLY Date Received Fee Paid Permit Number / Applicable Rules: ❑Coastal SW-1995 ❑Coastal SW-2008 D Ph II-Post Construction (select all that apply) ❑Non-Coastal SW-HQW/ORW Waters ❑Universal Stormwater Management Plan ❑Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Albert J.Ellis Airport Overall Airport Permit 2. Location of Project(street address): 264 Albert J.Ellis Airport Road City:Richlands County:Onslow Zip:28574 3. Directions to project(from nearest major intersection): From US 17,take US 258 North/NC 24 West to NC 111-Catherine Lake Road.Turn Left onto NC 111 for 5.3 miles.Turn Left onto Albert T.Ellis Airport Road. 4. Latitude:34°49'44.9920" N Longitude:77°36'43.6960"W of the main entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is(check one): ❑New ®Modification ❑Renewal w/ Modificationt tReneuals with modifications also requires SWU-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit numberSW8 931005 ,its issue date(if known)April 26,2011 ,and the status of construction: EINot Started ❑Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ®Low Density ❑High Density DDrains to an Offsite Stormwater System DOther 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application,list the stormwater project number,if assigned,N/A and the previous name of the project,if d' ' rent than currently proposed,N/A • ECIEWIE 4.a.Additional Project Requirements(check applicable blanks;information on req d st4ttpermits can obtained by contacting the Customer Service Center at 1-877-623-6748): J/HiN 02 2013 ❑LAMA Major ['Sedimentation/Erosion Control:_BY.ac of Disturbed Ar DNPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit:N/A 5. Is the project located within 5 miles of a public airport? ❑No DYes If yes,see S.L.2012-200,Part VI:http://portal.ncdenr.org/web/wq/ws/su/statesw/rules laws Form SWU-101 Version 06Aug2012 Page 1 of 6 , III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:Onslow County Signing Official&Title:Christopher White,Albert T.Ellis Airport Director b.Contact information for person listed in item la above: Street Address:264 Albert T.Ellis Airport Road City:Richlands State:NC Zip:28574 Mailing Address(if applicable):264 Albert T.Ellis Airport Road City:Richlands State:NC Zip:28574 Phone: (910 ) 989-3162 Fax: ( ) Email:Chris White@onslowcountync.gov c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: EIVFO Signing Official&Title: b.Contact information for person listed in item 3a above: JAN 0 2 2013 Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: Point of Contact: Phone#: ( ) Form SWU-101 Version 06Aug2012 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Stormwater on the airport will be treated and controlled through a combination of grassed shoulders, grassed swales,and infiltration trench/bioretention swales. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ❑Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Cape Fear&White Oak River basin. 4. Total Property Area:676.88 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area:0 acres 7. Total Property Area(4)-Total Coastal Wetlands Area(5)-Total Surface Water Area(6)=Total Project Area+:676.88 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHVV)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHI line. The resultant project area is used to calculate overall percent built upon area(BUA). Non-coastal wetlands landward of the NHW(or MHVV)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/Total Project Area)X 100 =19.12 % 9. How many drainage areas does the project have?1 (For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area_ Drainage Area_ Drainage Area_ Drainage Area_ Receiving Stream Name Please Stream Class * refer to Stream Index Number* Appendic C- Total Drainage Area(sf) Airport On-site Drainage Area(sf) Supplement Off-site Drainage Area(sf) Spreadsheet Proposed Impervious Area**(sf) %Impervious Area**(total) Impervious'"`Suiface Area Drainage Area_ Drainage Area— Drainage Area_ Drainage Area_ On-site Buildings/Lots(sf) On-site Streets (sf) On-site Parking (sf) E C On-site Sidewalks (sf) Other on-site (sf) JAN 0 2 2013 Future(sf) Off-site (sf) RY, Existing BUA***(sf) Total (sf): * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications " Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. ***Report only that amount of existing BUA that will remain after development.Do not report any existing BUA that is to be removed and which will be replaced by new BLIA. Form SWU-101 Version 06Aug2012 Page 3 of 6 1T. How was the off-site impervious area listed above determined?Provide documentation.N/A Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&Ivi)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality(DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. ..O 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants a/A Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M -X) agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative(one to two pages)describing the stormwater treatment/managementfor I) the project. This is required in addition to the brief summary provided in the Project Information,item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the >1) receiving stream drains to class SA waters within 1/2 mile of the site boundary,include the 1/2 mile radius on the map. 7. Sealed,signed and dated calculations(one copy). It �D 8. Two sets of plans folded to 8.5"x 14" (sealed,signed,&dated),including: >t] a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line . w'.: waters,and any coastal wetlands landward of the MHW or NHW lines. H 1 / Ell o Delineate the vegetated buffer landward from the normal pool elevation of' .ounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal erlh}N 0 2 2013 i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BTJA identified and dimensioned. BY: k. Existing contours,proposed contours,spot elevations,finished floor elevations. 1. Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). p. Vegetated buffers(where required). Form SWU-101 Version 06Aug2012 Page 4 of 6 9.= Copy of any applicable soils report with the associated SHWT elevations(Please identify elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed.Deed book:19 Page No:011 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC t4. Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item la,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Tustin Dewey,PE,CFM Consulting Firm:Reynolds,Smith&Hills,Inc. (RS&H) Mailing Address:10748 Deerwood Park Blvd.South City:Tacksonville State:FL Zip:32256 Phone: (904 ) 256-2137 Fax: (904 ) 256-2502 Email:justin.dewey@rsandh.com IX. PROPERTY OWNER AUTHORIZATION(if Contact Information,item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information,item 2a) ,certify that I own the property identified in this permit application,and thus give permission to (print or type name of person listed in Contact Information,item la) with(print or type name of organization listed in Contact Information,item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. EGENE ll JAN 02 2013 BY: Form SWIT-101 Version 06Aug2012 Page 5 of 6 As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DWQ Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, ,a Notary Public for the State of ,County of ,do hereby certify that personally appeared before me this_day of ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I,(print or type name of person listed in Contact Information,item la)Christopher White , certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H.1000 and any other applicable state stormwater requirements. Signature: Date: 11-/21 I i L I, GVr Y(A 55r4r) ,a Notary+ ` Public for the State of f 1O1i'lI' 1 (&Vb1U County of d If toti. ,do hereby certify that Cf i it:Y 1�/ U3h t — personally appeared before me this glday of CeCie►`►4)01 , ,200-,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, ��l� W SEAL SANDRA J.JANSSEN NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA MY COMMISSION EXPIRES 5-17-201 My commission expires .1 A v I 1 + Er FIVE JAN 02 2013 1 1 av: Form SWU-101. Version 06Aug2012 Page 6 of 6 c� /1 . Transmittal Letter , RS&H Architects-Engineers-Planners,Inc. 111 Architectural,Engineering,Planning and Environmental Services To: Linda Lewis Date: March 8, 2013 NCDENR --Wilmington Office 127 Cardinal Extension Wilmington, NC 28405 Project: Albert J. Ellis Airport Stormwater Project Number: 203-1169-002 Permit We Transmit: For Your: ® Herewith ❑Via Fax El Under Separate Cover Via El Under Separate Cover Via: ❑ Review and Comment El In Accordance with Your Request ® Use ❑ Regular Mail ® Overnight Mail El Courier El Signature The Following: Copies Date Description 1 03/08/2013 Stormwater RAI Response Letter 2 03/08/2013 22x34 Grading and Drainage Plans 2 03/08/2013 11x17 Drainage Structure Table and Profile Plans Remarks Copies To: Sean Brennan RS&H Architects-Engineers-Planners, Inc. Chris White 8601 Six Forks Drive, Suite 260 CLT File . Raleigh, NC 27615 Phone: 919-846-6701 By: Tom Slater, PE ECEIVE MAR 1.12o13 �r: "SI' IMPROVING YOUR WORLD RS&H Architects-Engineers-Planners,Inc. RS&H Architects-Engineers-Planners,Inc. 8601 Six Forks Road, Suite 260 Raleigh, NC 27615 Voice:(919)846-6701 Fax: (919)846-9080 March 8, 2013 Linda Lewis Environmental Engineer III NCDENR Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 (910) 796-7301 flECEIVE I) RE: Stormwater Project No. SW8 931005 MAR 1 1 2013 Conceptual Stormwater Master Plan Permit Albert J. Ellis Airport BY: Onslow County Dear Ms. Lewis: Thank you for your comments, pertaining to the above referenced project, provided in the Request for Additional Information Email dated February 8, 2013. Please see the following responses necessary to complete the application review and approval: 1. It's extremely difficult to follow the contours on the 11x17 plans. There are so few labels on the contour elevations that I can't tell which way everything is flowing. I need either larger plans or more contour elevations and spot elevations provided on the plans. We have attached to our original mailed letter a set of 22"x 34"grading drawings with additional contour labels. 2. What is planned for the existing sand filter that was permitted under SW8 000810?Will it be removed or remain in place as a BMP? The proposed O&M plan in Appendix D only provides for filter strips, level spreaders and grassed swales. All sand filters will be removed during the proposed Airside/Landside Project and the low density permit requirements will be in effect. 3. The narrative discusses something called the "Impervious Parking Rule" of 65% impervious and 35% pervious. What is that and where does it come from? How does it apply to this low density proposal? This statement was made referring to the 80% impervious - 20% pervious Impervious Parking Legislation of Senate Bill 845, which does not apply to coastal counties. It is discussed for reference only and does not apply to this low density Page 1 of 3 permit. The future parking lot in Phase IV will be designed with this rule in mind with approximately 65%impervious— 35%pervious. This will allow for stormwater runoff to remain "disconnected"prior to entering a closed conveyance. 4. It appears that you are modifying under the 2008 rule at a 24% density limit, is that correct?The original 1993 permit allowed for a 30% density limit, but would have removed the majority of the 401/404 wetlands from the project area before calculating the maximum BUA. Under the 2008 rules, non-coastal wetlands above the mean high water line may be included as project area, but the non-SA density limit is reduced to 24%. Please confirm which rule you will be meeting. The proposed conceptual stormwater master plan permit will be a modification to the low density permit, with an allowable 30% BUA density limit Currently there are no published wetlands located on the airport property. The wetlands that are shown in the stormwater permit application are located within the proposed future land acquisition area. Since this land is not currently owned by the airport, we could not include it in the current permit calculation areas. The future planned use for this acquisition area will not impact the existing wetlands. Should this land acquisition occur in the future, the stormwater master plan permit will need to be modified to include this area. This future area will not include the wetlands in the BUA calculations. 5. If this project is being reviewed under low density, there is still a lot of proposed piping, which is contrary to the intent of low density development. In order to maintain low density, please ensure that none of the proposed or future BUA is entering the existing piped drainage. How much of the existing BUA (pre-1993 permit) is draining into the existing collection system and is not proposed to be "disconnected"?The goal would be to not need the piped collection because the site has been designed such that runoff sheet flows off the impervious surfaces, overland flows through grass and then into grassed ditches and swales, and never touches a pipe (except to get under a road of course) until it discharges into the existing drainage offsite. As per the Express Terminal Stormwater Permit meeting on June 11, 2012, the closed conveyances are necessary due to FAA requirements for airside and landside design elements. Based on FAA design criteria for grading, passenger and vehicular safety, landscaping, maintenance, and fly and mosquito control, it is impossible to create all conveyances as open conveyances. However, the proposed design elements are disconnected either by overland flow or infiltration trenches, as discussed during the above referenced meeting. Our proposed design incorporates an extensive series of infiltration swales that eventually seep to an underdrain filtration system. During the future parking lot re-design phase, all existing BUA associated with the parking lots that are currently directly connected to the storm sewer system will incorporate grassy swales and infiltration systems to "disconnect"the impervious areas. While more expensive, our piped stormwater infiltration system serves both as underground storage and low flow conveyance, which actually increases the time of concentration thus lowering the overall site discharge rate. flECEIVEfl MAR 1 1 2013 Page2of3 BY: Please let me know if you have any questions or concerns by phone at 919.846.6701 or by email at Tom.Slater@rsandh.com. Since" , "6, A — 1� Tom Slater, PE Mid-Atlantic Aviation Manager cc: Chris White,OA]Airport Sean Brennan, RS&H Michael Blackmore, RS&H File EGE1VE MAR 11 2013 BY: Page 3 of 3 Lewis,Linda From: Lewis,Linda Sent: Friday, February 08, 2013 4:29 PM To: 'Dewey, Justin' Cc: chris_white@onslowcountync.gov Subject: Albert Ellis Airport SW8 931005 MOD Justin: I met with Mike Randall about 10 days ago and we discussed this project in some detail. I have the following questions: 1. It's extremely difficult to follow the contours on the 11x17 plans. There are so few labels on the contour elevations that I can't tell which way everything is flowing. I need either larger plans or more contour elevations and spot elevations provided on the plans. 2. What is planned for the existing sand filter that was permitted under SW8 000810?Will it be removed or remain in place as a BMP? The proposed O&M plan in Appendix D only provides for filter strips, level spreaders and grassed swales. 3. The narrative discusses something called the "Impervious Parking Rule" of 65% impervious and 35% pervious. What is that and where does it come from? How does it apply to this low density proposal? 4. It appears that you are modifying under the 2008 rule at a 24% density limit, is that correct?The original 1993 permit allowed for a 30% density limit, but would have removed the majority of the 401/404 wetlands from the project area before calculating the maximum BUA. Under the 2008 rules, non-coastal wetlands above the mean high water line may be included as project area, but the non-SA density limit is reduced to 24%. Please confirm which rule you will be meeting. 5. If this project is being reviewed under low density, there is still a lot of proposed piping, which is contrary to the intent of low density development. In order to maintain low density, please ensure that none of the proposed or future BUA is entering the existing piped drainage. How much of the existing BUA (pre-1993 permit) is draining into the existing collection system and is not proposed to be "disconnected"? The goal would be to not need the piped collection because the site has been designed such that runoff sheet flows off the impervious surfaces, overland flows through grass and then into grassed ditches and swales, and never touches a pipe (except to get under a road of course) until it discharges into the existing drainage offsite. Please respond by March 8, 2013. Thank you for your time. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. i DRAINAGE STRUCTURE TABLE DRAINAGE STRUCTURE TABLE RS' STRUCTURE NAME STRUCTURE TYPE STRUCTURE GRATE GRATE TYPE RIM ELEVATION HEIGHT INVERT ELEVATIONS STATION/OFFSET STRUCTURE NAME STRUCTURE TYPE STRUCTURE GRATE GRATE TYPE RIM ELEVATION HEIGHT INVERT ELEVATIONS STATION/OFFSET IMPROVING YOUR WORLD BASE AUGNMENT A AS-1 Concrete Mitered End Section SW NV OUT(36) =8230' STATION: 19+96.31 NCDOT Std.840.02 NCDOT Std. 840.03 NW INV IN (24)=86.40' EASE ALIGNMENT A RS1H ArchitectgnglneemPlanners,Inc. OFFSET:-124.75'L -24 Concrete Catch Basin Frame, Grate,and Hood Type E Grate 92.05 7.53 SE INV IN(18) -Nair STATION:30+75.59 3wBeal SD Forks RA.8uealee BASE ALIGNMENT A SW INV IN (38) =86.22' OFFSET: 629.83' R RANO,Nc7N1a AS-2 Concrete Mitered End Section STATION: 18+46.31 61saMG6ia1 FAXavaTseasa NE IDN IN(38) = 8152' BASE ALIGNMENT A e•menm,eom OFFSET:-124.91'L LS-25 Concrete Rectangular Ended! NW 9dV OUT(18) =90.10' STATION:30+93.05 Rd n=IEDWIC.a BASE ALIGNMENT A OFFSET:770.24' R AS-5 Concrete Mitered End Section NE INV IN(24) = 8265' STATION:23+66.12708 Neenah R-3165 Curb ln!et Frame,Grote. BASE ALIGNMENT A OFFSET:- ,3812736'L LS-26 93.87 Curb Box or Approved Equal 6.27 STATION:31+5664 ELLIS BASE ALIGNMENT A OFFSET: 302.36' R AS-6 Concrete Mitered End Section SW INV OUT(24) -83.10' STATION:OFFSET:- �� NCDOT Std.840.02 NCDOT Std. 840.03 �� BASE 302 ALIGNMENT A LS-27 Concrete Catch Basin Frame, Grate,and Hood Type E Grate - 93.40 6.86 NE INV OUT (10) - 66.70' STATION: 31+70.21 M AIRPORT BASE AUGNMENT A SW EN OUT(15) = 86.54' OFFSET: 535.60' R AS-7 Concrete Mitered End Section SE INV IN (18) =86.50' STATION:25+93.38 BASE ALIGNMENT A OFFSET:-118.86'L -� ADS 24'Square 24 Hole 93.50 6.86 (10) =88.64' STATION:32+31.82 ALBERT J.ELLIS Basin or Approved Equal SW INV INAIRPORT BASE ALIGNMENT A OFFSET: 535.60' R AS-8 Concrete Mitered End Section STATION:25+93.10 NW fNV OUT(18)=90.00' OFFSET:39.15'R Neenah R-3165 Curb Inlet Frame,Grate, 845E ALIGNMENT A RICHLANDS,NC -29 Curb Box or Approved Equal 94.49 6.57 STATION:33+08.65 IS-1 Concrete Mitered End Section BASE0N:AUGNMENT 3 N IW IN (36) =84.67' OFFSET: 297,85' R OFFSET:522.60'R Neenah R-3165 Curb Inlet Frame,Grate, BASE ALIGNMENT A ALBERT J.ELLIS LS-30 Curb Box or 93.41 6.27 STATION:33+67.15 NCDOT Std.840.02 Concrete Control Structure BASE ALIGNMENT A APPd Equal OFFSET: 308.33' R NEW TERMINAL LS-2Type E Grate 89.92 7.08 STATION:21+66.47 Concrete Catch Basin See Details. S INV OUT(35) =84.84' AIRCRAFT PARKING OFFSET:478.45'R 6'PVC Clean-Out Neenah R-3487 Airport Inspection Frame BASE ALIGNMENT A APRON AND UD-1 92.27 4.07 STATION:25+58.07 See Detail and Lid or Approved Equal SE INV Do(6) = BB20' LANDSIDE ACCESS BASE ALIGNMENT A OFFSET: 198.94' R NCOOT Std.840.36 NCDOT Std.840.37 ROADWAYS(PHASE I) LS-5 Traffic Bearing Drop Inlet Steel Grate and Frame Type E Grate 92.44 725 NE INV IN (18) -87.29' STATION:25+92.25 ENT A S INV OUT(24) =87.19' OFFSET:813.61'R UD-2 6'PVC Clean-Out Neenah R-3487 Airport Inspection Frame 93.09 5.45 NW INV IN (6) 87.64' STATION:BASE A251+58.08 See Detail and Lid or Approved EqualENGINEER'S SEAL NCDOT Std.840.02 NCDOT Std.840.03 BASE ALIGNMENT A SE INV OUT(5) = 87.64' OFFSET:460.43' R ovum I S-5Type E Grate 91.18 8.33 E INV IN (48) =84.84' STATION:25+03.78 'tN ewe Concrete Catch Basin Frame,Grate,and Hood W INV OUT(48)=84.84' OFFSET:794.32'R Ol, 6'PVC Clean-Out Neenah R-3487 Airport Inspection Frame NE INV IN (6) - 87.07' BASE ALIGNMENT A Eg �. y= BASE ALIGNMENT A UD-3 92.50 5.43 STATION:25+58.06 _�, See Detail and Lid or Approved EqualNW INV IN (6) = 87.07' NCOOT Std.840.02 NCDOT Ste, 840.03OFFSET: 76192' R 3,?t .P� LS-7 Type E Grate 90.82 8.17 E INV IN (48)=84.65' STATION:23+73.83 S INV OUT(8) = 67.07' Concrete Catch Basin Frame,Grate,and Hood SW INV OUT(48) =84.65' OFFSET: 549.55'R - *7T ;?' 6"PVC Clean-Out Neenah R-3487 Airport Inspection Frame BASE ALIGNMENT A BASE ALIGNMENT A UD-4 See Detail and Ild orApproved Equal 92,66 4.22 STATION:26+46.96 NCOOT Std.840.02 NCOOT SW.840.03 qSE INV OUT(6)-86.46' OFFSET: 198.94' R LS-8 Concrete Catch Basin Frame,Grate,and Hood Type E Grate 94.26 8.77 N INV IN (15) =87.59' STATION:27+40.41 CONSULTANTS SW INV OUT(18) -87.49' OFFSET:7137.41'R BASE ALIGNMENT A 8'PVC Clean-Out Neenah R-3487 Airport Ina ion Fame UD-5 94.00 6.10 MY INV IN (6) = 87.90' STATION: 26+45.131 NCOOT Std.840.02 NCOOT Std.840.03 Type E Grate BASE ALIGNMENT A See Detail and Lid or Approve Equal SE INV OUT(6) = 87.90' OFFSET:480.47' R Concrete Catch Basin Frame,Grate,and Hood 90.54 7.59 NE IN (48) =8 84.95' OFFSET:887.71'BR BASE AUGMENT A UD-5 6'PVC Clean-Out Neenah R-3487 Airport Inspection Frame NW I1N IN (6) =87.34' BASE ALIGNMENT A LS-10 NCOOT Std. 40.02 NCOOT Std. 40.03 Type E Grate 89.71 6.08 STATION:28+96.16 See Detail and Lid or Approved Equal 93,41 6.0E 8 8 NE INV IN (8) = 87.34' STATION:26+46.66 Concrete Catch Basin Frame,Grate,and HoodNW INV OUT(24)=65.63' SW INV OUT(8) =87.34' OFFSET:761.92' R OFFSET: 101121'R 8'PVC Clean-Out Neenah R-3487 Airport Inspection Frame BASE ALIGNMENT A NCDOT Std.64D.02 NCDOT Std.840.03 SE INV IN (24) =85.54' BASE ALIGNMENT A UD-7 93.21 4.48 STATION:27+35.57 LS-11 Concrete Catch Basin Frame,Grate,and Hood Type E Grate 92.30 8.88 NE INV N (24) =65.54' STATION:29+17.72 See Detail and Lid or Approved Equal SE INV OUT(6) = 68.73' OFFSET: 198.94' R NW INV OUT(36)=85.44' OFFSET:929.41'R - - BASE ALIGNMENT A 6'PVC Clean-Out Neenah R-3487 Airport Inspection Frame BASE ALIGNMENT A ADS 24'Square 2 HoleUD-8 See Detail and Lid or Approved Equal 94.99 6.82 NW INV IN (6)=88.17' STATION:27+35.42 LS-12 Basin or Approved Equal 92'5 7'� EON OUT(18) =86.70' `NATION:28+43.91 SE INV OUT(6)=88.17' OFFSET: 480.52' R OFFSET:261.35'R 6'PVC Clean-Out Neenah R-3487 Airport Inspection Frame BASE ALIGNMENT A NCDOT Std.840.03 BASE ALIGNMENT A UD-9 94.04 6.44 NW INV IN (6) =87.60' STATION:27+3527 See L5-13 NCOOT Std.840.02 Frame,Grata,and Hood "type G Grate 93.94 9.52 W INV IN (18)=86.52' STATION:29+83.87 peril and Let or Approved Equal SW INV OUT(8) =87,60' OFFSET: 761.92' R Concrete Catch Basin Type G Grate SE INV OUT(18) =88.42' OFFSET:382.47'R 8'PVC Clean-Out B45E ALIGNMENT A NCOOT Std.NCDOT Std.840.02 840.03 BASE ALIGNMENT A UD-10 Concrete Collar 91.03 2.04 NE INV IN (6) = 89.00' STATION:26+09.74 See LS-14 Concrete Catch Daa n Frame,Grate,and Hood Type G Grate 93.83 9.71 NW INV IN (18)=86.22' STATION: 29+84.89 DetailW 94V OUT(6) =89.00' OFFSET: 938.40' R Type G Crab SE INV OUT(18) =86.12' OFFSET:589.42'R BASE ALIGNMENT R 8'PVC Clean-Out UD-11 Concrete Collar 92.28 2.04 STATION: 26+36.31 A BASE AUGNMENT A See Detail SW INV OUT(6) = 90.25' LS-15 NCOOT Std.84052 NCOOT Std.840.54 Solid Manhole Cover 93.99 10.01 NW NV IN (18)=86.08' STATION:29+91.33 936.39' R Concrete Manhole Manhole Frame and Cover NE INV OUT(36)-86.30' OFFSET: 631.93'R BASE OFFSET: 936 ALIGNMENT A SE INV OUT(42) =B598' UD-12 8'PVC Clean-Out Concrete Collar 95.42 2.04 STATION 29+28.30 See Detail SE INV OUT (6) = 93.38' OFFSET: 727.16' R REVISIONS NW NV IN (42) =85.72' NO. DESCRIPTION DATE NCOOT Std.84052 NCDOT Std.840.54 BASE ALIGNMENT A 6'PVC Clean-Out BASE ALIGNMENT A LS-16 Concrete Manhole Manhole Frame and Cover Solid Manhole Cover 92.97 9.56 SE INV IN (36) =85.41' STATION:29-F27.90 LID-13 Detail Concrete Collar 93,25 4.54 NW INV IN (6) =91.22' STATION:30+37.11 NW INV IN(6)-91.50' OFFSET:887.71'R SE INV OUT (6) = 90.72' OFFSET: 660.50' R SW INV OUT(48) =85.31' 6'PVC Clean-Out BASE ALIGNMENT A NCDOT Std.840.02 NCDOT Std.840.03 BASE ALIGNMENT A UD-14 See Detail Concrete Collar 93.79 4.04 NW INV IN (6) =91.75' STATION:30+07.52 LS-17 Concrete Catch Basin Frame,Grate,and Hood Type E Grate 92.08 8.41 NW INV IN(6)=90.53' STATION:30+47.71 SE INV OUT (6) = 91.75' OFFSET: 669.77' R SW INV OUT(24) =85.67' OFFSET:928.78'R 8'PVC Clean-Out BASE ALIGNMENT A BASE ALIGNMENT A LID-15 Concrete Collar i1 94.31 4,04 STATION:30+07.52 LS-15 Concrete Mitered End Section • STATION:30+08.03 See email SE INV OUT (6) 92,27 OFFSET: 519.12'R DATE ISSUED, DEcHERna12 NW INV IN (12) =93.30' m 20,OFFSET:500.57'R RunrrETIEDn: SAE BASE ALIGNMENT A DRANNan LIRE LS-19 Concrete Mitered End Section SE INV OUT(12) -93.40' STATION:30+08.03 DESIGNEDer. NEB OFFSET:466.76'R AEP PROJECT NUMBER BASE ALIGNMENT A 203-1169-003 203-1169-004 LS-20 Concrete Mitered F..nd&iniinn STATION:30+72.87 ma SE INV OUT(12) =9268' OFFSET:470.39'R ®_,�" �"�,.,e"� SHEET TITLE LS-21 Concrete Mitered End Section BASE ALIGNMENT NW INV IN (12) =92.50' OFFSET:4 368.49'1 R7 DRAINAGE �_� NCDOT Std.840.52 NCOOT Std.940.54 Solid Manhole Cover 93.57 8.92 BBASE A:3 MENT A flECE1VEflSTRUCTURES 4 Concrete Manhole Manhole Frame and Cover SE INV OUT(24) =66.65 OFFSET:468.78'R MAR 1 1 2013 TABLE NCDOT SW.840.52 NCDOT Std.840.54 NE INV IN(18) = 86.47' BASE ALIGNMENT A sxEErNurnecR -23 Conlaete Manhole irionuoie Frame and Cover Solid Manhole Cover R3.A? Q'1.5 rile GiV in. L24 =86.57' STATION:3O+g4.44 SE INV OUT(24)=86.47' OFFSET:556.33'R I BY'-- C530 U NOT FOR CONSTRUCTION D=i,P Cep._.rrNaly.\p._..o',00 a6E2\0,,CL3aa.9 Platted an.3/e/2013 154 PM Malted by:8,1Mw.,MMnael 100 100 100 100 R PROPOSED GRADE NE INV.OUT(3B•�81.5 ENISf1NG GRADE /12 PROPED GRACE IMPROVING YOUR WDRLD 90 SW INV. IN(387=82.30 90 90 N NV. IN{387=8467 --- 90 mm RUH kchituls•Enginews•PlannNs,Inc. - o _ " r 9W180 Forks Rd,Bulb 2B0 Raleigh,NC I N j .—_�_--_-j<"_-_ _ -IIn, j _ /// 979d4E0703 FA29�59MSTSSltl80 80 80 72 IF 38•CI.V RCP 0 0.24% ° 147—._ 80 "Lk.Nn 1"O1" _150 IF 38-CL V RCP O OcnR + I xDDc..DruE..x=sNn FaD'cD fin, ron mum wag F7 N v c*2 S IW.OUT(38•)=84.84 ELLIS 70 00 -1-00 0+00 1+00 2+00 2+50 -1-00 0+00 1+00 2+00 3+00 3+50 • E AIRPORT Station Station SYSTEM 1 SYSTEM 2 ALBERT J.ELLIS AIRPORT STRUCTURES AS-1 AND AS-2 STRUCTURES LS-1 AND LS-2 MICHLANDS,NC 110 — 110 110 tta 1�A + RBtELEV. =90.82 ALBERT J.ELLIS RN D.EV =91 8 r Ew NY.IN 1487=84.84 INV E INV.IN :481 =84.65 NEW TERMINAL 100 .'�c�.t-„_ - - a f INK au-(4S�=84.84 SW .OUT 08}84.35 AIRCRAFT PARKING (BY�OTHERS) ' NC LIES 100 100 -- 100 APRON AND (BY OTHEs) LANDSIDE ACCESS PROPOSED -. ' _\ f4.PROPPED GRADE ROADWAYS(PHASE I) m m 184 IF 24-Ct.V RCP 0 0. % MOTETS SEAL N a 90 --- — _ 7 NG 90 90 NE INV.I (2•�82.65 90 au 3 � N 4 �5 + r. 4 33 80i ----"\i 60 80 -6 0 DAWNS MES TO 8E �� (BTE 48'CLASS II RCP 93 tF 4B'CL 11 RCP O 0.1DX cam 46•CLASS mRCP sw NV.our(2•1=83.10 80 , O! CONNECT PROPOS. RCP OW OTHERS) tiA,BREa TO REMAINING WITH -E70S'TING 46•CLASS II RCP A CONCRETE PIPE .. (BY OTHERS) EXISTING GRADE CONSULTANTS SEE ' 70 70 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+50 -1-00 0+00 1+00 2+00 3+00 3+50 Station Station SYSTEM 3 SYSTEM 4 STRUCTURES LS-4,LS-6,LS-6A,LS-7,LS-9,AND UD-10 STRUCTURES AS-5 AND AS-6 110 110 110 110 EXILING GRADE 100 100 100 156 IF TV CI.V RCP O 2.24% PROPOSED GRADE 100 ELLGRAOF m , z m 0 90 SE IN.IN UB9=BS .- -_ < ----�----------------------- ---------- -- -_- - -___ -I 90 a 90 'Ltll LF HOPE O 0.20R 1 281 LF 6•HOPE O 0.20% ,11 r"-i— Lk UO-3 90 o E WING GRADE 'r r RIM ELEV.=92.50 NE IN.IN On-87.07 !!EE2 Nw IN.IN(61=87.07 80 .. NE IN.OUT(181=90.00 80 80 -=-92•27 RN NV. IN t6 57.64 S NY.OUT(d`)=87.07 80 SE IAV.OUT(61=88.20 SE INV. OUT(87=5784 REVISIONS ND. DESCRIPTION DATE 70 -1 70 -1-00 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 Station Station SYSTEM 5 SYSTEM 6 DATEE3MEDr DEC91eEN 20,2012 STRUCTURES AS-7 AND AS-8 STRUCTURES UD-1,UD-2,AND UD-3 REVIEWED Iffi SAM DRAWN SW MS DESIGNED ET me A@ PROJECT NUMBER 203-4169.003 203-11694104 CE1� ©amern=3d,tam we xus de E SHEET TrimMAR 11 2013 DRAINAGE STRUCTURES - PROFILES BY: SHEET NUMBER C531 NOT FOR CONSTRUCTION .mains C+pv_•o*\ p. .-12“rWmpI322 A t:3,-owa.., Malin on/3/5/2013 1.5 W PGW I$MI,mad 110 I 110 R LNG GRAD. IMPROVING YOUR WORLD 100 /-PROPOSED GRADE 100 RUH Architectangineers Plamers,Inc. BEw SO FDA,Rd,SWF 260 1,., - - Ra1.1gh,NC VOW 9194/6-6701 F6X919679A339 rt 90 282 LP 6'fflPE v 0207E 281 LF 8'HOPE 0 0.20% -- - - vorrumandhsom 90 WO CRdMLkEM A.39RA•I-0IN•C76 IdL ILEA RIM F ry - RIM ELEV.-9U 41 80 RDAEIEV. -92.68 NW ENV.IN[6)=67.80 NW ENV.N(6')-87.54 80PAdmi ELLIS SE ENV.OUT(6')-88.48 SE RN.OUT(61=67.90 NE W.N (81=8734 ontoA!R O RT s� SW ENV.OUT On=87.34 70 ALBERT J.ELLIS 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 AIRPORT Station RICNIJWDS,NC SYSTEM 7 ALBERT J.ELLIS STRUCTURES UD-4,UD-5,AND UD-6 NEW TERMINAL 110 AIRCRAFT PARKING 110 110 110 APRON AND UO-3 LANDSIDE ACCESS RIM ELEV. =92.50 ROADWAYS(PHASE I) M INV. IN(81-67.07 EXI's191G GRADE RIM ELEV.=994.00044 COSTING GRADE S W.OUT(8_..87.07 100 EN011�NENCSEE!LL 100 / PROPOSED CRADE 100 100 NW ENV.IN(c)=87.80 PROPOSED GRADE tI OAR SW ENV.OUT 87=87.80 -s a� jy RIM ELEV=-=-8t t9 c 4' v. .7 n ------------- ---___ E IW. IN 48 84.64 90 282-LF 6'1 arc O 0.21)% _ -------- -- 90 .261 LF 6 HOPE II o.zo11 so rt so - w W.our(48�=8484 Ta ¢ TwZols LF 8'HDPE O 0.30 i 1\ eONSMTANTS �� PoM ElEV.=94.99 RN L_EV.=9 0044 80 80 80 80 SE ENV.OUT( 1 8B.73 NW INV.IN,(67=88.17 NW NV.N,(87=87.60 SE INK OUT(6'k 88.17 SW ENV.OUT(LI'"87.60 RIM ELEV.(61 =87.3 litE1 1B LF 8'HDPE 0 0.30X NW RN. N (6'-87.3A NE W. (8}=67.3k 1 LF 8'HOPE 0 0.36% 70 SW ENV.OLT(8'}=87.3= I 0+00 - 1+00 2+00 3+00 4+00 5+00 6+00 7+00 0+00 1+00 2+00 3+00 4+00 Station Station SYSTEM 8 SYSTEM 9 STRUCTURES UD-7,UD-8,AND UD-9 STRUCTURES UD-3,UD-6,UD-9,AND LS-6 -10 110 110 110 LS=111. RIM E-EV.=94.26 RIM ELEV. =t NNV N(8')=87� 100 N INV.IN(1)-)=6/.'�9 PROPCGED GRAM cx NFAL IU!SWIM IMP INLtI 100 100 SW 9N OUT(16')-97.49 PROPOSED GRADE 10D SW 1W.OUT(I8')=87.49 (W OTHERS) CORING GRADE D ' LAISIMAI WPM WATER - m CONVECT TO OL a 90 --------------- ---- -� 90 0 90 -,'�-- SEPARA70R(BY OTHERS) 90 o � .'_ _ - I ? +, - - -: Li=. REVISIONS J rN64 M0. DESCRIPTION DATE • RIM ELY.=9 109LF'S'CL III RCP OOSO7T 80 80 80 S INK OUT(241=87.19 8U LF24'CLII RCP 00.167I 70 70 -1+00 0+00 1+00 2+00 3+00 4+00 0+00 1+00 2+00 3+00 SATE I96NB.DECEMEBER 9D,2012 Station Station REVIEWED WO SAE DRAWN BY, IBM SYSTEM10 SYSTEM 11 DESIGNED BY. EWEAEP PROJECT MINDER STRUCTURES LS-5 AND LS-6A STRUCTURES LS-8 2003-1169.004 REC t/V1 ®= .e 1. a== ...e.Dnn n3.3.K MEET TIT9E MAR 11 2013 DRAINAGE STRUCTURES PROFILES BY: - EMMET MEMBER C532 NOT FOR CONSTRUCTION Prods,:D\m..*kalt,\pa_usErVms15324\auem1-0bJ5304 PYgW m 3/9/2013 10.38 PM nalr h+ea.rnw..Dm1 11a 11a 110 I 110 PROPOSED GRADE - NRIM WINV.V.=9297 PROPOSED GRADE NW INV.IN(44=B5./2jr EXISTING GRADE EXISrNG GRADE SE INV. IN(351 -85.41 1 RIM EL_V.=9228 IMPROVING YOUR WORLD NW INV.IN(8� 91.50RIM ELEV...90.54 SW INV.OUT(87-90.25 100 SW IN.OUT 481=85.31E INV.IN (87=88.50 100 100 1 DO NE INK 1N(48�=84 95 RUH Arehtectsagineersanners,Inc. 8601 SO Fedn Rd.SUR RN m mR.INOh.NCTi815o` 90 -------- `° _ 90 e1 oaf _- brae WI%E wm o - + 90 = 90 - - xuDcxorllElERn.RN1•F0E•DR ���-- IF 5'HDPE C 0.55% ---- LICII RN ELEV.= 91.03 80 NE NV.IN�358 LF 48'CL 11 RC2 0 0.10% 80 80 W W.OUT((B)=89.00 80 5 ELLIS AIRPORT 0+00 1+100 2+100 3+00 4+00 5+00 0+00 1+100 2+00 3+00 4+000 ALBERT J.ELLIS AIRPORT Station Station MIRANDA NC SYSTEM 12 SYSTEM 13 ALBERT J.ELLIS STRUCTURES LS-9A AND LS-16 STRUCTURES UD-10 AND UD-11 NEW TERMINAL AIRCRAFT PARKING 110 110 110 110 110 110 APRON AND LS-15 LANDSIDE ACCESS 1172 PROPOSED GRADE PROPOSED GRADE RDA Ei EV.=93.99 RIN F3E► -9542 jg 1g RIM . =93.94 .E u IAr.IN(181-58.08 ROADWAYS(PHASE I) SE IN. OUT(8�=93.38 RIM ELEV.=9297 W SW. OU 181) = .52 NE INV OUT(387-88.30 NW INV.IN(42')=85.72 RIA ELEV.=9 MING GRADE SE INV OUT(427=8598 RNGIIEEFs SEAL 100 SE INV.E(al-au, 100 100 100 1 DO ::° nlxnlly, NW INV IN(87=91.50 E INV OUT('87=86 70 PROPOSED GRADE ZN CARD SW INK OUT(48")=85.31, ---------- _---- f COSTING GRADE 2�? ��;_ 0 90 o 90 9a ------ o 80 158 LF 8-HOPE O 1.19% G GRADE 80 80 182 LF 18'CL II RCP O O.1D eoNsu�TANm Ls-13 202 LF 18'a III RCP 0 0.10%J LS=L4 IV RDA ELEV. =93.94 Bo ea IaM ELT.=9s.es ea W INV. N (18') =88.52 VW INV. IN (18')=58.22 OF IIN CHIT(IR')-N949 SF INK OUT 081-55.12 38 IF ir CI.II RCP 0 0.10% 70 70 70 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 Station Station Station SYSTEM 14 SYSTEM 15 SYSTEM 16 STRUCTURES LS-16 AND UD-12 STRUCTURES LS-12 AND LS-13 STRUCTURES LS-13,LS-14,AND LS-15 no no no 110 no • 110 PROPOSED GRADE RIM ELEV. - LS_10 PROPOSED GRADE NW INV.N(42') =85.72 RIM ELEV.=89.71- LR-18 _ S: I N.IN(38• EL�i 41 7 NW INV.OUT(247=85.83 RNW I IN(42�9=8572 100 UMW GRADE luv E(57 =91 90 100 100 E><SRNG GRADE 9E INV. IN (NY) =65.41 SW IW.OUT(451=55.31 NW INV.IN(87 =4150 100 100 MN Imo, N(12�=9330 too SW INV.OUT(481=55.31 ---- - 0 90 - 90 0 90 - 90 0 90 - 90 r - o - y. a- m REVISIONS D F = _ 1- 34 IF 12'CL II RCP 0 0.29% NO. DEICmpT1oN DATE LS15 81 LF 24'CL III RCP 0 0.102 \\ 5 V.OUT 12 93.40 80 RI; ELEV. 93.88 80 80 \ 80 80 Lw INV. 80 -_= NMINKN(1B)=88.08 LF4rCL III RCF00.1O% RIM�V -a2.30 ll 38LF38'CLIIIRCP00.10% N.INV.OUT(38')-88.30 S INV.IN(24 -85.5{ SE INV.OUT on-85.98 NE INK N(2A�-85.54 70 NW INV.OUT(357=85.44 70 70 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 0+00 1+100 2+00 DATE IEEUER DECE0BE1 Y0,2012 Station Station Station REVIEWED HTe 11E . DRAWN WO NW DESIGNED BYe E11 SYSTEM 17 SYSTEM 18 SYSTEM 19 AEF PROJECT NUMBER STRUCTURES LS-15 AND LS-16 STRUCTURES LS-10,LS-11,AND LS-18 STRUCTURES LS-18 AND LS-19 2 116 m04 SHEET TITLE DRAINAGE E IV STRUCTURES PROFILES MAR 1 1 20t3 BIEET NUMBER C533 ��� NOT FOR CONSTRUCTION C..49:C\PP_w,*yn_c+W-b...V=+mr\asv1-CUsvr., wawa=S/Mzu Ills PM Pixw by:axwmn.Michael 120 120 7`- RM ELEV.-9208 R.911 110 110 110 RIM ELEV. =93.25 NW IN.IN(6'=90.53 NW li IN..IR(I-) =91.2' ! I 64 =95 57 110 110 1 10 IMPROVING YOUR WORLD SE IN.OUT(87-90.72 --__---■ EH Architects Igineers�Iann1IS,Inc uD-IA MD RIM ELEV.-94.31 -------■ 91Ef 4S64 701For FAX Rd.,Selo 43 E70SIING SE IW.our -92.27 R.A IDn,NC laws oom 1 DO 28 LF 12'CL III RCP O 0.63X 100 100 (� 100 100 10D wDaa661m FAxinow.rsrinm9f=s�3aT39 rn PROPOSED GRADE NO aRlw IkonNoLlNDJwIN.cN PROPOSED GRADE 79 IF 36'CL II RCP 0 0.1• �� ■0 m -�T'�- _-_ _- -=• E9ISIING GRADE I __________________ 0 90 I 90 90 I -e- _ �__ �� 90 0 90 i��f ---""r-----__ 90 �$-27 151 IF 8' HOPE 0 0 345g. ELLIS _ EXISTING GRADE NW IN(18� 86.OB , _ - �LtC AIRPORT NW NV.IN(12�-9250 (36 �Er ��.ED StRUCNRE O. UD 14 NE OUT - 86.30 24' PTO 80 80 80 . ALBERT J.ELLIS 14-20 LW NV. IN(6 -91.75 8D 80 . N I . IN (24� =25 80 SW NV OUT(12�-92.68 SE W.OUT(• =91.75 67 Lf 6'HOPE O 0.28X CO , .- - FlE p RIM ELEV.=9205 /2:.a 3 a_1 y, AIRPORT 19 IF 6'HOPE O 0.28% -- . IN (18')-89.78 ■ RICMLANOS.NC 70 I + 70 IN =86•22 70 0+00 1+00 2+00 0+00 1+00 2+00 3+00 4+00 4+50 -1+00 0+00 1+.0 2+00 2+30 ALBERT J.ELLIS Station Station Station NEW TERMINAL AIRCRAFT PARKING SYSTEM 20 SYSTEM 21 SYSTEM 22 LAND8IOOE Access STRUCTURES LS-20 AND LS-21 STRUCTURE UD-13,UD-14,UD-15,AND LS-17 STRUCTURES LS-15 AND LS-24 ROADWAYS(PHASE I) no D 110 no 110 ENOINEER`S REAL RIM EY.=9208 _� D05TING GRADE pI��N N NW INV. IN 981-90.53 SE INV.OUT(241=B6.65 ?�I' �y,'1` SIN INV.OUT(241=85.67I 1 LF 24'CL II RCP 0 O.10X 100 E1IISnNG GRADE 100 100 y PROPOSED GRADE 100 C PROPOSm GRACE . _92.05 OF. N a! BRA "-' _�� m --- SE IN. IN (18') = 59.76 r CONSULTANTS 0 90 [74' F 90 Q 9D SW INV. IN (36� _ 86.22 111 [- 90 o _ .----- TIE :•,- , 15'RCP TO I-1 // ` LS-11 •..•.:'o SIRUCIURE / RIM B.W.-92 30 N IN.IN(157-89.08 80 J SE Iw-PI(2}l_�5a 80 80 �•.,I�- •+•.- am FFIO r TIC G 24'RCPTO NO NE 1W.N(24')-85.54 VERIFY EtEVA710N 1�23 126 Li 24°CL III - P 0 0.10X NW IN.OUT(36'- 35.44 82 IF 24'CI.III RCP•0.10X RN�--93.92 N INK IN 24 NW I .N(241=86.57 VERFY ELEVATION. 70 SE I .OUT(24'-86.47 70 0+00 1+00 2+00 3+00 -1-00 0+00 1+00 2+00 3+00 3+50 Station Station SYSTEM 23 SYSTEM 24 STRUCTURES LS-11 AND LS-17 STRUCTURES LS-22,LS-23,AND LS-24 120 120 Is-r2 RIM Ely.-93.40 110 NG INK UUT(11f) 06. 110 SW IN.OUT(181-88.54 DIETING GRADE REVISIONS NO. DESCRIPTION DATE 100 RN EEV.=93322 GRADE 100 110 110 NE IN.N(8')=86.47 NW IN.N(24 86.57 1�2,1 EXISTINi GRADE SE W.OUT(24 86.47 NNI EI8Y.-NL4J �� j� rn I 1 NW INV.OUT L181=90.10 t�2a 0 90 90 100 =Rno G RIM ELEV. 92<05 100 NN NV.IN(247•66.40 - SE NV.IN(187 -89.76 DATE=UMI.DECEMSER 20,1012 rn - -- REVIEWED BY, NAB DRAWN DY, IMO 80 74'IF 18'HOPE 0 O. =al 80 11 90 - - 90 DESIGNEDn, Isis RIM ELEV.=93.50 j AEP PROJECT NUMBER 57'IF 10'HOPE O 0.10X SW NV.IN(In -86.64 203vl169 GNa 140 IF 18'CL II RCP 0 0 ®xaaR.r,004 9• re. 70 -- 70 80 - Te 27O .4'RCP M 80 5NIETTrtaE N NV.N 241-8825 VERIFY ELEVATION. FlELD DRAINAGE 60 7D STRUCTURES 0+00 1+00 2+00 3+00 0+00 1+00 2+00 3+00 3+50 PROFILES Station Station SHEET NUMBER SYSTEM 25 SYSTEM 26 C634 STRUCTURE LS-23,LS-27,AND LS-28 STRUCTURES LS-25 AND LS-24 NOT FOR CONSTRUCTION Draw.,cNn_..eM\.+t-nW.-NO\a.*srl.\.....-adsa.a Pww o.e 3/e/20Id 11.11 w nmr Is.e.Iw=,..M,..I 110 110 110 110 110 -_--_ 110 MI PROPO.SIJ GRADE • _�--' r n 15-28 EXISTING GRADE EXISTING G' ,E IMPROVING YOUR WORLD 100 ITE2 100 tOD RIM ELEV. - 94A9 /- 100 1ODM t00 RSBHArchiects•Englneers•Planners,Inc. / �� 801 SD Forks Rd,Suite 260 0 90 ---� -!!!� 90 (2 90 ---___ 90 Raleigh.ISI.0615 —_—I— 90 rt 90 < 919d666701 019473411139 I wwN.nenln.Dan o > PROPOSED GRADE o �IIc:ii• 1. PROPOSEIk GRADE wncwn,u>.xo•Non•wIN•cN •IRTi3l---RIM ELEV.-9367 RIM ELEV. =93.41 ---- 60 THIS « RE WILL B 80 60THIS UCiURE WILL BHA 60 8D '"J ELLIS NEENAH R—,165 CURB —__ NEENAH R-3165 CURB NLET FRAM THIS IIRSTRU , RE WILL B 80 :.11 ., :.. •: -:•,I • 2. - E• NEENAH R—, 165 CURB THAT WILL RAIN TO A CDOT CON• ETE THAT WILLDRAIN TO A NCDOT CONCRETE THAT WILL DRAIN TO A DOT iiiii FLUME TO E OPEN •• ANCE, FLUME • TIE OPEN CCNVEYANCE FLUME TO TI1E OPEN ••NVETANCE 70 70 • 70 ALBERT J.ELLIS -1 00 0+00 1+00 2+00 —1+00 0+00 1+00 1+50 —1�I-00 0+00 1+00 2+00 AIRPORT Station Station Station RICHLANDS,NC SYSTEM 27 SYSTEM 28 SYSTEM 29 ALBERT J.ELLIS STRUCTURE LS-23 STRUCTURE L3-25 STRUCTURE LS-26 NEW TERMINAL AIRCRAFT PARKING APRON AND LANDSIDE ACCESS ROADWAYS(PHASE I) ENGINEER'S SEAL 11 CART]E�6s N01kA.91t�``'t CONSULTANTS REVISIONS Na DESCRERION DATE 1 DATE MUSH OEGBIIEER 00.2012 SEVIEIIED OD SAE DRANK ITT EIB DEOIS1IEO IT• NM ARP PROJECT NUMBER 203.1169.003 203.1169.004 ea.a awn Aomom,we. SHEET TITLE CEIVE DRAINAGE STRUCTURES li MAR 1 1 2013 PROFILES ONSET NUMBER gv: C535 NOT FOR CONSTRUCTION Dmr i c\-_*'J.�1AA_usa\Nes.OLI\GC511-0.3... Pill erc 3/I/]01]1IrS PM Rolled 2$BsVm.,Mel= AIRPORT SUPPLEMENT SPREADSHEET %Disconnected Disconnected Connected { i. Length of Length of Impervious %Impervious °Open Impervious Area r - River Basi Development Area Open Space ImperviousImpervious Piped Vegetative Area (% BUA) • Space Area (Of Total Area Numbers Conveyance Conveyance Impervious) Fr (Acres) (Acres) _(Acres (Acres) r- (Acres) rHrs) _ et) (Feet) i Existing 454.12 55.84 12.30% 398.28 87.70% 51.61 92.44% • 4.22 1 65.5 3.89 7,561 40,572 Cape Fear Proposed 454.01 62.18 13.70% 391.83 86.30% 58.13 93.48% 4.05 66.1 3.89 8,108 41,867 Future 454.01 91.65 20.19% 362.36 79.81% 89.78 97.96% 1.87 68.5 3.89 See Note 4 See Note 4 Existing 222.77 31.79 14.27% 190.98 85.73% 29.54 92.93% 2.25 66.3 4.16 2,539 24,730 White Oak Proposed 222.87 30.99 13.90% 191.88 86.10% 29.46 95.06% 1.53 66.1 4.16 2,309 I 25,446 Future 222.87 37.76 16.94% 185.11 83.06% 37.44 99.16% 0.32 67.3 4.16 See Note 4 See Note 4 Disconnected Total Total% DisconnIi Connected Length of Length of Total Site Total Ope Total% mpervious Area Curve ViDevelopment Impervious Impervious(°� Empery Impervious Pipe Vegetative Areae (Of Total Number'Area BUA) AreImpervious) Area Conveyance Conveyance -a.. (Acres) (Acres).-- . , _,(Acres (Ac L (Acres) _ Irs)._W. .,(Feet) (Feet) Existing 676.88 87.62 12.95% 589.26 87.05% 81.15 92.62% 6.47 65.8 1 N/A 1 10,100 65,302 Airport Totals Proposed 676.88 93.17 13.76% 583.71 86.24% 87.58 94.01% 5.59 66.1 N/A 10,417 67,313 Future 676.88 129.40 19.12% 547.48 80.88% 127.22 98.31% 2.18 68.1 N/A See Note 4 See Note 4 Notes: 1. Proposed development includes the new terminal and airside/landside projects(Phase I shown on Figure 4). 2. Future development includes development Phases II-V. 3. Future development impervious area shall be disconnected to the maximum extent practible. 4. Future development shall utilize vegetative conveyances to the maximum extent practicable. Piped conveyance shall only be used as culverts under roadways, runways,and taxiways. PC ey,. Ni§' PROPOSED DRAINAGE SUB-BASINS& BMP DEVICES/PRACTICES Treated at Volume Req`d Storage ; Basin Name _ •ervious �' lmpervious Point of Simple Method Provided Treatment ID No. River Basin- _Area(Acres) Area(Acres) Area (Acres). Treatment Device. Description of Area Generation? P=1.5" (CF) (CF) OAJ-01 Cape Fear 40.41 39.40 1.01 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-02 Cape Fear 32.14 30.70 1.44 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road Yes 0 OAJ-03 Cape Fear 41.06 40.10 0.96 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road Yes 0 OAJ-04 Cape Fear 23.43 22.51 0.91 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road, Runway Yes 0 OAJ-05 Cape Fear 3.26 2.37 0.90 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road, Runway Yes 0 OAJ-06 Cape Fear 57.89 47.78 10.11 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road,TW A Yes 0 OAJ-07 Cape Fear 17.16 11.97 5.19 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Runway,TW A Yes 0 I OAJ-08 Cape Fear 14.72 9.92 4.80 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Runway,TW A Yes 0 OAJ-09 Cape Fear 13.20 8.77 4.44 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Runway,TW A Yes 0 OAJ-10 Cape Fear 45.07 42.00 3.07 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road, Runway Yes 0 20000 OAJ-11 Cape Fear 4.36 4.29 0.06 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road Yes 0 OAJ-12 Cape Fear 27.82 20.83 7.00 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road, Runway Yes 0 OAJ-13 Cape Fear 28.26 27.12 1.14 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road Yes 0 OAJ-14 White Oak 19.70 15.40 4.30 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Apron, Road,TW A Yes 0 OAJ-15 White Oak 9.93 6.33 3.60 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Runway,TW A Yes 0 OAJ-16 White Oak 8.74 5.57 3.17 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Runway,TW A Yes 0 OAJ-17 White Oak 23.64 19.29 4.35 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road, Runway Yes 0 OAJ-18a White Oak 13.89 12.98 0.91 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-18b Cape Fear 45.53 44.17 1.36 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-19 White Oak 9.72 8.75 0.97 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-20 White Oak 6.80 5.67 1.13 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-21 White Oak 9.31 8.12 1.19 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road, Runway Yes 0 OAJ-22 White Oak 37.55 36.62 0.92 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 12000 OAJ-23 White Oak 1.03 0.80 0.23 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-74 White Oak 1.17 1.00 0.17 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-76 White Oak 1.40 1.16 0.25 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Parking Lot, Road Yes 0 OAJ-82 White Oak 0.81 0.77 0.04 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Parking Lot, Road Yes 0 OAJ-90 White Oak 2.26 1.51 0.75 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Parking Lot, Road Yes 0 OAJ-92 White Oak 6.05 1.26 4.80 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Apron,TW A Yes 0 Other Pery Area White Oak 68.75 67.88 0.87 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Open Space, Road Yes 0 Other Pery Area White Oak 0.87 0.87 0.00 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Open Space Yes 0 Other Pery Area Cape Fear 22.40 22.40 0.00 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Wooded Area Yes 0 _-- , T r*V. ome R 1d' : Storage . rested Basin Name/ l Pervious Impervious . Point of Simple Metho Provided Treatment ID No. River Basin, 'rea (Acres) Area(Acres) Area (Acres) - ill -nt Device Description of Area : Generation? ' -1.5" (CF) (CF) OAJ-101 , Cape Fear i 6.16 2.96 3.20 • Disconnected Surf.,Veg. Filter Strip, Grassed Swale Apron,TWA Yes 0 OAJ-102 Cape Fear 1.33 0.89 0.45 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Apron, Road Yes 0 OAJ-103 Cape Fear 6.59 2.77 3.83 Disconnected Surf.,Veg. Filter Strip,Grassed Swale, Detention. Apron Yes 0 1850 1 OAJ-104 Cape Fear 2.22 1.44 0.78 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road Yes 0 • OAJ-105 1 Cape Fear 1 1.70 0.69 1.01 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Apron,TW A Yes 0 OAJ-106 Cape Fear 0.13 0.13 0.00 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Landscaped Area Yes 0 • OAJ-107 I Cape Fear I 1.10 • 0.52 0.58 Disconnected Surf.,Veg. Filter Strip, Grassed Swale 1 Apron Yes I 0 PROPOSED DRAINAGE SUB-BASINS& BMP DEVICES/PRACTICES --. . - - - _ Treated at Volume Req`d - Storage - Basin Name/ li , Pervious Impervious = Point of Simple Method Provided reatment ID No. River Basin r Area(Acres) Area(Acres) Area (Acres) ' Treatment Device Description a Generation? P=1.5" (CF (CF) OAJ-108 Cape Fear 5.78 1.27 4.51 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Apron,TV,/A Yes I 0 OAJ-109 Cape Fear 0.57 0.43 0.14 Disconnected Surf.,Vegetative Filter Strip Sidewalk, Flag Memorial Yes 0 OA1-110 White Oak 2.36 1.67 0.69 Connected Impervious, Discharges to Grass Swale Parking Lot, Road Yes 4026 • OAJ-111 Cape Fear 0.53 0.15 0.37 Connected Impervious, Discharges to Grass Swale Road, Sidewalk No 1980 OAJ-112 Cape Fear 0.52 0.15 0.37 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road,Sidewalk Yes 0 OAJ-113 Cape Fear 0.12 0.04 0.08 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road,Sidewalk Yes 0 OAJ-114 Cape Fear 0.41 0.00 0.41 Connected Impervious, Discharges to Grass Swale Parking Lot No 2145 • OAJ-115 Cape Fear 1.00 0.73 0.26 Disconnected Surf.,Veg. Filter Strip, Grassed Swale Road Yes 0 380 OAJ-116 Cape Fear 0.88 0.00 0.88 Connected Impervious, Discharges to Grass Swale Terminal Building No 4561 OAJ-117 Cape Fear 0.34 0.00 0.34 Connected Impervious, Discharges to Grass Swale Road,Sidewalk No 1735 OAJ-118 Cape Fear 0.27 0.04 0.23 Connected Impervious, Discharges to Grass Swale Apron No 1215 OAJ-119 Cape Fear 0.79 0.26 0.53 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road,Sidewalk Yes 0 OAJ-120 Cape Fear 0.30 0.25 0.06 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road Yes 0 OAJ-121 Cape Fear 0.07 0.00 0.07 Connected Impervious, Discharges to Grass Swale Trash Facility No 347 OAJ-122 Cape Fear 1.37 0.43 0.94 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Parking Lot, Road Yes 0 OAJ-123 Cape Fear 1.09 0.74 0.35 Disconnected Surf.,Veg. Filter Strip,Grassed Swale, Detention Road,Sidewalk Yes 0 440 OAJ-124 Cape Fear 0.27 0.12 0.14 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Road,Sidewalk Yes 0 OAJ-125 Cape Fear , 0.09 0.07 0.01 Disconnected Surf.,Vegetative Filter Strip Road,Sidewalk Yes 0 OAJ-126 Cape Fear 0.05 0.04 0.01 Disconnected Surf.,Vegetative Filter Strip Sidewalk Yes 0 OAJ-127 Cape Fear 0.84 0.24 0.60 Connected Impervious, Discharges to Grass Swale Road,Sidewalk No 3163 OAJ-128 _ Cape Fear 0.46 0.19 0.27 Disconnected Surf.,Vegetative Filter Strip Parking Lot, Sidewalk Yes 0 OAJ-129 Cape Fear 0.57 0.00 0.57 Connected Impervious, Discharges to Grass Swale Parking Lot No 2953 OAJ-130 Cape Fear 0.64 0.00 0.64 Connected Impervious, Discharges to Grass Swale Parking Lot No 3312 OAJ-131 Cape Fear 1.10 0.26 0.84 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Parking Lot Yes 0 OAJ-132 Cape Fear 1.34 0.56 0.78 Disconnected Surf.,Veg. Filter Strip,Grassed Swale Parking Lot, Road Yes 0 OAJ-134 White Oak 0.67 0.12 0.55 Connected Impervious, Discharges to Grass Swale Road,Sidewalk No 2891 OAJ-135 White Oak 1 0.02 I mpervious, Discharges to Grass Swale Road No 81 OAJ-136 White Oak 0.57 0.20 0.37 Disconnected Surf.,Vegetative Filter Strip Parking Lot, Road Yes 0 OAJ-137 White Oak 0.88 0.12 0.76 Connected Impervious, Discharges to Grass Swale Parking Lot No 3951 Treated at'-"-' Volume Req'd Storage Perviousmpervious Point of Simple Method Provided 41.1.tBasin Name River BaI .... .... . ... ......... rea (Acres) Area(Acres) evice ' Description of • 'Generation? P=1.5" (CO (CF) Cape Fear 455.33 389.69 65.64 See above See above See above 21,412 22,670 Totals: White Oak 226.11 196.08 30.03 See above See above See above 10,950 12,000 I Airport 681.45 585.77 95.68 See above See above See above 32,362 34,670 ,fit � i 40' a . __...,.. ,, . .. try 4. , ,r ,A -i too. i ' . l'aie , A 2 _ k Y -1 Y.�Xis • .f sl{ =Pt ELIA "*.°F.... ! E OAJ AIRPoRT ALBERT J. ELLIS AIRPORT STORMWATER MANAGEMENT FACILITIES MASTER PLAN CONCEPTUAL DESIGN REPORT Onslow County ������ Jacksonville, North Carolina RS&H No. 203-1169-002 JAN 0 2 2013 December 2012 APPROVED BY:`Z)I93/chi NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION „Rs!'" DIVISION OF WATER/ QUALITY o_%1 i i,/, , J' _GC6 .. ;( �/i IMPROVING YOUR WORLD 02 — �A �� •' '" RS&H Architects-Engineers-Planners, Inc. ct 0( Z • � 4 8601 Six Forks Road, Suite 260 o 36$ • 3 Raleigh, North Carolina 27615 �: (919)846-6701 % sl;lit tilik;-4.• www.rsandh.com `. /Architectural, Engine ring,Planning. LY Environmental Services Reynolds,Sn..t{h and I-iUls,inc. 2008 Corporate Center Drive Suite 410 Charintt ,NC 28226 Voice:(704)752-0810 Fax: (704)541-3081 December 19, 2012 rph Linda LewisEnvironmental Engineer IllO NCDENR Division of Water Quality 815 ?0j3 127 Cardinal Drive Ext. Wilmington, NC 28405 (910) 796-7301 RE: Albert J. Ellis Airport Stormwater Permit Onslow County Dear Ms. Lewis: Please find the enclosed airport stormwater permit package for the above referenced project. Below is a list of the action items from the second meeting on June 11, 2012. Please review our responses to the actions items. These responses and resulting changes can also be found in the permit narrative. Action Items 1. The RS&H Team is to develop a conceptual plan for the public parking lot redevelopment illustrating the envisioned application of stormwater BMP's consistent with what is being adopted elsewhere in the terminal area. Action:A conceptual plan for the public parking lot has been developed and is shown in Figure 4. The existing parking lots are directly connected to the stormwater collection system. The proposed conceptual plan will utilize sheet flow into grassed swales to disconnect all impervious parking areas within the loop road. There will be no piping except for culverts under roads and sidewalks. The plan also proposes using pervious pavement such as pavers for all sidewalks associated with the parking lot. Also, the impervious parking rule is met with the conceptual plan as 65%is Impervious and 35%is pervious. This change significantly reduces the amount on connected impervious on the airport. Refer to the Airport Supplement Spreadsheet in Appendix C of the enclosed report. 2. RS&H shall add a notation to the stormwater master plan stating that the proposed land acquisition acreage shown on the master plan is not included in the low density permit. Action: The requested notation has been added to all exhibits that show the future land acquisition area. The land acquisition acreage and associated future BUA have been Page 1 of 2 removed from the Airport Supplement Spreadsheet in Appendix C. An airport supplement spreadsheet that represents the overall future development with the land acquisition included is shown in Appendix G, for refororwe only. 3. RS&H shall analyze other BMP options for the terminal roof drains that meet the requirements of the NFPA Code and FAA criteria. Action: The terminal roof drain collection system that drains to the airside of the building (approximately half of the roof area) is being treated by an oil-water separator before entering the stormwater collection system. The portion of the roof that drains from the landside portion of the terminal building is connected directly to the stormwater system. All of the roof drains are fitted with a raised and slotted drain to prevent any debris from the roof from entering the drainage system. See attached building plans for roof collection system layout and details. 4. RS&H will initiate an Express Permit for the modification of the high density permit that LPA filed for the 2 sandfilters in order to get a permit to receive local building permits and initiate contract awards for the first to enabling projects_ The Express Permit will be presented on 6/21/2012 at 3:00 pm at the Wilmington NC NCDENR Office by Mr. Blackmore. Mr. White will need to provide a$2,000 application fee and sign and notarize the application. Action: The Express Permit package to modify permit SW8 000810 for the New Terminal and T-Hangar Relocation project was submitted on June 21, 2012. Request for Additional information was received, and comments were addressed and submitted to NCDENR on July 3,2012. A permit for the construction of the project was received on July 26,2012. Please let me know if you have any questions or concerns by phone at 904.256.2137 or by email at i stin.dewey@rsandh.com. Sincer Justin ewey, PE, CFM Senior Water Resources Engineer cc: Chris White,OAJ Airport Sean Brennan,RS&H File Page 2 of 2 fish? IMPROVING YOUR WORLD Reynold.,smith and His Inc. TABLE OF CONTENTS LIST OF TABLES 2 LIST OF FIGURES 2 LIST OF APPENDICES 3 1.0 GENERAL INFORMATION 4 1.1 Project Location 4 1.2 Project Need 4 1.3 Project Description 5 2.0 EXISTING CONDITIONS 6 2.1 Existing Basins 6 2.2 Soils 7 2.3 Groundwater 8 2.4 Existing Stormwater Management 8 3.0 PERMITTING 9 3.1 Permitting History 9 3.2 Proposed Permitting 12 3.3 Anticipated Permits 13 4.0 PROPOSED AND FUTURE CONDITIONS 14 4.1 Proposed Basins 14 4.2 Design Criteria 14 4.3 Hydrologic Parameters 14 4.4 Disconnected Impervious Area 15 4.5 Best Management Practices 16 4.6 Environmental Impacts 17 5.0 CONCLUSIONS AND RECOMMENDATIONS 19 6.0 SCHEDULE 19 7.0 REFERENCES 20 ELLIS 1 "0 OAJ_ AIRPORT 11 IMPROVING YOUR WORLD Reynolds.Smitn m a Hide,Inc. LIST OF TABLES Table 1 -OAJ Existing Basin Parameters 7 Table 2- OAJ Existing Permit History 10 Table 3- OAJ Proposed & Future Development 11 Table 4- OAJ Proposed Basin Parameters 15 LIST OF FIGURES Figure 1 - Project Location Map 4 Figure 2- USGS QUAD MAP A Figure 3-AIRPORT LAYOUT PLAN A Figure 4- DEVELOPMENT PLAN A Figure 5- EXISTING CONDITIONS A Figure 6-SOILS MAP A Figure 7- EXISTING CONDITION CONVEYANCE A Figure 8- EXISTING CONDITION CONVEYANCE A Figure 9- EXISTING CONDITION FLOW PATHS A Figure 10- EXISTING CONDITION FLOW PATHS A Figure 11 - PROPOSED CONDITION CONVEYANCE A Figure 12- PROPOSED CONDITION CONVEYANCE A Figure 13- PROPOSED CONDITION FLOW PATHS A Figure 14- PROPOSED CONDITION FLOW PATHS A Figure 15- EXISTING CONDITION CONNECTED IMPERVIOUS A Figure 16- PROPOSED CONDITION CONNECTED IMPERVIOUS A Figure 17- PROPOSED CONDITION STORMWATER MANAGEMENT A ELLIS 2 "'; �•, AIRPORT viger "S IMPROVING YOUR WORLD Reynolds.Smith and Hills.Inc. LIST OF APPENDICES A REPORT FIGURES B GEOTECNHICAL INFORMATION C SUPPLEMENT FORMS AND CALCULATIONS D OPERATION AND MAINTENANCE PLAN E MEETING MINUTES FROM JUNE 11, 2012 F TERMINAL ROOF PLANS G FOR REFERENCE ONLY- AIRPORT SUPPLEMENT SPREADSHEET WITH LAND ACQUISITION AND ASSOCIATED BUA ELLIS 3 a' 4i OM, AIRPORT �� 1181►.:: IMPROVING YOUR WORLD rtoynNd$.a{ml h end HIt.,Ine. 1.0 GENERAL INFORMATION 1.1 Project Location The proposed development is located at Albert J. Ellis Airport (OAJ) in Onslow County, North Carolina. See Figure 1 below for a general location map. Refer to Figure 2 in Appendix A for the USGS Quad Map. Figure 1 — Project Location Map 1 i a. i-+F... 1 1 1 z.Li 1..1'1 Crodata' ALBERT J.ELLIS AIRPORTNal"l`i !I�r r i li i";x Forrn F a SOW a • i'til.illid16111.-11k* Tcp__ KEYI'4IAP W1li't 1iftglo1 +J 4 1.2 Project Need Several reasons exist in support of the need for this project. Most importantly is the Airport's need for a new terminal and support facility so that it can meet the forecasted demand and remain competitive and relevant as the regions primary commercial and cargo service airport. Along with the terminal development plan, the Airport has the desire to place all the current and future proposed development on property under a single stormwater permit. This application requests that all existing permits be replaced with a single airport specific permit following the guidance of the NCDENR BMP DEL IS 4 . ; Oki AIRPORT RS41 IMPHOVSNO YOUR WORLD Reynolds.Smith end Hills,Inc. Toolbox for Public Airports. The primary driver for this action is to reduce wildlife attractants on and near the airfield in order to increase the safety of the air traveling public. Since many traditional stormwater management practices promote standing water for extended times, they have been identified by the. FAA, NCAA, NCDENR and other aviation industry stakeholders as wildlife attractants that are hazardous to aircraft. This is discussed in FAA Advisory Circular 150/5200-33B, Hazardous Wildlife Attractants On or Near Airports. In accordance with the FAA Advisory Circular, North Carolina Senate Bill 229 Part VI states that DENR shall not require stormwater control measures with standing water at airports and shall permit BMPs such as grassed buffers, shoulders, and grass swales that provide overland flow and infiltration. Thus, the underlying goal of the new airport permit and BMP toolbox for airports is to reduce or eliminate these practices while implementing other practices which have been shown to provide equal or better stormwater treatment. 1.3 Project Description The airport development is in accordance with the approved Airport Layout Plan (ALP) shown in Figure 3, Appendix A. Development from the ALP is divided into five construction phases described below. Refer to Figure 4 in Appendix A for the Proposed Development Projects. Phase I will be constructed first and is referred to as the "proposed" condition in this report and analysis. The "future" condition is the site development after the remaining phases have been constructed. Phase I: • Passenger Terminal and Associated Infrastructure (Landside and Airside) • Land Acquisition Phase II: • GA Facilities, including terminal, parking lot, apron, replacement hangars, etc. • Rental Car Maintenance Facilities Phase III: • GA Facility Access Road • Air Traffic Control Tower, Access, and Parking • Airport Maintenance & Equipment Storage Facilities Phase IV: • Fuel Farm Relocation • Parking areas • Runway 23 Hold Apron & Runway 5 Extension Phase V: • Runway 23 Extension • Additional Airport Development ELLIS 5 OAJAIRPORT IMPROVING YOUR WORLD Reynaldo.Smith and Hilo,Inn Existing Conditions 1.4 Existing Basins The airport property is divided into two basins: South and North. Refer to Figure 5 in Appendix A for the Existing Drainage Conditions. The South basin contains the majority of the airfield and terminal area on the airport property. Existing collection systems, overland flow, and swales convey stormwater to intermittent streams which discharge to Back Swamp located in Cape Fear Basin. Back Swamp is classified as Class C Swamp waters (C;Sw). Class C is a primary freshwater classification described by DWQ as "waters protected for uses such as secondary recreation, fishing, wildlife, fish consumption, aquatic life including propagation, survival and maintenance of biological integrity, and agriculture. Secondary recreation includes, "wading, boating, and other uses involving human body contact with water where such activities take place in an infrequent, unorganized, or incidental manner". Swamp waters is a supplemental classification described by DWQ as "waters which have low velocities and other natural characteristics which are different from adjacent streams". The North basin contains a smaller portion of the airfield and terminal area. Existing collection systems, overland flow, and swales convey stormwater to intermittent streams and ditches/canals which discharge to Southwest Creek in White Oak Basin. Southwest Creek is classified as Class C Nutrient Sensitive Waters (C;NSW). Class C is a primary freshwater classification which is described above. Nutrient Sensitive Waters is a supplemental classification described by DWQ as "waters needing additional nutrient management due to being subject to excessive growth of microscopic or macroscopic vegetation". The hydrologic parameters of the existing basins are summarized below in Table 1. ELLIS 6 4,. OAJ AIRPORT R8H IMPROVING YOUR WORLD IIaynolds,Small and Hilly,he. II Table 1 - OM Existing Basin Parameters ' --Tr"il .-w o 1 w. .. I Total 0 4 si o N to Basin I Area ° '0 _ a I E 0 © o CAPE FEAR 454.12 [ 55.84 12.30 51.61 65.5 3.89 WHITE OAK 222 77 31.79 14.27 29.54 66.3 4.16 AIRPORT 676.88 87.62 12.96 81.15 65.8 N/A TOTALS 1 1.5 Soils The U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS) maps for Onslow County, North Carolina (see Soils Map in Appendix A, Figure 6) indicate the following mapping units underlie the development area: • Goldsboro-Urban land complex • Leon fine sand • Foreston loamy fine sand • Woodington loamy fine sand Foreston loamy fine sand consists of moderately well-drained soils on uplands. Slopes range from 0 to 2 percent. Goldsboro-Urban land complex consists of 50% moderately well-drained Goldsboro soil, about 30% Urban land, and soil that has been disturbed during urban development. Slopes range from 0 to 5 percent. Leon fine sand and Woodington loamy fine sand consist of nearly level, poorly-drained soil on uplands. Foreston loamy fine sand and Goldsboro-Urban land complex are hydrologic soil type "B". Woodington Loamy fine sand and Leon fine sand are hydrologic soil type `BID". ELLIS 7 KA) (E"‘t AIRPORT , v_ \,. RS" IMPROVING YOUR WORLD Reynolds.smith end H(n..Inc. 1.6 Groundwater Geotechnical reports for the terminal project show groundwater measurements of 1 to 7 feet below existing ground and an estimated seasonal high groundwater table of 1 to 3 feet below existing ground. See Appendix B for the geotechnical report. High groundwater conditions are not favorable for use of dry facilities for stormwater treatment. 1.7 Existing Stormwater Management As discussed previously the primary form of stormwater conveyance on the site are open, grassed swales. There is minimal collection system or curb and gutter in the existing condition. This is all in an effort to minimize the impact on the environment and provide an easily maintainable landscape for the airport. The terminal development area is on the highest part of the site and is not within the primary time of concentration flow path to the ouffall(s). As a result of past permitting requirements, there are some sand filter BMP's that treat stormwater runoff from a portion of the terminal parking lot and the GA T-Hangar areas. A good portion of the existing impervious area is considered disconnected per the criteria in the BMP toolbox. See Figures 7-10 in Appendix A for a depiction of the existing basins, stormwater conveyances and flow paths. ELLIS 8 .•F' *. oA AIRPORT _RSII IMPROVING YOUR WORLD Reynelds.Smith and Hilts,Inc. 2.0 PERMITTING 2.1 Permitting History North Carolina Department of Environment and Natural Resources (DENR) Division of Water Quality (DWQ) is the agency responsible for statewide regulatory programs in surface water and groundwater protection. The project is in the Wilmington Region. OAJ currently holds two existing stormwater permits with DWQ: SW8 931005 and SW8 000810. Permit SW8 931005 is a low density permit which allows a maximum density of 30% Built Upon Area (BUA) on the airport property. Projects that fall under this permit are vested to the 1995 rules. The permit covers the construction of 944,021 square feet (21.7 acres) of BUA within a 672.75 acre project area. SW8 000810 was a high density special-use permit to construct taxilanes and future hangars which added only 2.5 acres of BUA to a general aviation site of approximately 672.75 acres. No hangars were built on this site and existing taxilanes are scheduled for demolition in the proposed development projects. The permit also covers a parking lot expansion project which added 0.64 acres of BUA. Only these specific projects are subject to the 2008 rules. Any proposed project at the airport will fall under these permits and a permit modification or plan revision will be required. Permit SW8 931005 also states that the two permits be combined before airport expansion occurs so that only one permit will apply to the airport. Table 2 below summarizes the existing permits and modifications. ELLIS 9 Oar AIRPORT i .; "S&K, IMPROVING YOUR WORLD Reynolds.Smith and HIS.,Mc. Table 2— OAJ Existing Permit History .1 Total jSite i^ Cumulative °o Permit Elate Permitted Area it Permitted Project t to BUA►(sq-ft) (Ac) �"- Q Construction of SW8 931005 6-Oct-93 Low 348,480 672.75 1.2 30 Perimeter Road& Apron Repair Construction of SW8 931005 Perimeter Road.Apron Rev 20-Jan-95 Low 527,076 672.75 1.8 Repair,&Taxiway Widening Construction of SW8 931005 Perimeter Road,Apron Mod 26-Apr-11 Low 538,051 672.75 1.8 30 Repair,Taxiway Widening,&Pump Station 2004 Airfield SW8 000810 26-Apr-05 High 826,854 672.75 2 8 30 Improvements, LPA Drainage Area 4, BMP Sand Filter#1 2004 Airfield Improvements, LPA SW8 000810 26-Apr-05 High 842,535 672.75 2.9 30 Drainage Area 5, BMP Sand Filter#2 2004 Airfield Improvements,LPA SW8 000810 26-Apr-05 Low 884,788 672.75 3.0 30 Drainage Area 3, No BMP required for low density Parking Lot Expansion, SW8 000810 RS&H Drainage Area Mod 24-Oct-08 High 944,021 672.75 3.2 30 I Basin 5, BMP Sand Filter#3 *Total%BUA is permitted BUA only.It does not include existing non-permitted BUA.Refer to Table 3. ELLIS . 10 clIE„ AIRPORT 1RSII IMPROVING YOUR WORLD Reynaldo,$mhh and I4Ws,Inc. All proposed development must be categorized by density based on its BUA percentage or percent impervious area over the site. The proposed development results in the total site built upon areas shown in Table 3. Note that the Total Cumulative % BUA decreases after Phase I because the Total Site Area increases with land acquisition. After Phase V, there is approximately 20% total site BUA which is below the 24% allowable for low density under the 2008 Coastal County criteria. Table 3-- °Ail Proposed & Future Development - f-- - -- - � Total r - — - -- I Phase of Project Site Total Allowable Development Cumulative Project pmenit BUA(ac) Area %BUA %BUA (ac) Existing --- 676.88 12.95 30 --- I 5.55 676.88 13.76 24 New terminal&airside/landside access I Land 0.00 700.80 13.29 24 Land acquisition Acquisition 11 General Aviation(GA)facilities, 12.25 700.$0 15.04 24 Rental car maintenance facilities _ GA facility access road,Air traffic III 3.35 700.80 15.52 24 control tower,Airport maintenance facilities Fuel farm relocation,Parking II IV 17.19 700.80 17.53 24 areas, Runway 23 hold apron& Runway 5 extension Runway 23 extension,Additional V ` 21.36 700.80 20.13 24 airport development Note: This table represents all development per the airport ALP, including land acquisition and its associated BUA. However, land acquisition acreage is not included in the low density permit. Refer to the Airport Supplement Spreadsheet in Appendix C for BUA calculations that exclude land acquisition. EL L I S 11 +�e�C o-. C AIRPORT � ' ` RSA IMPROVING YOUR WORLD Reynolds.smida and HIM,ins 2.2 Proposed Permitting Public airports throughout North Carolina continue to develop to meet the needs of the expanding population of the state. Public airport expansions include the addition of newly constructed hangars, terminal building expansions, runway extensions, and construction of new taxiways and apron or ramp areas. Each airport has a long-term master plan, known as an Airport Layout Plan (ALP). The ALP includes future expansion plans, and shows the impervious surfaces that will be constructed. OAJ's ALP as discussed previously is the basis for the stormwater master plan and permit. Wildlife, including birds and mammals, is a threat to human safety during takeoff and landing, and stormwater BMPs must not increase that threat. To that end the Draft BMP Toolbox for Public Airports as published by NCDENR was used to as the basis for the requested Low Density Airport Specific Permit. Planned development maintains a total site BUA well below 24%. Since the airport is a single tract of land with prescribed building restriction lines that limit development of airfield properties and the potential BUA is maintained significantly below the high density threshold pursuant to 15A NCAC 02H .1005(3)(a), the overall development consistently meets the criteria for a low density classification. Low-density development must meet the following design requirements, included in the 2008 Session Law under Section 15A NCAC 02H .1003(d)(1) for development activities within coastal counties that drain to non-SA and non-ORW waters: • Built-upon area of 24 percent or less; ® Stormwater runoff transported primarily by vegetated conveyances; conveyance system shall not include a discrete stormwater collection system as defined in Rule .1003 of Section 15A NCAC 02H; • A 50 foot wide vegetative buffer between new development activity and a 30 foot wide vegetative buffer between redevelopment activity and surface waters. Adoption of these requirements is a stated goal in the design criteria for future development projects. Along with these requirements the Airport plans also locate the higher density portion of the site at the highest/farthest point from the rt ELLIS 12 AIRPORT , = S IMPROVING YOUR WORLD Rgnalda.Smith and Hills.Inc. outfalls, disconnect impervious surfaces to the greatest extent practicable, preserve open space, utilize small scale BMP's to treat runoff at the source and promote overland flow. This approach maximizes the flow path lengths and times of concentration and promotes infiltration. As such the Airport feels that the development should be permitted as a low density development and requests this per the proposed Airport permitting approach. 2.3 Anticipated Permits Sedimentation/Erosion Control Plan: This is required by NCDENR Division of Land Resources for projects that disturb more than 1 acre. This will be required for each phase of development. NPDES Stormwater General Permit for Construction Activities: This will be required for each phase of development. Upon receiving permit approval for the Sedimentation/Erosion Control Plan, the project will automatically be covered by a state NPDES Stormwater General Permit NCG01000 from DWQ. 401/404 Wetland Permit: This applies to projects with impacts to wetlands. This permit may be required after Phase I land acquisition occurs. NPDES Industrial Stormwater Permit: Airport General Permit No. NCG150000 is required for stormwater discharges associated with industrial activity from Air Transportation facilities. This includes a Stormwater Pollution Prevention Plan, which will need to be modified for the proposed development. ELLIS 13 . AIRPORT ' p RS11 IMPROVING YOUR WORLD Reynolds,Smith and HMIs,Inc. 3.0 PROPOSED AND FUTURE CONDITIONS 3.1 Proposed Basins Proposed basin lines are substantially similar to the existing basin lines. Several existing basin lines are modified in the terminal and general aviation facilities, including the apron, parking, and roadways which maintain the flow to the southern outfall. Proposed basin lines are depicted in Figures 11 and 12 in Appendix A. 3.2 Design Criteria Based on the draft BMP toolbox for airports the primary focus of the stormwater management is to preserve the natural flow paths, disconnect as much of the impervious surface as possible and maintain the peak post development discharge at or below the peak pre development discharge for the 1 yr-24hr design discharge. Proposed drainage elements will include vegetative conveyances to the maximum extent practicable and a 50 foot wide vegetative buffer between proposed development and at least 30 feet between redevelopment and surface waters. This will include grassed swales with no steeper than 3:1 (H:V) side slopes. In addition a minimum of 8 feet has been provided between almost all impervious surfaces and the conveyance system. A small amount of impervious area is being collected at the front of the terminal building and within the existing parking lot. Due to the safety of the passengers utilizing the airport facilities, aviation security needs, and ADA requirements, curb and gutter will be installed which will require portions of the terminal curb front must be collected to prevent concentrated flow in areas of pedestrian traffic. See Figures 13 and 14 in Appendix A for proposed condition flow paths. 3.3 Hydrologic Parameters Utilizing the design criteria described above, the proposed hydrologic parameters are summarized below in Table 4. Refer to the Airport Supplement Spreadsheet in Appendix C for detailed calculations, which include all BUA to be included in the low density permit. An Airport Supplement Spreadsheet for the overall future development with land acquisition acreage and associated BUA has been included in Appendix G, for reference only. f 14 It.90 IMPROVING YOUR WORLD Reynotdo.smith and I1II,,Ine. Table 4- OAJ Proposed Basin Parameters Total Basin Arty c . (Ac) cs ae 3 E a Proposed 454.01 62.18 ' 13.70 58.13 66.1 3.89 CAPE FEAR Future 454.01 91.65 20.19 89.78 68.5 3.89 Proposed 222.87 30.99 13.90 29.46 66.1 4.16 WHITE OAK Future 222.87 37.76 16.94 37.44 67.3 4.16 AIRPORT Proposed 676.88 93.17 13.76 87.58 66.1 N/A TOTALS Future 676.88 129.40 19.12 127.22 68.1 N/A Note: This table does not include any acreage associated with future land acquisition. 3.4 Disconnected Impervious Area Disconnected Impervious area is defined by the BMP toolbox as impervious or impermeable surface which is directed to a pervious area to allow infiltration, filtration and increased time of concentration. The BMP toolbox has several requirements for an impervious surface to be classified as disconnected. Based on these requirements the existing and proposed impervious surfaces at the airport have been classified as either connected or disconnected. Figures 15 and 16 in Appendix A display this information graphically. Table 4, above, summarizes the disconnected impervious areas on the site for the proposed and future development conditions. As requested in the meeting on June 11, 2012, a conceptual plan for the public parking lot (part of Phase IV) was developed to disconnect all impervious surfaces associated with the parking lot. Currently, the parking lot is directly connected to the stormwater collection system. The proposed conceptual plan redevelops the area to provide sheet flow to grassed swales. Refer to Figure 4 for the proposed redevelopment of the parking area. ELLIS 15 OMAIRPORT Reeff IMPROVING YOUR WORLD Rnynalds,Smith and HIM',Inc. 3.5 Best Management Practices Using the design criteria established for the site and the current BMP toolbox for airport developments several BMP's were identified as suitable for use at OAJ. Those BMP's are: • Open Conveyances • Disconnected Impervious Area/Overland flow • Bioretention Swales • Dry Detention Open Conveyances — This BMP has been utilized to the maximum extent possible on the airfield. The existing swales on the site have proven to me suitable and maintainable by the Airport. They have also been shown to be effective at removing pollutants and suspended solids from average storm events. Maintenance of these features consists of routine mowing and removal of trash and other debris. Disconnected Impervious Area/Overland Flow — This concept is somewhat unavoidable on the majority of the airside impervious area. FAA grading criteria governs the width and slope of the areas immediately adjacent to runways, taxiways and aprons. These areas, know as shoulders and safety areas are relatively flat (less than 3%) and in most cases wider than the area flowing to them. This idea has been extended to the roadways and parking areas wherever possible. Research has shown that the majority of the pollutant removal occurs in the first 8 feet of overland flow. For the entrance roadways, parking lots and staging areas around support facilities a minimum of 8 feet of overland flow has been provided between the impervious area and the open conveyance. Maintenance of this area consists of routine maintenance and preservation of the stand of grass. Bioretention Swaies — This BMP is utilized in three different landside locations to assist in the infiltration of stormwater runoff. It is designed to enhance performance of the open swale conveyances by providing additional infiltration through the use of engineered soil underlain by a gravel layer surrounding a perforated pipe. This type of BMP configuration will reduce ponding time and increase infiltration. ELLIS 16 4` 1 AIRPORT c ` ' .IS_ IMPROVING YOUR WORLD Reynolds,Smith and Hills,Inc. Dry Detention —While this method does control discharge by detaining runoff in an open water configuration, it is the most effective BMP for this site in terms of peak discharge attenuation. Detention was avoided to the maximum extent possible but in order to meet the peak discharge a dry detention swale is proposed along the runway between the safety area and the perimeter road/fence. This BMP is a modification of the existing swale where there will be a "shelf" and a weir added to the swale that will provide the flow attenuation required to meet the pre/post discharge at the south outfall. The north outfall due to the other BMP's will not require the use of any detention swaies. Maintenance of these facilities is the same as a normal swale consisting of routine mowing and debris removal. See Figurel7 in Appendix A for proposed stormwater management plan. Refer to Appendix D for information on BMP Operation and Maintenance. As requested in the meeting on June 11, 2012, RS&H analyzed other BMP options for the terminal roof drain. The terminal roof drain collection system that drains to the airside of the building (approximately half of the roof area) is being treated by an oil-water separator before entering the stormwater collection system. The portion of the roof that drains from the landside portion of the terminal building is connected directly to the stormwater system. All of the roof drains are fitted with a raised and slotted drain to prevent any debris from the roof from entering the drainage system. See enclosed building plans for roof collection system layout and details. 3.6 Environmental Impacts Wetlands A section 404 jurisdictional features site evaluation was performed in August 2011 by CZR Inc. with the Army Corps of Engineers (COE) in attendance. The evaluation flagged approximately 14 acres of wetlands south and southeast of the airport in the area near proposed land acquisition. The draft wetlands map is pending approval by the COE and the wetlands are shown on Figure 4. All planned development is placed adjacent to the wetlands so as to provide a minimum of 30' buffer thereby not impacting the wetlands. Stormwater from ELL`IS 17 . ' ` •AJ AIRPORT I RSA IMPROVING YOUR WORLD Reynolds,smith and HIlia,Inc. existing and proposed areas does at one point leave the airport property and flow through an undeveloped portion of channel. This portion of channel is not expected to have any increase in discharge or velocity flowing through it as a result of this project. Floodplains According to FEMA Flood Insurance Rate Maps (FIRM), the proposed project will not encroach on any FEMA floodplains. Wildlife When land acquisition occurs in Phase I, a wildlife survey will be conducted as part of the environmental assessment. ELUS 18 ow , AIRPORT il�e IMPROVING YOUR WORLD Reynolds,smhh and Hills,Inc. 4.0 CONCLUSIONS AND RECOMMENDATIONS Future development at OAJ consists of five phases scheduled to be constructed over the next three to four years. When combined with the existing permitted and non-permitted built upon area, these projects will result in a total of 20% BUA on the airport property. Importantly, any future development of the Albert J. Ellis Airport must comply with regulations and policies imposed by the Federal Aviation Administration and the U.S. Department of Agriculture that reduce and eliminate waterfowl, other migratory birds and wildlife habitat on and in the vicinity of the airport. Albert J. Ellis Airport has been designated as having a "high risk" bird strike environment. We believe that the stormwater management approach outlined in this master plan permit application will satisfy all of these requirements. Utilizing concepts outlined in BMP Toolbox for airports the site will comply with and be good stewards of the environment by providing stormwater treatment that complies with the intent of the NCDENR airport permit. 5.0 SCHEDULE Master Plan Conceptual Permit—Aug 2012 Construction Bid for Phase I —Aug/Sept 2012 Construction Start for Phase I— Sept/Nov 2012 Construction Estimate for Phase II —2013-2014 Construction Estimate for Phase III —2014-2016 Construction Estimate for Phase IV—2016-2018 Construction Estimate for Phase V—2018-2020 fELUS 19 S„, OAJ AIRPORT IMPROVING YOUR WORLD Reynolds,Swath and Hills,Mc. 6.0 REFERENCES Federal Emergency Management Act, DFIRM Database North Carolina Department of Environment and Natural Resources, Division of Water Quality, Correspondence with Linda Lewis North Carolina Department of Environment and Natural Resources, Division of Water Quality, GIS Data Downloads http://207.4.252.94/DWQ Data Dist/ North Carolina Department of Environment and Natural Resources, Division of Water Quality, Stormwater BMP Manual http://portal.ncden r.ora/web/wq/ws/su/bm p-manual North Carolina General Assembly-Session Law 2008-211 http J/www.ncaa.state.nc.us/Sessions/2007/Bills/Senate/P D F/S 1967v4.pdf U.S. Department of Agriculture, Natural Resources Conservation Service, Soil Survey Geographic (SSURGO)database for Onslow County, NC • E L I S 20 a '"`°�� - AIRPORT t' CD 7 a x WUNIWYINQ YOUR WORLD APPENDIX A Figure 2— USGS QUAD MAP Figure 3—AIRPORT LAYOUT PLAN Figure 4— DEVELOPMENT PLAN Figure 5— EXISTING CONDITIONS Figure 6—SOILS MAP Figure 7— EXISTING CONDITION CONVEYANCE Figure 8 — EXISTING CONDITION CONVEYANCE Figure 9 — EXISTING CONDITION FLOW PATHS Figure 10— EXISTING CONDITION FLOW PATHS Figure 11 — PROPOSED CONDITION CONVEYANCE Figure 12— PROPOSED CONDITION CONVEYANCE Figure 13— PROPOSED CONDITION FLOW PATHS Figure 14— PROPOSED CONDITION FLOW PATHS Figure 15— EXISTING CONDITION CONNECTED IMPERVIOUS Figure 16— PROPOSED CONDITION CONNECTED IMPERVIOUS Figure 17— PROPOSED CONDITION STORMWATER MANAGEMENT ELLIS A e••`` F�` OA-I AIRPORT . _ ..... ..,. N...,, . ',,,,_\.--- ',..1 . -7---r-r..‘_..—_N - T--‘' ) h : ' -7.'141 "r. i "=a Y. r `. 3 "�`kii-,.., r �. IL� yl!"�{.:Gv :#LC(5 �� Ns it �� 5 ^ Ali t� r ..' r ;� 6 ? H`t�t�I=f i. \-/-). rhr''''''''' I' - Stour :��.�='! J �_ ° { ;� i r� +:lri'i+�i�: CraaLa[ �, - \ • `f� • .' ` y\ ALBERT J.ELLIS AIRPORT I , �iaWonaE!� L't t.: f JAR le '4 ,•+ . {r,5_ . }� I,./' 1 _ !p r ►�1 L] iPSY _ •4 yea I } �+ a� Iv c'�� '-`• - J.°i ",i L_LI ' rF' ` ;�,r'4"F 1' rr l� 1'.G k - r. +J`!,, . . y au: �:ti. `.Irk.-1�)�'71� - 3t ,. .r'! ` ..� •—. r �I r f 111 � ;t}' ;• l r: r`•. ,. - - �• 7' .t: w J 111 -1r q a `+fir Pu ``< } i ' * ,::: 7.4::,,,, • .!-• ' .11 - - •"'t r^'_ ��a d+^",:.-sa aYt VI',} •°��. ! ° jj _� >��fp ) iiisimisviii,y ' ,i ` _ ez � .. «•- "'.`4: I, q .', ,r ) }`a >, \ TcpSall i „ •r. s �4^a - 1 gr•Fiir,, ti` ,' F .+= .+''�• >�\ ; ff : f X 1Y7� !' ,) , �, _J. n- 'RS, d i.ci ' . 1 -0- l y ., -,' • Y as11'7',tittall 26 .2 20 Af ., r r� •_` _.vat �u !' �y= i t , . hr arj }R _l • r ti_ .l- .r- �� _ ,�. ..�- I •{Y� .,,y'�.. ^"'. . I �� F F ! S ! r§'. wF �'T .!.'ti.' 4'�. i f' ,! F, f _ • g` '� _ 1 , a`y 8 •5 7/ -...0''''' i '`N .c(i' lir , g\i, ' ( p��j I ...r- .�_ Irr y e+t � -<•ei- '' r`r y` 'ye.''� A .:y�'�C''J -f % Tit*ou- -"" t. --r-- , , ,* - - SJ' t - . .� ..`..• •- 7 f \p" 1 [1 gyp.` ' , y-•�" F ;/‘,it ..(. , . m.o.'''. "'t '.. ,,, ty**---‘-'......: = �� s7+ l/ - • ram ' f: ij 4_4*. f • r i `- l • Fir ,! �• : -.7. L�` A E' r �; . • + i 'tires__ ��Iy ' • .._.r.. r r , ^ _ � -` .- � I . -wJti •�� L - v),Ks i s, ii .•...— '-• )-.1, d, ,-,-',.. • ' , 1:_.s.:14:-.-t ( c,,/?__ i --‘-'!, ''N,' { •`"ti r 4 • .F .� - _,_‘),' ....,.._6411'_:::4F-1 \.. � A ::::,)<\--:--: � ,. i a Jyd' , 1 S .. !"f_ � �� d!.. 1 I�A,-1: . iy+ ft• ! yiL 1 i •t�,,, i r , r !- - + `�, 11),.:;:1,4"...!..,,,,'Il .,;d�yA 2• ,,�. .� a '!i•'+.� 4. �"', y -f �f= 'way..'-,M;,-is. iir, :.. ,,,--. as ' 'it \,4., ..� 1`_7, � TP V • y rkLM)l +� +/fir�•.]�' `n!. �� t+ '�+ _�' • I .. - v 1 ,,,,,. . ') 3,...' � \ :• .�\ i--*'''''''re.,, may,.,,. _ - ff} _ 1,;: . , !«-4.ti{f' 1 *'�_ {,+ t 1 i t, ... r. r V v y,�, _ !.* 'r - --''''l.4.....„.' ' -": -‘-'7*r.' 0.'s()--:' .1 ‘;'--'1 : 1:-: ' ,♦. .1y '"� r, ! .r' ..,1 .,_�,s' �.. Y .f� :A--,,---4-..:',.. T .. i f` }.k><,. �i` _ -�•' � }i� a`_. 1 t• t9...__ ° 1_ . ZI . W -� ,. .ke y ,¢} J y r f�} � ra ly h•� FYt 1 f ''',,{y ,,h f~♦ i 1`gir'Y 1' J Qi I'.+ i' FE " _� • , ¢ ,. a+`�`a - I, ?'� �.r^': L 'suej y t �. 11 .,E�r • �.._ �,<y f.t' tl 4 -,/ i _- '41 'J - i 4. 1.�`:! e_,� RRRtr-;I L2yy1 e.:\ � - /'r. ',., i .� �'4.� �-•i'R y -r ... '{ .� r' , ! „ -',j`��1 r^..._i f , - I. j .s r,,.w:4, [ !,; ,• F�.~5 m i, .*+'.A i '. - r �''- f"'1 *, «rr' fx �, y r�Valr`at4 4�Ff r IC.y: " ..• +�+'INS..v,Y u... q'14 s .._ - _ 1+' _ f� �` ''. It P^y L�l �331A t' i i .,.,.rs�+wr,.....41., • I I r.� D. J. W�l . -`�•.,�"_`r ..�f I. . e •, ,�Es- 1._ .J I: �.,M'�'-. .,i ,�.;,�. 4� r. \ ♦ } ++. d ♦y Cam: • N :JECTLATION • V 'Z.(' T ' - . -,• git f_ f ' 1 T Rairt } I ALBERT J. ELLIS AIRPORT I FIGURE 2 Rs&,ilf PROJECT N0.:209-1189-002 /]n RICHLA I DATE: JULY 25,2911 lJ E R��R� NDS,NORTH CAROLINA 1 USGS QUAD MAP DRAWN BY/REVIEWED BY:UMBD STORMWATER MANAGEMENT FACILITIES CONCEPTUAL DESIGN IMPROVING YOUR WORLD SCALE: 1•_8000' ALL-WEATHER 1:.IAiOLiI:T 6FR MELROSE �, Y" ' * 4 � - „ :�� d eft * ,'Pl': : o RStirlS11 &tf 40 Wt,ai• -6 paA \ RUM uNt.ea .E, lAo. swAmiii E� E w �[ MAGNETIC DECLINATION 999'W •; / 4- 10 - \ OOOa COIporal•Center Drive,SW'Eo 410 // ■Jon .4.. �/� E o,'w/y ar(Oct. 2007) I cl�� w �S� c.ee•Oe �� � .0 .Na auvuec �'Q•■ C Ms/MU,NC�GS:6-44Ssi ,Q © 9e.31 X ��I �1 p� I 99.10 X �W a IN. ' -• �&, • % \ T04.752-0410 FAX 704-04140N k*IA#P' �1rt :. � ,�.i1 ❑ 5CU 1000 , soa.3 . 410$+ O'• Seals in Feet • . .,,4, . ''.70. le to--441- -- - • n IAI� 4 , y � 'l ' AI �':1rS X jam_.¢, �p '�S\c' ����Jjj „ , '-'*:,.: INNWAY��•—e KNOTS M KNOTS RUIWAY KNOTS IS KNOTS ' ��•�� _�� I�Y' L 1` 1 z { 9►\ 5-23 I 90.327E 90.31X 5-23 �96.36X 99.19i �+. � ', 11-5 ;y ""' c' ODIA:L..\::11.11;.z,T IMILMT J.ELLIS PEE:£*C.' elect •'2005) '� ,jk,c,re ' / .::!Y ' '> !, O fir--� '' • /'�tn ALBERT J. ELLIS ;2 ' ' AIRPORT 45e0400, Rsa �, .; �► JACKSONVILLE, NC ,00 1 • AIRPORT LAYOUT *'' • ��'��'i t�;, ar :\ f �w�, ` PLAN UPDATE . .A4112.*:604" •-10, V - p` '.„'� ' " \ t` `T Wr't Ft.Itd1Y s MUMS�}iYy APU ME 006. �. , / •^` ,e / 'N' I ' l �l �r.� ! PM PRECtSON APPROACH P XX71GTC5 • ' x C'' ��r! Arras KrrawTO WEATHER o ING STATION REVIS!cPTloN t !. A:7' �6=�_A ,W Fort vnEa sal ourAaF Ens mNE NO. DATE';14- :•• '; . �� • �"�e�l AIRPORT DATA TABLE o//w/tt a C / oe*e oPn .ta Swot 9S.Ics Prism , * - / • • fV' Akpt . Ok00'YA 04.00'YR ,y),�.E1 �`,f,Q Y, . •( Akpert Rah.not PNnt-Latitude 34'N H-AWN M••A•'44.S63Y �, .e!"�Ey[� -'p . ' -�. r ... '•'� ,C(`�.- �/( -LCn.SWMe 7T 30•41".w _:_-7T 3E'imir `Or�7 ! /,a[�l'_ �(1.`- 'A}pvi Av:ag-1 _ fYi.l _ 77G.15} 1O /�. I 1• \• j �'(_�1..• TV7.arwn AV IK.Holtwl Manlh IV f�rii_ . /�: RRS-- NaU AN•MAV PAM.MAW.Me.Strom'. $- � oat j.� t•�alnr s•enw.vr oa.,1s Prwblm CPS L�E.�1 I // V. # '* 1,„v� -4 _%j'f/� •/ ��"..-- .aNI" _,C).f Nor N'O!&•®SAN13A1RD GONSYJIlC9'i-., EL• , / /' f DATE ISSUED'OCTOBER 2010 t !//<r r J - . . .-• I._a-ea 111 MEWED SY' SKte •� '�"".. „ > ../`N I. TM SRL Y Clow et 730',wMW vN•eearM/ata.35'MO Mombon. DRAWN EY, RTO !. eVfY' % s. Al futon MAIM bhMI at Approiaah wM show Ds.nSSIM NM re f ?%' . *y � % RI[izTIAY Ram TABLE 4E0 FM wean.n Nrwayt •FM.w.w w.A P.t E.a" DUNNED rig am 3. AN CwgrpMc bmin•t•a w NAD03.Run Y.wtlon,.nd eongmt.. �.. . / ll t,� 1"-ctl av1F2 EXITING MIXON to IS 00*9veu 4. o•.ar m.a,•r4 mot amen .Wed m EAk••�•ata y for INA AEP PROJECT NUMBER 1 , .? o• �. � ',F `- %• a�' S'e!i1 TNN A . water Pk:, ..{at.. W""y r l r r• ) fS j �° w w. S. Na On Object Pm•t,awn. 2®9-E�I19-0®® !;r/, 11I r �p_F(is rr�1 u sr:a RtTL •. Na '// ' r '' V' V •� MCP' N/A P� N/A ApAaaatNmarWln ThrnWdd Mot Surface Nett PnNratlaru ' . a W„e._xfTM!:!w(n,_...".. .. N sa zs•a-E s.n. irAr 7111/101/ , .- � Run.ey Oan.ndan.� .____ 140'■ " .___._.__' ' ---_.__�.._"__ NQWIFK7AT10W>3 Y.J r,-,..'r_Ji,. iTANDAR09 ('4008 RF.'R101D5,SI.TH NND HILLS 0'C. '/ //// r { / AA,eiV rams Cod•(MC) CrXIf•mn .'ataulm tANlatR -s p/AN/A ._. y ___-�.i) Sem 1 1 I/;/ f!/ / / 1 onNS/aver Aircraft(Moe) YO-w Sens — M-Nrf PFIPOtn UPC N/A DATE OF FAE 6".Y4EB QESOP-aTkl3 SHEET TITLE 1 ,o7r 37X(Ts/149,000.9 n.�* �AWP $f/tW''/tifJii h' I / �r , �w«.yt�. ._ t tl ACM*ARMS __ - -- - AIRPORT r t r` t �wId--A-CrtTfHt— ss re , t! <`' • exPP..Rur wy aadl nt(vA[unt3 _oo»: I MA { Row str•nglh(Um.) u 7s, AMC o,.tes'vm�°Na�m e t ! l7 'i,A' ..A° 11 9rr. r/ ` FAA's APPROVAL OF THIS AIRPORT LAYOUT PLAN (ALP) EPRESENTS (lTI,:.I/ �i/fr It��lfrl!�/�l E�1 / - a s.: . o.13.! PT_oMw Tend= OM 300.00 s-n• ACCEPTANCE GF NE cEr r:w LDcdnoN of FUTur� ACInEs DEPICT D, PLANLAYOU ' s'r�+i r rl! °p y Jf r)r� I��.. • • L*op" Me -'''''"*".".""a" am.tr ■/A DURING THE PREUMINAF3Y DESIGN PHASE, THE AIRPORT OWNER IS 7/Jtf?±j,j l/ a �t/ /J jr�I t�+k, 1 IP\ E7097N9 MORE - r REQUIRED TO RESUBMIT FOR APPROVAL THE FINAL LOCATIONS, HEIGHTS FIGURE RAW '/r r17 17 it i' I il r1^ ll11/d€ Jr17r4r r+A� 11/A N/A AND EXTERIOR FINISHES OF STRUCTURES. FAA'. CONCERNS ARE _ 1 f / 1 tdr )11)!,!i{/'ll�f! r! 1 II f 1 " 7 Si Di 6 RF7 w^ _ OBSTRUCTIONS. IMPACT ON ELECTRONIC AIDS AND ADVERSE EFFECT OF ,,,,,t'1�t fr t����f +(!tiff ,',4,,tr ,/,-:"" �•.` A•aE•u.O3�M »iaGll•0'N u'H''.J.11 M.DM tip'N t.wmTat iaxter+ ...AM NM r r s f 1 - �� CONTROLLER VIEW OF AIRCRAFT APPROACHES AND GROUND MOVEMENTS. SO.ay F."C...r at"(NAO W) Fumy cum Am �ue� �,;� N/A r VA t 11 r7 1 !r j(t r +Nr -77•s7 -- '7r z'fa.,•. — WHICH POtT.D Af7VFR5ELY AFFECT?H_SAFETY,EFFICIENCY OR UTR.fTY OF 'f tf! it �/J rIr/(J lfil/r �`,,, 'R nwo i S tie.DIAKYIT(YD___ ;yp�a.!rlCorw ---7�0_'--T�Xo Re rr.eMT Rei sect an �...A— NA THE AIRPORT. I //f{7 r t�r/I� i f lil'/7�i• �� mriPi mom Nom SUMO las'xraw Uec —w.— Nn I R.w�T.7.��Taea TOMS 02GCT MS MCA IOPA— a({ r _ wt/ i�'t�!'/ 1 f l71 iIf'i zr.,. 0.-7 En••f R....yi sar.T;66ff SWF.%OUT outs - —r SHEET RUNNER YIt r/JlrI 1 ��1° s „.�IdU.�y yU.a ma•r aw... .pQ•�r t.a0g EON I Xao' P.n Wax a a.....nm _ - N/A iN/A 1/11'�l f 1irt n.ar c, .. r.eraN t•p .w. P..atON �,wa TM MC A.� NM NA neINE ['E�''"•Nr3F- NOTICE F".''.,tPsi�.:EL4ti_�n ��i +�• HAV3 ani{19U�i�'� IE [:fa N/A NA f / _—_ .._AOCi;Prai m`-63..INI-F------ - TO PROTECT OPERATIONAL SAFETY AND FUTURE - •" will 9wr.a saps sal sift "Sr. . . N/A— DEVELOPMENT,ALL PROPOSED CONSTRUCTION �.; vLseay MinimumsT/a n• Mud r i'R! T Me N/A ON THE AIRPORT MUST 9E COORDINATED BY + P�t-77 A®rwtl.CH Mary YF .... PI - .n.Elmo' -N A 9'p.s- 03X IMMO AIM Q.. •/a •/ THE AIRPORT OWNER WITH THE FM AIRPORTS [N�'UOnw.•. sf,0.,slrhUN ray 1� L..l� P.e.nf 14 t AL sin- Titi R!95 _. DISTRICT OFFICE (ADO) PRIOR TO CONSTRUCTION. FM'S REVIEW TAXES APPROXIMATELY 60 DAYS. FINAL SUBMITTAL ow co,„ pi f .. .144P7 ONSLOW COUNTY o,Th�Aa�� ALBERT J ELLIS AIRPORT .---�.��---�m�_.°•�rsis _l_''L�'_.----`- _-----=—_=_.�-____fr=tee- .----..tee S.e c....ea..eaaa ..zsTsss:.+Ta=sins=..:�iTF —mx - ...:..Ja—.v=-aa/�„-fib'.` S'. s:1.... —_ \ ---------- y4 CIh yy i __� �:<. y 11= Ir. '' 1 y II H cti}� �, . ._-, -, i. .. - - .... "" ) ( ..) C pAig 1 s\ ) (____ , _ \ / ._ __„ , _ __ 1 ., —,-,,,/ „, A • - _ IIjj - ris -„_ '7�.; -..� »-,mac=�7..- .-- _ - _— -- a-- _s....:rJL--�._-.__-_- . - _J< _ - - .-0. -�.-- r _ '� _ -e—�-�-��.-.��_��- -.�.�„...— �__— -'__ PHASE I: „ k'- ' ,AI •' • PASSENGER TERMINAL AND ASSOCIATED INFRASTRUCTURE '�. i ,,, (LANDSIDE AND AIRSIDE) /� � • LAND ACQUISITION -- -�;j . ,, PHASE II: • GENERAL AVIATION (GA) FACILITIES, INCLUDING TERMINAL, PARKING LOT, APRON, HANGARS, ETC. • RENTAL CAR MAINTENANCE FACILITIES (2 SITE ALTERNATIVES SHOWN) PROPOSED DEVELOPMENT PROJECT BUA TOTAL ESTIMATED PHASE CUMULATIVE CONSTRUCTION PHASE III: I (AC) SITE % 13UA SCHEDULE • GA FACILITY ACCESS ROAD I EXISTING N/A 13.0 N/A • AIR TRAFFIC CONTROL TOWER, ACCESS, AND PARKING P i 5.6 13.8 — 2012 to 2014 — • AIRPORT MAINTENANCE & EQUIPMENT STORAGE FACILITIES I l and Acq y 0.0 13.3 2012 - 4 12.3 15.0 2013to2014 PHASE IV: III 3.4 15.5 2014 to 2016 • FUEL FARM RELOCATION Par 17.2 17.5 2016 to 2018 • PARKING AREAS V 21.4 20.1 2018 to 2020 • RUNWAY 23 HOLD APRON & RUNWAY 5 EXTENSION NOTE: THE PROPOSED LAND ACQUISITION ACREAGE AND ASSOCIATED PHASE V: BUA SHOWN IS NOT INCLUDED IN THE LOW DENSITY PERMIT. • RUNWAY 23 EXTENSION • ADDITIONAL AIRPORT DEVELOPMENT ti LEGEND FIGURE 4 SCALE: 1'= 80o' °�a,,, PHASE. PHASE III ----- EXISTING PROPERTY LINE ALBERT J. ELLIS AIRPORT 800' 40,0 p alo 1 PHASE I LAND ACQUISITION U PHASE IV PROPOSED PROPERTY LINE PROPOSED & FUTURE DEVELOPMENT 7i PHASE II 0 PHASE V — EXISTING WETLANDS PHASES RS•911- -. ELLIS C' AIRPORT 1 IMPROVING YOUR WORLD k A r.- - sq CAPE FEAR BASIN r, itr...,.._ — .,40 s _ +fit � [ it, 'N\\\\'' .' '''. .,. . } 4- . PRIMARY OUTFALL FROM SOUTH AIRPORT BASIN / ~`" ,,� f a / . CI Pr,' ' _ NORTH BASIN I c: t SOUTH BASIN _ 1 --- - - I •Dirt i r, low e Lm>� " . ` OUTFALL FROM NORTH AIRPORT BASIN ) ..„ ,..,--.4.1, i . \\\ [M OAK BASIN ....r,:i . : .. . \ LEGEND - RIVER BASIN DIVIDE -' . EXISTING SUB-BASINS .. '�" AIRPORT PROPERTY '' ' .� / 1 F ram- / DWQ CLASSIFIED SURFACE WATERS ,: ,. F Jl , DWQ UNCLASSIFIED TRIBUTARY STREAMS '" ,, ' � • ,'''' fit ' .- , ALBERT J. ELLIS AIRPORT FIGURE I@ I PROJECT NO.:203-1189.002 il �� �r' rRPURT RICHLANDS,NORTH CAROLINA EXISTING DRAINAGE ` J11811 DATE: JULY25,2011 DRAWN BY/REVIEWED BY:LMK/JBD I' STORMWATER MANAGEMENT FACILITIES CONCEPTUAL DESIGN CONDITIONS I IMPROVING YOUR WORLD SCALE: 1•-900' i ' 116085 • E 116095 116100 4' 116106Al . .. 116700 116094 116096 116079 116079 1 086 116102 116101 116102 _ _— -- - 116078 • 116080 :: I . tip, 44: .... - 116105 MOO. _ Y 11-- � it r R -Ir r- wry Ire 116085 7 w \\it 116102 I ._..it-- __ _ _ ilepo ..,."""" k", is .. ..� ... ... ..r I • iy C .f. `, . ' • KT7.—fey . iifi[I�$ 116108 .—— "r µ.,,me;,0...r _�___. ..r` \ — 116086 LEGEND AIRPORT PROPERTY 116089: Muckalee loam 116085 i 116100 116095 FUTURE LAND ACQUISITION 116090: Murville fine sand 116068 DWQ CLASSIFIED SURFACE WATERS 116094,095: Norfolk loamy fine sand 1 SOIL TYPE 116096:Onslow loamy fine sand 116090 .. 116068: Baymeade fine sand 116100: Rains fine sandy loam 116078: Foreston loamy fine sand 116101:Stallings loamy fine sand 116078 116079: Goldsboro fine sandy loam 116102:Torhunta fine sandy loam 116080: Goldsboro-Urban land complex116102 P 116105: Urbaniand 116079 116089 116085: Leon fine sand 116106:Water 700 050 0 700 N. 116086: Lynchburg fine sandy loam 116108:Woodington loamy fine sand e NRCS{2000) Fact 116068 ._. 6.068 LALBERT J. ELLIS AIRPORT R I RS DATE: J LD2,201169-002 ELLIS FIGURE 6 I DATE: JULY25,2011 iC 1 , 1 RICHLANDS,NORTH CAROLINA ® DRAWN BY/REVIEWED LMK/JBD L. .. .... .___.....±._______.NPORT SOILS MAP I� STORMWATER MANAGEMENT FACILITIES CONCEPTUAL DESIGN IMPROVING YOUR WORLD E SCALE. 1 -70P 1 2`'�ow cote„, o. J - aA p ONSLOW COUNTY °'Th CAa ALBERT J ELLIS AIRPORT ( CAPE FEAR RIVER BASIN N, 1 i - / -- \- i so 1 AI r, -II a r.Z ..0 ' i 0 e ..— ..: RUNWAY.5-23 _.... _... -W - RUNWAY 5-23 _ _ I \c"---7 TAXIWAY_A_ i . :TAXIWAY A: i i r e I .,r^ ale7 l � ''r—..Jl.—ems/ i Length of Piped Length of Vegetative FIGURE 8'INSt°F'" �,i' River Basin Development Conveyance(FT) Conveyance(FT) i° Existing 7,561 40,572 'i i Cape Fear Proposed 7,974 41,867 / / Future Minimize Maximize i f Existing 2,539 24,730 White Oak Proposed 2,309 25,446 Future Minimize Maximize River Basin Development Length of Piped Length of Vegetative Conveyance(Fr) Conveyance(FT) Existing 10,100 65,302 WHITE OAK RIVER BASIN Airport Totals Proposed 10,283 67,313 Future Minimize Maximize SCALE: 1•_ 1,000' LEGEND EXISTING DRAINAGE PIPES - - - -- BASIN DIVIDE FIGURE 7 1,000'l 500' i,o` -0a _ EXISTING DITCH CENTERLINE EXISTING CONDITIONS EXISTING PROPERTY LINE PIPE AND OPEN CONVEYANCE SYSTEMS RS!Itlp ELLIS OAS AIRPORT IMPROVING YOUR WORLD 0 Co 6.4,,.. .o.• : : •,- I :' ,,, '• ofigr‘ UP ONSLOW COUNTY ' loili ;v ALBERT J ELLIS AIRPORT ,,, _______.....__.... ______________ -------•-------•---------- . . - -- -___ .., • ..• . . ••••••-• -- TAXIWAY A - -- ..:------ . . . - • vi ,.,.....;. . TAXIWAY-A • -...., ____. -- -----;;;;;;;-------- _ .,_, • to ,..._ ...._ ,,---- --- . - r .' -9•• ' , '-.0" ` /, . 7 \ A .....0 X [ ..'"nrillilh" .. •• i + ,, ,- 4 ..... - • •••• . _--, • -••--- .1 ."-- " . ........1 i -- .... _..: -.4 I GENERAL _J. ....... ....... .... . ..... .... 1 1 I • COMMERCIAL AVIATION IJ .. \\ \ • . 1 ' ... ,.. APRON I L• 1' i 1 , , I .., ' I .. . .... ... _,..... : .•... ..:... ...•_, , , .... _ F • --- I\\ -- .•---.- •• ••••• 1- _. ...., • 1 ;GENERAL. ; . BUILDING ' ..i slasivia oAstNGEof TERMINAL jl 1==i i : I ..."..,e 1 1 '. 'AVIATION•••••••-i2 . j. ../. .. • ,• -. 1 1 . FACILITY :.. - , , ..- tkv ...........-- i ... 1 I ..../.. .1 , ..., ......-••• ___ • • [ . . \ „: 1 , , , . ._.. .. /- , [ .__ ;;Oi°•.;;. i I j . . 1/4 1 i i : ,. , , . • : : L. .. . ., .: -I, ; •...\. '• i ,•••-, r...i 1 i 1 0 I • ....i., - \ __,„ ,,,,• , ! 1 ! ____. ' ;...... . .__.............. gc . .... ....1 / .,„..„......--..,..0.-0" N,..... .• GENERAL AVIATION T4IANGAR • • :,[1:ill [i*.:;•: ;;; • :::•:111 jilici:: '118ft.....,,,,,, . :. 400- , . . I . ;' • / / 1 1 i. '''' ' ! •. •! .......'. , lic :. , :•,,, , , ,-, •1 . _ 1 ,L ,,, ' ' EXISTING PARKING • 1 .:ij I r • ; „ . J .:1 :ii 1;;; ;11 ji; l[j ;[1 ;; : ; :: : ::: ; •••: : t ._ - i , •./ , _ ,,,i,• ': .... .._. , . . i 1,'iv , . . ...:.:-. ..-.-•: \•, i ,: I, — — ,I.,1, •lw, -, 11..' .I lit' - -::••-----::•• 7 ''• ..... . - • • ... . _____ . : 0 I __.•••.--' PARKING LOT ..... \;,, ,,,..\ ,-PC,,: 1:13,M9...!1.2, 11, K.,.IN,:el,: •.. :, [ 1- -- I. /----.ITOLL BOOTH '' ;-: ' \ \ 1•, •I ;: ••;:; : •:. 1 •L ./. • • . '• 't . . ,, .. . . , . EXISTING FUEL FARM 1 ' / j • .09owl...wv: to ,r,ong •:•• --Iv j . 5 -s• i .: •. I ""-,--- - - ..• • -"'" • I ALBERT ELLIS.ROAD .....-..:.-- • ...." ' • ...._. . .›. ,•mow i I•7•-rmiv• -rr- —, --1.-,mm,.1 i i •-•4 4 I w vi i.iiiis-t•i t w-rt•i•mop t--- • ,,,. ... .. , ) RENTAL CAR MAINTENANCE FACILITY , ,,,.. :- t SCALE 1 LEGEND EXISTING DRAINAGE PIPES BASIN DIVIDE FIGURE 8 200' 200' 1 01:111 200' C,..171/.....„„tf ''' "' EXISTING DITCH CENTERLINE EXISTING CONDITIONS 1 4' f.,:j —--— EXISTING PROPERTY LINE PIPE AND OPEN CONVEYANCE SYSTEMS , RS ELLIS K cma. AIRPORT: IMPROVING YOUR WORLD C ..), , ,.od,0,..21,1t ,s � ONSLOW COUNTY o9T � ALBERT J ELLIS AIRPORT CAPE FEAR RIVER BASIN / • - ''., �, \ • , 4j, 'El 11. J $1_ 5.., f.......—. .._............._..........._,..._. „T.,: . ,...L., ,. c, ? si, , .,.., , , , , , / h � C•f "L `I s, \ f> 1 , , i L ,,, .,,RUN.. ra .RUNWAY 5-29 ..-- am'- ` 1 _ T --.:.._... ..._.yam.. ... .. • .1`L• S _Fr .T� NI _ .-..... fir .S'� .f'a r� 5-7 '."..... ...a.''.**---Ailana=ii; -; , r /'' River FIGURE 10 INS ' ---^' Development Tc(Hours) CN /‘ Basin /` Existing 3.89 65.50 / Cape Fear Proposed 3.89 66.10 �' Future 3.89 68.60 Existing 4.16 66.30 White Oak Proposed 4.16 66.10 Future 4.16 67.50 River Development Tc(Hours) CN Basin WHITE OAK RIVER BASIN Existing N/A 65.80 Airport Totals Proposed N/A 66.10 Future N/A 68.20 SCALE. t•= 1.000 LEGEND — EXISTING DRAINAGE PIPES BASIN DIVIDE FIGURE 9 1,i o• 501 1,01 0• --•---•-- EXISTING DITCH CENTERLINE qv' FLOW ARROW EXISTING CONDITIONS �"�; ---- EXISTING PROPERTY LINE - — SUBBASIN DIVIDE BASIN FLOW LINES ASK ELLIS •• :AIRPORT IMPROVINGYOUR WORLD ,,,,..,,,v,,co-4:4,• e, ,,r '''.'• ONSLOW COUNTY lo'''•—11110P's.-. -4, ALBERT J ELLIS AIRPORT — . — . .._....___. — —•-- ____ ___._._ _______—•--- , -•-••__ ... ___________________.__________ ___________ ____TAXIWAY A ...---- „..... `......,,,... ____ ---- -.: ----- -TAXIWAY—A -. •••• •• - . .••••.. ..... . ...... • ••••••••••••••••••--.....•••••••••• ••••••. ..........•..............•. - ........•• .... -..... """""--""'"""----•':•':-- • - •-•••••••;•-.-- .— ' ----- . ....--- .---------- .__-----•— ... .4 / , 5 1 ...•••• 1 310 1 I 46 : I • ..._ , - ...._.. _..._ ..... ....„. : . . . _. -•• • (-1-!A : 1 . __. .. . . I . ! ! •-. : I .• GENERAL .... ,, i ‘‘. • 1 ••••• • • -- AVIATION S 1 Sj 7 COMMERCIAL '--1.....--- „. i •- . .APRON .... ... . .. .. -. 1 AVIATION ------ ..--1.."-.) : ,: • APRON _ ...Sj 1 .. ..... . . . ..,, ,.. . . I I!" . ...._. .171 ...... , . ! ,!! ' - .------- ARFF 1 ,-•,-- .., :-,,,, —*,,i;fm ,, "" '1---- - - 1 : : I (..-1- - -- r•GENERALT 1 . .. . BUILDING ,,- .-:...„.....—, ...—... (-7--.1 E : " . AVIATION" 1 ' 1\.. ' • '----.=-.' !tz,) 2...) z. --eio (R. i rj • : ,. EXISTING PASSBN _....•,.: I 4 i ERA ... : ! II FACILITY . .7 ..... „.. .,.. ! • .....-4 Sj . . I!!• (!--e.4!ii ; - I. ••• I .. , ... .. , , ,,,,o, ....*....-__:'.......... . . .. ., , GENERAL AVIATION T-INANGAR I •- 11) •-:irt -) 1.•••1 L____„„' -•- 3 .. . . . • :, x r--Li. %kb , Hy, ., i,,,,, ,,, .,,, . .11.,11! • 1,1 !,, . • / ... ././ ,... -. • / j :1,..,;.,..._..... 47",,,,,:,, .„,, i,r ; :,:,:•-!,:-,,!; ,, • ,,, :: ,,! .i!,! I'.... ..._. :..... 71..../ ;;--- ..:-...._..._..._ . ..=tz,..r.....—.._._ ., lomat ..._,M, ... 'I , _ ... , @ • . ... ..- !!..1=1. !!.- . ! !• : ,:I -iv , .!1,,, ., ;I: . ...... i : 11111. 1' Eli I : i;Ii1.1. .i 1 . ' :- :, :I. i! • 1 I 1 / .. . ( 11--) i fin i - : • ' . i I :I .. . EXISTING PARKING . , ,,,,,, ,. lif w ,Hi,,' !, 41i- ; ,'i, ;1 ,,,,,,: : •, , : 7 .... t . ....... .,.. ...:.., .. .. .. ,. i'T7-'477, tr"-'l --., - • ., )'' 17— . . • ..... „. .. ,...,"" ,.. .. ... .... ..... . _....... Sji\'''.' • , ij Itlii II: :II it Jiiii,izi., ! I - e, . 1 I \EXISTING FUEL FARM ,...-_ ‘ \ „.. ..... _ / - --ri=tr)------. ""-<-...", .I-/,--•' 171 , ,i .-s "--,-....._..._......_r ..,=.41—...-,„4,-.)...._:_...-__:::-......-- . .. . . RENTAL CAR MAINTENANCE FACILITY il .,- /,' , . . . , ... LEGEND FIGURE 10 200' . 4,04, - - EXISTING DRAINAGE PIPES ..-.•- , • ' BASIN DIVIDE SCALE: 'In- 200' I 1003 200' EXISTING DITCH CENTERLINE FLOW ARROW EXISTING CONDITIONS I 1--aim-- - -. EXISTING PROPERTY LINE SUBBASIN DIVIDE BASIN FLOW LINES ,11. S. RSH ELLI OAJ. AIRPORT IMPROVING YOUR WORLD OW C 0 t, AONSLOW COUNTY '1;q111%V ALBERT J ELLIS AIRPORT r CAPE FEAR RIVER BASIN /.• 'N.,, s• / •„, ,.• • / .• . • / . / — ... .t..7.----. \ --...—.:—..,. : 1 \ •.. - - - - --- .. - - -:.,./.. ‘...... \ -.) \,,, N., /I \ I i_..._...J l .-_L. ._,L I= ...."" .... M... i...21:T. ' '''.. - - - \ Ntk I 1! jURROAT-SERVICE-R0101 ' . RUNWAY 5-23 - - - - - \-RUNWAY 5-23 , \ ••...E ........4.-4-tt--_,-. ..s... _ . .It. ..::::......- ----....=.=,.............. I C: ; r\ ...-• T: 1 ....* I C , 7 •-„, '\ ' l'' i'_ i _ ( - / Length of Piped Length of Vegetative FIOUcE 12 IN: ' --=-7 - • -. __ i-' River Basin Development ./' Ccrrnreyance(FT) Conveyance(FT) .1 Existing 7,561 40,572 / .-• Cape Fear Proposed 7,974 41,867 / .• Future Minimize Maximize Existing 2,539 24,730 White Oak Proposed 2,309 25,446 Future Minimize Maximize Length of Piped Length of Vegetative River Basin Development Conveyance(FT) Conveyance(FT) WHITE OAK RIVER BASIN Existing 10,100 65,302 Airport Totals Proposed 10,283 67,313 Future Minimize Maximize LEGEND FIGURE 11 ,00 PPRROOPPOOSSEEDD DDIRATCIHNACGEENTPEIPRELSINE SCALE: 1"=- 1,000' 10' 5131C ) 1,000' PROPOSED CONDITIONS I I * _..._..: EEEXXXIII:STTTIIINNNGGG PDDRIRTAOCIPHNEARGCiyEENTPLEIIPNREELSINE 7 - -- BASIN DIVIDE PIPE AND OPEN CONVEYANCE SYSTEMS •••••111••• •••1• 1111111•111111=1111•111 •1k. liA5. ELLIS RISK 011/4-1 AIRPORT IMPROVING YOUR WORLD ea\ ONSLOW COUNTY '14 116frt° •)-4 6A,,,9‘-' ALBERT J ELLIS AIRPORT --- • -- ------------ _________________________________________ .._._______________________ .__,_._ , -— •-- •__. _______.__ ,_ „. , . . . .i, TAXIWAY - TAXIWAY'11-. .• . .. .• . . .."--- .. • -'cam ,....---•-- -- _. __ _ .._ _ ..... ' " -----.----------- " .- ---r,.. .,---- ,-,__ —_-:::-----N• _ -....\ ,. , .. - "" T:\ ..__. • . ....._ ... . .. ,..... . :. , .., .. .... .. . __ ... ....____..... .4, __,....,,.._._..._ ,. , ... ... . I,r ---...- . ._... .. .... ...... .... ... ........... ..... I+I . 4 i .._ COMMERCIAL . i GENERAL REMAIN 11 AVIATION—•---- OVERNIGHT • i. _ APRON AVIATION - ' , _ , I RELOCATED T-HANGARS . - ; r --...I._ APRON ..-- \,...„.. ....................... ..___........................ . It' r. — • ---. ', — -,— — II C\—..-• , X.._ — _ _ , ... ........._ '. .._. . ( . ! ,. 0 • il (1 . , : ; -_, BUILDHNuG I ...."'. • • ..........._ I 1 h - • F — El . . ____ ____ • .. ......... \ : , ' .. ' F ,i;or„.:: •••:.:,i / . LI . . ,:-..., :___--- ,‘,NN.N.,.... ,• . . •) ... , , ' • 00-• ,,:.......: ...........,s,....-,;0:7,...,...,,,, ....;/..:,./......,. _....., T . '—.1 • 7 :1 :1„.p ' -.. o• 11--` ,---;- - --:-..".... • % MERCIALI '- r. — • L. ,....„ _ . -z • .t. • ,_ r- - ..„,.........* — r!.. . nu.,•-• --,-,.........._ AilATION — :A ,ff,':-- .;.- iiilj _., - 1 __....... . _IF,CILITY - - --' ill Tli] . :...-' . ‘. ... .. ._,... .. .....,, o. fr, %e I L.r i ! i / 4151.......... . -- 4..\.. . _ _u_ _ : 2p• ' 1 .• ,, ,. : E t _ _ 1 tE . ' P3'..I:.• •::01;'., • ,/, 1: • ' 1 . . . . .,.... . -----• , 1 ......... , • — — . 1 - :*1 ' ' r. r Hi 1 ir •rre t . • r. I = ' I / -.),_ 1 Ail 1": i i • • ' EXISTING PARKING .\ t 67, • .., • •iii . : . • •IH.11.11- 11,1 iii. Ili 1,1 .• !i•! . i •I 1 IL t! Hi : i __••/- ---,v-7.........---r,71._, _ ,,•, .„ ••• -.:: ., PROPOSED i . ' .,a.' : 11III. 1'....ri !Hi' riHri , !:. -1'. - ..... •:. • ,-•- • :_ •-•• X \ \ . . • RENTAL PARKING i .,\'' 1; cist,IT.1, .:: + -.,,, .. PARKING LOT i / ,i VAR € ' A • '• HI' !!!! Iri TOLL BOOTH . i I. \-- - \' :''- FACILITY l''' ' ; ' r• , , , . - li I i ) .... ..N. ,.. ,.;„ , „,::.i , , „,, ....- • , / , EXISTING FUEL FARM j ; , t . \., \ N, '........„_______ ..) . _________....---". • .,.- •°' i'' .• ......er_`.:-....-." .,•• ,, - _/I .... _... -.. 1 ALBERT ELLIS•ROAD ••• .."-/ -:---' •''''''' i ,. —, -,. ._._ : : win= •! r I r .-- • • . . __ .• -1 .i.'i /.,•,, LEGEND . ' +0,p, -- -6, ' EXISTING DRAINAGE PIPES PROPOSED DRAINAGE PIPES FIGURE 12 SCALE: 1-. 200 200' 1011:11 200. tt i) ------- EXISTING DITCH CENTERLINE PROPOSED DITCH CENTERLINE PROPOSED CONDITIONS ---- EXISTING PROPERTY LINE BASIN DIVIDE PIPE AND OPEN CONVEYANCE SYSTEMS RSA (M. AIRPORT IMPROVING YOUR WORLD .o ,ovJ COG4 `' <.1 . ONSLOW COUNTY 1o44i CAa �P ALBERT J ELLIS AIRPORT CAPE FEAR RIVER BASIN / / /` ` sty �� / .„./ tt t' ij 'I / ? s? [I: Lk c4 r..1., 54 -., �� .. / ". V--:(:,,, . c.' \ \ `, —�� ` ....___._ ............ ..._..._. _ ..... yi ........ .. .._—._ ....-....... _....._... _._ ....___ ........_..... ... .._... ..... ........ \ \ , \I �� YY ;pi, _. t.. •'� ... --.ram-=�- ..•�.,. """"' auti-'�-.. �-. --,�'---'fin•= --.c.���. ..� ik "r tt . , tz -I. Sr / ,,,, ••._•••�.,,.�.,...••_••. •••.....•—_ `•. _... .-... --. .��_....r - •• ..�,�,,, 5, 4,, s, sa J311:113:11132113111-? ' : - ` J / '� T, Ft ,1(.1 / "'—'River FIGU) 14 IN~ •" ',,i'•-•- — "' • Development Tc(Hours) CN /` Basin ` Existing 3.89 65.50 Cape Fear Proposed 3.89 66.10 Future 3.89 68.60 Existing 4.16 66,30 White Oak Proposed 4.16 66.10 Future 4.16 67.50 River Development 'lc(Hours) CN Basin WHITE OAK RIVER BASIN Existing N/A 65.80 Airport Totals Proposed N/A 66.10 Future N/A 68.20 LEGEND —SCALE: EXISTING DRAINAGE PIPES PROPOSED DRAINAGE PIPES 4"-" FLOW ARROW FIGURE 13 1"= 1,000' t,o'o' S00 �p i,aloo' —•••—•••— EXISTING DITCH CENTERLINE PROPOSED DITCH CENTERLINE SUBBASIN DIVIDE PROPOSED CONDITIONS � EXISTING PROPERTY LINE — —',1'— BASIN DIVIDE BASIN FLOW LINES ASK _--r w,,,.- ELLIS IMPROVING YOUR WORLD OAJ AIRPORT 7.;,7.' Cc. . oi `'' ONSLOW COUNTY 'rti 6Aa0'. ALBERT J ELLIS AIRPORT TAXIWAY-A .. _ TAXIWAY A ...___- , --'"-----:":; „..i=firgnmmormvs ...............••• • i 6 _ f i 4 JZ.> --r n� .IL) I \ ` ...s' ... ... r, Sji L �- ..__._. _. I • , ilit GENERAL COMMERCIAL I RELOCATED T-HANGARS AAPRONN REMAIN ') .............. OVERNIGHT ::"`:\ ; ' AVIATION - - I -- --_ x xiim APRON _ . ___ r - r _ �^ -- _ ��•\ _ �x ARFF} :....,s,,:::tns., -.-_ _ I I - = `� , .�� v-- BUI -- 1 r■ - !! I..I .0 7 ' 6. .. ! , , II :::: 7:211 :::16: RDPOSE - �41 ' _=1 C' I ILl' 3. - Y COMMER - 1 -- - 1,1I is■. °' o ` a� — -- R� III i • :. �� \. �a s� .rr._ `- — A. ■ I. 1 . . iACILETf R . I \. • iLI 16 ■ 'IJI n 1 . ... '', /i --_ I 1 ■ r' - .r. I ___ r— wills i E i i .... .... • / r_.. -f ' - I - �7�F - 1 I. '! 'll i, i.. :III!3I , : / � t. a F } E:�':I1 EXISTING PARKING // •\\\\'imiri __IT-- l;� ■ u J :I. I7. WWI 1. t I i i l'.=;I 'I. II I: I .... .I\, PROPOSED 1(1 1 t., :r.. = -RENTAL 1 t- \EXI!JING P/�RKI 9 ,: : r- - i• PARKING LOT � CAR---..... . III '\ ;5� `' � \- .I `.i . I TOLL BOOTH • FACILITY EXISTING FUEL FARM \� J " 1 l - m� •t. do LEGEND EXISTING DRAINAGE PIPES PROPOSED DRAINAGE PIPES FLOW ARROW FIGURE 14 SCALE: 1"= 200' 200' 100' 0 200' , EXISTING DITCH CENTERLINE PROPOSED DITCH CENTERLINE SUBBASIN DIVIDE PROPOSED CONDITIONS EXISTING PROPERTY LINE BASIN DIVIDE BASIN FLOW LINES RSKELIIS IMPROVING YOUR WORLD M. AIRPORT 0210111 1V . ONSLOW COUNTY °4,4cooS' ALBERT J ELLIS AIRPORT ...... ___,... _._ , ,,• • _ ____._.._________...__ ____.........___ ____ _„, . __________ _.._ _ „ • —_____ ________ ,,...-- ,.• ,..„ .... .-------------- • TAXIWAY A --- - -........... ..• -...........- ......•••••••••••••••-•............- -......-...........- . .- -------------------- .--,----- ----------;:-... • ----- ---- • •-----• - ...:... - - - TAXIWAY-A--••••-- ....... .,...-- - ' .... , a; -- ._____________.................................,,,..__.:. ..__. .._...... _... . . . .....__ ______. . -- . es, ..- , __.... . _______ -- -- — , ! •• • -'' 1 m - .. a- - :a• •' a / •nt--------- .• ..- r • , .im.. ' :" ' i . ).• .. -. 4 .. i 3g . •-••••• ......•-- ' -1 • 1 - - k- ._ ......._ a i 1.- 9 2 1 , ,• i I I I I /• 9 1 COMMERCIAL ..., i i • • AVIATION -- APRON . k GENIRAL .., • ,, AVIATION ..- .., . ,... • ..'.. , , 1 7 1 \ 1 . i AlificoN ,,,, .,.. . , . \ . .. ,„_.,....... .. 1 - ..11 - • / . 1 . , • • ce , ... .._. ''... A-.,-,,-"-..•4,y.-,. ARFF . ,..„ • ' GENERAL re..441f:04v.. .:-:',-,=41;114.r1V-='--77:7•1' ji • BUILDING, • . , , . Rib Cor e/v 117 ,.. 1 r\C 111,/, i ' i 7 1:- AFAVICAILtlitY H111010"/ZZ . '7'f--loirAtt, , ' 9 •••• or 40/3" Aot ir 90 ‘' " .. . • -• ...., _ . .61 , 11 /../ -- , --- -• --- _____' ., . - ... •,;•...-;,-'•, ...„- ,.._.. - , ccib e:fe, _____ _ _ . .. Ix • : 1 -. "If AO 1,/ ' • ''''''''S,/ •• 46.4'.... 86 e• • ..-- .--- „....-- ./.:1/ Cr.> co<.) A ' • : -. , ••••••• .-- ,.. it--,• .• . •. .• ..... .. ..._. . „--./. • ' ' •-- --•• ,, ..._, . I 1 l• Tipp. , .. ,. '....•\ LENERAL AVIATION T-HANGAR - t cn, c-c! ---Abg..1-------- ....m i I. it / -i''i .*.: ,. ''ff,.7140,",/,Fir ;' ' 53 / _ ..._ .. .. ..[-,,. .. 14001 4610 r / . .. . .. .. , i : , ! ' J. : •-. • I I ! i / /.-. . .-.....- • • ,• .. !1 ---... " f 1 -r•-•:-, 'Hilo I: 75 ;1 ,::1 1, El! f 'HEW i: -'Il IIE:El : : ; 1 76 _ . .. .... .-- • k : '..\- \ Hi 1:..!11.. :1,1i- ii .11, :.•:, 1:f „,. \ \\\\ , EXISTING!I3iTiFf111: 1 • i' 'ARKINQ LOT / i -. , -• - .. •.-•- 'i i ''.. TOLL BOOTH / . . . . \ H-I 75Iii. II: Iiiii,,iill• i i ,...,, EXISTING FUEL FARM , 1 , - 5 I •,--- ' • :___---__ . _,,, „._-,., f_,. , :: .,‘. IN "'", '•---- • - . ---,..-. . - . 7-7 m..-.--.. . .=' .... .-1-=1.".-,-7,' -- 1'"" --7.-.".. ... .. ............... -., .•...'- • ‘‘,.- ' RENTAL CAR MAINTENANCE FACILITY //- SCALE 1 = 200' LEGEND 4,0 % A CAPE FEAR BASIN CONNECTED IMPERVIOUS AREA- EXISTING DRAINAGE PIPES FIGURE 15 : . 20:..........L100. 0 200' AP,,,,, , A WHITE OAK BASIN CONNECTED IMPERVIOUS AREA .,i i. BASIN DIVIDE EXISTING CONDITIONS - - - I ------- EXISTING PROPERTY LINE --------•-- EXISTING DITCH CENTERLINE CONNECTED IMPERVIOUS AREAS Fr; RS K. ELLIS OA-1 AIRPORT IMPROVING YOUR WORLD ___ 2�'~.. co.,,,‘� o F ONSLOW COUNTY o zogThP ALBERT J ELLIS AIRPORT -- - . TAXIWAY A -' --- - - T-AXIWA -- __ x� - - j _ 1 r 92 • g j 101 - -I 1. GENERAL1i COMMERCIAL ; -... AVIATION........................................ REMAIN OVERNIGHT 1 .� APRON ... .. AVIATION f �, a h APRON �..- R. IC --- _ O/ 1 x —X- x^ x ,..,p497 .„...,-.._-.--..-..-_-•••_••••_• ;_9__0i,_-Ii1I ARFF .: . . ,_ . . __......,.. ,.i 10 I (,I1 - ,I-x,i 1 03 11 •'-,------.--4:.__. -=---=I1_= r _ - _ ,F1.i„7,,.-4r i. •)' .(t' '.'c1 ,„ BUILDING - 110 \' __ , qaf I '''741-d'pl,:-4/:. e 1 •'I L .,,r "'41,i' . - . . / s \ ‘', K \\Ths.aiweetiwa. 0,04 :....., ,...1.••. ...... / Br .., - -- , 1 tittli..t.4.t/;i:/:/,..t01:11 ,� 36 ' r __-4 te".;,;..".: 0 ,,/ NNN : ,...:j,ri.i:‘At -, ... -: '. -.,', .: : ..: : .:.. _jetH,;(1e. : ___ 82 ...! . 1 ''. ., ',1",-1,:, _ _ _ , 7, - -- �C'�''�: a ,4: C _ _ FC .n I c 1 t /1 1 R i \ illi.iEli _ 1 •PROPOSED 1 t i` ' 11 : i 1 I -rr ! 1 t22 R ItT.*L 11 ° , �1 t \ \EXIS INa,!AR ING. - : . 1 TOLL IBOOTHT AAA � � � i FACILITY i �'� \ 1�21: ;: . . 3 t t; �; • EXISTING FUEL FARM �, ` ��� _ _ - \.,��\���_, .._--..._..._ _1I 1' -- -._.._...- - ,! a. _ � � 4 i. j ri• i I LEGEND %///// CAPE FEAR BASIN CONNECTED IMPERVIOUS AREA EXISTING DRAINAGE PIPES FIGURE 16 SCALE44% .•= zoo' ot - BASIN DIVIDE PROPOSED CONDITIONS zf i 200'l %/////. WHITE OAK BASIN CONNECTED IMPERVIOUS AREA --- EXISTING PROPERTY LINE EXISTING DITCH CENTERLINE CONNECTED IMPERVIOUS AREAS IRS ItOA-1 AIRPORT. IMPROVING YOUR WORLD o. co,,,, .,, o t ONSLOW COUNTY 1�94,coe ALBERT J ELLIS AIRPORT Cape Fear Basin Outfall Information Pervious Impervious Percent BUA CN Tc Area(Acres) Area(Acres) - (Hours Existing Conditions 398.28 55.84 12.30% 655 3.89 ��~.,■ Proposed Conditions 391.83 62.18 13,70% 66.1 3.89 �� .'` Future Conditions 362.36 91.65 20.19% 685 3.89 NOTE:TABLE CALCULATIONS DO NOT INCLUDE THE PROPOSED LAND /�{ •♦� ACQUISITION ACREAGE AND ASSOCIATED BUA. + J ` CAPE FEAR BASIN OUTFALL SRO 4,\ it 7., , Z , ,* ( _ l•`,` , i ^ 2000' _ �•.• t WINDSOCK �<• -\.. Ii' ..::. EI 60NTROL STRUCTURE `7 ��I'� � �`in � .\` 11 ` �� I PHASES II- PHASE I PROPOSE J ' DETENTION SWALE `.� I \ l !� ` �tl DETENTION SWALE --.. .... .__.7.. - -t�= --..._ Y _ /'s'. i '•. L' \ if ---- i EXPANSION AREA -�_ '•f"~'-= _____� -�s:�a�i........ ._`^_--_-_ :. __-._, •\ i. �; 1I • `�' _Jil ill — — e.I •7�'—. 'I �� ... �--___ - ._..--- _- -- - `" ( i - C y `�s�' �+.�""!� I f D ENfION SWALE Ifr \i I' Y � \ 1� r 11�I i _._."--___. I. _ _. I r FUTURE RE TALC •.��` o s -- !E .�! �-�_wta s.' T 1 \ ..... ... _ �•_---__ �..__ _ ;:\y ---_ . l n��, -_____--- IACKF Eauy B \A ��...ill c ._.... AXLWAY'9:. -- -- -- �- - _ - - ~ I_k SITE 0 ON `i 1 , ..`^-- 1. 400 i{° il _ 41 . -1— _.. c...„. , , n._ ‘,„_, , , ...,,., ,, \\_. -- - - -- $s _ _ os`—*s...... _`= _ ..�—: wrw.T.r..-r-r r�-a._�...�r-:.-.::ri.�.r:� - - - _ _ _ _ _ i� _ _ _ 1E .', RT3H'SiT- r t e -.� .. . I f. �T, F• _'�� g PHASE ( PROPOSE — !k —• � F ti • , y� `•� + - •f F DETENTION SWALE II'k \ .i J f i WEIR CONTROL STRUCTURE FUTURE ER TRAFFIC-1/ �� 4 _�! .'d:. `FUTURE FUEL FARM WHITE OAK BASIN OUTFALL ♦ CONTROL TOWER \ �-� 6r; - _�-_ - ��` WEIR CONTROL STRUCTU w,0 ATERSHED BASIN DMDE FUTURE RENTAL CA' _ .. . ' r MAKE READY FACILITY U JRE PARKING URE PARKING SITE OPTION A HIGH FLOW C----EL ___--`` I WhkeOak Basin OtrtfallInformation \ Pem's A• , -.l 1� (Acres) eA � ) Percent BUA CN Tc (Hours) Area J 1 ExistingConditions 190.984.16 3L79 1427% 66.3 7 ( Proposed Conditions 191.88 30.99 13.90% 661 I EXISTING GROUND 4.16 1 r ! Future Conditions 185.11 37.76 16.94% 673 4.16 1 DESIGN HIGH WATER ELEV. 79.0' NOTE:TABLE CALCULATIONS DO NOT INCLUDE THE PROPOSED LAND I• ACQUISITION ACREAGE AND ASSOCIATED BUA. 't 1 ,A } r 2' 1 7 j LOW FLOW CHANNEL 0I COLLECTION SWALE TYPICAL SECTION xm!.I SCALE:I+TB LEGEND FIGURE 17 "° ALBERT J. ELLIS AIRPORT 2 44. ■PHASE I PROPOSED DEVELOPMENT ----EXISTING PROPERTY LINE PROPOSED CONDITION STORM WATER PHASE I LAND ACQUISITIONPRDPOSEO PROPERTY LINE NOTE:THE PROPOSED LAND ACQUISITION ACREAGE AND ASSOCIATED �/� b - ti ■PHASE II-V- FUTURE DEVELOPMENT WATERSHED BOUNDARY LINE BUA SHOWN IS NOT INCLUDED IN THE LOW DENSITY PERMIT. MANAGEMENT RSP&M ,W, ELLIS IMPROVING YOUR WORLD OAIRPORT a 13 CD 3 a CO r IMPROVING POURiyOYRLD Reynold-a,ikukh and HO Inc. APPENDIX B GEOTECHNICAL INFORMATION E11�IS B OAJ AIRPORT � , REVISED GEOTECHNICAL ENGINEERING REPORT NEW TERMINAL PROJECT ALBERT J. ELLIS AIRPORT JACKSONVILLE, NORTH CAROLINA S&ME Project Number 1061-11-016A Prepared For: RS&H 8601 Six Forks Road, Suite 260 Raleigh, North Carolina 27615 Prepared By: S&ME 3006 Hall Waters Drive, Suite 100 Wilmington, North Carolina 28405 NC PE Firm License No. F-0176 December 6, 2011 S&ME December 6,2011 RS&H 8601 Six Forks Road, Suite 260 Raleigh,North Carolina 27615 Attention: Mr. Sean A.Brennan,P.E. Aviation Engineer Reference: Revised Geotechnical Engineering Report New Terminal Project Albert J. Ellis Airport Jacksonville,North Carolina S&ME Project Number 1061-11-016A Dear Mr.Brennan: We are pleased to present this Revised Geotecluueal Engineering Report for the above- referenced project. Our services were provided in general accordance with Proposal No, 154B-11 dated September 26,2011. This report presents the findings of our subsurface explorations along with geotechnical design and construction recommendations based on these findings. S&ME appreciates having the opportunity to be of service to you during this phase of the project. If you have any questions or comments after reviewing this report,please do not hesitate to contact us at your convenience. Sincerely, toons114001 S&ME,Inc. LESS/'••.'y�'•. SEAL • /i„aii I .933 w r r. 1 ;��. � l Torn Schipporeit, P.E. O . )yQi44t2�lo""l `, Nathan P P. Buffum Branch Manager/Senior Engi gs+ '••••••••' �•` Construction Services Manager N.C.Registration No. 19331 � '��,,7�SCN�Q 0•�` Attachments TMS:NPB/jns E-Mail: RS&H,Mr.Sean Brennan.P.E. ean,BrennanktIrsandh.eom S&ME.iplc./3006 Hap Waters Drive,Suite 100/Wiknington,NC 28405.8786/p.910.799.99451 t 910.799.9958 f www smeinc com Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project.Albert J. Ellis Airport,Jacksonville, NC December 6.2011 TABLE OF CONTENTS PAGE 1 PROJECT DESCRIPTION 1 2 FIELD EXPLORATION PROGRAM 2 2.1 CONE PENETROMETER TEST SOUNDINGS 2 2.2 SOIL TEST BORINGS 3 3 LABORATORY TESTING 4 4 SUBSURFACE CONDITIONS 4 4.1 AREA GEOLOGY 4 4.2 SOIL SURVEY 4 4.3 SOIL TEST BORINGS AND CPT SOUNDINGS 5 4.3.1 T-Hangar 5 4.3.2 New Terminal Building 6 4.3.3 Pavements 7 5 CONCLUSIONS AND RECOMMENDATIONS 8 5.1 SITE PREPARATION 8 5.2 STRUCTURAL FILL AND BACKFILL 9 5.2.1 Placement 9 5.2.2 Use of On-Site Soil as Structural Fill and Back f ll 10 5.3 SEISMIC DESIGN 10 5.4 FOUNDATION SUPPORT 10 5.4.1 T-Hangar 10 5.4.2 Terminal Building and Mechanical Building 11 5.5 GROUND FLOOR SLABS 13 5.6 PAVEMENTS 14 5.6.1 Existing Airside Pavements 14 5.6.2 New Airside Pavements 14 5.6.3 Landside Pavements 16 5.6.4 General 17 5.7 RETAINING WALLS 17 6 LIMITATIONS OF GEOTECHNICAL REPORT 19 APPENDIX Important Information about Your Geotechnical Engineering Report Figure 1 Site Vicinity Map Figure 2 Exploration Location Plan- Site Figure 3 Exploration Location Plan—Terminal Building Area Figure 4 Subsurface Profile—T-Hangar Figure 5 Subsurface Profile—Terminal Building Figure 6 Anticipated Undercutting Plan- Site Figure 7 Anticipated Undercutting Plan—Terminal Building Area Legend to Soil Classification and Symbols CPT Soil Classification Legend Exploration Logs (March and October,2011) Shear Wave Velocity Measurements Laboratory Test Results Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville,NC December 6,2011 1 PROJECT DESCRIPTION We understand that the Albert J. Ellis Airport plans to construct a new two-story terminal building at its facility near Jacksonville,North Carolina. The site is at the approximate location shown in Figure 1. The new terminal building will be located southwest of the existing terminal building. The new terminal building will be a steel-framed structure with a maximum design column load of approximately 165 kips. The project will include a single-story structure with masonry block walls east of the new terminal building. This structure will house mechanical equipment(pumps, generators,and chillers). The new terminal project will also include a T-Hangar,paved access roads, drives,and parking areas for cars and trucks (i.e., land-side pavements). Proposed air-side pavements,which will be subject to aircraft wheel-loading,will include two asphalt apron areas and one concrete apron area. S&ME previously completed a geotechnical engineering study for the originally proposed terminal building location'. Since the date of that report,the location of the proposed terminal building was shifted approximately 100 feet toward the runway and approximately 60 feet toward the south. The proposed T-Hangar will be a pre-engineered, steel-framed structure with metal walls and a slab-on-grade floor. It will be approximately 20 feet high and will have maximum column loads of approximately 10 to 20 kips. Small private airplanes will be stored in the hangar. The site includes pavements for vehicles and small airplanes in addition to grass-covered, landscaped areas. The site is relatively level,but includes stormwater drainage swales. The proposed buildings and most of the proposed pavements are inside a fence which separates public areas from secure areas at the airport. We assume that: • The new terminal and mechanical buildings will have slab-on-grade ground floors with design floor loads less than 150 pounds per square foot(psf). • Design loads for the proposed mechanical building will be relatively light(wall loads less than 2 kips per foot). • The finish floor elevation of the proposed buildings will be within 2 feet of the existing grade at the site. 'Report titled"Geotechnical Engineering Report,New Terminal,Albert J.Ellis Airport,Jacksonville,North Carolina,S&ME Project No. 1061-11-016",prepared for RS&I-1,prepared by S&ME,dated April 12,2011. 1 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville. NC December 6.2011 • Earthwork resulting in up to 2 feet of excavation and/or 2 feet of fill will be necessary to achieve the design grades. • New underground utilities will be less than 5 feet deep. o Design traffic conditions for the land-side pavements will be limited to automobiles and light-to moderately-heavy trucks. The proposed pavements will be subjected to less than 15 Equivalent 18-kip Single Axle Loads (ESALs)per day in heavy-duty areas (terminal loop access road), 5 ESALs per day in medium- duty areas (T-Hangar access road, drive through parking lots), and less than 1 ESAL per day in light-duty areas (parking lots) over a 20-year design life. • Design traffic conditions for the air-side pavements will include aircraft weighing more than 60,000 pounds. We have made these assumptions based on our experience with similar projects. The conclusions and recommendations given in this report will be applicable for the project based on the background information provided to us and on our assumptions. 2 FIELD EXPLORATION PROGRAM 2.1 Cone Penetrometer Test Soundings Our field exploration included the advancement of four cone penetration test(CPT) soundings in March 2011. Soundings B-1, B-5,B-7, and B-9 were advanced to depths ranging from 45 to 48 feet beneath the existing ground surface. The CPT soundings were performed using a CPT rig mounted on an all-terrain vehicle to hydraulically advance an electronically instrumented cone penetrometer. During penetration,the tip resistance,pore water pressure,and sleeve friction were measured and recorded in general accordance with ASTM D-5778. The method produces a nearly continuous record of information of subsurface conditions. In addition,the cone used for this exploration was instrumented with seismic sensors for measuring shear-wave velocities in selected soil layers. The CPT soundings were terminated when refusal to additional cone penetration occurred. CPT sounding logs and shear wave velocity measurements are included in the Appendix to this report. The approximate sounding locations are shown on Figures 2 and 3. Since the soundings were located in the field by our personnel by estimating right angles and approximating distances using existing site features,their locations should be considered approximate. Ground surface elevations arc not shown on the attached CPT sounding logs since site specific topographic information has not been provided to us. 2 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project.Albert J. Ellis Airport.Jacksonville. NC December 6.2011 2.2 Soil Test Borings Our field exploration also included drilling 36 soil test borings(B-2,B-3,B-4,B-6, B-6A,B-8,NA-1 through NA-23, and NB-1 through NB-7)to depths of 10 to 60 feet below the existing ground surface in the proposed building and pavement areas. The boring locations are shown on Figures 2 and 3. Since the borings were located in the field by our personnel by estimating right angles and approximating distances using existing site features,their locations should be considered approximate. Ground surface elevations are not shown on the attached boring logs or profiles since site specific topographic information has not been provided to us. The soil test borings were drilled using wash boring and hollow stem auger drilling procedures with a CME-550x drill rig mounted on a rubber-tired all-terrain vehicle. Within the borings, samples of subsurface soils were generally taken at 2.5-foot intervals within the upper 10 feet,and at 5-foot intervals thereafter using a split-spoon sampler. Standard penetration testing(SPT)was performed in conjunction with split-spoon sampling in general accordance with ASTM D-1586. The SPT values given on the boring logs were measured using an automatic hammer. Bulk samples of near-surface soils-were obtained front'the auger cuttings from Borings NA-2,NA-5,NA-i i, and NA-19. Boring B-6A was advanced to a depth of 30 feet below the existing ground surface near Boring B-6 without split-spoon sampling to obtain undisturbed Shelby tube samples of the very soft clay. Shelby tube samples were obtained from depths of 18 to 20, 23 to 25, and 28 to 30 feet below the existing ground surface in accordance with ASTM D-1587. At completion of the drilling operations,temporary slotted PVC standpipe piezometers were installed in Borings B-2,B-6, and B-8. The remaining soil test borings were backfilled with bentonite chips. Representative portions of the split-spoon samples were returned to our laboratory for visual-manual classification in general accordance with the Unified Soil Classification System. Boring logs containing soil descriptions, SPT N-values, and drilling observations are included in the Appendix to this report. Generalized Subsurface Profiles (Figures 4 and 5)presenting the subsurface information obtained at the soil test boring locations are also included with this report. After measurement of stabilized water levels,the temporary piezometers were removed and the boreholes were backfilled with bentonite chips. 3 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project.Albert J. Ellis Airport.Jacksonville. NC December 6.2011 3 LABORATORY TESTING S&ME performed moisture content tests, grain-size tests,Atterberg limits tests, and organic content tests on representative samples obtained from the soil test borings. Moisture content, grain-size,Atterberg limits,modified Proctor compaction, standard Proctor compaction,and California Bearing Ratio (CBR)tests were performed on the bulk samples of near-surface soil. We also performed moisture content,grain-size, Atterberg limits, and consolidation testing on two of the Shelby tube samples. These tests were performed to confirm visual soil classifications, estimate the engineering properties of the soils tested,and perform detailed consolidation/settlement analyses for the proposed buildings. The testing was done in general accordance with the applicable ASTM standards. The test results are attached in the Appendix. 4 SUBSURFACE CONDITIONS 4.1 Area Geology The site is located within the Coastal Plain Physiographic Province of North Carolina. The Coastal Plain Province is typically characterized by marine, alluvial, and eolian sediments that were deposited during periods of fluctuating sea ieveis and moving shorelines. The soils in this province are typical of those laid down in a shallow sloping sea bottom: sands,silts,and clays with irregular deposits of shells. Alluvial sands, silts,and clays are typically present near rivers and creeks. Deposits of peat,organic silt,and organic clay are also typically present in or near current or former tidal marsh areas in the lower portion of the Coastal Plain. According to the 1985 Geologic Map of North Carolina,the site is underlain by the Castle Hayne Formation of Tertiary age. This formation consists in part of light gray limestone,more or less consolidated,and in part of light colored marl that varies from loose to consolidated. The limestone is usually quite fossiliferous, and in many places is composed of shells. At places the shells have been removed entirely, and the limestone is vuggy(has voids)or contains the casts and molds of the original organisms. 4.2 Soil Survey The Soil Survey Report for Onslow County,North Carolina,(published by the United States Department of Agriculture Soil Conservation Service in 1982)indicates that the site is underlain primarily by the Foreston, Goldsboro Urban Land,Leon,and Urban Land Soil Series. The following soil properties and characteristics are given in the Soil Survey Report: 4 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport.Jacksonville, NC December 6.2011 Table 1 —Soil Survey Soil Properties r Soil Typical Unified' Liquid Plasii iir Flooding High Water r Name Depth Classification Licit index Frequency l Table wft) .! _fn) _ - FoA- 0-8 SM — NP None 2.5-3.5 Foreston 8-70 SM,SM-SC <25 NP—5 Apparent 70-80 SP-SM,SM -- NP Dec-Apr GpB— 0-13 SM,SM-SC,SC <25 NP-14 None 2.0—3.0 Goldsboro 13-80 SM-SC,SC, 16-37 4-18 Apparent Urban Land CL-ML,CL Dec—Apr Ln— 0-17 SP, SP-SM — NP None 0—1.0 Leon 17—51* SM,SP-SM,SP -- NP Apparent 51—91* SP,SP-SM I — NP June-Feb Ur— No typical properties. Natural soils have been altered by extensive urbanization and Urban develo ment. To o ra h and on inal landsca a have chap ed. *Includes a zone that is weakly cemented when wet and strongly cemented when dry(i.e.,hardpan) 4.3 Soil Test Borings and CPT Soundings 4.3.1 T-Hangar Borings NB-1,NB-2,and NB-3 encountered 2 to 3 inches of grass,grass roots,and topsoil at the ground surface. Below these surficial materials, five basic soil strata were encountered within the maximum expioration termination depth of 50 feet. The strata are briefly described in the following table: Table 2—Generalized Subsurface Strata for T-Hangar Building Average Depth Stratum From (feet) To Description 1 0.2 14 Loose Sand(SP, SW,SP-SM, SM) (N=3 to 10 bpf, N-avg=5 bpf) 2 14 18 Very Loose Clayey Sand(SC, SC-SM) (N=0 to 2 bpf, N-avg= 1 bpf) 3 18 29 Loose Sand(SW,SP-SM, SM) (N=2 to 14 bpf, N-avg=6 bpf) 4 29 48 Firm Clay(CL,CH) (N=0 to 14 bpf, N-avg=5 bpf) CASTLE HAYNE FORMATION: 5 48 50 Medium Dense Sand(SW,SM) (N=24 bpf) Notes: N = Standard Penetration Test blow count bpf = Blows per foot avg = average The stabilized water levels were measured at a depth of 3.0 feet below the ground surface in the borings performed in the proposed T-Hangar area. A generalized profile representing the subsurface conditions in the proposed T-Hangar area is given on Figure 4. 5 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Protect,Albert J. Ellis Airport.Jacksonville, NC December 6.2011 4.3.2 New Terminal Building Explorations B-4,B-5,B-6,B-7,B-9,NB-4,NB-5,NB-6,and NB-7 encountered 2 to 7 inches of grass, grass roots,and topsoil at the ground surface. Below these surficial materials,five basic soil strata were encountered within the maximum exploration termination depth of 51.5 feet. The strata interpreted from the CPT soundings represent approximate boundaries between soil behavior types2. The strata are briefly described in the following table: Table 3—Generalized Subsurface Strata for New Terminal Building Average Depth Stratum From (feet) To ( Description Loose Sand(SP, SC,SM, SP-SC, SP-SM) 1 0.5 14 (N=2 to 18 bpf, N-avg=8 bpf) (qc avg=44 tsf) Very Soft Clay(CH)and Very Loose Clayey Sand(SC) 2 14 28 (N=0 to 5 bpf, N-avg=2 bpf) (qc avg=6 tsf) Very Loose Sand(SM,SW,SP-SC) 3 28 32 (N=1 to 5 bpf, N-avg=4 bpf) (qc-avg=31 tsf) Very Soft Clay(CL, CH) 4 32 47 (N=0 to 6 bpf, N-avg=2 bpf) (qc-avg=28 tsf) CASTLE HAYNE FORMATION: 5 47 51.5 Very Dense Sand(SC,SM) (N=28 to 100 bpf, N-avg=88 bpf) (qc= 125 tsf to refusal) Notes: N = Standard Penetration Test blow count bpf = Blows per foot qc = CPT tip stress avg = average Please note that some exceptions to this generalized profile were encountered. For example,Boring NB-5 encountered peat(PT) from depths of 8.5 to 13 feet below the ground surface. Also,Boring NB-4 encountered soft clay(CL)at depths of 3.5 to 6.5 feet below the ground surface. The measured shear wave velocities ranged from 387 to 1,259 feet per second(fps) above a depth of approximately 47 feet in CPT Sounding B-9. 2Soil Behavior Type is calculated based on empirical correlations which use the three fundamental penetrometer measurements(i.e.,tip resistance,sleeve friction,and pore pressure). A CPT may define a soil based on its behavior as one type,while its grain size and plasticity(the traditional basis for soil classification)may define it as a different type. 6 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 The stabilized water levels were measured at depths ranging from 2.3 to 6.0 feet below the ground surface in the piezometers,boreholes, and CPT soundings performed in the proposed terminal building area,with an average depth of approximately 4 feet. A generalized profile representing the subsurface conditions in the proposed terminal building area is given on Figure 5. 4.3.3 Pavements The proposed pavement area explorations(B-1,B-2,B-3,B-8,and NA-1 through NA-23) encountered either topsoil or pavement materials(asphalt overlying crushed stone)at the ground surface. Below these surficial materials,five basic soil strata were encountered within the maximum exploration termination depth of 60 feet. The strata interpreted from the CPT sounding(B-1)represent approximate boundaries between soil behavior types3. The strata are briefly described in the following table: Table 4—Generalized Subsurface Strata for Pavements r Average Depth 1 Stratum From ( )I To Description 1* 0.3 I 7 Loose Sand(SP,SW, SP-SM, SP-SC, SM,SC) (N= 1 to 35 bpf, N-avg= 10 bpf) (qr avg=49 tsf) Very Soft Clay(CH, CL)and Very Loose Clayey Sand 2* 7 13 (SC) (N= 1 to 8 bpf, N-avg=3 bpf) (qc avg=5 tsf) Loose Sand(SW,SP, SP-SM) 3* 13 30 (N=2 to 16 bpf, N-avg=10 bpf) (q-avg=37 tsf) Soft Clay(CL) 4* 30 46 (N=1 to 7 bpf, N-avg=4 bpf) (qr avg= 13 tsf) CASTLE HAYNE FORMATION: 5* 46 60 Very Dense Sand(SC) (N=35 to 100 bpf, N-avg=60 bpf) (qc= 124 tsf to refusal) Notes: N = Standard Penetration Test blow count bpf = blows per foot qc = CPT tip stress avg = average * =not encountered in all of the proposed pavement area explorations 3Soil Behavior Type is calculated based on empirical correlations which use the three fundamental penetrometer measurements(i.e.,tip resistance,sleeve friction,and pore pressure). A CPT may define a soil based on its behavior as one type,while its grain size and plasticity(the traditional basis for soil classification)may define it as a different type. 7 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 The stabilized water levels were measured at depths ranging from 2.2 to 5.4 feet below the ground surface in the piezometers, boreholes, and CPT soundings performed in the proposed pavement areas,with an average depth of approximately 3 feet. 5 CONCLUSIONS AND RECOMMENDATIONS 5.1 Site Preparation Site preparation should be initiated by clearing and stripping the proposed construction areas of any asphalt, curbing,trees, shrubs, other plants,topsoil,roots, organics, and other unsuitable material. We anticipate an average stripping depth of 8 inches to remove the topsoil and rootmat in existing grass-covered areas, and an average stripping depth of 6 inches to remove asphalt from existing paved areas. Any buried existing structures, pavements, slabs, or foundations should be completely demolished and removed from the proposed construction areas. Any utilities that may exist within the proposed building footprints should be relocated, and any within pavement areas should be evaluated and relocated as needed prior to construction. After stripping in proposed fill areas and after excavation to design subgrade elevations in cut areas,we recommend that the exposed subgrade soils be proofrolled with a loaded tandem-axle dump truck to locate any areas of soft or otherwise unsuitable surface conditions. Any area that ruts or pumps should be disced,moisture conditioned to near the soil's optimum moisture content by drying or wetting, and recompacted. Alternatively, unstable soils could be undercut and replaced with compacted backfill, as discussed below. Based on the explorations and our site observations,we anticipate potential undercutting of near-surface soils in the approximate areas shown on Figures 6 and 7, in addition to localized areas between the boring locations, such as drainage swales to be filled. We anticipate that approximately 3 feet of undercutting will be necessary in the areas shown on Figure 6, and 3 to 6 feet of undercutting in the areas shown on Figure 7. The total amount of undercutting will depend on the design grades and the weather conditions at the time of proofrolling and site earthwork. It is typically more practical and economical to undercut and replace soft,wet subgrades soils rather than disc,dry, and recompact them, especially during the typically cooler,wetter months of the year(November through March). We recommend that the construction contract include an allowance for the undercutting of unsuitable soils and replacement with compacted structural fill. Due to the relatively shallow seasonal high water table,we recommend that,if possible,design grades be no lower than.the existing ground surface,and preferably at least 1 to 2 feet higher than existing grades. For local projects,it is typically more economical to import fill and raise grades rather than balance the site earthwork. 8 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project.Albert J. Ellis Airport,Jacksonville, NC December 6.2011 Once the initial proofrolling and,if necessary,undercutting of the subgrade soils in the building,pavement,and any other structural areas have been completed,the contractor should protect the exposed soil subgrades by smooth-rolling and grading the site to promote surface water runoff. Exposure to the environment and construction activities will likely weaken the exposed subgrade soils. If deterioration of the soil occurs during the construction process,discing and drying,recompaction,densification, stabilization with geotextiles,and/or undercutting and replacement with structural fill may be necessary,and should be performed by the contractor as recommended by the geotechnical engineer at no additional expense to the owner. Because this is a site which has been developed in the past,there is a potential for existing fill,buried foundations,utilities,and debris to be present at the site. The explorations did not encounter refusal on any relatively shallow obstructions,but they were widely spaced, and buried debris or obstructions are possible at this site. The construction contract should include allowances for the demolition and removal of obstructions or buried debris from the site. 5.2 Structural Fill and Backfill 5.2.1 Placement Where structural fill is required to reach finished grade,we recommend that a clean sand, a slightly silty sand, a slightly clayey sand,a silty sand, or a clayey sand having a Unified Soil Classification of SW, SP, SP-SM, SP-SC, SM,or SC be used. The fill should be generally free of organics (less than 1 percent by weight per ASTM D-2974)and free of debris. Structural fill in the building areas and landside pavement areas should be placed in 8 to 10-inch thick lifts, and should be compacted to at least 95 percent of the standard Proctor maximum dry density(ASTM D-698). The upper 12 inches of structural fill under structures or landside pavements should be compacted to at least 98 percent of the material's standard Proctor maximum dry density. The moisture content of the fill should be within+/-3 percent of the material's standard Proctor optimum moisture content for SP-SM, SP-SC, SM,or SC and within+/- 5 percent for SW or SP. The contractor should wet,mix, and/or dry the soil, as necessary,to meet this moisture requirement. Structural fill in the airside pavement areas should be placed in 8 to 10-inch thick lifts, and should be compacted to at least 95 percent of the modified Proctor maximum dry density(ASTM D-1557). The upper 12 inches of structural fill under airside pavements should be compacted to at least 98 percent of the material's modified Proctor maximum dry density. The moisture content of the fill should be within+/-2 percent of the material's modified Proctor optimum moisture content. The contractor should wet, mix, and/or dry the soil,as necessary,to meet this moisture requirement. 9 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Protect,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 To confirm that the specified degree of compaction is being obtained, field density testing should be performed in each fill lift by the geotechnical engineer's representative. We recommend that density tests be performed at a minimum frequency of one test per 2,500 square feet per lift in the building and pavement areas, and one test per 100 linear feet per lift of utility trench backfill in structural areas. 5.2.2 Use of On-Site Soil as Structural Fill and Backfill Based on the near-surface soils encountered in the borings,the majority of the on-site soils down to a depth of approximately 2 to 4 feet should be suitable for use as structural fill (excluding topsoil,rootmat, and peat). The clayey sands(SC)may be reused, but are moisture sensitive and can be more difficult to adequately compact. Soils excavated from below the water table(approximately 2 to 4 feet deep)are likely to be excessively wet and should not be reused as compacted structural fill unless they can be disced and dried to within the specified moisture content range. 5.3 Seismic Design A Site Class D is recommended for design based on the seismic shear wave velocity measurements in CPT Sounding B-9. The seismic shear wave velocity measurements are included in the Appendix of this report. 5.4 Foundation Support 5.4.1 T-Hangar The proposed T-Hangar should be supported on shallow foundations. A net allowable bearing pressure of 1,500 psf should be used for design of the shallow foundations bearing on suitable natural soils or properly compacted structural fill. We estimate the total settlement for the footings will be less than 1 inch,which is typically tolerable by structures similar to that proposed. Differential settlement between column footings should also be tolerable(less than about 1/2-inch). Shallow foundations should be designed to bear at least 12 inches below finished grades for frost protection and protective embedment. In accordance with the North Carolina Building Code, column footings should be at least 24 inches square and wall footings should be at least 16 inches wide to prevent a punching shear failure of the foundation bearing soils. Turndown slabs should be at least 12 inches wide under walls in accordance with the North Carolina Building Code. We recommend that the footing excavations be observed by the geotechnical engineer's representative to verify that suitable soils are present at,and below,the proposed bearing elevation. If soft,very loose,or unsuitable materials are encountered in the footing excavations,they should be undercut and replaced with washed crushed stone(NCDOT No. 57 or No.67)or compacted structural fill. Relatively thin zones of very loose sand(SP, SP- SM)at the bottom of the footing elevation can be densified in place using a jumping jack compactor or vibratory plate tamp. 10 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport.Jacksonville, NC December 6.2011 Based on the borings,we anticipate that undercutting of footings will be required in the vicinity of Boring NB-2 to remove zones of very loose sand within 3 to 5 feet of the existing ground surface,as shown on Figure 6. Localized undercutting of footings between the boring locations may also be necessary. We recommend that the construction contract include an allowance for the undercutting of unsuitable soils and replacement with No.57 or No. 67 stone or compacted structural fill. Prepared bearing surfaces for foundations should not be disturbed or left exposed during inclement weather. Saturation of the footing subgrade can cause a loss of strength and increased compressibility. If construction occurs during inclement weather and concreting of foundations is not possible at the time they are excavated,the footing bearing conditions should be re-evaluated after removal of any water and wet,softened soils prior to placement of reinforcing steel and concrete. Also, concrete should not be placed on frozen subgrades. 5.4.2 Terminal Building and Mechanical Building If the proposed terminal building and mechanical building are supported on shallow foundations,we estimate total column settlements greater than 2 inches and total wall settlements greater than 1 inch,which are greater than those typically tolerable by similar structures. Differential settlements between consecutive columns,along walls,and between columns/walls/floors would also be excessive. We evaluated surcharging the site,followed by shallow foundation support of these buildings. However,due to the thickness of the soft to firm clay and very loose clayey sand foundation soils(Strata 2 through 5)and the consolidation test results,we estimate that post- construction total settlements would be greater than 1 inch and differential settlements would be greater than 1/2 inch,even with up to 10 feet of surcharge. S&ME and RS&H also evaluated both ground improvement(aggregate piers or stone columns)and deep foundations(precast concrete piles)for foundation support of the proposed terminal building and mechanical building. Preliminary pricing information for ground improvement was obtained from a specialty contractor which designs and installs aggregate piers/stone columns. It was determined that aggregate piers/stone columns would be more economical than precast concrete piles for this project. Therefore,we recommend that the proposed terminal building and mechanical building be supported on shallow foundations following ground improvement of subsurface soils to control settlement from foundation loads. Ground improvement options for this site include rammed aggregate piers and vibro-replacement stone columns. Design and installation of ground improvement elements should be performed by a specialty contractor to limit footing and floor slab settlements to 1 inch total and%2 inch differential. The type,diameter,depth,and spacing of stone piers/columns, in addition to the allowable bearing pressure of the footings,are determined by the specialty contractor's professional engineer. Installation of the ground improvement elements should be monitored by S&ME for compliance with the specialty contractor's design and the project requirements. 11 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville. NC December 6,2011 Vibro-replacement typically relies on densification of existing soils, in addition to the stone columns themselves,to limit settlement to tolerable amounts. If vibro-replacement is selected,we recommend that CPT soundings be performed at the site between the stone elements after installation is complete to measure the densification of the sands(Stratum 1) and potentially clayey sands(Stratum 2)by comparison of pre-and post-construction cone tip stress values. Once foundation locations and design loads have been further developed,this information could be provided to specialty contactors such as GeoConstructors/GeoStructures,Lane GeoConstruction,Hayward Baker,or others for them to develop a detailed design and construction cost estimate. We recommend that their design and cost estimate he submitted to S&ME for review prior to final acceptance by the owner and general contractor. To limit post-construction floor slab settlement to tolerable amounts,the aggregate piers/stone columns should not be installed until rough grading is completed in the terminal building and mechanical building areas and a delay period is observed. Site preparation and structural fill placement should be performed in these areas as previously recommended in this report. A delay period of 30 days should be observed after any structural fill placement in these building pads prior to installation of the aggregate piers/stone columns. This will allow for consolidation of the soft clay foundation soils(Strata 2 and 4)due to the weight of the structural fill to occur prior to foundation and floor slab construction,limiting post- construction settlements to tolerable amounts. Please note that stone columns and rammed aggregate pier installation can bring groundwater to the surface,resulting in deterioration of the building pad soils from the construction equipment,especially when the soils are clayey sands or clays. If ground improvement is selected,the entire building pad should be raised at least 1 foot above existing grades by placing compacted structural fill consisting of clean sand(SP, SW)or slightly silty sand(SP-SM)prior to installation of ground improvement elements. Also,please note that even though the borings/soundings did not encounter roots,stumps, limbs,or other obstructions,they may be present at the site,especially in the Stratum 1 sands and Stratum 2 clays. These types of obstructions may impede the stone element installation equipment,and production. The specialty subcontractors should include costs for dealing with potential obstructions in their bids. After installation of ground improvement stone elements,the proposed terminal building and mechanical building can be supported on shallow foundations with a slab-on-grade ground floor. For preliminary design purposes,a net allowable bearing pressure of up to 5,000 psf can be used for sizing of the column and wall footings bearing on stone columns/rammed aggregate piers. This value needs to be confirmed by,and may possibly be modified by,the specialty subcontractor's design. For the columns subjected to uplift loading,one of the following two options could be implemented: 12 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 1) Enlarge the column footings to provide uplift resistance,which would decrease the applied bearing pressure for a given column compression load. 2) Incorporate uplift anchors in the stone columns or rammed aggregate piers designed by the specialty contractor to resist the design uplift loads. The load-bearing walls should be supported by conventional wall footings or stiffened grade beams bearing on the foundation soils improved by the stone columns or rammed aggregate piers. The stiffened grade beams will better span loose or soft soils between the stone columns or rammed aggregate piers and limit settlements to the design tolerances. Shallow foundations should be designed to bear at least 12 inches below finished grades for frost protection and protective embedment. In accordance with the North Carolina Building Code, column footings should be at least 24 inches square and wall footings should be at least 16 inches wide to prevent a punching shear failure of the foundation bearing soils. We recommend that the footing excavations be observed by the geotechnical engineer's representative to verify that the stone elements and suitable soils are present at,and below, the proposed bearing elevation. If soft,loose,or unsuitable materials are encountered in the footing excavations,they should be undercut and replaced with washed crushed stone (NCDOT No. 57 or No. 67)or compacted structural fill. Relatively thin zones of very loose sand at the bottom of the footing elevation can be densified in place using hand compaction equipment. We recommend that the construction contract include an allowance for the undercutting of unsuitable soils and replacement with No. 57 or No. 67 stone or compacted structural fill. Prepared bearing surfaces for foundations should not be disturbed or left exposed during inclement weather. Saturation of the footing subgrade can cause a loss of strength and increased compressibility. If construction occurs during inclement weather and concreting of foundations is not possible at the time they are excavated,the footing bearing conditions should be re-evaluated after removal of any water and wet,softened soils prior to placement of reinforcing steel and concrete. Also,concrete should not be placed on frozen subgrades. 5.5 Ground Floor Slabs The proposed buildings can incorporate slab-on-grade ground floors. Construction(i.e., cold)joints in the floor slab should incorporate dowels to prevent differential settlement at the joints. Concrete floor slabs should be constructed above suitable existing soils or newly- placed,well-compacted structural fill. We recommend that at least 6 inches of compacted clean sand(SP,SW)be placed beneath all ground floor slabs to provide more uniform slab support and to reduce damage to subgrade soils during construction. A modulus of suhgrade reaction value of 150 pci(pounds per square inch,per inch)may be used to design floor slabs on properly prepared subgrades. The need for a synthetic vapor barrier should be evaluated by the designer of the structure. 13 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Proiect,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 Depending on design grades and the thickness of structural fill to be placed in the building areas,undercutting,reconditioning,and/or replacement of the near-surface soils could be required for the ground floor slabs. If fill is placed in the building areas,we recommend that a 30-day delay period be observed between placement of the fill and beginning floor slab construction to allow for consolidation of the deeper very soft clays for the T-Hangar,the terminal building,and the mechanical building. 5.6 Pavements 5.6.1 Existing Airside Pavements As requested, some of the borings were drilled in existing airside paved aprons to evaluate the existing pavement section thicknesses and evaluate the soil subgrade conditions. These borings were NA-9,NA-10,NA-14,NA-15,and NA-17. The measured pavement layer thicknesses are given in the table below. We have also calculated the equivalent structural number for the combined asphalt-crushed stone pavement at each of the boring locations,as shown in the table: Table 5—Existing Apron Pavement Conditions I I Crushed I I li Asphalt Equivalent Stone Soil Subgrade Boring Thickness Structural (in) Thickness Number' Description (in.) NA-9 3 7 2.30 Medium Dense Moist Sand(SM) NA-10 5 5 2.90 Medium Dense Moist Sand(SP-SM) NA-14 7 0 3.08 Loose Moist Sand(SP-SM) NA-15 7 5 3.78 Medium Dense Moist Sand(SP-SM) NA-17 10 3 4.82 Very Loose to Loose, Moist to Wet, Clayey Sand(SC)with Organics Average: 6 4 3.20 Note: Equivalent Structural Number calculated assuming layer coefficients of 0.44 for asphalt and 0.14 for crushed stone. No reduction applied for pavement age or distress. The subgrade soils indicated by the borings in the existing apron area are generally suitable for support of asphalt pavement for aircraft using the airport. However,the subgrade soils at NA-17 are very poor pavement subgrade materials. Please note that the asphalt is thickest at this location,possibly due to past overlays and repairs needed because of the very poor subgrade soils in this area. 5.6.2 New Airside Pavements In cut areas after stripping,the cleared surface should be completely broken up by plowing or scarifying to a minimum depth of 6 inches. These areas should then be compacted to at least 100 percent of the material's modified Proctor maximum dry density within+/-2 percent of the material's modified Proctor optimum moisture content. 14 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville, NC December 6.2011 In fill areas,the upper 12 inches of the pavement soil subgrade should be compacted to at least 100 percent of the material's modified Proctor maximum dry density within+/-2 percent of the material's modified Proctor optimum moisture content,as previously discussed in this report. After the subgrade has been substantially completed,the full width shall be conditioned by removing any soft or other unstable material that will not compact properly. The resulting areas and all other low areas,holes, or depressions should be brought to grade with suitable select material. Scarifying,blading,rolling and other methods should be performed to provide a thoroughly compacted subgrade shaped to the lines and grades shown on the plans. Grading of the subgrade should be performed so that it will drain readily. The Contractor should take all precautions necessary to protect the subgrade from damage. The Contractor should limit hauling over the finished subgrade to that which is essential for construction purposes. All ruts or rough places that develop in a completed subgrade should be smoothed and recompacted. No subbase,base, or surface course should be placed on the subgrade until the subgrade has been evaluated by the geotechnical engineer's representative. The laboratory test results indicate California Bearing Ratio values for on-site,near- surface soiis within the upper 4 feet of the existing ground as given in the following table. The modulus of subgrade reaction for each sample was based on published correlations with CBR values4: Table 6—Laboratory CBRs and Estimated k-values Sample Soil Boring Depth Classification CBR (psi/in) (feet) NA-2 1 -5 SM 61 575 NA-5 1 -5 SP-SM 36 380 NA-11 1 -5 SP-SM 25 300 Average: 41 425 The laboratory measured CBR values are relatively high for local soils which classify as silty sand(SM)and slightly silty sand(SP-SM),most likely due to the higher than typical medium sand content. Most locally available soils have much more fine sand and medium sand. We assume that imported fill will be required to achieve the design grades in the majority of the airside pavement areas. Therefore,we recommend that a CBR=15 and k=200 psi/in be used for design of the apron pavements. 4FAA Advisory Circular No. 150/5320-6E,"Airport Pavement Design and Evaluation", September 30, 2009. 15 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville. NC December 6,2011 5.6.3 Landside Pavements We anticipate that a majority of the near-surface soils in the proposed pavement areas will be sands (SP, SP-SM, SM)with some zones of clayey sands(SC). These soils are generally fair to good for pavement support. Our experience with similar soils indicates typical soaked CBR values of 5 to 10. The laboratory test results for the bulk sample obtained from Boring NA-19 indicated a CBR value of 17 for the silty sand(SM). Based on the laboratory test results and our experience with similar projects,we recommend that a CBR=8 and k=175 psi/in be used for design of the landside pavements. Based on the anticipated traffic and subgrade conditions,we recommend the pavement thicknesses and configurations over the prepared soil subgrades given in the following table: Table 7—Landside Pavement Thickness Recommendations Thickness(in. Light-Duty Medium- I Heavy-Duty Pavement Material (1 ESAL per Duty(5 (15 ESALs Type day, 20 yrs) ESALs per per day,20 day,20 yrs) Yrs) Concrete 5 6 Rigid (4,000 psi) Aggregate Base Course(ABC) 4 4 4 Superpave Asphalt Surface Course 1.5 1 1 Flexible- Type SF9.5A Option 1 Superpave Asphalt Intermediate Course N/A 2.5 2.5 Type I19.0B Aggregate Base Course (ABC) 6 6 8 Superpave Asphalt Surface 3 3 Course 2 (two lifts) (two lifts) Flexible- Type S9.5B Option 2 Superpave Asphalt Intermediate Course N/A N/A N/A Type 119.0B Aggregate Base Course (ABC) 6 6 8 Light-duty pavements should be designated for car parking areas. Medium-duty pavements should be designated for entrances and exits,access roads,driveways, and truck lanes, such as the T-Hangar access road. Medium-duty concrete pavement should be used in areas in front of loading docks and dumpsters. One of the recommended heavy-duty pavement sections should be used for the terminal loop access road. Pavements and bases should he constructed in accordance with the guidelines of the current edition of the North Carolina Department of Transportation's "Standard Specifications for Roads and Structures". Materials,weather limitations,placement, and compaction are specified under appropriate sections of this publication. 16 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport.Jacksonville, NC December 6,2011 5.6.4 General Early placement of the graded aggregate base course will minimize the deterioration of prepared soil subgrades. However, some loss of graded aggregate due to ratting and surface contamination may occur prior to final asphalt or concrete paving. Some infilling and regrading of the graded aggregate in conjunction with sweeping with a wire broom may be required. Prevention of infiltration of water into the subgrade is essential for the successful performance of any pavement. Both the subgrade and the pavement surface should be sloped to promote surface drainage away from the pavement structure. Although the asphalt pavements should have a 15 to 20 year performance period,our experience indicates an overlay may be needed in approximately 7 to 10 years due to normal weathering of the asphalt surface if flexible pavements are used for this project. Also, some areas could require repair in a shorter time period. 5.7 Retaining Walls We understand that retaining walls will be constructed to provide general site grade separation. We recommend that any retaining walls be designed with regard to the lateral pressure exerted by the compacted backfill and retained soils in accordance with the North Carolina Building Code. In addition to the iaterai ioads exerted by the soii against the walls, allowances should be included for lateral stresses imposed by any temporary or long-term surcharge loads,such as vehicles or equipment,adjacent to the walls. In addition to internal and external stability,we recommend that the global stability of any retaining wall be analyzed. In accordance with the North Carolina Building Code,retaining systems greater than 5 feet in height within a horizontal distance of 50 feet should be designed and certified by a registered professional engineer. We recommend that the following soil properties be used for retaining wall design, provided the on-site soils observed in the explorations (or similar soils)will be used as backfill against the walls or between geogrid layers if a reinforced segmental block wall system is constructed: 1. Active Lateral Earth Pressure Coefficient=0.33 2. At-Rest Lateral Earth Pressure Coefficient=0.50 3. Passive Lateral Earth Pressure Coefficient=3.0 4. (1)' =30° Angle of Internal Friction of Backfill 5. c=0 psf Cohesion of Backfill 6. chili 1,500 psf Allowable Bearing Pressure of Foundation Soil 7. yM=120 pcf Moist Soil Unit Weight of Backfill 17 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Proiect,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 Cantilever retaining walls should be designed using the active lateral equivalent pressure coefficient given above. Fixed walls (e.g.,pit,basement,or foundation walls) should be designed using the at-rest lateral earth pressure coefficient given above. The backfill should be properly drained and meet other requirements given in this report. The design of the retaining walls should also include surcharge loads due to vehicles, equipment, or other live loads acting at the top of the wall. Typically, segmental block retaining walls are designed as cantilever systems using active earth pressure coefficients. Cantilever retaining walls have to deflect laterally to mobilize the active earth pressures,which are lower than at-rest earth pressures. The lateral movement can result in settlement of the reinforced and retained soil zones behind the walls. Pavements, slabs, structures, and utilities in these areas can be cracked or otherwise damaged due to settlements induced by wall movements. Therefore,we recommend that the wall designer evaluate the proposed wall, including the proposed project components above and behind the retained zone, for resistance to this type of movement and damage. Structures,slabs,pavements, or utilities should not be placed at or within one height of the top of cast-in-place or segmental block retaining walls,unless the walls are designed to limit horizontal and vertical movement of the backfill and retained soils. This can be done by modeling the at-rest,rather than the active,earth pressure conditions. External stability of the proposed retaining walls should be checked during design, including resistance to sliding, overturning,and global slope failure. Lateral loads applied to cast-in-place concrete retaining wall footings can be resisted by the friction between the footing concrete and the foundation bearing soil. A friction factor of 0.45 may be used for this case. To achieve this friction factor,the bearing surface must be free of mud or loose soil at the time of concrete placement. In addition to the dead weight of the structure and footing concrete,the soil backfill above the footing may be included as dead weight in sliding and overturning analyses. The analysis of global slope stability for the retaining walls was beyond the scope of our services. We recommend that this stability be checked once the design wall heights and grades have been determined. Drainage of the backfill behind the retaining walls should be provided to prevent the build-up of hydrostatic pressures from moisture in the backfill. We recommend that a prefabricated geocomposite drainage material(Miradrain TM 6000 or equivalent)be applied to the back of cast-in-place concrete walls. This vertical drain should be tied into a perforated PVC or HDPE pipe drain located at the base of the wall by wrapping the bottom edge of the product sheets all the way around the pipe. In addition,a 2-foot wide zone of clean sand fill(SP, SW) should separate the drain material from the common soil backfill behind the wall. Alternatively, a 2-foot wide zone of clean crushed stone may be used instead of the prefabricated geocomposite drainage material and sand provided it is separated from the backfill by a filter fabric. Perforated pipe used to assure positive drainage should have a slot width or hole diameter no larger than 3/8 inch. A 2-foot thick layer of clay or clayey sand should cap the backfill and slope away from the wall to reduce the quantity of surface water that might seep into the backfill. 18 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 If gravity drainage of retaining walls cannot be achieved due to site grade restrictions,a permanent sump pit and pump should be designed and used for this project. Alternatively,reinforced concrete retaining walls could be waterproofed and designed to resist potential hydrostatic pressure(e.g., elevator pit walls). We recommend that wall backfill materials be compacted with hand-held equipment to at least 95 percent of the standard Proctor maximum dry density and that moisture contents be maintained as previously recommended. Hand-held equipment must be used to avoid placing high stresses on the wall during compaction. Heavy compactors and grading equipment should not be allowed to operate within 5 to 10 feet of the wall during backfilling to avoid developing excessive temporary or long-term lateral soil pressures. 6 LIMITATIONS OF GEOTECHNICAL REPORT The exploration locations given in this report should be considered accurate only to the degree implied by the methods used to determine them. The exploration logs represent our interpretation of the subsurface conditions based on the field logs and visual examinations of samples by a soils technician or a geotechnical engineer in addition to tests of the field samples. The lines designating the interfaces between various strata may be gradual. The generalized subsurface strata and profiles described in this report are intended to convey trends in subsurface conditions. The boundaries between strata are approximate and idealized. They have been developed by interpretations of widely-spaced explorations. Therefore, actual subsurface conditions may vary from those given between test locations. Groundwater levels have been measured or inferred in the explorations at the times and under the conditions stated on the exploration logs in this report. Changes in the groundwater conditions may occur due to variations in rainfall, evaporation, construction activity, surface water runoff, and other site specific factors. The assessment of possible wetlands, site environmental conditions, and the determination of contaminants in the soil,rock, surface water, or groundwater of the site were beyond the scope of geotechnical engineering services provided for this project. The recommendations provided in this report are based on our understanding of the project information given in this report and on our interpretation of the surface and subsurface data collected. We have made our recommendations based on our experience with similar subsurface conditions and similar projects. The recommendations apply to the specific project discussed in this report;therefore, any changes in the project information should be provided to us so we may review our conclusions and recommendations and make any appropriate modifications. S&ME should be retained for a general review of the design drawings and specifications to verify that geotechnical recommendations are properly interpreted and implemented. 19 Revised Geotechnical Engineering Report S&ME Project No. 1061-11-016A New Terminal Project,Albert J. Ellis Airport,Jacksonville, NC December 6,2011 Regardless of the thoroughness of a geotechnical study,there is always a possibility that subsurface conditions will be different from those at the exploration locations where conditions will not be as anticipated by the designers or contractors, or that the construction process will alter soil conditions. Therefore,the geotechnical engineer's representative should observe the site preparation, earthwork,foundation construction, floor slab construction,pavement construction, and/or retaining wall construction to confirm that the conditions indicated by the geotechnical explorations actually exist. We recommend the owner retain S&ME for this service due to our familiarity with the project,the subsurface conditions at the site, and the intent of the recommendations and design. This report has been prepared in accordance with generally accepted geotechnical engineering practice for specific application to this project. The conclusions and recommendations contained in this report are based on applicable standards of our practice in this geographic area at the time this report was prepared. No other warranty,expressed or implied,is made. 20 40. S&ME APPENDIX S&ME,!NC./3006 Hall Waters Drive,Suite 100/Wilmington,NC 28405/p 910.799.9945/www.smeinc.com $S&ME Important Information About Your Geotechnical Engineering Report Variations in subsurface conditions can be a principal cause of construction delays, cost overruns and claims. The following information is provided to assist you in understanding and managing the risk of these variations. Geotechnical Findings Are Professional Services Are Performed for Specific Projects Opinions Because the scope of each geotechnical Geotechnical engineers cannot specify material exploration is unique, each geotechnical report is properties as other design engineers do. unique. Subsurface conditions are explored and Geotechnical material properties have a far broader recommendations are made for a specific project. range on a given site than any manufactured Subsurface information and recommendations may construction material, and some geotechnical not be adequate for other uses. Changes in a material properties may change over time because proposed structure location,foundation loads, of exposure to air and water, or human activity. grades, schedule, etc. may require additional geotechnical exploration, analyses, and Site exploration identifies subsurface conditions at consultation. The geotechnical engineer should be the time of exploration and only at the points where consulted to determine if additional services are subsurface tests are performed or samples required in response to changes in proposed obtained. Geotechnical engineers review field and construction, location, loads, grades, schedule, etc. laboratory data and then apply their judgment to render professional opinions about site subsurface Geo-Environmental Issues conditions.Their recommendations rely upon these The equipment,techniques, and personnel used to professional opinions.Variations in the vertical and perform a geo-environmental study differ lateral extent of subsurface materials may be significantiy from those used for a geotecnnical encountered during construction that significantly exploration. Indications of environmental impact construction schedules, methods and contamination may be encountered incidental to material volumes.While higher levels of subsurface performance of a geotechnical exploration but go exploration can mitigate the risk of encountering unrecognized. Determination of the presence, type unanticipated subsurface conditions, no level of or extent of environmental contamination is beyond subsurface exploration can eliminate this risk. the scope of a geotechnical exploration. Scope of Geotechnical Services Geotechnical Recommendations Are Not Professional geotechnical engineering judgment is Final required to develop a geotechnical exploration Recommendations are developed based on the scope to obtain information necessary to support geotechnical engineer's understanding of the design and construction.A number of unique proposed construction and professional opinion of project factors are considered in developing the scope of geotechnical services, such as the site subsurface conditions.Observations and tests exploration objective;the location,type, size and must be performed during construction to confirm weight of the proposed structure; proposed site subsurface conditions exposed by construction grades and improvements; the construction excavations are consistent with those assumed in schedule and sequence; and the site geology. development of recommendations. It is advisable to retain the geotechnical engineer that performed the Geotechnical engineers apply their experience with exploration and developed the geotechnical construction methods, subsurface conditions and recommendations to conduct tests and exploration methods to develop the exploration observations during construction.This may reduce scope. The scope of each exploration is unique the risk that variations in subsurface conditions will based on available project and site information. not be addressed as recommended in the Incomplete project information or constraints on the geotechnical report. scope of exploration increases the risk of variations in subsurface conditions not being identified and addressed in the geotechnical report. Portion obtained with permission from Important Information About Your Geotechnical Engineering Report",ASFE,2004 S&ME,Inc.2010 :" 7 " T,"tee d• -, __,________(:,... ,.,4* i re i ... ,Z '4... e . EC-9 a : a ' re W v o L. CO Z,, —I WOwr r CO Et Lia r a Q Z , J r'` r' ZJ W 1 ZMZ 0 V 0 ( ' rW ® > 1— co W • \ c \ : �V� Ca Z �I N ♦ - f ti ..... la • •, .. „. / ♦ Y -- IY. o 1 ir; ` III1\4- m' 1-0 ---.„________ ii\i'.....- ca IA Q f ® q•,. \''. 1 \ , n m Q '. , ,-. N_ ��® may. Yr E z cn 0 M ift 1 c w ❑ , 2 w pi CD ae 0 ct _ . , .... , \ if .: -.., . , i 12 C\I ii ,,,,..\\, , \ --.0 : N r..- /"„ , ,_(: 11,...,1,, i , ( la 1 y \ f g d _. -iji- 1• \ ,,, ''.\ re" 1,16' .F 9a . ., ED BE g- N,r 1 (---- „,..,. ii\''' -.'" p g. 1 • Log/ 4 oti0, ‘:".•-`'0 Z —I i_ , diii z Lu 0.,z i . k... . —I li 1 i(rill ' A _ --I _z u.,--1 Luz. ,i \.I ,_. I r. z m _, I , I I _ 4 0 ce , p. , 1.7. w — — g zi— fleJ 4 2 o's V I: : l' . = -I '' 0 W.— _jra 4° —I Z 04 :ii I buil; ik. I ....,...„..1" a_ X N It I ,- w E w - i ---7.:_--,./1- I: r— - °I r . ,... .4 ,,,, . ...,, .., ,..,:..., „,-;,..,. .• ,,, ..-- .-,,. . ,. ,, . • 1 , . T. 4 r .. : - , '„, '...71.— • ,2;.. •,t.- . -N . . , ky:. , i ... ,,,,,,.,,,,,,,,.. „„ , ... , I , , %,,)Z,,..„ t..,. :TI --,,: kire )t ler. a is• \ ' ,ft..\\,,\* kf,„,(t, . , ' '\:,,,,„ e.,L, . is 4 z •:,,,,A ,,,,, .., \ N..N'Ati,'.,N. VS„N‘N i. E :1 6 '0, . , -.. -,. i'm 1 s''''k'''',,:.,\\. ' Fi'''' ''''' . \\.,-..,.... . -441k - ., -,,-,-..,-- , \..•.N, z .„ .\ .:k k pl, : /:‘,‘,,,,:,11V'.: -S : <,-,S.:,.„, -...> ,Zs\ ,3-.'„,',‘,Y '••,,,,-„i‘,-e$`4" " N „:,:z I I., ,,,,,....; .;,:.,&„\,.\. .,,.„• ,:,...- .,„„„. .,\-„ , ,, O• b 2.rlit/ 0.9 z_LE '1. "s 2'''''''''L'T'Th\NN'''Z''''''" 'Ns'`':''''''' '.:\''''''' `-.1:S3'. •ritv, a Plill i $ ILI r, 1:, .°,•.; ..:. .,„, .. , , , ,,,,,, , . e• .... "7.1 0.- .• • zz at' 1 tZ .... '' ',.'•';z,-t:,\ ''''•.;;-: , ,...1 •/ z9, 05.....\-Nk . e zz / I: 1110 WWI )/ / i t .0.• .. 2 t, / i ' •.- i' - 1• V 3 i' z 5 0 1 I a g I I il z 4 1: E E 1 v ca A 1 i E 1_ co 0, m 2 i 7 B \ 1 ; 1 0 .1 LI' 1 114 1 8 I ig re re 17, 8 g 5 : ft 0 0 b 7• 10) A O g < to 0Z o• e e s- x ,•7 z 1 1 1 CO -±, LLI 9 9 e CO I-o CO -i'm 4] II . .8' El 0 0. 5 or /......• ..i. _.,. yIP .. ' a IN il .M lis i .7;"'' 4- efill:,.047 a i 111. 1 IN ii,e• 1 © eee ' I: ili • ,.M0.." �--+-EXIST. T-HANGAR it- 2' 41 1� .d.'L r? NB-7 NB-4 / " " ■iia."•G eir fe' I,. / - ., e 111.-6, a . • 1011 . rAtri 0111.11 '' #3 e, .,.._•' Or - -, - .11‘ - 'gr.. 4 . ' NA-18 iii, a 07 01 . - • ,A B-1 . / 1 NB-5 r illf • Alli APPROX. • ;1 jr / $ 01 r" PROPOSEDPri TERMINAL F T B-a 4LDG. IG. • �� A Air - .P. B-z �, i li B-8,B-6A La j • ,/�`�, • . •� I Vie, 1 ..• y B-9 i """I .a • LEGEND r l �' �� "7rI) EXIST. SECURITY FENCE r 4 ..-. B-i F qm rB-3 APPROX. .�' •/` MECHANICAL A S&ME CPT Sounding 3/8/2011 BLDG. e . .. �;: •r -,i` L ® S&ME Soil Test Boring 3/11/2011 and 3/14/2011 REFERENCE: DRAWING TITLED"ONLSOW COUNTY,ALBERT J. Qh S&ME Soil Test Boring 10/24/2011 50-0' ELLIS AIRPORT,EXHIBIT 1,GEOTECHNICAL Through 10/27/2011 BORING LOCATIONS",PRPARED BY RS&H. SCALE:AS SHOWN EXPLORATION LOCATION PLAN FIGURE NEW TERMINAL PROJECT NUMBER CHECKED BY: NPB omS&ME ALBERT J. ELLIS AIRPORT 3 DRAWN BY: TMS JACKSONVILLE, NORTH CAROLINA DATE: 11/30/2011 S&ME PROJECT NUMBER: 1061-11-016A W Le ui c iti N g Z C c o 63 aci O s., 0. O � = W CO Co NI- N N m> • gZXIN O :40 o co H i_ ci IC) a. a LO IJJV x Le N• Q co Q M .- N ' La T N ch v m = 0 w 'v Ln • ei, a . D 0 0 g a+�Z.� c co a r o =h . U m Lapa m .c =.r+ ., to 3 ::::'} . 2 0)O Q CO cq 2 J• g CO ��v co 0 aJ v a)• W ZS WW Z Hcn W ._1 o (.1 w m ZW a oc CO u LO Cr) en '41- g Z "0 H 13e -0 ca ii) VII (D c co c a) i ww N • rn! ! i \2) • y — d a co B o Q B i ai n it a 6• • • Z r o • • Z o Uo 0 U) 0 u�V) CIUn 0 U) 0 is Cl) 0 0 - N (ieef) .jjcf3a co v v U) u) W o 0Z U- • • • c o CO • • a m o ZO • _ 3 a c Z °: O cp.: m 1.10 = 3 = C - Z W co r co cl e- N N U = i CI ,• • 3 o th N' 0Wo � N �' a) c . . J 3 -CIO • ❑>Za •• W in W w onV Z Q In Zs- Cr) 0) CO 10 N r 1.0 Nt (0 C) 10 an o c• m a w C.) a ci 0 H' 0 g I 1 a Z w N O = O \ a V co O N 0 0 p \ \ `` °°° 11.1 T— T C) • CD ce) In CO N U) ° d �A vrio as 0 Cl)ca • g g O)I - c ,rm_� IR • — CO�n CfltY3 N N N r 141 . !0 QfC cLO =�Cam~ E. LU - com � a M N a E Q X m m c� C9W C U .c c v zU W r- co � �t ti 5 er Ls w H5 uqg Z r N N CO w 2 ti t wi n W I I z 0 0 0 C a Zte c00`Nr N- C �CO N tea+ U 5 N CP g ZZ G U9 co N C [�E 0) T i o in a co o L' o p - 1 I I it F- co co V �' a o 1 1 27, CO X > • . Z a . � � ° FCO• LLj Z U U 2 ui Q m in 1 0 in 0 0 10 0 10 0 u) 0 u3 0 1 a) I ❑ O 1 s- N `il}eei)"Hld3�' v v m i I i . d z ,\ , .•---,,,C.,..._1_-_i ,?. /I , Li • '.. r: y \ .7-k ....p ..., .., ' a I '1 2 r°45 \ A_....--.. .•-, 144-, 1 14 •• , tu)e4M < . ..• z .?.,- —1 a. I - --] , . II: a 1 n ac R 6 1 . ..• ., •- . -•-• ._ . cel- L1.1 t c 1 0 1 z _1z i z 5 W.LI{ • )" ''g• Z : n ,. 4 it. 0 la 11 - 4 i•ci u.i 1— r4 8 • .'..t. . .. 1 W; 't .7.. .7.• ./tA . i= . 1 z b 6 .4..1 .11.'-:„.I'''.....--.7'..ii,„.':„::-,1 .m.,--:;-774-..-,77-Z7.1....n.'-',. •:....A104,-._ - 4 .4..s, Er' :-. t 4 1 . ' ' :• .; , . ,..--: /.. . Z 2 •-...r..'...,,x-:-.4":i','. .,,, i i 1 dik ,. . :-.-•:,...,-..c...v : - -''''' --.:".\#. . ,00 I, 4- .3 • • ' •'`...- '.'-'-'•1:.:',.4:.` '' ' EV •• '42 .3 I , i•01 •004 9 a 1 . t• '..3CN-'•;,:!;,•: ,;,:, • 1.„,,,,IF,:.'„,,,:...:,„ ,'„:.••••77!i,- ..elp •; , . 6 • 1 „Lc. 1!kt‘.. j. z111,! !<,:t.4,1‘ 2'.10,1400.; - :rod/ #00•0 co . 4 -•,),.`,A.,,,,.,-.,''*.,r.. ''...,..-, -,- -.-•, I n . agb-V, \.-\;$"..„.s\--,.-:,.- 4 :;''''' ' '.' " < cc I t f‘7,,T.-.....'",•....2. :.''.:;‘,Z- -,'.:z ?'\' ''::--*-i.:: sa it‘I' / let•N`......, c.9 l';',...':,':`•'-'Z';',7:','',...\ -;\.0.„` :\r. 1-'••\•7••••:;•,•-•,-'-• - - , , 4 ', d7 4- P,a_ T•,(1 g ....,:`.., -;',... 3 I dwzPITI W.062 . ', 2',"''''• , ".`:"•',-&:‘',..::‘,i -''•:•.,-'.':.:`,4k.' '''',"'' ‘-.'s''''.; ••,/,.:'' ' z - •:::,2.',., •,,,I.,:lit!:;.:,•,,,......‘•:\•. . : •-s" '''-'•••IF''',.'"*" ...!;S:1... .7 3 dn..1 ,e ,•,.. ,......,...,...:3.--•-=- —.• --"---v.-- - ----- - - i Pi .... 2 Z'•-• r-- -i r•-,-... . 2 . , • fi , a .. • / III .... z.... ., • 1 .--. . . zi r., 4:\ z f.% ,; ,..2,4,• , ,.,1%; Z, .., :** ' 26 , '', N ,.,:,:--N. •— A .„.• 4 . 43- (0) LI •.e. E )1. . ..,... E g f! : • . .-.-- . -..-...- ..• S ; ' •I 5 0 co 3 . 2 li . • 1 1 1 I F 1 1 g 1 \-1•-• .1 . I I ''• .- ' „.1 111 ix im 2 8 2 g • P, 5 10 0 LL. I 1 0 uj • i ! ::• ILI in it g g g I I-Li. z I- i- • • •IC 8 P a E5< z P'cc t 5 5 r? z rt I, 60 (0 0 s- 11 << 11J LU al 2 2 M n w I 6 . z 4 4 di C° csE, w 9 67 0, 0 1- 0 r , Z _ < 0,-.i ul I . „.... . gili._ __ if • Y� d" II .is•srsss1e .e. • I , �• � � � e sr di' •' lea a r •- ,..E lf bal e ne 1(1' : ' *" 11 111--'EXIST. T-HANGAR . • w - NB-7 ▪ F a• ■ 1 lii . N.. NB-4 'IA-1 li, rr " fir. • r ." 1 .. . 7 .„--••/./.., -.'al - ; • J d /ill▪ IF ii: ' -mr - 1 '\..\ . . "�■ NA-18 !"� B-5 -- dIrl 104 -6 ' \ B-1 % iii. \ Si.- e 1.1 .1411 APPROX. - ir 4 je I , PROPOSED B-4 . r„ ili TERMINAL F I " BLDG. al A • •f B.6,B-6A 4 • iller '' ' w°111;e112-1111— i 4/14,:el ' - 4 IF —u•-i Vilir A. . .1 _ _.. .. , � LEGEND 7:" . � I �� • J • 1 ,. UNDE AREA ANTICIPATED3 TO 6 FEET RCUT , I rle B-7 y,A. • 1 B-3 APPROX. . . '` • I •`` MECHANICAL S&ME CPT Sounding 3/8/2011 I BLDG. ® S&ME Soil Test Boring 3/11/2011 and 3/14/2011 REFERENCE: DRAWING TITLED"ONLSOW COUNTY,ALBERT J. } S&ME Soil Test Boring 10/24/2011 0, — 5f1 imom 0' ELLIS AIRPORT,EXHIBIT 1,GEOTECHNICAL Through 10/27/2011 BORING LOCATIONS",PRPARED BY RS&H. SCALE:AS SHOWN ANTICIPATED UNDERCUT PLAN FIGURE CHECKED BY: NPB � NEW TERMINAL PROJECT NUMBER - ALBERT J. ELLIS AIRPORT 7 DRAWN BY: TMS JACKSONVILLE, NORTH CAROLINA DATE: 11/30/2011 S&ME PROJECT NUMBER: 1061-11-016A _ I LEGEND TO SOIL CLASSIFICATION AND SYMBOLS SOIL TYPES (Shown in Graphic Log) CONSISTENCY OF COHESIVE SOILS ':'''':' STD. PENETRATION ,t F i I I '.t.t.t RESISTANCE WWI CONSISTENCY BLOWS/FOOT Asphalt Very Soft 0 to 2 Soft 3to4 Concrete Firm 5 to 8 Stiff 9 to 15 UVeryStiff 16 to 30 Topsoil Hard 31 to 50 ��� Very Hard Over 50 I Partially Weathered Rock RELATIVE DENSITY OF COHESIONLESS SOILS i / i Cored Rock STD. PENETRATION '1•4� WELL-GRADED GRAVELS,GRAVEL- RESISTANCE ;�; GW SAND MIXTURES,LITTLE DR NO RELATIVE DENSITY BLOWS/FOOT FINES d40', POORLY-GRADED GRAVELS, Very Loose 0 to 4 ,o, ; G p GRAVEL-SAND MIXTURES,LITTLE Loose 5 to 10 OR NO FINES Medium Dense 11 to 30 Nh'�'' GM SILTY GRAVELS,GRAVEL-SAND- Dense 31 to 50 SILT MIXTURES Very Dense Over 50 ,'., GC CLAYEY GRAVELS,GRAVEL-SAND- i j,,, CLAY MIXTURES SAMPLER TYPES ,.,:ti# WELL-GRADED SANDS,GRAVELLY (Shown in Samples Column) ::::.8 `SW SANDS,LITTLE OR NO FINES II Shelby Tube ;•�. POORLY-GRADED SANDS, "••,`• SP GRAVELLY SAND,LITTLE OR NO ,, :j FINES ® Split Spoon s"11::: c .;, . SILTY SANDS,SAND-SILT :::•.:: SM MIXTURES I Rock Core ��rr, CLAYEY SANDS,SAND-CLAY ❑ No Recovery f ,if SC % MIXTURES 1-1- I-1 INORGANIC SILTS AND VERY FINE FLOUR SILTY OR ML CLAYEY F NE SANDS, KSANDS OR CLAYEY TERMS SILTS WITH SLIGHT PLASTICITY INORGANIC CLAYS OF LOW TO CL MEDIUM PLASTICITY,GRAVELLY Standard - The Number of Blows of 140 lb. Hammer Falling CLAYS,LEANCLAYSs,snTY Penetration 30 in. Required to Drive 1.4 in. I.D. Split Spoon =_= ORGANIC SILTS AND ORGANIC Resistance Sampler 1 Foot. As Specified in ASTM D-1586. _=_=_ WI- SILTY CLAYS OF LOW PLASTICITY REC - Total Length of Rock Recovered in the Core IIiIll MH D1 R MAceous InMiESArn oRDR • Barrel Divided by the Total Length of the Core SILTY SOILS Run Times 100%. CH p ORCn,ACNImO CLAYS OF HIGH RQD - Total Length of Sound Rock Segments Recovered that are Longer Than or Equal to 4" OH ORGANIC CLAYS OF MEDIUM TO (mechanical breaks excluded) Divided by the • HIGH PLAsncITY,ORGANIC SILTS Total Length of the Core Run Times 100%. WATER LEVELS (Shown in Water Level Column) a = Water Level At Termination of Boring A .Y. = Water Level Taken After 24 Hours "' ... . Loss of Drilling Water ENGINEERING •TESTING HC = Hole Cave ENVIRONMENTAL SERVICES CPT Soil Classification Legend Normalized Friction Ratio Classification Chart Si Lj -- ", O 10 a \Y 0.' oo A0.1 0.5 1.0 FRICTION RATIO. f x 100% NORMALIZED 41 _a,p (Ref Robertson, 1990) Robertson's Soil Behavior Tyne(SBT),1990 Group# Description 1 Sensitive, fine grained 2 Organic soils-pests 3 Clays-silty clay to clay 4 Silt mixtures-clayey silt to silty clay 5 Sand mixtures-silty sand to sandy silt 6 Sands-clean sand to silty sand 7 Gravelly sand to dense sand 8 Very stiff sand to clayey sand(High OCR or cemented) 9 . Very stiff,fine grained(High OCR or cemented) Soil behavior type is based on empirical data and may not be representative of soil classification based on plasticity and grain size distribution. Relative Density and Consistency Table SANDS SILTS and CLAYS Cone Tip Stress,qc(tsf) Relative Density ' Cone Tip Stress, qc(tsf) Consistency Less than 20 Very Loose Less than 5 Very Soft - 20-40 Loose 5- 15 Soft to Firm 40- 120 Medium Dense 15-30 Stiff 120=zoo . erase sa-60 Ve y Stiff Greater than 200 YL. Ver'I Dense Greater than 60 Hard PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-1 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD: Mud Rotary BORING DEPTH:20.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-27-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x Lu Ili p STANDARD PENETRATION TEST DATA Nno ! a a (blows/ft) N-Valuew i a MATERIAL DESCRIPTION tx 2 0 u a 0 u L Q O Z W > 10 20 30 60 80 _`:7:.•:; \Topsoil(3 inches) f _ I _.•. Loose Wet Gray-Brown Silty SAND(SM) 8 _:'.1.:•• Loose Saturated Gray-Brown Poorly-Graded SAND - 5—••,•1. with Silt(SP-SM) X _ 5 Very Loose to Loose Saturated Brown ID 5 -•• ,• • Poorly-Graded SAND(SP)with Cemented Sand - - • •. Fragments - 10— - 3 -• • Very Loose Saturated Gray Silty SAND(SM) Z - 3 15—• • • — 20 Z 4 Boring terminated at 20 feet. - 25— — 30— — 5 - - 0 35— — 0 u; - - 2 - - as 40— — <o _ 0 S - - 0 45— — w - a ❑ _ z - - co } a 50— — a 2 O - - o oil - I =- NOTES: 1.MIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE Page a of NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. S&ME2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. .yTc ' HAMMER FALLING 30IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER •' 1 FT. `e' ENGINEERING -TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL!SAT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-2 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD: Mud Rotary BORING DEPTH:50.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-27-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J v w w p STANDARD PENETRATION TEST DATA 0- o a > 17 (blows/ft) N-Value I MATERIAL DESCRIPTION W Wt.v0 0 ¢ CO Z w 10 20 30 60 80 _ •. Topsoil(2 inches) ` _ - :• Very Loose Saturated Gray Silty SAND(SM) Z _ 4 - • Very Loose Saturated Gray Poorly-Graded SAND - 4 5— (SP) 1.,'' Loose Saturated Brown Poorly-Graded SAND with ID - 8 -• : Silt(SP-SM)with Cemented Sand Fragments - -• •• Very Loose Saturated Greenish-Gray Silty SAND E 4 10—'• • (SM)with Cemented Silt Fragments - _ - Very Loose Saturated Gray Silty,Clayey SAND _ 15 (SC SM) - WOH W=21.5%,%Fines=26.6%,LL=20,PI=5 _:•.f.: ' Very Loose Saturated Gray Poorly-Graded SAND _ • with Silt(SP-SM) E 3 20— •..`•': Medium Dense Saturated Yellow-Brown 14 25 Well-Graded SAND(SW) - 30J/, Very Soft Saturated Gray Fat CLAY(CH) Ln - 2 4 35 -V Z WOH iii a 40� Firm Moist Greenish-Gray Lean CLAY(CL) X - 5 4 - 0 45 Stiff Saturated Gray Lean CLAY(CL)with Shell 14 a J/ Fragments o a _:.:1 Medium Dense Saturated Gray Well-Graded SAND a 50 with Silt(SW-SM)with Shell Fragments E _ 24 a_ - Boring terminated at 50 feet. - o - - O W = i m co NOTES: Page4 of 4 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE r of r NAMED PROJECT AIDD MUST ONLY BE USED TOGETHER WITH THATAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN .400,.._ sill milt GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. ' HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER <e," 1 FT. ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-3 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD: Mud Rotary BORING DEPTH:20.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-28-11 DRILLER : Norwood Williams DRILL RIG: CME-550x xIw I Wa aw p STANDARD PENETRATION TEST DATA w o MATERIAL DESCRIPTION W < C w (blows/ft) N-Value 0 0 C CO Z J W 10 20 30 60 80 _ . \Topsoil(3 inches) f _ • Loose Wet Gray Silty SAND(SM) i = 6 5-••••:.: Loose Saturated Brown Well-Graded SAND(SW) 10 2 ' Loose Saturated Brown Poorly-Graded SAND(SP) _ 8 -' ' • Very Loose Saturated Gray-Brown Silty SAND(SM) Z 4 10— '•:•• with Cemented Sand Nodules 15� Very Loose Saturated Gray Clayey SAND(SC) L 2 _: : :� Very Loose Saturated Gray Silty SAND(SM) - 20 • 2 _ Boring terminated at 20 feet. - _ 25— - 30— - n - la 35— - W ui - - m a - a 40- - Co 4 - - $ - - 0 45— - re - o - z a - rn _ 50— a - a - m o - _ o cn f NOTES: D.-A.wr. 4 , 4 7.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE a uy I vI I NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. MEI 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN 4 GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLO WS OF 140 LB. HAMMER FALLING 30IN.REQUIRED TO DRIVE 1.4IN.LD.SAMPLER '•' 1 FT. e' ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-4 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD: Mud Rotary BORING DEPTH:48.5 ft LOGGED BY: T.Schipporeit WATER LEVEL: 4'on 10-28-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x J 0 > _ � a lL Q a p STANDARD PENETRATION TEST DATA o v o MATERIAL DESCRIPTION w (blows/ft) N-Value • 0 1-LU cn z i w 10 20 30 60 80 '',!\Topsoil(3 inches) f 1 FILL:Loose Moist Black and Gray Silty SAND(SM) - 8 with Wood and Asphalt Fragments Soft Saturated Dark Gray Sandy Lean CLAY(CL) 1 X - 4 5 with Trace Roots _ -'•••:• Loose Saturated Gray Silty SAND(SM) X - 10 1''I.= ' Loose Saturated Light Brown and Gray X - 9 10—:•;•. ` Poorly-Graded SAND with Silt(SP-SM) _, Very Loose Saturated Light Gray Clayey SAND _ 15 (SC) _ 3 20 •. Very Loose Saturated Light Brown and - 2 4 Yellow Brown Clayey SAND(SC) -../Very Soft Saturated Gray Sandy Fat CLAY(CH) _ 25 WOH 30 - Loose Saturated BrownLi ht - 5 g and Orange Brown r. Silty SAND(SM) 1 > 0 35 Very Soft Saturated Gray Fat CLAY(CH) WOH a w 2 m co a (4 40 1 4 o \,........ ......................,. 0 452 Fd Very Dense Saturated Gray Slightly Cemented -_ a Clayey SAND(SC)with Limestone FragmentsEX } Boring terminated at 48.5 feet. - 50 a 50 — a co = i l NOTES:1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page 1 of 7 NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. !1® 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A GENERAL ACCORDANCE WITH ASTM D-1586. y Y, .. • 9.PENETRATION(N-VALUE)IS THE NUMBER OF BLO WS OF 140 LB. HAMMER FAI1.1. G 30IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER oe�' 1FT.. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-5 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:Mud Rotary BORING DEPTH:50.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 4'on 10-28-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x J _ C.) ij W W p STANDARD PENETRATION TEST DATA W - a o MATERIAL DESCRIPTION W m (blows/ft) N-Value 0 Q CO Z W 10 20 30 60 80 _-:. Topsoil(2 inches) f - • Loose Wet Gray-Brown Silty SAND(SM) E - 7 5_,r, Loose Wet Gray Clayey SAND(SC) - E - • 6 l _ : Loose Saturated Dark Gray Well-Graded SAND with 10 Silt(SW-SM) - ' . - ). Soft Saturated Brown Sandy PEAT(PT) - 4 , �10—, ,,, Organic Content=45.7% r --01 I, ,1 _•:•f.='• Loose Saturated Gray Poorly-Graded SAND with 15—•••'•••. Silt(SP-SM) E _ 7 -••...1•'}•. - ...,;>: Very Loose Saturated Gray Clayey SAND(SC) 20 _ 4 _9 Very Soft Saturated Gray Fat CLAY(CH) 25 :� �� WOH 30—•;: : Very Loose Saturated Yellow-Brown Well-Graded 'A 4 SAND(SW) is - - • Very Soft Saturated Gray Fat CLAY(CH) _ 8 35 • • •, g WOH iii cei u) / Very Soft Saturated Gray Lean CLAY(CL) a 40 I 1 o i4 1 _ 2 a 45 o 1- - • Medium Dense Saturated Light Gray Slightly 'z -• • Cemented Silty SAND(SM)with Shell Fragments �� 28 a 50 • _ Boring terminated at 50 feet. 2 O - - 08 = I = i i i NOTES: 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE Page 1 of I NAMED PROJECT AND MUST ONLY BE USED IOGE7HFR WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A GENERAL ACCORDANCE WITH ASTM D-1586. ,z _ SURE 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER oe,' 1FT. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-6 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:Mud Rotary BORING DEPTH:48.8 ft LOGGED BY: T.Schipporeit WATER LEVEL: 4'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J i x k MI I w ru - MI _1 STANDARD PENETRATION TEST DATA a 0- o MATERIAL DESCRIPTION w (blows/ft) N-Value Q Z w s 10 20 30 60 80 \Topsoil(3 inches) r - Medium Dense Moist Dark Brown Silty SAND(SM) E _ 15 ::.I.:is Loose Saturated Gray-Brown Poorly-Graded SAND 1 5 with Silt(SP-SM) 8 •.'.•..• E Loose Saturated Light Brown Poorly-Graded SAND _ 6 (SP) - ..•:f.=./' Very Loose Saturated Gray Poorly-Graded SAND - 3 10 .• with Silt(SP-SM) :.I,:}. Very Loose Saturated Gray Silty SAND(SM) _ 15 2 Very Soft Saturated Gray Fat CLAY(CH) 20 Z WOH 1 A 25 • Very Loose Saturated Gray Silty SAND(SM) - 1 Very Soft Saturated Gray Fat CLAY(CH) - 2 30 - 5 O 35 1 ca ui m - Very Soft to Firm Saturated Gray Lean CLAY(CL) cn 40 � 5I o - $ 2 45cf - a Very Dense Saturated Light Gray Cemented Clayey - I- SAND(SC)with Shells - r Boring terminated at 48.8 feet. E - 50/ 4'a 50 — — _ W - m 05 co NOTES' ,/ 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page 1 V I NAMED PROJECT AND MUST ONLY BE USED TOGETHER WI171 THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. B s'e, _t 3MEMTERLINGA0LIUNE) .REQUIREDMOEDOFE1LOIWSI.OF.SMER 1 FT. °e' ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NB-7 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/26/11 ELEVATION: Ground Surface . Automatic hammer used. DRILLING METHOD:Mud Rotary BORING DEPTH:48.5 ft LOGGED BY: T.Schipporeit WATER LEVEL: 5'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J _ o w ww p STANDARD PENETRATION TEST DATA w . * o MATERIAL DESCRIPTION w a > (blows/ft) N-Value U' Q m Z -J 5 w 10 20 30• 60 80 \Topsoil(2 inches) ` _ I Medium Dense Moist Black and Gray Silty SAND I 18 .•.•1•'i, Loose Saturated Dark Gray Poorly-Graded SAND Z/ - 10 5 ::.�•:. with Silt(SP-SM) Y. Loose Saturated Gray Poorly-Graded SAND(SP) _ 9 :•:.�.:i• Loose Saturated Yellow-Brown Poorly-Graded X - 12 10 , SAND with Silt(SP-SM) Loose Saturated Light Gray Poorly-Graded SAND _ 15 (SP) 6 • 20 (C Loose Saturated Orange-Brown Clayey SAND _ 3 oee er Very Loose Saturated Gray Clayey SAND(SC) 25 W=27.0%,%Fines=36.7%,LL=30,PI=18 - WOH f1: 30 . Very Loose Saturated Yellow-Brown Well-Graded IX - 5 SAND(SW) - .. . . Soft Moist to Wet Yellow-Brown Lean CLAY(CL) Z - 3 o 35 w - m En - D. 40 Very Soft Moist to Wet Gray Lean CLAY(CL) X( - WOH g _ 4 0 45 X - 2 0 A - En Boring terminated at 48.5 feet. �/ - 50/ a 50 — 0" a o - o w` - U) NOTES: 1.THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE Page i of I NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. mmii 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A IF GENERAL ACCORDANCE WITH ASTM D-1586. MIN 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. -`_ HAMMER FALLING 30IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER ,, 1 Fr. ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. .0 21'.iF LO 0 LO a in 0 CC) a in 0.•..•• •,- :- cv (NI v.) ce) er et Ifti a) e Vial t . co L. LL. 0 t all-o Lo 1 to .2 2 a c..) E t o I b 1 C 0 al co co co 2 i i E g 2". *An wi co w tii P 8 k t ' tCD A 03 -a r 9 a) ca.7- T (i.? Ce CO E E i E t 1 Cl) , 0 0 Cl) co 0 0 liaggio E go = , W CO TC co Ift, Lr.i.g rs: 12) •• •• •• s--• . . " v co 0 O.0:,,,,, O w . . . . z i Viz .... • Lt.-- C.) C C 03 Id, c 0 • • . . . - 16. 0 0 o .> trz a . . CD cts c _ cr 1 Lu II' E — InPa161:1\_. 1 rill\ . ID a) ' EL ' CD , • • " 0 o 0 IX CD ' 1 .ce,.... o e... II „\A„) .2 Ili. N I.........%.........,A/A, AP) t 0 0. I L 47 CO 0 " go co , , , 1-c.--•••••'-'''"/ la Z al e ,c- 0• 0 4c2 e , Nt IIIa 0 ... a. c3--pr—..-- jiL.e-".-A—'------IvN1.--.-- 0 .a) . V) : co •c iv Lu E m • • • • ,- Le CD Cl) I- 1 5 .— X o e •,— .0 to 0 Z co- ..7., t Cal IL. L,C.. ••••S ii oS ce . . r 1 -- i 61= .2 u) • . . . • 0 e Es C) 0 1111 2 0 a . • • -0 r ii a 415 *a co 6 la E 0 Et 0. (0 ... co 0.e 10 gm in a LO a in c) in co L LAM 100.2161VS r•:10.91.0-1.I.-L90 L 08.1.88-ONVONVIS-.1110d38 Id° PROJECT: New Terminal at Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD B-2 1061-11-016 NOTES: Boring location Is approximate. DATE DRILLED: 3/11/11 ELEVATION: Ground Surface SPT N-values were measured using an automatic DRILLING METHOD:Wash Boring BORING DEPTH:30.0 ft hammer. LOGGED BY: B.Grant WATER LEVEL: 4.1'on 3-14-11 DRILLER: J.White I DRILL RIG: CME-550x La Z _ _ > J ww p STANDARD PENETRATION TEST DATA w a o MATERIAL DESCRIPTION _, g >_ ¢ (blows/ft) N-value 412 0 H Q o J `r f/� W 10 20 30 60 80 `¶ Topsoil Medium Dense Light Brown Silty SAND(SM) - 14 -- '• Loose to Medium Dense Brown Well Graded SAND 1 p 5— (SW) 6 - 12 Loose Light Gray Poorly Graded SAND with Clay _ 10—. .'- (SP-SC) 10 _ie Very Loose Orange-Light Brown Clayey SAND(SC) IX 15 . • _ 1 Very Soft Gray Sandy Fat CLAY(CH) _ 20 E - 1 J -_ 25J 1 30 % E i 2 _ Boring terminated at a depth of 30 below the existing - - ground surface. - 35— — 40— - - - CD _ w s - - 45— — a _ Ca - - 4 50— — g - - ❑ - - 0▪ 55— z - - a 1- - - to _ z - - a 60— — 2 _ - 0 U - - w - ICl) NOTES: 1.7HIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page i of i NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. S&ME 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN 4 GENERAL ACCORDANCE WITH ASTM D-1586. •:-.w, v 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. fir-- HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.W.SAMPLER V' 1FT. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOTEXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal at Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD B-3 1061-11-016 NOTES: Boring location is approximate. DATE DRILLED: 3/11/11 ELEVATION: Ground Surface SPT N-values were measured using an automatic DRILLING METHOD:Wash Boring BORING DEPTH:60.0 ft hammer. LOGGED BY: B.Grant WATER LEVEL: 3.8'on 3-14-11 DRILLER: J.White DRILL RIG: CME-550x _ Cs. !o w J ui p STANDARD PENETRATION TEST DATA EL w ° o MATERIAL DESCRIPTION W a > > (blows/ft) N-Value CO Q a) Z J w 10 20 30 60 80 ::-\Topsoil f _ • Medium Dense Light Brown Clayey SAND(SC) E - 12 _'•••:•• Loose Brown Silty SAND(SM) 1 _ 5—' :• E 8 Loose Brown Poorly Graded SAND(SP) - _ 10 _.:-.•.: Loose Gray-Brown Poorly Graded SAND(SP) ��pp 6 fj/ Very Loose Gray Clayey SAND 15 3 Very Soft Gray Sandy Fat CLAY(CH) _� 20� Z _ 1 IVery Loose Gray Clayey SAND _ 25 0 N 1 -, 30 Ia 2 Very Soft to Firm Gray Sandy Lean CLAY(CL) 35� _ 1 _ 40 4 n J _ Lu .5 ci) 45 ID 7 a //� CASTLE HAYNE FORMATION:Very Dense Dark _ 4 50- Gray Clayey SAND(SC)with Shell Fragments N7 _ Jfie) L� _ 3 - CASTLE HAYNE FORMATION:Dense Light Gray Clayey SAND(SC)with Limestone and Shell - 35 z 55 Fragments y4Z 60 _ Boring terminated at a depth of 60'below the existing - 46 M oI - I ground surface. - W - - � - - NOTES: 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE Page I VI I NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN . GENERAL ACCORDANCE WITH ASTM D-1586. B S �3. MMETERAFONLI GVLUNE.JREQTURDMDRFE1OIWOF. AMLPR " ,g, 1 FT. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal at Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD B-4 1061-11-016 ( NOTES: Boring location is approximate. DATE DRILLED: 3/14/11 ELEVATION: Ground Surface SPT N-values were measured using an automatic • DRILLING METHOD:Wash Boring BORING DEPTH:51.5 ft hammer. LOGGED BY: B.Grant WATER LEVEL: 3.3'on 3-15-11 DRILLER: J.White DRILL RIG: CME-550x J Lir= V > al w o STANDARD PENETRATION TEST DATA w J a W 41 o MATERIAL DESCRIPTION a (blows/ft) N-Value ❑ . 0 I-. u <0 w Z w 10 20 30 60 80 _ Loose Dark Gray Poorly Graded SAND(SP) _ I _ 1 _ 10 _...•:•• Very Loose Brown Silty SAND(SM) �p _ 3 5—....• .'• — I� ' Loose Light Brown Poorly Graded SAND(SP) E _ 9 10 _J,/. : Very Loose Light Gray-Tan Clayey SAND(SC) _ 3 _ Loose Light Brown-Orange Clayey SAND 15, _ E _ 5 Very Soft Gray Sandy Fat CLAY(CH) _ 20 _ 2 J/ _ 25 -I 1 Loose Gray Poorly Graded SANDwith Clay - - `•, (SPSC) 30— :'.•': 5 �//// Soft to Firm Dark Gray Sandy Lean CLAY(CL)with 35 J Cemented Lenses = 4 6 F 40 - a - a uE - w 45 3 m _ CASTLE HAYNE FORMATION:No sample _ 4 50— recovered. (Probably limestone) Z - Ip 50/ - Boring terminated at a depth of 51.5'below the Ip - •50'0" a _ existing ground surface due to tri-cone bit refusal. _ 'ACC 55— — z - - - a 60— — m _ U - - f wl _ 111C a as - - U) NOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page 1 of 1 NAMED PROJECT AND MUST ONLY BE USED TOGE7 HER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A GENERAL ACCORDANCE WITH ASTM D-1586. .0 3.PENETRATION fN-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. y-T, • HAMMER FALL!NG 30IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER -,4 ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. 0 Or N N M M COJL1 .Y. �..fnVcati9 Cal a () yy lfa iz 0) y J P Ili +-' r.•N c o• 0'a'y s . •: C 03 O CD •�CO c GAS w 1:.rliN vi w F oQ. 0P w o do ON :.. i I v O I Q /0 m ' N- N R c1 WV� ml �oo- m air 0 v Q ° aol earn; W ea O N I— C er- .. e- X 0 01) ' 5 I Z N LL co- .. • co- Q m'6u. "a W ` N e6d'� 0 2co< co r_ QOL c 0 ' cd ' ' "r0V 3a_' i 8 N c , cis cis E rev CO- O. CO (1) W c� .- r 2 IA P. _ III II I II I II I I i ! 1 PRINIPTIFIMPPIIiiiiMPF1 v. lb wr, Co N in CO LO CO a vi- eL .._ I 1 I I I 1 I 1 I 1IJI /E 109•31/18S rd9•91.0-1.1-1901. 0919S-ONVONtl1S-121Od32,11d0 PROJECT: New Terminal at Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD B-6 1061-11-016 NOTES: Boring location is approximate. DATE DRILLED: 3/14/11 ELEVATION: Ground Surface - SPT N-values were measured using an automatic DRILLING METHOD:Wash Boring BORING DEPTH:30.0 ft hammer. LOGGED BY: B.Grant WATER LEVEL: 3.6'on 3-15-11 DRILLER: J.White DRILL RIG: CME-550x J Lir c) > J W p STANDARD PENETRATION TEST DATA W . i o MATERIAL DESCRIPTION (b10 ) N-Value O ►- COZ J w 10 20 30 60 80 .•;•,Topsoil 1 _ - Loose Dark Gray Poorly Graded SAND(SP) g - I 8 _'•. :•• Medium Dense Brown Silty SAND(SM) - _ 12 Medium Dense Light Brown Poorly Graded SAND E _ 12 T— \(SP) r - 10—•�•` Very Loose Light Gray Poorly Graded SAND with E - • 3 ' Clay(SP-SC) 15 - _S�, Very Loose Dark Gray Clayey SAND(SC) _ 3 • Very Soft Gray Fine Sandy Silty CLAY(CH) _ ::i J' g 1 // 2 30 / Very Soft Gray Fine Sandy Silty Fat CLAY(CH) _ I 2 Boring terminated at a depth of 30'below the existing - - ground surface. _ 35— — 40— - - - o - - cD - ul - - - 8 45— — a _ o - Co - - 4 50— — g - - o - 0 55— — z - - I- - - CD> - - z - - a 60— — 2 - _ U - - 2/ - II /VOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page I of NAMED PROJECT AND MUST'ONLY BE USED 7OCETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. * ME 3.PENETRATION WeVALUE)f5 THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLIlNVG 30IN.REOWRED TO DRIVE 1.4IN.LD.SAMPLER ;., IFT.. ENGINEERING - TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal at Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD B-6A 1061-11-016 NOTES: Auger probe location is approximate. DATE DRILLED: 3/14/11 ELEVATION: Ground Surface DRILLING METHOD:Auger Probe •BORING DEPTH:30.0 ft LOGGED BY: N/A WATER LEVEL: Not measured DRILLER: N/A DRILL RIG: N/A { I ^12- W W WW. p STANDARD PENETRATION TEST DATA f • w 0- o MATERIAL DESCRIPTION w m (blows/ft) I N-Value 0 W Q O W a w z W 10 20 30 60 80 _I"'"; See B-6A for Soil Descriptions r _ 1 ' -• 10 • i - 15 / Very Soft Gray Fine Sandy Silty CLAY(CH) _ UD-1 - 20--I/ I - J/ UD-2 - 25 Very Soft Gray Fine Sandy Silty Fat CLAY(CH) _ 1UD-3 - 30 ' Boring terminated at a depth of 30'below the existing _ - ground surface. - 35— — c 40— - - - o - _ ca - W s - - m 45— — a - - ca - fo - - 4 50— — 7 - - E. o - _ a - K - - O 55— — z - - a - - > - - z - - a 60— — m - LAi Ll - _ if NOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page ! of 1 NAMED PROJECT AND MUST ONLY HE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. _ y.., 7, ✓ 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS SF- CI F T40 LB. JA HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER a, iFT. ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. V I I I I I I , I • co to C.)C P. o a O c N N c �U D m .F. m 1 as ~ a T : 1n U CO= 0 T Et y tq iu _. E IG) co•CN ti ' O 6 G r .... c .E a+ C Cc0N . 1. 0hOi : dcn 000 ..z p. ....... 4-...• I-;� r c wI ..-. I— .,- )1 Ili\ A A CD t13- 1 f ' ' . o V o�� .....JA 0. I :zj • t EL zi . e ,s, .:. WI H o 2I WZ. g �"c d d,- E v .0ro cl ..v_ A e-rv'N-------------"--11-‘1"."-----../Ar. isH0 Y Q cta cea I— co I 3 vi X 0 al ' a) + Z N LL C c) Q II. d I N minftA(../ S6....026...-,............6....62. 1 cts 0 a) W 0 °' Q. 2 td__ 0 a).13 N_ � Oi • p411113 03 re O. CO fle 0 PI w "� o , o. Lo o Le) p in p In p 4' ICI- D..r N CV C., co •4- Nr Q. . 1 . . , . I . . . . 1 . . . . I . . . , I , I I I 1 LLILZME 1OO'31118S rdo'910-6L-1.901 0818S-ONVONVIS-.L Od3211dO PROJECT: New Terminal at Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD B-8 1061-11-016 NOTES: Boring location is approximate. DATE DRILLED: 3/11/11 ELEVATION: Ground Surface SPT N-values were measured using an automatic • DRILLING METHOD:Wash Boring BORING DEPTH:30.0 ft hammer. LOGGED BY: B.Grant WATER LEVEL: 2.3'on 3-14-11 DRILLER: J.White DRILL RIG: CME-550x -J _ _ w w w p STANDARD PENETRATION TEST DATA W a o MATERIAL DESCRIPTION W ¢ > (blows/ft) N-Value v 0 Q Z J > w 10 20 30 60 80 l ,; \Topsoil _ Very Loose Tan Clayey SAND(SC) m E _ 4 _Y. :• Medium Dense Brown Silty SAND(SM) Ip _ 25 s„....... 5—' I� -1 Loose Brown Clayey SAND(SC) _ 5 Very Loose Brown-Green Poorly Graded SAND with ff�� 10— '. Clay(SP-SC) ID _ 4 • Loose Gray Silty SAND(SM) _ E — 6 Very Soft Gray Sandy Fat CLAY(CH) 20 IIpp ID 1 -_ 25—'/ Z 2 30 El / Boring terminated at a depth of 30'below the existing _ - ground surface. - 35— — 40— - - - 0 - - ui - 2 - - 01 45— — a' _ 0 - Ca - - 4 50— — § -_ - 0 r - - 0 55— — z - - r - _ ro > - - z - - a 60— — o - - U - - w - 2 _ - N I NOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Day c 1 of i NAMED PROJECT AND MUST ONLY BE USED IOUFTHER WITH THAT REPORT. r 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. L HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.1.D.SAMPLER 1Fr. n ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. L i 0 10 N N M M U) UCh rf 1 Ill 0 W F ° W y C 2 rnE 8 Is 63 r CO II a coaLa a) m— m 4 R v In re y o E 1 Inn_1 ii Nr L T o 0 a0 N ca c CD °4-.vi '� QUc14. H'7.. CrOS m I c w IA Ew r r 0 ♦ co-. V 12 0-. oC� 1 , I I t co 1° "- .enj "- o 0i V.4: 0 1 ao- VZ ,Nla m ti o co a C I v- CO y 0 CY O` va cciw a) U) ~ c er- x 0 Z N LL oU. c.,- ` mI N_ OJ=� Mu)Q w mii== \j, d= w co d. Q II_ 1. laL. it 0 2N 40 IS 3� o .... . .......... .. 1 E IP co LLI CO) Cf) E_a cq kl. A!Io LOo In 0 N N M CO d' a. m' C LL/LZ/E 100'301'8S fdO.91.0-1.L-490I. 0019S-OLIVONV1S-1210d3L11d0 PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-1 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 2.7'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x I J v w w w p STANDARD PENETRATION TEST DATA I— w e o MATERIAL DESCRIPTION _, >_ > w (blows/ft) N-Value o r a CBZ -3 > 10 20 30 60 80 Topsoil(2 inches) I _ Medium Dense Moist Light Brown Silty SAND(SM) 17 _,/,�`, Very Loose Saturated Gray Clayey SAND(SC) 4 - Loose Saturated Gray Poorly-Graded SAND(SP) Z - or'''.......5-.............. 7 (CH Soft Saturated Dark Gray Sandy Fat CLAY _ 10 — 2 Boring terminated at 10 feet. _ 15— — 20— — 25 — 30— — 0 35— — o w - - m▪ - - c? 40— - E - - 0 45— — re _ a - z a▪ _ rn z▪ 50— — a _ o w I I _ co U) y NOTES: 0.-.^^ 4 of 4 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE u y L.. I WI r NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. Ai& I- 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. �Y :._ 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER ao. ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-2 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft Bag sample obtained from 1 to 5 feet. LOGGED BY: T.Schipporeit WATER LEVEL: 3.2'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x = I > J u p STANDARD PENETRATION TEST DATA a- o MATERIAL DESCRIPTION W Q (blows/ft) N-Value C9 Q 0 z w 10 20 30 60 80 _•:1•.f=.�. \Topsoil(3 inches) _ ;:I: : \Medium Dense Moist Brown Silty SAND(SM) ` - 12 Medium Dense Moist Yellow-Brown Poorly-Graded r 1 - -• \SAND with Silt(SP-SM) / �/ - 6 5—. • Loose to Medium Dense Wet to Saturated Brown L^ Silty SAND(SM)with Trace Cemented Sand Fragments - 14 - : Very Loose Saturated Light Greenish-Brown - 4 10 \Poorly-Graded SAND(SP) Boring terminated at 10 feet. 15— — 20— — 25 30— — 35— — w w - - m u, - a 40— — o a 45— 0 - z a _ 50— • — a U w - m CD NOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page v{ i NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN A GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. 4 SiliME HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER 1Fr. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-3 1061-11-016A NOTES: Boring location Is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3.3'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J c) > w w p STANDARD PENETRATION TEST DATA I- o MATERIAL DESCRIPTION Ce M > .45 (blows/ft) N-Value o -J 3 w 10 20 30 60 80 _. :.. \Topsoil(3 inches) r _ I! I! -. Loose Moist Black Silty SAND(SM) E _ 8 - 1 - -. • Loose Wet Gray Silty SAND pm) E _ 4 Very Loose Saturated Gray-Brown Silty SAND pm)Loose Saturated Light Brown Poorly-Graded SAND - 7 (SP) _ 105.• 5 Boring terminated at 10 feet. - 15— — 20— 1 25— 30— si - - 0 35— — U) u7 - - m - - m 'a - - a 40— — m - R - $ - - a 45— — a - - o _ - z - - U) - - z _ a 50— a _ - m _ UM W I I = I 1I Cl) NOTES; D 1 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE P age of I NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. ess,.0 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. ': HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER V 1Fr. ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-4 1061-11-016A NOTES: Boring location is approximate. I DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3.7'on 10-28-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x J _ _ w will I p STANDARD PENETRATION TEST DATA w w IZ o MATERIAL DESCRIPTION re m > (blows/ft) N-Value g ¢ o 0 (� Q CO 2 _, s W 10 20 30 60 80 •I. .1 \Topsoil(3 inches) ir _% '•:•• `Loose Moist Black Silty SAND(SM) / X - 9 Loose Wet Gray-Brown Poorly-Graded SAND(SP) r i ��A Very Soft Wet Black Sandy Lean CLAY(CL)with r 3 5—••:• :• `Organics(Roots) / -. . Loose to Medium Dense Saturated Gray and Brown E •• Silty SAND(SM) 9 10 L7 12 Boring terminated at 10 feet. _ 15— — 20— _ -I 25— 1 1 30- - 0 35—o ui - m - m a 40— — Co 0 - - 0 45— — w - a 0 - z I- -Co - z — a 50— a _ m U' _ i i u, - Cl) NOTES' 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page 1 of ? NAMED PROJECT AND MUST ONLY RE.USED TOGEIH&H WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. '' ' HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER aev' IFT.. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-5 1061-11-016A NOTES: Boring location is approximate. I DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft Bag sample obtained from 1 to 5 feet. LOGGED BY: T.Schipporeit WATER LEVEL: 3.5'on 10-28-11 DRILLER: Norwood Williams 1 DRILL RIG: CME-550x J U w u2 p STANDARD PENETRATION TEST DATA oo MATERIAL DESCRIPTION W ¢ o a (blows/ft) N-Value v O Q < Z LLI J v w 10 20 30 60 80 \Topsoil(3 inches)•.. \Loose Moist Brown Silty SAND(SM) r E __ 7 - . Loose Wet Light Brown Poorly-Graded SAND(SP) y - 5-jFirm Wet Black Sandy Lean CLAY(CL)with 8 Organics Loose Wet Dark Brown Clayey SAND(SC) E _ 6 - f / -:r ' Very Loose Saturated Dark Brown Silty SAND(SM) - 3 10 - Boring terminated at 10 feet. 15— — 20— — I 25— — 30— — E - - 0 35— — o ui - - m - - o as - - a 40— — CD 4 _ - R - - 0 45— — m _ -o _ z _ 50— — a _ o - - o LAIe — - I I Ili NOTES. 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page i of I NAMED PROJECT AND MUST ONLY BE uSEI)TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN 44. GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. -.- --.4-:. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER ae� IFT.. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-6 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 5.4'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J i STANDARD PENETRATION TEST DATA W qq¢ o MATERIAL DESCRIPTION W Q (blows/ft) N-Value Lyi 0 U a Z J 5 w 10 20 30 60 80 _ II \Topsoil(3 inches) _...I: . Loose Moist Brown and Dark Brown Silty SAND ,(SM)with Rootlets - 5 -••I•'I• Very Loose Saturated Dark Gray Poorly-Graded - 4 5— .." SAND with Silt(SP-SM) 1 0 Very Loose Saturated Black Clayey SAND(SC) 2 -:'C. Very Loose Saturated Black Poorly-Graded SAND - 10 • ' \with Silt(SP-SM) ` 2 Boring terminated at 10 feet. 15— — 20— — 25— — 30— — 0 35— — c� w - 2 - w - a - 40— - 4 - 0 45— — Ir ocn - z a _ y - - a 50— — a wI - - U) NOTES: I v Page 4 of 7.THIS LUU IS ONLY A PORTION OF A REPORT PREPARED FOR THE Page ' NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN 411111116 GENERAL ACCORDANCE WITH ASTM D-1586. 3 0 LB. HAMMERATION FALLING 30 N.REQUIRED TO DRE NUMBER IVE 1.4F 0IN.5 D.FSAMP ER 1 FT. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-7 1061-11-016A ' NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 2.6'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x v w ww p STANDARD PENETRATION TEST DATA 0- o MATERIAL DESCRIPTION w ¢ > (blows/ft) N-Value CD a Z - I 5 W 10 20 30 60 80 _ \Topsoil(2 inches) [ - Loose Wet Dark Gray Silty SAND(SM) 10 5— ••' Loose Saturated Light Brown Poorly-Graded SAND 9 - C Loose Saturated Gray Poorly-Graded SAND with - 7 \Silt(SP-SM) ♦ - 10 Soft Saturated Sandy Lean CLAY(CL) �� 3 Boring terminated at 10 feet. - 15— — 20— — I 25— — 30— — 0 35—cn — c� w Ct 40— — m S 0 45— — c o• - z - z• 50— a O I NOTES: 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE ' a y c NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH si THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN E GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. -� HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-8 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 2.2'on 10-28-11 DRILLER: Norwood Williams 1 DRILL RIG: CME-550x �1 w 111 I uj a I 0 STANDARD PENETRATION TEST DATA COo o MATERIAL DESCRIPTION w a § (blows/ft) N-Value C� Q Z w 10 20 30 60 80 - \Topsoil(1 inch) /C /- 1 _ \Very Loose Wet Light Brown Silty SAND(SM) E _ -•,•''(. Medium Dense Saturated Gray Poorly-Graded - 3 -°' ; \SAND with Silt(SP-SM) f E - 13 5—•°•°•°• Loose Dark Brown Saturated Well-Graded SAND \(SW) r _ 6 Loose Saturated Gray Silty SAND(SM) - 10 ID 4 Boring terminated at 10 feet. _ 15—20- - -I 25 30— — O 35— — 0 w - - m - - m a - - c1 40— — 4 - - g - 0 45— ix _ o _ z I- C/3 50— — a - - 0 N I NOTES: F A 1.THIS LOG IS ONLY A PORTION OFA REPORT PREPARED FOR THE Page ge v� NAMED PROJECT ANU MUST ONLY BE USED TOGETHER WITH THAT REPORT. !Mr 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1566. 3.PENETRATION(IV-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. -rS HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER v' 1 FT. •° ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-9 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 2.6'on 10-27-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J _ o w w p STANDARD PENETRATION TEST DATA oo MATERIAL DESCRIPTION W Q W °' (blows/ft) N-Value 0 1 CO Z w 10 20 30 60_77-\Asphalt(3 inches) ` _ -•.1-'f. \Crushed Stone(7 inches) f _ E $ a23 Medium Dense Moist Brown and Dark Brown 1 _ ,Poorly-Graded SANDwith Silt(SP-SM) [ E - 10 5—.:.:.:. Loose Wet Gray Well-Graded SAND(SW) _ •• Medium Dense Wet Gray-Brown and Yellow-Brown 15 Poorly-Graded SAND(SP) — - _ Loose Saturated Light Brown Poorly-Graded SAND Z�77 10 • \(SP) l� 10 - Boring terminated at 10 feet. - 15— — 20— _ J25-j 30— — r. 0 35— — c0 u; - s - m _ a - - d 40— — o - g - - 0 45— — a o - z 1 - - tl) a 50— — 0. - W - - III N I NOTES: 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE Page i of i NAMED PROJECT AND MUST ONLY BE USED TOC.ETHEH WI IH THAT REPORT. as 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1566. r--r,fry 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. E HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER oe; ,FT.. ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-10 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 2.2'on 10-27-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x _ La.-1 p STANDARD PENETRATION TEST DATA oo MATERIAL DESCRIPTION w 2 (blows/ft) N-Value 5 w 10 20 30 60 80 71 \Asphalt(5 inches) _ .I`fi \Crashed Stone(5 inches) 1 _ 16 Medium Dense Moist Light Brown Poorly-Graded - I' L `SANDwith Silt(SP-SM) J 6 5—.'.' Loose Saturated Gray Poorly-Graded SAND with - Silt(SP-SM) Loose to Medium Dense Saturated Dark Gray Silty - 16 _ SAND(SM) • 10 10 _ Boring terminated at 10 feet. 15— — 20— — 25 30— — N 0 35— — o w - 2 - v, - a - 40—ca — 4 45— — rc 0 z a - a 50— 2 - • - i I li 8 rn NOTES: On.," 4 f 4 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE S u&c i gat NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT.2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. r ;sCitu.��... 3.PENETRATION(IV-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER oav' 1FT.. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-11 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft Bag sample obtained from 1 to 5 feet. LOGGED BY: T.Schipporeit WATER LEVEL: 5'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x . J Lir v W w p STANDARD PENETRATION TEST DATA w • * J MATERIAL DESCRIPTION w m t w (blows/ft) N-Value 0 0 Q COZ w 10 20 30 60 80 :•:I.;:J \Topsoil(1 inch) / Loose Moist Light Brown and Gray Poorly-Graded _ 9 . 1•+• \SANDwith Silt(SP-SM) - - •I''f, Medium Dense Wet Light Brown and Gray - 5— Poorly-Graded SAND with Silt(SP-SM) _ 11<\ 13 Very Loose Saturated Brown Poorly-Graded SAND _ SP �j ` 3 J \Very Loose Saturated Gray Clayey SAND(SC) �7 _ 10 \Loose Saturated Brown Well-Graded SAND(SIN) r L� 10 - Boring terminated at 10 feet. - 15— — 20- - 251 _ 30— 0 35— — o vi - s - - m m - - a - - c? 40— — 4 _ g - - 0 45— — c - a - o _ z - 1 m 50— — a o - - o Ii ..1a - cn )VOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page 1 of NAMED PROJECT AND MUST ONLY BE USED TOGE11-iiH WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. ,LY^4 ,:y" 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. �.-.` HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER ao, 1FT. ENGINEERING - TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-12 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporelt WATER LEVEL: 3.3'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x J 0 > w IAIL p STANDARD PENETRATION TEST DATA W I. o MATERIAL DESCRIPTION w a w (blows/ft) N-Value o (0 a Ca Z w 5 10 20 30 60 80 •. \Topsoil(1 inch) / _ Loose Wet Black and Gray Silty SAND(SM)with _ I 8 ::: \Cemented Sand Layer from 1.0 to 1.2 feet [ 1 _ -°•°°' ° Medium Dense Wet to Saturated Brown �( - 5—•°.•'.` c> ,Well-Graded SAND(SW) [ v� 22 Very Loose to Loose Saturated Light Brown and �7 - Gray Poorly-Graded SAND(SP) XX - 4 10 L 5 Boring terminated at 10 feet. _ 15— — 20— — 25— — 30— — h 0 35— — cp w - - 2 - 'a - - q 40— m _ 4 _ - g _ - 0 45— - cc _ o _ . z a _ r a 50— a _ f ra NOTES: Inrf" 4 of 4 I.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE ccy'' �' NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. ,r,.- \ � 7 1� 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN -. GENERAL ACCORDANCE WITH ASTM 0.1585. �*<- •% '� •' 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. ' - N ' s HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER ` -'J' IFr. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-13 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3.5'on 10-28-11 i DRILLER: Norwood Williams DRILL RIG: CME-550x J o w w p STANDARD PENETRATION TEST DATA o w CL o MATERIAL DESCRIPTION ce m E j (blows/ft) N-Value w < O w 0 a CO z w 10 20 30 60 80 ' '.. \Topsoil(2 inches) [ _ :. Very Loose Wet Black Silty SAND(SM) E _ 4 -': :' Very Loose Wet Light Brown Silty SAND(SM) 1 - • 5—:'.1.,l' Medium Dense Wet Brown Poorly-Graded SAND X 6 with Silt(SP-SM) - Very Loose Saturated Gray Poorly-Graded SAND .X - 11 (SP) - 10 4 _ Boring terminated at 10 feet. _ 15— — 20— I 25— — 30— — 35— - (3 Li; - - 2 - - m a' - - LI 40— — 6 4 _ - 8 - - 0 45— — x - 0 z 1 - - m )- z — a 50— a - - 2 U W� - - 3 - N NOTES: 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page ; v,` i NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH 'I•. THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. •r •- a PENETRATION(IV-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER oa. IFr. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-14 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 3.3'on 10-27-11 DRILLER: Norwood Williams f DRILL RIG: CME-550x J _ v w w o STANDARD PENETRATION TEST DATA w w a o MATERIAL DESCRIPTION Q_ 5- (blows/ft) N-Value 0 US 0 J w 10 20 30 60 80 _Asphalt(7 inches) r _ C' f, Loose Moist Gray and Yellow-Brown Poorly-Graded _ - 7 ANDwith Silt(SP-SM) 1 _ - f. Very Loose to Medium Dense Saturated Gray,Light 5— ..' : Brown,and Yellow-Brown Poorly-Graded SAND 4 .t.'l•• with Silt(SP-SM) 25 - Loose Saturated Orange-Brown Poorly-Graded - SAND(SP) 10 9 - Boring terminated at 10 feet. 15— — 20— - I 25— — 30— I — 0 35— — c0 _ w m - 'a - c, 40— m _ 4 0 45— z — O _ z - _ - 50— — 0. O - _ o w I I I I y NOTES' A 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE r ova ' V I I NAMED PROJECT AND MUST ONI Y BI-'IISED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. -•SI"SRrf''�errs; 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. 1 HAMMER FALLING 30IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER T. `a' ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-15 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 3.5'on 10-27-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x J _ _ w J w z STANDARD PENETRATION TEST DATA o4.2 o IVIA'I LRIAI_DESCRIPTION > (blows/ft) N-Value 3 w 10 20 30 60 80 _ffliAsphalt(7 inches) _••J. .f: Crushed Stone(5 inches) / IX • 13 Medium Dense Moist Dark Gray Poorly-Graded r 1 - - •! f. �SANDwith Silt(SP-SM) J E - 15 5—.•.. ;'. Medium Dense Saturated Brown and Gray •• \Poorly-Graded SANDwith Silt(SP-SM) - 4LN.2 . Medium Dense to Dense Saturated Gray ` - 35 = Poorly-Graded SAND(SP) _ 10 22 - Boring terminated at 10 feet. - 15— — 20— — 25 — 30— — n - 0 35— — o ui - - m - - - g 40— I - g - — 4 $ - - O 45— — o _ z a _ m a 50— — a - m U - C� I I = II NOTES' O I 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE P age , of NAMED PROJECT AND MUS(ONLY BE USED IDUET.HER WITH THAT REPORT. ism 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(IV-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. m- - ' &ME HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER o� IFr. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-16 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3.1'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x _ > W a p STANDARD PENETRATION TEST DATA 0- a o MATERIAL DESCRIPTION W Q (blows/ft) N-Value � vo I- CO 3 10 20 30 60 80 _\Topsoil(2 inches) f - Loose Moist Light Brown Silty SAND(SM) - 6 - 5— Loose Wet Gray-Brown Poorly-Graded SAND(SP) 5 - Loose Saturated Light Brown Poorly-Graded SAND 9 (SP) - 10 %/ Loose Saturated Gray Clayey SAND(SC) 5 Boring terminated at 10 feet. _ 15— — 20— 25 30— 0 35— — `a - - a - u' 40- 4 _ 7 o 0 45—co — a O Z H Z a 50— a U W = - I I NOTES' 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page i of I NAMED PROJECT AND MUST ON!YBE_IISEU TOGFTHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1588. •• -- 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. '` HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER e� IFT. ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-17 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD:3-114"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 3.1'on 10-24-11 DRILLER: Norwood Williams f DRILL RIG: CME-550x J Y. > 111 kJ p STANDARD PENETRATION TEST DATA W v o MATERIAL DESCRIPTION W a (blows/ft) N-Value o a Z w 3 10 20 30 60 80 mil[Asphalt(10 inches) .• \Crushed Stone(3 inches) E _ J • Very Loose to Loose Moist to Wet Black Clayey / 1 - 8 SAND(SC)with Organics(Roots,Wood Pieces) 5 3.5'-5.0':W=36.4%,%Fines=30.7%,LL=42,PI411<_ 3 =19 Loose to Medium Dense Saturated Gray L - 8 Poorly-Graded SAND(SP) _ 10 13 Boring terminated at 10 feet. _ 15— — 20— _ 25 - I 30— — 0 35— (5 ui - - m - - m - - 0- - - 40— — 0 45— 0 _ _ z a - co z a 50— — a _ 2 0 - - _ = I ' I 0) NOTES: Page ' of I 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE NAMED PROJECT AND MUST ONLY B1 USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN t, GENERAL ACCORDANCE WITH ASTM D-1586. ,s413.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. �r�' Akie HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER -" 1Fr. ENGINEERING • TESTING 4. STFA TIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-18 1061-11-016A NOTES: Boring location Is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-28-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x J w w p STANDARD PENETRATION TEST DATA >o (blows/ft) N-Valueow g MATERIAL DESCRIPTION m m¢ coZ0 w 10 20 30 60 80 _ Topsoil(2 inches) r -1 Very Loose Saturated Black Silty SAND(SM)with z 3 • Rootlets,Roots,Wood Fragments 1 <Thsb,5-- • Loose to Medium Dense Saturated Light Brown X8 Poorly-Graded SAND(SP) 1011 Boring terminated at 10 feet. _ 15— — 20— — 25— — 30— — 5 - - 0 35— — U 'Li - - m - _ ad 0. - d 40— — m _ R _ - 0 45— — - o _ z 1- - - co 50— — a. _ s O - - WI - - W - 1 - y NOTES' 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page I o I NAMED PROJECT AND MUST ONI.Y RE USED'1 OGF.THFR WITH THAT REPORT. Mi 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN ,GENERAL ACCORDANCE WITH ASTM D-1586. �-� 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. -r ' HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER A' IFT.. �,.• ENGINEERING • TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J.Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-19 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/24/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD: 3-1/4"HSA BORING DEPTH:10.0 ft LOGGED BY: T.Schipporeit WATER LEVEL: 3.6'on 10-28-11 DRILLER: Norwood Williams DRILL RIG: CME-550x ' J x w w 0 STANDARD PENETRATION TEST DATA w w CL o MATERIAL DESCRIPTION re m e -1-- (blows/ft) N-Value 0 v '6 I- Z Lij J w 10 20 30 60 80 _Topsoil(2 inches) 7 - • Loose Wet Gray Silty SAND(SM) E - 6 Medium Dense Moist Brown Poorly-Graded SAND i ,•I., with Silt(SP-SM) y > 20 Medium Dense Saturated Greenish-Brown E _ 13 - •• Poorly-Graded SAND(SP) _ ':' •Z•, Loose Saturated Gray Clayey SAND(SC) E 6 10 _ Boring terminated at 10 feet. - 15— — 20— — 25 30— — 0 35— — q w - - - - 8 _ a - - g 40— — 4 - i - - O 45— — - a - ct z - - z - a 50— — a - 2 8 U) - - - i C - NOTES: of 1 1.TIIIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page ' of I NAMED PROJECT AND MUST ONLY BE USED TOGETHEK WII H THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN 4 a GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER axe ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-20 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-27-11 DRILLER: Norwood Williams I DRILL RIG: CME-550x C.) Ill> w w o STANDARD PENETRATION TEST DATA w w CL o MATERIAL DESCRIPTION cc 2 > (blows/ft) N-Value p w Q o w .r C7 I- CO2 W 5 10 20 30 60 80 Asphalt(6 inches) - yCrushed Stone(6 inches) J i 8 � Very Loose to Loose Wet Gray-Brown and Light SJf Brown Clayey SAND(SC) E/ _ 3 vv���j -_'�':.1. :r` Medium Dense Saturated Gray,Yellow-Brown,and E - lii< 13 Orange-Brown Poorly-Graded SANDwith Silt -•.`I.:}• (SP-SM) - 10 16 Boring terminated at 10 feet. _ 15— - 20— 25— - 30— - 0 35— Or u1 - 2 - as m 'a - - 40— - fD - S - I _ 0 45— - o - z - - - co _ - z a 50— - a - 2 O - - - I I I W - - - Cn NOTES• 1.THIS LOG IS ONLYA PORTION OF A REPORT PREPARED FOR THE Page 1 of i NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN 4 4 GENERAL ACCORDANCE WITH ASTM D-1586. -v`r_ ' 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. "t.c HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER ,-' 1 FT. e ENGINEERING - TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal-Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-21 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/25/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfllled and DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-25-11 DRILLER: Norwood Williams DRILL RIG: CME-550x co w w p STANDARD PENETRATION TEST DATA o MATERIAL DESCRIPTION Q (blows/ft) N-Value Q Z W 10 20 30 60 80 _T\Asphalt(4 inches) `r _ ,Crushed Stone(6 inches) -�Medium Dense Wet Dark Gray Silty SAND(SM) j - Very Loose Saturated Brown Silty SAND(SM)with - 2 5-. Rootlets _:'1.=f Loose Saturated Gray-Brown Poorly-Graded SAND _ _ \with Silt(SP-SM) _ 7 Medium Dense Saturated Light Brown 10- Poorly-Graded SAND(SP) ` L� 12 Boring terminated at 10 feet. - 15- - 20- 25 30- 0 35- - m m - - 40— 4 0 45— — c ▪ - z w _ _ z ▪ 50- a 2 w - 2 co NOTES; 1.THIS LOG IS ONLY A PORTION OF A REPORT PREPARED FOR THE OdG I tat NAMED PROJECT AND MUST ONLY BE USED TOGETHF'H Wr,H THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30IN.REQUIRED TO DRIVE 1.4 IN.LD.SAMPLER 1 FT. tee' ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-22 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/25/11 ELEVATION: Ground Surface Automatic hammer used. Boring backfilled and DRILLING METHOD: 3-1/4"HSA BORING DEPTH:10.0 ft asphalt patched immediately after drilling. LOGGED BY: T.Schipporeit WATER LEVEL: 3'on 10-25-11 DRILLER: Norwood Williams DRILL RIG: CME-550x i v w J ww I p STANDARD PENETRATION TEST DATA w MATERIAL DESCRIPTION W (blows/ft) N-value I1 -J �Q CO Z J w 10 20 30 60 80 Asphalt(5 inches) \Crushed Stone(5 inches) 18 FILL:Medium Dense Moist Light Brown and Gray r - - C'I', ,Silty SAND(SM)with Gravel / - 11 5— Medium Dense Moist to Wet Light Brown and Orange-Brown Poorly-Graded SAND with Silt VSP-SM) - 12 Medium Dense Saturated Light Brown 10 ' '_Poorly-Graded SAND(SP) - 13 _ Boring terminated at 10 feet. - 15— — 20— — 25— 30— — 0 35— — ui - m O. - 40— — ro 4 - - R - 0 45— — o - z a 50— — a Ii )VOTES: 1.THIS LOG IS ONLYA PORTION OFA REPORT PREPARED FOR THE Page 1 of I NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH. THAT REPORT. NOM 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. •:— suNE 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER ■' 1FT. e' ENGINEERING TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. PROJECT: New Terminal -Albert J. Ellis Airport Jacksonville, North Carolina TEST BORING RECORD NA-23 1061-11-016A NOTES: Boring location is approximate. DATE DRILLED: 10/27/11 ELEVATION: Ground Surface Automatic hammer used. DRILLING METHOD:3-1/4"HSA BORING DEPTH:10.0 ft !LOGGED BY: T.Schipporeit WATER LEVEL: 1.9'on 10-28-11 1 DRILLER: Norwood Williams DRILL RIG: CME-550x J IJJ U LLI W w p STANDARD PENETRATION TEST DATA w .1 i- o MATERIAL DESCRIPTION N (blows/ft) N-Value o � �a 3 w 10 20 30 60 80 Topsoil(2 inches) [ _ Medium Dense Wet to Saturated Brown and m 15 Gray-Brown Poorly Graded SAND(SP) _ 5— ----j 12 %J/ Very Soft to Soft Saturated Light Gray and = 3 Yellow-Brown Sandy Fat CLAY(CH) 10 / 2 Boring terminated at 10 feet. - 15— — 20— — 25— — 30— — 0 35— — 0 w - m - - N - - 'a - - c? 40— — e - - 4 - - 0 45— — A - z - - co - - z — a 50— a - - s o - - _ _ NOTES. Qnin,s 4 .,f 4 1.THIS LOG IS ONLYA PORTION OF REPORT PREPARED FOR THE u�vc r v� NAMED PROJECT AND MUST ONLY BE USED TOGETHER WITH THAT REPORT. 2. BORING,SAMPLING AND PENETRATION TEST DATA IS IN GENERAL ACCORDANCE WITH ASTM D-1586. Ete. er ..%��.r£Cin.Y+�r- 3.PENETRATION(N-VALUE)IS THE NUMBER OF BLOWS OF 140 LB. ' HAMMER FALLING 30 IN.REQUIRED TO DRIVE 1.4 IN.I.D.SAMPLER <e�' 1FT. ENGINEERING •TESTING 4. STRATIFICATION AND GROUNDWATER DEPTHS ARE NOT EXACT. ENVIRONMENTAL SERVICES 5. WATER LEVEL IS AT TIME OF EXPLORATION AND WILL VARY. 10 U OE, c� H ^0 O In ON el - N el- 1/40 N 10 01 10 .--i en1O O\ en el-' O 1n to 01 in 00 1„1 r„1 gen10 v0 00 5 10 1/40 ch N en0�\0 co y O o O O O O O O O 0 O 0 P. O O O O O O O O O O O M ti v O O O O O O O O O O O O to A c' ^ 00 O S 00 10 N 10 o0 in en � N - A d- e) •--+ N N N M een M . - O 4 .-- V1 0000 d• to en d• 'Cr d• � ,, 0000 c� .y .-- U y 1 N en ON 0 00 en en O1 1n 00 or, en 10 in 00 � VC 1/40 el- N en �+ 0 O O O 0 0 0, 0 0, 0 N U 0,O O O O 0, 0. O O O O O 5 O 0 v O O O O O O 0 O O O O d V ..-A- V U •4 N ti 73 H '� Oh O .--1 kn ^t N M . N 00 N O V U O en en tcs s. � OO O 0 O O O O O Op �yO cd , U O O O O O O C O O O O O C.) U g U C N M '.O 10 •--- .-, N M M O cos0. •.ter ) �D l� O -i .-, ,--I •--. N N N COD N Ni M M re; re; M cc; en en en 0 A ++ a+ U U U U w w y� p 0 w N kn .--i in ,-, N en kn 01 N N •-i Os I 00 CDP U N D \C 00 � N oo ON O + d 1/40 o0 ~ oo >cel ed � � ' •-- N N N N ten M M eV C4 WA0 0 0O .0 y - M 00 Nco og ~NU 0 0 V O 00 O . i EO „ Mv A NNNMMdO rri '00, ro 0 O U f a ii E i +^, 01 10 d• C1/4 N 'n 01 N d• in •� '.0 0 N cH •--, 4s O 4S O en l� O en '.O �tU A � . - •--, N N N en en en d• d- d- k Form No:TR D2974-I Revision No. 0 S&MERevision Date:07/10/08 Moisture,Ash, and Organic Matter ' ASTMD-2974 Quality Assurance S&ME,Inc.Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 2R4[Ni Project#: 1061-11-016A Report Date: l 1/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s): 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite M60:,Raleigh,NC 27615 Sample Id: 173 Type: Soil Boring Sample Date: 10/25/11 Location: Jacksonville,NC Sample: • NB-5/S4 Depth(ft): 8.5'-10.0' Sample Description: Brown Organic Material(Peat) Equipment: Balance: 0 01 g.Readability,500g. Minimum Caparc ty Balance SttME ID#, 4852 Cal. Date 7/1/11 Due: 7/1/12 Method A:Moisture Content Determination Required Oven Temperature:105 + 5°C Oven Temperature: 105 °C Tare# I t Tare Weight(Dish plus Aluminum Foil Cover) grams 96.51 a Mass of As Received Specimen+Tare Wt. grams 154.52 b Mass of Oven Dry Specimen+Tare Wt. grams 106.15 w Water Weight (a-b) 48.37 A Mass of As-Received Specimen (a-t) 58.01 B Mass of Oven Dry Specimen (b-t) 9.64 Moisture Content as u %of As Received or Total Mass (w/A)*100 83.4% I %Moisture Content as a %of Oven-dried Mass I (w/B)*100 j 501.8% Sc&ME ID#: 14603 C:al. Date 9/28/Il Due. 1/28/Il Method C(440°C)or D(750°C):Ash Content and Organic Matter Determination Muffle Furnace: 440 °C Tare# I t Tare Weight(Dish plus Aluminum Foil Cover) grams 96.51 b Mass of Oven Dry Specimen+Tare Wt. grams 106.15 c Ash Weight+Tare Wt. grams 101.74 C Ash Weight c-t 5.23 B Mass of Oven Dry Specimen (b-t) 9.64 D %Ash Content (C/B)*100 54.3% Organic Matter 100-D 45.7% Muffle Furnace: Sc&%IE,ID#: 14687 Notes/Deviations/References: ASTM D2974:Moisture,Ash,and Organic Matter of Peat and Other Organic Soils Classification was done visually. ....fi Tom Schipporeit,P.E. Senior Engineer 11/16/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. k. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016A Raleigh,NC.27616 Page 1 of 1 Form No:TR-D422-WH-1 Ga Revision No. 0 S&M E Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME, Inc.-Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016 Report Date: 3/16/11 Project Name: Ellis Airport-New Terminal Test Date(s): 3/15-3/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd.,Suite 260,Raleigh,NC 27615 Sample Id. 51 Type: Soil Boring Sample Date: 3/11/11 Location: Jacksonville,NC Sample: B-2/S 1 Depth(ft) 1.0'-2.5' Sample Description: Light Brown Silty SAND(SM) ,- ---- 3" 1.S" 1"3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100% ....• --- 90% 00% I70%60%50%40% 30% 20% 1 10% , 0% • ♦ -... ♦ • , ♦ 100.00 10,00 1.00 0.10 0.01 Millimeters Cobbles <300 mm(12")and% 75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm(#4) Silt <0 075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2 00 nim and>0,425 mm(#40) Colloids <0.001 mm Maximum Particle Size Coarse Sand 0.3% Fine Sand 43.3% Gravel 0.2% Medium Sand 37.3% Silt&Clay 18.9% Liquid Limit NP Plastic Limit NP Plastic Index NP Specific Gravity N/A Cc= N/A Cu= N/A Moisture Content 10.8% Coarse Sand 0.3% Medium Sand 37.3% Fine Sand 43.3% Description of Sand& Gravel Particles: Rounded MI Angular El Hard&Durable lei Soft 0 Weathered&Friable 0 Notes/Deviations/References: Tom Schipporeit,P.E. i, '. Branch Manager 3-28-11 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016 Raleigh,NC.27616 Page 1 of 1 Form No:TR-D422-WH-1Ga Revision No. 0 S&IVIE Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&0#11E,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016 Report Date: 3/18/11 Project Name: Albert Ellis Airport-New Terminal Test Date(s): 3/15-3/18/11 Client Name: RS&H Client Address: Boring No.: B-6A Sample: UD-1 Sample Date: NA Location: Site-Borehole Offset: NA Depth(ft): 18-20 ft. Sample Description: Gray Fine Sandy Silty CLAY(CH) -- �3" 1.5" �1"314" 3/8" *I. #1.0 #20-- 840 #i00 #200 1 100% i - - - - r _........-.,_.__._. 90% 80% ea n• 70% a •y a 60% a I 50% d 30% ; 20% 10% 0% • " — — •— 40 — -- ! , _ ►. -- ,. _ __ 100.00 10.00 1 1.00 0.10 0.01 Millimeters Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4 75 mm(#4) Silt <0.075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0.001 mm Maximum Particle Size #20 Coarse Sand 0.0% Fine Sand 38.7% Gravel 0.0% Medium Sand 0.1% Silt&Clay 61.2% Liquid Limit 57 Plastic Limit 17 Plastic Index 40 Specific Gravity 2.692 Moisture Content 43.5% Coarse Sand 0.0% Medium Sand Fine Sand '0... Description of Sand&Gravel Particles: Rounded 0 Angular 0 Hard&Durable ❑` Soft © Weathered&Friable Notes/Deviations/References: ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTM D 2487: Classification of Soils for Engineering Purposes(Unified Soil Classification System) Mal Krajan,ET Laboratory Manager Technical Responsibility Signature Position Date This report shall not be reproduced:except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road B-6A UD-1(18-20 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No:TR-D422-WH-I Ga Revision No. 0 c S&IVIE i Revision Date:07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016 Report Date: 3/18/11 Project Name: Albert Ellis Airport-New Terminal Test Date(s): 3/15-3/18/11 Client Name: RS&H Client Address: Boring No.: B-6A Sample: UD-3 Sample Date: NA Location: Site-Borehole Offset: NA Depth(ft): 28-30 ft. Sample Description: Gray Fine Sandy Silty CLAY(CH) 3" 1.5" 1"3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100% r- 80% • e 0 44 a 70% y a 60% 15 d .4i1% H a+ 40% 30% 20% 10% I 100.00 10.08 Millimeters 1.00 0.10 0.01 Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 tnm and>0.075 mm(#200) Gravel <75 mm and>4 75 mm(#4) Silt <0.075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0 001 mm Maximum Particle Size #10 Coarse Sand 0.0% Fine Sand 19.0% Gravel 0.0% Medium Sand 0.3% Silt&Clay 80.7% Liquid Limit 59 Plastic Limit 17 Plastic Index 42 Specific Gravity 2.695 Moisture Content 42.1% Coarse Sand 0.0% Medium Sand 0.3 i i Fine Sand 19.0% Description of Sand&Gravel Particles: Rounded C3 Angular Cl Hard&Durable El Soft Cl Weathered& Friable 13 Notes/Deviations/References: ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) Mal Krajan,ET Laboratory Manager Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road B-6A UD-3(28-30 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No:TR D422-WH-1 Ga Revision No. 0 .t-s. S&ME Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME,lnc.-Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016 Report Date: 3/16/11 Project Name: Ellis Airport-New Terminal Test Date(s): 3/15-3/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample Id. 51 Type: Soil Boring Sample Date: 3/11/11 Location: Jacksonville,NC Sample: B-8/S5 Depth(ft) 13.5'-15.0' Sample Description: Gray Silty SAND(SM) 3" 1.5" 1"314" 3/8°' #4 #10 #20 #40 #00 #100 #200 100% r 90% 0 dp 70% al 60% a 14 d - 40% i , 30% 20% 10% 0% r -• , - -- 0 . • *� 110.00 10,00 Millimeters' 1.00 MO OM l Cobbles 300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm(#4) Silt <0 075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0.001 mm Maximum Particle Size Coarse Sand 1.1% Fine Sand 62.1% Gravel 0.1% Medium Sand 16.8% Silt&Clay 19.9% Liquid Limit NP Plastic Limit NP Plastic Index NP Specific Gravity N/A Cc= N/A Cu= N/A Moisture Content 22.0% Coarse Sand Medium Sand 16.8% Fine Sand 62.1% Description of Sand&Gravel Particles: Rounded E Angular 0 Hard&Durable ❑ Soft 0 Weathered&Friable 0 Notes/Deviations/References: Tom Schipporeit,P.E. Branch Manager 3-28-11 1 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016(2) Raleigh,NC.27616 Page 1 of 1 Form No:TR-D422-WH-1Ga Revision No. 0 VIE Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s): 11/14- 11/16/11 Client Name: RS&H Client Address: Boring No.: NA-2 Sample: Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Light Brown and Brown Silty SAND(SM) r_ 3" 1.5" 1"3l4" 318" #4 #10 #20 #40 #60 #100 #200 100% • • - - - - - • - 1 • • • • 90% ,. 80% tm 70% I I I III I I I I I I I I n •660% a, u t, w N 40% _ 30% I I I I 20% .4 10% 100.00 10.00 I 1.00 � 0.10 0-01 Millimeters Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm(#4) Silt <0 075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0.001 mm Maximum Particle Size 3/8" Coarse Sand 0.5% Fine Sand 36.3% Gravel 0.2% Medium Sand 48.2% Silt&Clay 14.8% Liquid Limit 22 Plastic Limit 0 Plastic Index N.P. Specific Gravity ND Moisture Content 12.6% Coarse Sand 0.5% Medium Sand 48.2% Fine Sand .. Description of Sand&Gravel Particles: Rounded 0 Angular 0 Hard&Durable 0 Soft t] Weathered&Friable 0 Notes/Deviations/References: ND=Not Detemined. ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) Tom Schipporeit,P.E. Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date E. This report shall not be reproduced except infull,without the written p p p approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-2 Bulk(1-S ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No:TR D422-WH-1 Ga Revision No. 0 S8cIV1E ( Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s): 11/14- 11/16/11 Client Name: RS&H Client Address: Boring No.: NA-5 Sample: Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 - 5 ft. Sample Description: Light Brown and Brown Poorly Graded SAND with Silt(SP-SM) I 3' 1.5" 1"3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 .\ 100% ---. - _ . _ . . .—_. l �..... 90% .7 e en 70% a ta ca ea 60% a, -44 L. d -1 40% 30% I 20% \'‘ 441"••• 10% 0% I • • • , a a �_��. 100.00 10.00 Millimeters' 1.00 0.10 0.01 Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm(#4) Silt <0.075 and>0.005 mm Coarse Sand <4 75 nun and>2.00 mm(#10) - Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids 0.001 mm Maximum Particle Size 3/8" Coarse Sand 1.3% Fine Sand 71.8% Gravel 1.1% Medium Sand 17.2% Silt&Clay 8.6% Liquid Limit 21 Plastic Limit 0 Plastic Index N.P. Specific Gravity _ ND Moisture Content 17.8% Coarse Sand I.7'U Medium Sand 17.2% Fine Sand 71.8% Description of Sand&Gravel Particles: Rounded Cal Angular 0 Hard&Durable 11 Soft 0 Weathered&Friable Notes/Deviations/References: ND=Not Detemined. ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) Tom Schipporeit,P.E. s ; ..."/ Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-5 Bulk(I-5 ft)Classification Raleigh,NC.27616 Page I of I Form No:TR-D422-WH-1Ga Revision No. 0 S&IVIE Revision Date: 07/14/08 Sieve Analysis of Soils . ASTMD 422 Quality Assurance S&ME,Inc,Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Hate: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s): 11/14- 11/16/11 Client Name: RS&H Client Address: Boring No.: NA-11 Sample: Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Light Brown and Gray Poorly Graded SAND with Silt(SP-SM) 3" 1S" 1"3/4" 3/$" #4 #10 #20 #40 #60 #100 #200 100% -- -----] . 90% f1{f{{f1{f a 70% y a 60% a, w ii to 50% o L. I 40% 30% \‘‘,......... . 20% 100-00 10.00 Millimeters 1.00 0.10 0.01 Cobbles 300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm(#4) Silt <0.075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and> 0.425 mm(#40) Colloids <0 001 mm Maximum Particle Size 3/8" Coarse Sand 0.8% Fine Sand 66.3% Gravel 0.2% Medium Sand 24.6% Silt&Clay 8.1%�fn Liquid Limit 23 Plastic Limit 0 Plastic Index N.P. Specific Gravity ND Moisture Content 12.9% Coarse Sand r,. ;' : Medium Sand Fine Sand 66.3% Description of Sand&Gravel Particles: Rounded 18) Angular CI Hard&Durable ill Soft ❑ Weathered& Friable Cl Notes/Deviations/References: ND=Not Detemined. ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils ASTivi D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) Tom Schipporeit,P.E. '`" { �`�:f �'`� Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-11 Bulk(1-5 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No:TR D422-WH-I Ga Revision No. 0 _ S&IVIE Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME,Inc.-Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s): 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd.,Suite 260,Raleigh,NC 27615 Sample Id. 173 Type: Soil Boring Sample Date: 10/27/11 Location: Jacksonville,NC Sample: NA-17/S2 Depth(ft) 3.5'-5.0' Sample Description: Dark Brown Clayey SAND(SC)with Organics 3" 1.5" 1"3/4" 318" #4 #10 #20 #40 #60 #10e #200 100% » 99% . 80% eo 70% 0 V a 60% a d 50% d a '" 40% 30% 20% 10% 0% *,-.4 • • . • r .. ..- _ .. 100.00 10.00 IMillimeters� 1.00 0.10 0.01 Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm 04) Silt <0.075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(410) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids •<0.001 mm Maximum Particle Size Coarse Sand 0.7% Fine Sand 43.6% Gravel 0.7% Medium Sand 24.4% Silt&Clay 30.7% Liquid Limit 42 Plastic Limit 23 Plastic Index 19 Specific Gravity N/A Cc= N/A Cu= N/A Moisture Content 36.4% Coarse Sand 0.7% Medium Sand 24.4% Fine Sand 43.6% Description of Sand&Gravel Particles: Rounded al Angular i] Hard&Durable i Soft C3 Weathered& Friable 0 Notes/Deviations/References: Tom Schipporeit,P.E. Senior Engineer 11/16/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016A Raleigh,NC.27616 Page 1 of 1 Form No:TR D422-WH-1 Ga Revision No. 0 ,ter S&IVILRevision Date:07/14/08 Sieve Analysis of Soils ' ASTMD 422 Quality Assurance S&ME,Inc.Raleigh,3201 Sprit,F.Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s): 11/14- 11/16/11 Client Name: RS&H Client Address: Boring No.: NA-19 Sample: Bulk Sample Date: 10/24/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Gray Silty SAND(SM) 3" 1.5" 1"3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 100% .. ...,._....._. ...,...F._....._..m.a...-......,.___......____. 90% .� 80% e 70% a1 60% a, d 50% d a+ 40% 30% 20% 1\"*""---.10% i e% 100,00 10.00 Millimeters 1'00 010 0.01 Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4.75 mm(#4) Silt <0.075 and>0.005 mm Coarse Sand <4.75 mm and>2.00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0.001 mm Maximum Particle Size #4 Coarse Sand 0.6% Fine Sand 45.1% Gravel 0.0% Medium Sand 41.9% Silt&Clay 12.4% Liquid Limit 23 Plastic Limit 0 Plastic Index N.P. Specific Gravity ND Moisture Content 17.9% Coarse Sand 0.6% Medium Sand 41.9% Fine Sand 45.1% Description of Sand&Gravel Particles: Rounded 'XI Angular LI Hard& Durable !a7 Soft C Weathered& Friable 0 Notes/Deviations/References: ND=Not Determined. ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils AS Tlvi D 2487:Classification of Soiis for Engineering Purposes(Unified Soil Classification System) Tom Schipporeit,P.E. Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-19 Bulk(1-5 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No:TR D422-WH-1 Ga _ Revision No. 0 ' s& E Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance S&ME,Inc.-Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s): 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample Id. 173 Type: Soil Boring Sample Date: 10/26/11 Location: Jacksonville,NC Sample: NB-2/S5 Depth(ft) 13.5'-15.0' Sample Description: Gray Silty, Clayey SAND(SC-SM) � 3" 1.5" 1"3/4�' 3/8" #4 #10 #20 #40 #60 #100 ono � 100% ...0 -41 • • • • ♦ e 1 ♦ • 4 90% 80% F u 70% fA a 60% — i a d 50% u 20% 10% , 0% • • • 4--M - . -I (.. u, 100-00 10.00 Millimeters' till) 0.10 0e01 Cobbles <300 mm(12")and>75 mm(3") Fine Sand <0.425 mm and>0.075 mm(#2001 Gravel <75 mm and>4 75 mm(#4) Silt <0.075 and>0,005 mm Coarse Sand <4.75 mm and>2 00 mm(#10) Clay 0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0.001 min Maximum Particle Size Coarse Sand 1.1% Fine Sand 49.7% Gravel 0.5% Medium Sand 22.1% Silt&Clay 26.6% Liquid Limit 20 Plastic Limit 15 Plastic Index 5 Specific Gravity N/A _ Cc= N/A Cu= N/A Moisture Content 21.5% Coarse Sand 1.I% Medium Sand 22.1% Fine Sand 49.7% Description of Sand&Gravel Particles: Rounded 0 Angular fill Hard&Durable 0 Soft 0 Weathered&Friable 0 Notes/Deviations/References: Tom Schipporeit,P.E. '' `s` , Senior Engineer 11/16/2011 Technical Responsibility Signature Position Dale This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016A(2) Raleigh,NC.27616 Page 1 of 1 Form No:TR D422-WH-1 Ga Revision No. 0 S&M E 7 Revision Date: 07/14/08 Sieve Analysis of Soils ASTMD 422 Quality Assurance SSIME,Inc.-Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s): 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd.,Suite 260,Raleigh,NC 27615 Sample Id. 173 Type: Soil Boring Sample Date: 10/26/11 Location: Jacksonville,NC Sample: NB-7/S7 Depth(ft) 23.5'-25.0' Sample/ Description: Gray Clayey SAND(SC) f ----.--3" —.-1-5" I"3/4" 3/8" #4 #1O #20 #40 #60 #100 #200 No% r. ..._,,___ 80% , e r. 70% , a A: 60% C7 Li 50% a" '' 40% 1 30% . 20% 0% 1 �• ,• • .. + ,, 100.00 10.00 1." 0.10 0.01 Millimeters Cobbles <300 mm(12")and>75 mm(3') Fine Sand <0.425 mm and>0.075 mm(#200) Gravel <75 mm and>4 75 mm(#4) Silt <0.075 and>0.005 mm Coarse Sand <4.75 mm and>2 00 mm(#10) Clay <0.005 mm Medium Sand <2.00 mm and>0.425 mm(#40) Colloids <0.001 mm Maximum Particle Size Coarse Sand 1.9% Fine Sand 36.3% Gravel 0.0% Medium Sand 25.1% Silt&Clay 36.7% Liquid Limit 30 Plastic Limit 12 Plastic Index 18 Specific Gravity _ N/A Cc= N/A Cu= N/A Moisture Content 27.0% Coarse Sand 1.9% Medium Sand :'.�.1`; Fine Sand 3O.1" Description of Sand& Gravel Particles: Rounded Angular MI Hard&Durable 11 Soft 0 Weathered&Friable 0 Notes/Deviations/References: Tom Schipporeit,P.E. �`"'A"�" Senior Engineer 11/16/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016A(3) Raleigh,NC.27616 Page 1 of 1 Form No. TR-D4318-T89-90 �"' ��� Revision No. 0 rrr Revision Date:11,20/07 Liquid Limit, Plastic Limit, and Plastic Index Another code ASTM D 4318 11 AASHTO T 89 ❑ AASHTO T 90 ❑ Quality Assurance S&M.E,Inc. Wilmington;3006 Rail Waters Drive,Suite 100,Wilmitugton,NC 28405 Project#: 1061-11-016 Report Date: 3/16/11 Project Name: Ellis Airport-New Terminal Test Date(s) 3/15-3/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample#: 51 Type: Soil Boring Sample Date:3/11/11 Location: Jacksonville,NC Sample: B-2/S1 Depth(ft): 1.0'-2.5' Sample Description: Light Brown Silty SAND(SM) 1.1ype and Specification S&.t1F IQ.i Cal!.kale: Two and Specification 84 M1.It) = Cal Dale: Balance (0.01 g) 4852 7/1/2010 Grooving tool 4940 7/12/2010 LL Apparatus 4884 7/12/2010 Grooving tool Oven 14603 1/14/2011 Grooving tool Pan A Liquid Limit Plastic Limit Tare#e 1 2 3 A Tare Weight B Wet Soil Weight+A C Dry Soil Weight+A D Water Weight(B-C) E Dry Soil Weight(C-A) P %Moisture(D/E)*100 I N #OF DROPS Afoisture Contents determined LL, LL=F*FACTOR by ASTM D 2216 Ave. Average 65.0 t 1 One Point Liquid Limit 1 N Factor N Factor 60.0 1 20 0.974 26 1.005 e 55.0 a 21 0.979 27 1.009 I... t 22 0.985 28 1.014 c 50.0 - — 23 0.99 29 1.018 O 45.0 , 24 0.995 30 1.022 • 40.0 25 1.000 i 35.0 : NP,Non-Plastic 30.0 ; Liquid Limit Plastic Limit 25.0 Plastic Index 20.0 ' i t 1 M Group Symbol NP 10 15 20 25 30 35 40 #of Drops I 100 Multipoint Method One-point Method 0 Wet Preparation U Dry Preparation U Air Dried U Estimate the%Retained on the#40 Sieve: 38% Notes/Deviations/References: No LL or PL could be determined,therefore material is classified as"NP". A,S7MD 4318:Liquid Limit, Plastic Limit, &Plastic Index of Soils Tom Schipporeit,P.E. y Branch Manager 3-28-11 ( Technical Responsibility Signature Position . Date This report shall not be reproduced:except in full,without the written approval ofS&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road 1061-11-016 Raleigh,NC.27616 Page 1 of 1 Farm No.TR D4318:7.89-90 Revision No,0 ''' 7,-SileME Liquid Limit,Plastic Limit,and Plastic Index Revision Date:11/20/07 Anti 4318 MI AASIITO T 89 0 AASNTO T 90 ❑ &talltl►Assurance S&ME,Inc.Raleigh,3n01 Spring Forest Road,Raleigh,North Carolina 27616 - Project#: 1061-11-016 Report Date: 3/18/11 Project Name: Albert Ellis Airport New Terminal Test Date(s) 3/1.5-3/18/11 Client Name: RS&H Client Address: Boring#• B-6A Sample#: LID-1 Sample Date:NA Location: Site-Borehole Offset:NA Depth(ft): 18-20 ft. Sample Description: . Gray Fine Sandy.Silty CLAY(CH) Type Specification S&M D# Cal Date- Type and Specification S&ME 1D# Cal Dale Balance (0.01 g,) 1024 11/4/2010 Grooving tool S-1 5/26/2010 LL Apparatus 1084 8/17/2010 Oven I3289 8/17/2010 Pan it Liquid Limit Plastic Limit Tare#. 7 16 29 26 5 A Tare Weight 12.99 13.02 13.03 12.87 12.45 B Wet Soil Weight+A 26.26 28.39 27.69 24.82 24.35 C Dry Soil Weight+A 21.58 22.80 22.10 23.03 22.61 D Water Weight(B-C) 4.68 5.59 5.59 1.79 1.74 E Dry Soil Weight(C-A) 8.59 9.78 9.07 10.16 10.16 air7;1VlJuilV lLIL� 1 JT•J/V ✓r.�io tia,Vro 17.6° 17,1% N #OF DROPS 35 25 15 I Moisture Contents determined LL 1 LL=F*FACTOR .by 4S7:11D 2216 1 Ave.. I Average 17.4% t- 1 One P'olnt Liquid Limit - N Factor N Factor 62.0 ! 20 0.974 26 LOOS ,,, 61.0 21 0.979 27 1.009 1 60A - {._. . t..._ ..__ 22 0.985 28 1.014 • U 59.0 23 0.99 29 1.018 e• 58.0 ,_ - , F i 24 0.995 30 1.022 25 1.000 I 57.0 NP,Non-Plastic ,t• 56.0 . �_ _ 1 Liquid Limit' 57 55,0 N. j_ Plastic Limit 17 s l.o i i z Plastic Index 40 53.0 ' - , i b i I 1 , Group Symbol CH 10 15 20 25 30 35 40 100 #of Drops Multipoint Method 0 ,.�� -. - _ � - ��,. One-point Method El Wet Preparation LI Dry Preparation DAit Dried Cl Estimate the%Retained on the#40 Sieve. Notes/Deviations/References: ASTM D 2487:CIastification of Soils for Engineering Purposes(Unified Soil Classification System) ASTM D 4318 Liquid Limit,Plastic Limit,&Plastic Index of Sens Mal Krajan,ET Laboratory Manager 3-1-, -II Technical Responsibility Signature Position Dale This report shall not be reproduced,except Injidt,wilhoul't the written approval of Sc&AIE,Inc SECIIEE,INC. Corporate 3201 Spring Forest Road R-6A 11D-1(18-20 j1)Classification Raleigh,NC.27616 Page 1 of 1 Form No.TR-D4318-T89-90 Revision No. 0 Liquid Limit,Plastic Limit, and Plastic Index S&IVIE Revision Date: 11/20/07 q i ASTMD 4318 11 AASHTU T89 0 AASHTO T 90 a Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Protect#: 1061-11-016 Report Date: 3/18/11 Project Name: Albert Ellis Airport-New Terminal Test Date(s) 3/15-3/18/11 Client Name: RS&H Client Address: Boring#: B-6A Sample#:UD-3 Sample Date:NA Location: Site-Borehole Offset:NA Depth(ft):28-30 ft. Sample Description. Gray Fine Sandy Silty CLAY(Cl Tape and specrfkation S&ME rD# Cal Date' Type and Specrfkkation S&ME ID# Cal Date. Balance (0.01 g) 1024 11/4/2010 Grooving tool S-1 5/26/2010 LL Apparatus 1084 8/17/2010 Oven 13289 8/17/2010 Pan 4 Liquid Limit Plastic Limit Tare#: 13 1 24 27 14 A Tare Weight 13,03 12.87 12.97 12.92 12.88 B Wet Soil Weight+A 26.49 27.63 29.41 23.85 23.80 C Dry Soil Weight+A 21.70 22.16 23.05 22.27 22.25 D Water Weight(B-C) 4.79 5.47 6.36 1.58 1.55 E Dry Soil Weight(C-A) 8.67 9.29 10.08 9.35 9.37 F %Moisture(D/E)*100 33.2% 53,9% 63,i% 16.9% 16.5% N #OF DROPS 35 25 17 ,ilo:sta a Contents determined LL LL=F*FACTOR 10 AST.MMD 2216 I Ave. Average 16.7% e 1 Ono Point Liquid Limit - I i i N Factor N Factor 63.0 -- -1 - 20 0.974 26 1.005 62.0 tr _ 21 0.979 27 1.009 61,0 __ �' 22 0-985 28 1.014 V 60.0 __._ -`_•'I -- ' `= 23 0.99 29 1.018 i 24 0.995 30 1.022 t 59.0 • -r--= 25 1:000 �, ssa , NP,Non-Plastic 0 X 57.0 `- , i r ` Liquid Limit 59 '"''''56.0 _ Plastic Limit 17 55.0 r } i Plastic Index 42 54.0 T-r �-' Group Symbol CH 10 15 20 25 30 35 40 #of Drops 100 Multipoint Method Q _ = - One-point Method ❑ Wet Preparation Dry Preparation Air Dried Estimate the%Retained on the i140 Sieve. Notes/Deviations/References: ASTM D 2487:Classification of Soils-for Engineering Purposes(Unified Soil Classification System) ASTM D 431�8_Liquid Limit,Plastic Limit,&Plastic Index of Soils Mal Krejan.ET ++ Laboratory Manager -,eSr4/_ € Technical ResponsibilitySlgnatmre Positron bate This report shall not be reproduced except in MI.without the written approval of SLIMS,Inc S&MR.PlC -Corporate 3201 Spring Forest Road $-6/1 UD-3(28-3011,1 Classaeatlon Raleigh NC 27616 Page 1 of 1 Form No.TR-D4318-T89-90 SS8cME Revision No. 0 Revision Date:11/20/07 Liquid Limit,Plastic Limit, and Plastic Index Another code ASTMD 4318 ❑x AASHTO T 89 ❑ AASHTO T 90 ❑ Quality Assurance SC VIE,Inc.Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016 Report Date: 3/16/11 Project Name: Ellis Airport-New Terminal Test Date(s) 3/15-3/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample#: 51 Type: Soil Boring Sample Date:3/11/11 Location: Jacksonville,NC Sample:B-8/S5 Depth(ft): 13.5'-15.0' Sample Description: Gray Silty SAND(SM) Type and Specification S&41E ID g Cal Date: 7•ipe and Speci/ic alion Sd tIE Ii)i• Cal Date: Balance (0.01 g) 4852 7/1/2010 Grooving tool 4940 7/12/2010 LL Apparatus 4884 7/12/2010 Grooving tool Oven 14603 1/14/2011 Grooving tool Pan# Liquid Limit Plastic Limit Tare#: 1 2 3 A Tare Weight B Wet Soil Weight+A C Dry Soil Weight+A D Water Weight(B-C) E Dry Soil Weight(C-A) F %Moisture(D/E)*100 _ I I N #OF DROPS Afoistwe Contents determined LL LL—F*FACTOR by ASTM D 2216 1 Ave. Average I' 4S, One Point Liquid Limit - N Factor N Factor 60.0 20 0.974 26 1.005 55.0 21 0.979 27 1.009 C 50.0 22 0.985 28 1.014 j 23 0.99 29 1.018 si. 45.0 24 0.995 30 1.022 0 H 40.0 25 1.000 i 35.0 NP. Non-Plastic 0 e Liquid Limit 30.0 Plastic Limit 25.0 - Plastic Index 20.0 1 Group Symbol NP 10 15 20 25 30 35 40 #of Drops 100 p 1 Multipoint Method ❑ One-point Method Q Wet Preparation U Dry Preparation I] Air Dried ❑ Estimate the%Retained on the#40 Sieve: 18% Notes/Deviations/References: No LL or PL could be determined,therefore material is classified as"NP". AS7:11 D 4318: liquid Limit, Plastic Limit: &Plastic Index of Sods Torn Schipporeit,P.E. ;:aor,Ilia Branch Manager 3-28-11 Technical Responsibility Signature Position Date This report shall not be reproducers except in full,without the written approval of S&ME,Inc , S&ME,INC.-Corporate 3201 Spring Forest Road 1061-11-016(2) Raleigh,NC.27616 Page 1 of 1 T Form No.No. D43I8-T89-90 E Revision o. o Liquid Limit,Plastic Limit, and Plastic Index ‘f14,,,41,11° S8cM Revision Date:11120107 ( ASTMD 4318 M AASHTO T 89 0 AASHTO T 90 0 Quality Assurance S&ME, Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/14- 11/16/11 Client Name: RS&H Client Address: Boring#: NA-2 Sample#:Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset:NA Depth(ft): 1 -5 ft. Sample De criptior° Light Brown and.Brown Silty SAND(SM) 'ripe and Specification S&tIL ID 4 Cal Date: Type and SpecU aiaou SWAM'1l)l= Cal Dale: Balance (0.01 g) 1024 11/4/2011 Grooving toot S-I 5/2612011 LL Apparatus 1084 8/10/201! Oven 1 454 10/28/201 I Pan# • Liquid Limit Plastic Limit Tare#: 3 A Tare Weight 12.98 B Wet Soil Weight+A 27.64 C Dry Soil Weight+A 24.98 D Water Weight(B-C) 2.66 E Dry Soil Weight(C-A) 12.00 F %Moisture(D/E)*100 22.2% #Vl N DRUM J 7 '-1 r : �,�� s eraunerl LL LL=F*FACTOR I I I I I hrnr'.A('Sri1tent 11]721 det6 Ave. Average _ N One Point Liquid Limit 27.0— --"-- - - -=--- N l Factor N Factor 26.0 ; 20 0.974 26 1.005 e 25.0 : 21 0.979 27 1.009 e 24.0 : 22 0.985 28 1.014 U 23.0 ; 23 0.99 29 1.018 22.0 24 0.995 30 1.022 21.0 ; 25 1.000 ° NP,Non-Plastic tEl 20.0 : e Liquid Limit 22 19.0 Plastic Limit 0 18.o " Plastic Index N.P. 17.0 4 I ' I Group Symbol N.P. 10 15 20 25 30 35 40 #of Drops' 100 Multipoint Method 0 One-point Method ❑ Wet Preparation 0 Dry Preparation El Air Dried El Estimate the%Retained on the#40 Sieve: Notes/Deviations/References: ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils Tom Schipporeit,P.E. .r�^.r+o yA- rr "' Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road NA-2 Bulk(1-5 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No.TR D4318-T89-90 _ E Revision No. 0 S M Revision Date:I1/20/07 Liquid Limit,Plastic Limit, and Plastic Index ( ASTMD 4318 0 AASHTO T 89 0 AASHTO T 90 ❑ Quality Assurance S&ME,Inc.Raleigh.3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/14- 11/16/11 Client Name: RS&H Client Address: Boring#: NA-5 Sample#:Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Light Brown and Brown Poorly Graded SAND with Silt(SF-SM) 'I've and S!r eyieaiion Sct ME AD g Cal Date: 7 pe and Specification Set;W ID r' Cal Daze: Balance (0 01 g) l024 11/4/2011 Grooving too! S-1 5/26/2011 LL Aparatus 1084 8/10/20 1 1 Oven 1454 10/28/2011 Pan# Liquid Limit Plastic Limit Tare"#; 21 I A Tare Weight 12.92 B Wet Soil Weight+A 27.45 C Dry Soil Weight+A 24.90 D Water Weight(B-C) 2.55 E Dry Soil Weight(C-A) 11.98 F %Moisture(D/E)*100 21.3% N #OF DROPS 5 Ifoisrure C muents de•rmni,h.c1 LL LL=F*FACTOR I I I I by ASI hI D 2216 Ave. Average P N One Point Liquid Limit 27.0 -- _ N Factor N Factor 26.0 ' 20 0.974 26 1.005 e 25.0 : 21 0.979 27 1.009 a 24.0 ; 22 0.985 28 1.014 U 23.0 ; 23 0.99 29 1.018 ' 22.0 24 0.995 30 1.022 �' 21.0 25 1.000 20.0 . NP,Non-Plastic OD Liquid Limit 21 19.0 ' Plastic Limit 0 18.0 Plastic Index N.P. 17.0 i ' iGroup Symbol N.P. 10 15 20 25 30 35 40 #of Drops1 100 p 1 Multipoint Method 0 One-point Method ❑ Wet Preparation 0 Dry Preparation 2 Air Dried ❑r Estimate the%Retained on the#40 Sieve: Notes/Deviations/References: ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) ASTMD 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils , Tom Schipporeit,P.E. '`eF4.0r....4`' "' � Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road NA-5 Bulk(I-5 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No.TR-D4318-T89-90 gm Revision Na 0 CC irm Revision Date:11/20/07 Liquid Limit,Plastic Limit, and Plastic Index ASTMD 4318 1] AASHTO T 89 ❑ AASHTO T 90 0 Quality Assurance S&ME, Inc. Raleigh,3201 Spring Forest Road,Rakigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/14- 11/16/11 Client Name: RS&H Client Address: Boring#: NA-11 Sample#:Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sarrip D -ii do : LiglIt Brown and Gicray Poorly Graded SAND with Silt ;,ti ll '1 Ttpc anti Specification S&:IIF_ID 1; Cal Date: I:ipe and Specification MAIL::ID 4 Cal Date; Balance (0.01 g) 1024 11/41201 I Grooving tool S-I 5/26./2011 LI..Apparatus 1084 8/10/201 Oven I454 10/28/2011 Pan II Liquid Limit Plastic Limit Tare#: 6 A Tare Weight 12.99 B Wet Soil Weight+A 27.38 C Dry Soil Weight+A 24.68 D Water Weight(B-C) 2.70 E Dry Soil Weight(C-A) 11.69 F %Moisture(D/E)*100 23.1% N #OF DROPS 6 I . I I ti lai�tru•c.('Clot".. .. :,curiae rl LL LL=F*FACTOR hi.•i T:tl l'2216 Ave 1 Average 1 One Point Liquid Limit N Factor N Factor 26.0 1 __ 20 0.974 26 1.005 a 25.0 : 21 0.979 27 1.009 a 24.0 - 22 0.985 28 1.014 U 23.0 : 23 0.99 29 1.018 cLa O 22.0 24 0.995 30 I 1.022 at 21.0 _ 25 1.000 20.0 `. NP,Non-Plastic e Liquid Limit 23 19.0 Plastic Limit 0 18.0 - Plastic Index N.P. 17.0 a I ' 1Group Symbol N.P. • 10 15 20 25 30 35 40 #of Drops 100 Multipoint Method 0 One-point Method ❑ Wet Preparation 0 Dry Preparation L] Air Dried 0 Estimate the%Retained on the#40 Sieve: Notes/Deviations/References: ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils Tom Schipporeit,P.E. '`'`*'--i`:1% `"' Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,INC. Corporate 3201 Spring Forest Road NA-Il Bulk(I-5 ft)Classification Raleigh,NC.27616 Page 1 of 1 Form No. TR-D4318-T89-90 anti- Revision No. 0 Liquid Limit,Plastic Limit, and Plastic Index • � C Revision Date: 11/20.'07 ASTMD 4318 ❑x AASHTO T 89 0 AASHTO T 90 ❑ Quality Assurance S&ME,Inc.Wilmington,3006 Hall Waters Drive.,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s) 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample#: 173 Type: Soil Boring Sample Date: 10/27/11 Location: Jacksonville,NC Sample:NA-17/S2 Depth(ft): 3.5'-5.0' Sample Description: Dark Brown Clayey SAND(SC)with Organics type and Specification S&ME ID k. ' Cal Date.: Type and Specification St'I4fE II)it Cal Cate: Balance (0.01 g) 4852 7/1/2011 Grooving tool 4940 7/11/2011 LL Apparatus 4884 7/11/2011 Grooving tool Oven 14603 9/28/2011 Grooving tool • Pan ft Liquid Limit Plastic Limit _ Tare#: 1 2 3 A Tare Weight 11.08 15 11.61 B Wet Soil Weight+A 19.45 19.25 20.35 C Dry Soil Weight+A 16.99 17.64 18.70 D Water Weight(B-C) 2.46 1.61 1.6:, E Dry Soil Weight(C-A) 5.91 6.99 7.09 F %Moisture(DIE)*100 41.6% 23.0% 23.3% N #OF DROPS 26 Moisture Contents determined LL LL=F*FACTOR 41.8% I I I I I by.4ST*iD 2216 Ave. 1 Average 41.8% 23.2% r N One Point Liquid Limit 65.0-- -_------•. • - N Factor N Factor 60.0 ; 20 0.974 26 1.005 a 55.0 : 21 0.979 27 1.009 2° 22 0.985 28 1.014 ° 50.0 ' 23 0.99 29 1.018 t. 45.0 24 0.995 30 1.022 q • 40.0 : 25 1.000 i 35.0 : NP, Non-Plastic 0 30.0 : Liquid Limit 42 Plastic Limit 23 25.0 Plastic Index 19 20.0 ' 1 Group Symbol CL 10 15 20 25 30 35 40 #of Drops 1 100 Multipoint Method ❑ 4 One-point Method (] Wet Preparation El Dry Preparation 0 Air Dried 0 Estimate the%Retained on the#40 Sieve: 26% Notes/Deviations/References: AST:b1 D 4318 Liquid Limit,Plastic Limit. &Plastic Index of:Soils Tom Schipporeit,P.E. -`"".."'yf£-•'�r1" Senior Engineer 11/16/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road 1061-11-016A Raleigh,NC.27616 Page 1 of 1 Form No. TR-D4318-T89-90 i Am. _ _ ::::: No. 0Liquid Limit,Plastic Limit, and Plastic IndexRI Date:11/20/07 ASTMD 4318 ❑X AASHTO T 89 0 AASHTO T 90 0 Quality Assurance S&ME,inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/14- 11/16/11 Client Name: RS&h Client Address: Boring#: NA-19 Sample#:Bulk Sample Date: 10/24/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Gray Silty SAND(SM) Type and Spec f ication S&"vIE ID 4 Cal Dale: 7 pe and Specification S&WE If)1# Cal Date: Balance (0.01 g) 1024 11/4/2011 Grooving tool S-1 5/26/2011 LL Apparatus 1084 8/10/2011 Oven 1454 10/28/2011 Pan it Liquid Limit Plastic Limit Tare#: 13 A Tare Weight 12.97 B Wet Soil Weight+A 28.65 C Dry Soil Weight+A 25.77 D Water Weight(B-C) 2.88 E Dry Soil Weight(C-A) 12.80 F %Moisture(D/E)*100 22.5% 1N - #O BOPS 5 i 1°1.+•rure C ont err+... i,•��r in cl LL LL=F*FACTOR I I I I by ASTM D 2216 Ave. 1 Average e N. One Point Liquid Limit 27.0--_.-._--/' «_ 4—. ...._._ N Factor N Factor 26.0 : - 20 0.974 26 1.005 a 25.0 ' 21 0.979 27 1.009 24.0 22 0.985 28 1.014 U 23.0 Z 23 0.99 29 1.018 22.0 co 24 0.995 30 1.022 25 1.000 0 21.0 zo.o ` NP, Non-Plastic Liquid Limit 23 19.0 ' Plastic Limit 0 18.0 d Plastic Index N.P. 17.0 F I 1Group Symbol N.P. 10 15 20 25 30 35 40 of Drops I 100 Multipoint Method 0 One-point Method ❑ Wet Preparation ❑ Dry Preparation El Air Dried 1] Estimate the%Retained on the#40 Sieve: Notes/Deviations/References: ASTM D 2487:Classification of Soils for Engineering Purposes(Unified Soil Classification System) ASTM D 4318:Liquid Limit,Plastic Limit,&Plastic Index of Soils Tom Schipporeit,P.E. .> ." "�"i'` Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road NA-19 Bulk(1-5 ft)Classification Raleigh,NC.27616 Page I of 1 Form No.TR-D4318-T89-90 Revision No. 0 *S611VIE Revision Date:11/20/07 Liquid Limit,Plastic Limit, and Plastic Index ASTMD 4318 0 AASHTO T 89 0 AASHTO T 90 ❑ Quality Assurance S&ME,Inc.Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s) 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample#: 173 Type: Soil Boring Sample Date: 10/26/1 i Location: Jacksonville,NC Sample:NB-2/S5 Depth(ft): 13.5'-15.0' Sample Description: Gray Silty, Clayey SAND(SC-SM) 71/Ie and.Speciific•ation S'&714E ID i. Cal Date: Type and Specification Stt.A47;11D it Cal Date: Balance (001 g) 4852 7/1/2011 Grooving tool 4940 7/11/2011 .LL Apparatus 4884 7/1.1/2011 Grooving tool Oven . 14603 9/28/2011 Grooving tool Pan S Liquid Limit Plastic Limit Tare# 4 5 6 A Tare Weight 11.35 10.72 11.23 B Wet Soil Weight+A 24.81 18.81 20.09 C Dry Soil Weight+A 22.48 17.77 18.98 D Water Weight(B-C) 2.33 1.04 1.11 E Dry Soil Weight(C-A) 11.13 7.05 7.75 F %Moisture(D/E)*100 20.9% 14.8% 14.3% N #OF DROPS 1 20 e nte LL LI.=F''FACTOR 20.4';.. I I I I Mnisttt br y ASco TMDents 2d 216termined Ave. 1 Average 20.4% 14.6% e- One Point Liquid Limit 65.0 r N Factor N Factor 60.0 1 20 0.974 26 1.005 t 55.0 MEIN 1 21 0.979 27 1.009 e 50.0 22 0.985 28 1.014 23 0.99 29 1.018 i 45.0 - 24 0.995 30 1.022 7 ,' 40.0 25 1.000 35.0 NP, Non-Plastic CI 30.0 Liquid Limit 20 Plastic Limit 15 25.0 ' Plastic index. 5 20.0 Group Symbol CL-ML 10 15 20 25 30 35 40 #of Drops' 100 P Multipoint Method ❑ One-point Method Wet Preparation e❑ Dry Preparation ❑ Air Dried ❑ Estimate the%Retained on the#401Sieve: 24% Notes/Deviations/References: AST,AI D 4318:Liquid Limit Plastic Limit, & Plastic Index of Soils Tom Schipporeit,P.E. ! '' `'- `'1}, Senior Engineer 11/16/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,INC.-Corporate 3201 Spring Forest Road 1061-11-016A(2) Raleigh,NC.27616 Page 1 of 1 Form No.TR-D4318-T89-90 Revision No. 0 Sad -.-.... • Revision Date:11/20/07 Liquid Limit, Plastic Limit, and Plastic Index ASTMD 4318 ❑x AASHTO T 89 0 AASHTO T 90 0 Quality Assurance S&ME,inc. Wilmington,3006 Hall Waters Drive,Suite 100,Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s) 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd.,Suite 260,Raleigh,NC 27615 Sample#: 173 Type: Soil Boring Sample Date: 10/26/11 Location: Jacksonville,NC Sample:NB-7/57 Depth(ft): 23.5'-25.0' Sample Description: Gray Clayey SAND(SC) twe and Spc iccitlnn S&Ad1:1!)J Ca!!kite: type and Specification S&ME ID n Ca!Date: 'Balance (0.01 g) 4852 7/1/2011 Grooving tool 4940 7/11/2011 LL Apparatus 4884 7/11/2011 Grooving tool Oven 14603 9/28/2011 Grooving tool Pan# Liquid Limit Plastic Limit Tare it- 1 2 3 A Tare Weight 11.09 10.65 11.61 B Wet Soil Weight+A 22.07 18.85 20.17 C Dry Soil Weight+A 19.52 17.95 19.25 D Water Weight(B-C) 2.55 0.90 0.92 E Dry Soil Weight(C-A) 8.43 7.30 7.64 F %Moisture(D/E)*100 30.2% 12.3% 12.0% N #OF DROPS 26 I Moisture Contents determined LL LL=F*FACTOR I 30.4% I I I I by4ST11D2216 Ave. Average 30.4% 12.2% C One Point Liquid Limit 65.0 ----- _ .n . N Factor N Factor 60.0 20 0.974 26 1.005 a 55.0 i-�==M Mi•�! ° 21 0.979 27 1.009 c 50.0 22 0.985 28 1.014 23 0.99 29 1.018 L., 45.0 • 24 0.995 30 1.022 40.0 __ 25 1.000 • i 35.0 r NP,Non-Plastic 30.0 • 1111 Liquid Limit 30 Plastic Limit 12 25.0 1 Plastic Index 18 20.0 I i Group Symbol CL 10 15 20 25 30 35 40 #of Drops' 100 Multipoint Method ❑ One-point Method 0 Wet Preparation 0 Dry Preparation ❑ Air Dried 0 Estimate the%Retained on the#40 Sieve: 27% Notes/Deviations/References: ASTA1 D 4318: Liquid Limit, Plastic Limit. &Plastic Index of Soils Tom Schipporeit,P.E. arm �l�r� 1 Senior Engineer 11/16/2011 Technical Responsibility Signature Position Date l This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,INC. Corporate 3201 Spring Forest Road 1061-11-016A(3) Raleigh,NC.27616 Page 1 of 1 Form No:TR-D2216-T265-2 Revision No. 0 SaME: ( Revision Date: 02/22/08 Laboratory Determination of Water Content -V NI ASTMD 2216 0 AASHTO T 265 ❑ Quality Assurance S&ME, Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016 Report Date: 3/16/11 Project Name: Albert Ellis Airport-New Terminal Test Date(s): 3/15-3/16/11 Client Name: RS&H Client Address: Sample by: S&ME,Inc. Sample Date(s): NA Sampling Method: Shelby Tube Drill Rig: NA Method: A(1%) 0 B(0.1°/a) (] Balance ID. 1024 Calibratron Date' 11/4/09 Sample Sample Tare Wt.+ Tare Wt.+ Water Percent Boring No. No. Depth Tare# Tare Weight Wet Wt Dry Wt Weight Moisture ft.or in grams grams grams grams °6 B-6A UD-1 18-20 ft. 6 79.97 220.66 177.99 42.67 43.5% B-6A UD-3 20-30 ft. 4 73.70 275.37 215.65 59.72 42.1% Notes/Deviations/References AASHTO T 265:Laboratory Determination of Moisture Content of Soils ASTM D 2216:Laboratory'Determination of Water(Moisture)Content of Soil and Rock by Mass Yogesh Chauhan _ NA Technician Name Signature Certifecation Type/No. ale Mal Krajan,ET Laboratory Manager 3-28-11 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road Moisture Table Raleigh,NC.27616 Page 1 of 1 Form No:TR-D2216-T265-2 Revision No. 0 S&IVIE t Revision Date: 02/22/08 Laboratory Determination of Water Content4 ASTMD 2216 0 AASHTO T 265 ❑ Quality Assurance S&ME,Inc.Wilmington,3006 Hall Waters Drive,Smite 100 Wilmington,NC 28405 Project#: 1061-11-016 Report Date: 3/16/11 Project Name: Ellis Airport-New Terminal Test Date(s): 3/15-3/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd.,Suite 260,Raleigh,NC 27615 Sample by: N/A Sample Date(s): 3/11/11 Sampling Method: Split Spoon Drill Rig: N/A Method: A(1%) ❑ B(al%0) El Balance ID. 04852 Calibration Date: 7/1/10 Sample Sample rare Wt.+ Tare Wt.+ Water Percent Boring No. No. Dept Tare# Tare Weight Wet Wt Dry Wt Weight Moisture ft.or m. grams grams grains grams % B-2 S1 1.0'-2.5' N/A 0.00 247.98 223.79 24.19 10.8% B-8 S5 13.5'-15.0' N/A 0.00 254.05 208.27 45.78 22.0% Notes/Deviations/References AASHTO T 265:Laboratory Determination of Moisture Content of Soils ASTM D 2216:Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass Tom Schiptoreit,P.E. Branch Manager 3-28-11 Technical Responsibility Signature Position Date This report shall not be reproduced except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016 Raleigh,NC.27616 Page 1 of2 Form No:TR-D2216-T265-2 Revision No. 0 teS&IVI E Revision Date:02/22/08 Laboratory Determination of Water Content ,,' ASTMD 2216 0 AASHTO T 265 ❑ Quality Assurance S&ME,Inc.Wilmington,3006 Hall Waters Drive,Suite 100 Wilmington,NC 28405 Project#: 1061-11-016A Report Date: 11/16/11 Project Name: Albert J.Ellis Airport Terminal Project Test Date(s): 11/14-11/16/11 Client Name: RS&H Client Address: 8601 Six Forks Rd., Suite 260,Raleigh,NC 27615 Sample by: S&ME Drillers Sample Date(s): 10/26-10/27/11 Sampling Method: Split Spoon Drill Rig: N/A Method: A(1%) ❑ B(0.1%) 0 Balance ID. 04852 Calibration Date' 7/1/11 Sample Sample Tare Wt.+ Tare Wt.+ Water Percent Boring No. No. Dept Tare# Tare Weight Wet Wt Dry Wt Weight Moisture ft.or m. gams grams grams grams % NA-17 S2 3.5'-5 0' N/A 0.00 83.87 61.47 22.40 36.4% NB-2 S5 13.5'-t.' I.!' N/A 0.00 90.70 74.67 16.03 21.5% NB-7 S7 23.5'-25.0' N/A 0.00 85.07 66.99 18.08 27.0% Notes/Deviations/References AASHTO T 265:Laboratory Determination of Moisture Content of Soils ASTM D 2216: laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass Tom Schipporeit,P.E. ,✓t , st+„ t,. A---/ Senior Engineer 11/l6/20i 1 Technical Responsibility signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. i S&ME,Inc.-Corporate 3201 Spring Forest Road 1061-11-016A moist Raleigh,NC.27616 Page 1 of 2 Form No:TR D2216 T265-2 Revision No. 0 ��ME Revision Date: 02/22/08 Laboratory Determination of Water Content -' ASTMD 2216 0 AASHTO T 265 0 Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/15/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s): 11/14- 11/15/11 Client Name: RS&H Client Address: Sample by: S&ME,Inc. Sample Date(s): Various Sampling Method: Site Borehole Drill Rig : N/A Method: A(i%) 0 B(o.1%) ❑ Balance ID. 1024 Calibration Date: 11/4/11 Sample Sample Tare•Wt.+ Tare Wt.+ Water Percent Boring No. No. Depth Tare# Tare Weight Wet Wt Dry Wt Weight Moisture ft.or m grams grams grams grams % NA-2 Bulk 1 -5 ft. 903 124.62 468.83 430.19 38.64 12.6% NA-5 Bulk 1 -5 ft. 909 126.64 418.58 374.49 44.09 17.8% NA-11 Bulk 1 -5 ft. 8004 122.88 402.78 370.81 31.97 12.9% NA-19 Bulk 1 -5 ft. 905 123.20 456.29 405.78 50.51 17.9% Notes I Deviations/References AASHTO T 265:Laboratory Determination of Moisture Content of Soils ASTM D 2216:Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass Mal Krajan,ET N/A Technician Name Signature Certification Type/No. Date Tom Schi oreit,P.E. r., 44 PP Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road Moisture Table Raleigh,NC.27616 Page 1 of 1 Form No.TR-D698-2 Revision No. :0 S& IVIE Revision Date:11/21/07 Moisture-Density Report Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 S&ME Project#: 1061-11-016A Report Date: 11/7/11 Project Name: Albert Ellis Airport Terminal Projcet Test Date(s): 11/4- 11/7/11 Client Name: RS&H Client Address: Boring#: NA-2 Sample#: Bulk Sample Date: 10/27/2011 Location: Site-Borehole Offset: N/A Depth: 1 -5 ft. Sample Description: Light Brown and Brown Silty SAND(SM) Maximum Dry Density 127.5 PCF. Optimum Moisture Content 8.8% .1.5TM 1)1.557 -.. Method A Moisture-Density Relations of Soil and Soil Aggregate Mixtures I Soil Properties 140.0 I \ Natural I I I I I Moisture 12.6% 2.650 100%Saturation Curve Content Assumed 135.0 \x Sp.ciTc 2.650 \ Gravity \ \ Liquid Limit 22 \ Plastic Limit 0 130.0 \ \ Plastic Index N.P. \ \ %Passing 25.0 A. 3/4" 100.0% Q \ 3/8" 100.0% A \\ #4 99.8% i \ #10 99.3% 120.0 1 \� #40 51.1% \ #60 29.6% \ #200 14.8% I \ 115.0 ' \ 1 ` \\ Oversize Fraction \ \ Bulk Gravity 110.0 i \• %Moisture 0.0 5.0 10.0 15.0 20.0 25.0 %Oversize Moisture Content(%)I MDD Opt.MC Moisture-Density Curve Displayed: Fine Fraction © Corrected for Oversize Fraction(ASTM D 4718) ❑ Sieve Size used to separate the Oversize Fraction: #4 Sieve © 3/8 inch Sieve 0 3/4 inch Sieve 0 Mechanical Rammer 0 Manual Rammer 0 Moist Preparation ® Dry Preparation 0 References/Comments/Deviations: ASTM D 422:Particle Size Analysis of Soils ASTM 0 2216:Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass ASTM D 1557:Laboratory Compaction Characteristics of Soil Using Modified Effort Tom Schipporeit.P.E. Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-2 Bulk(1-5 ft)Proctor Raleigh,NC.27616 Page 1 of 1 Form No.TR-D698-2 Revision No. :0 S&IViERevision Date:11/21/07Moisture-Density Report -r Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 S&ME Project#: 1061-11-016A Report Date: 11/7/11 Project Name: Albert Ellis Airport Terminal Projcet Test Date(s): 11/4- 11/7/11 Client Name: RS&H Client Address: Boring#: NA-5 Sample#: Bulk Sample Date: 10/27/2011 Location: Site-Borehole Offset: N/A Depth: 1 -5 ft. Sample Description: Light Brown and Brown Poorly Graded SAND with Silt(SP-SM) Maximum Dry Density 1.15.7 PCF. Optimum Moisture Content 12.8% ASTM DI557 -- ,Ifethod A ti Soil Properties Moisture-Density Relations of Soil and Soil-Aggregate Mixtures I 125.0 Natural I ° 2.650 100/o Saturation Moisture 17.8% Curve Content \ 4s.rumed 120.0 w Specific 2.650 \ Gravid' •\ Liquid Limit 21 ry � Plastic Limit 0 115.0 \ Plastic Index N.P. w 1 ‘ o \\ qb Passing '� 110.0 3/4" 100.0% A' e _ #4 98.9% . \ #10 97.6% 105.0 - \ #40 80.4% ' \\ #60 60.7% \ #200 8.6% 100.0 . \N • Oversize Fraction Bulk Gravity 95.0 , ' %Moisture 0.0 5,0 10.0 15.0 20.0 25.0 %Oversize I Moisture Content(%)I II MDD Opt.MC Moisture-Density Curve Displayed: Fine Fraction ® Corrected for Oversize Fraction(ASTM D 4718) 0 Sieve Size used to separate the Oversize Fraction: #4 Sieve © 3/8 inch Sieve 0 3/4 inch Sieve 0 Mechanical Rammer ❑ Manual Rammer © Moist Preparation ® Dry Preparation ❑ References 1 Coxunemr!Deviations: ASTM D 422:Particle Si/c Analysis of Soils ASTM D 2216:Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass ASTM D 1557:Laboratory Compaction Characteristics of Soil Using Modified Effort Tom Schipporeit,P.E. '`�`�¢' c``" Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-5 Bulk(1-5f)Proctor Raleigh,NC.27616 Page 1 of 1 Form No.TR-D698-2 Revision No. :0 S&ME Revision Date: 11/21/07 Moisture-Density Report .j' Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,.Raleigh,North Carolina 27616 S&ME Project#: 1061-11-016A Report Date: 11/7/11 Project Name: Albert Ellis Airport Terminal Projcet Test Date(s): 11/4- 11/7/11 Client Name: RS&H Client Address: Boring it: NA-11 Sample#: Bulk Sample Date: 10/27/2011 Location: Site-Borehole Offset: N/A Depth: 1 -5 ft. Sample Description: Light Brown and Gray Poorly Graded SAND with SILT(SP-SM) Maximum Dry Density 117.4 PCF. Optimum Moisture Content 11.9% ASTM DI557 -- Method A Moisture-Density Relations of Soil and Soil Aggregate Mixtures Soil Properties 130.0 I Natural I 1\ 1 I I I I I Moisture 12.9% 2.650 ,100%Saturation Curve Content A.$sutncd 125.0- �\ Specific 2.650 \ Gravity -- \ \ Liquid Limit 23 \ Plastic Limit 0 120.�r \ Plastic Index N.P. k \• - ,\ %Passing g 15.0 \ 3/4" 100.0% A' \ 3/8" 100.0% \ #4 99.8% A #10 99.0% I \ 110.0 \ ;.40 74.4% \ #60 54.6% \ #200 8.1% 105.0 ' \ \ Oversize Fraction 1 \ \ Bulk Gravity 100.0 , , \I %Moisture 0.0 5.0 10.0 15.0 20.0 25.0 %Oversize Moisture Content(%)I 1 MDD I Opt.MC Moisture-Density Curve Displayed: Fine Fraction © Corrected for Oversize Fraction(ASTM D 4718) 0 Sieve Size used to separate the Oversize Fraction: #4 Sieve 0 3/8 inch Sieve 0 3/4 inch Sieve 0 Mechanical Rammer ❑ Manual Rammer El Moist Preparation I] Dry Preparation 0 References/Coma nts/Devatiotts: ASIM 1)422:Particle Size Analysis of Soils ASTM D 2216:laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass ASTM D 1557:Laboratory Compaction Characteristics of Soil Using Modified Effort ( Tom Schipporeit.P.E. /i`�' Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval ofS&ME,Ina S&ME,Inc.-Corporate 3201 Spring Forest Road NA-11 Bulk(1-5 f)Proctor Raleigh,NC.27616 Page 1 of 1 Form No.TR-D698-2 Revision No. :0 S&IVIE Revision Date:11/21/07 Moisture-Density Report Quality Assurance S&ME,Inc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 S&ME Project#: 1061-11-016A Report Date: 11/7/11 Project Name: Albert Ellis Airport Terminal Projcet Test Date(s): 11/4-11/7/11 Client Name: RS&H Client Address: Boring#: NA-19 Sample#: Bulk Sample Date: 10/24/2011 Location: Site-Borehole Offset: N/A Depth: 1 -5 ft. Sample Description: Gray Silty SAND(SM) Maximum Dry Density 120.0 PCF. Optimum Moisture Content 11.9% AST 3t D 698 -- :3lethod A Moisture-Density Relations of Soil and Soil Aggregate Mixtures Soil Properties 130.0 Natural I I\ 1 11 I I I Moisture 17.9% 2.650 •100%Saturation Curve Content . Assumed 125.0 \\ Specific 2.650 \ Groviry N \ Liquid Limit 23 \ Plastic Limit 0 120.0 • , - - ‘‘t Plastic Index N.P. U ' \ %Passing 115.0 ' \ 3/4" 100.0% to ' `\ 3/8" 100.0% \ #4 100.0% \ 110.0 : #40 57.5% \ #60 32.4% ' \ \ #200 12.4% N 105.0 \ ' \ Oversize Fraction I \ ' \ Bulk Gravity \ 100.0 . \. %Moisture 0.0 • 5.0 10.0 15.0 20.0 25.0 %Oversize Moisture Content(%)I I MDD' I Opt MC Moisture-Density Curve Displayed: Fine Fraction (l Corrected for Oversize Fraction(ASTM D 4718) 0 Sieve Size used to separate the Oversize Fraction: #4 Sieve I 3/8 inch Sieve 0 3/4 inch Sieve 0 Mechanical Rammer 0 Manual Rammer ❑x Moist Preparation ® Dry Preparation 0 References/Cornmeal%/Deviations: ASTM D 422: Panicle Stzc Analysis of Soils ASTM I)2216:Laboratory Determination of Water(Moisture)Content of Soil and Rock by Mass ASTM[)698:Laboratory Compaction Characteristics of Soil Using Standard Effort Tom Schipporeit.P.E. ' `°'.'`44 Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full,without the written approval of S&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-19 Bulk(1-5 ft)Proctor Raleigh,NC.27616 Page 1 of 1 Form No. TR-D1833-T193-3 Revision No. 0 CBR(California Bearing Ratio) of Laboratory ftS&ME Revision Date:2/6/08 Compacted Soil ASTMD 1883 Quality Assurance Sc&ME,lnc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/13/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/4- 11/12/11 Client Name: RS&H Client Address: Boring#: NA-2 Sample#: Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Light Brown and Brown Silty SAND(SM) t.cTV 1)1557 5lethadA Maximum Dry Density: 127.5 PCF Optimum Moisture Content: 8.S% Compaction Test performed on the Fine Fraction only %Retained on the 3/4"sieve: 0.0% Uncorrected CBR Values Corrected CBR Values CBR at 0.1 in. 35.4 I CBR at 0.2 in. 53.3 CBR at 0.1 in. 60.6 ! CBR at 0.2 in. 58.3 1000.0 - i Corrected Value at.2" ninimminiii 900.0 800.0 - - 700.0 - , Corrected Value at.1" V) 600.0 - ig 500.0 rA 400.0 - WV I I 200.0 i �, I 1 0.0 - ® ♦ ® L. 0 0.00 0.10 0.20 0.30 Strain(inches)I 40 CBR Sample Preparation: 1'en formed on the fine fraction Grading was in accordance with the above method and compacted using the 6"diameter("BR mold. Before Soaking After Soaking Compactive Effort(Blows per Layer) 56 Final Dry Density(PCF) 125.0 Initial Dry Density(PCF) 125.6 Average Final Moisture Content 9.2% Moisture Content of the Compacted Specimen 8.7% Moisture Content(top 1"after soaking) 9.1% Percent Compaction 98.5% Percent Swell 0.0% Soak Time: 47-fir Surcharge Weight 20.0 Surcharge Wt.per sq Ft. 101.9 Liquid Limit 22 Plastic Index N.P. Notes/De$iations/keterenecs: Test specimen compacted to 98%at opt moisture. Tom Schipporeit,P.E. Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-2 Bulk(1-5 ft)CBR Raleigh,NC.27616 Page 1 of 1 Form No.TR-D1833-T193-3 _ _ MS Revision No. 0 CBR(California Bearing Ratio) of Laboratory S&1E Revision Date:2/6/08 Compacted Soil ASTMD 1883 Quality Assurance SAME,lnc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/13/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/4- 11/12/11 Client Name: RS&H Client Address: Boring#: NA-5 Sample#: Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Light Brown and Brown Poorly Graded SAND with Silt(SP-SM) ASl 4l 1)1557 Meihod s1 Maximum Dry Density: 115.7 PCF Optimum Moisture Content: 12.8'%% Compaction Test perfu;mcrl on the Finc Fraction only %Retained on the 3/4"sieve: 0.0% Uncorrected CBR Values Corrected CBR Values CBR at 0.1 ins-29.6 I CBR at 0.2 in. 40.8 CBR at 0.1 in. 36.1 I CBR at 0.2 in. 43.3 T- - --------- 800.0 - 700.0 - Corrected Value at.2" • / I 600.0 Corrected Value at.1"I ( r 500.0 I w 6 400.01 Ill f I 300.0 - I I I 200.0 I l I 100.0 - 1 s 0.0 ' 0 • • • L. -4 • C> L • o 0.00 0.10 0.20 0.30 Strain(inches)1 CBR Sample Preparation: Performed on the fine fraction Grading was in aco. ' !:'-m e method and compacted tecf using the 6"diamoter('1312 mold. Before Soaking After Soaking Compactive Effort(Blows per Layer) 56 Final Dry Density(PCF) 113.0 Initial Dry Density(PCF) 113.8 Average Final Moisture Content 13.2% Moisture Content of the Compacted Specimen 12.5% Moisture Content(top 1"after soaking) 13.9% Percent Compaction 98.4% Percent Swell 0.0% Soak Time: 97.5-11r Surcharge Weight 20.0 Surcharge Wt.per sq.Ft. 101.9 Llct:id Limit 21 Plastic Index NP_ Test specimen compacted to 98%at opt,moisture. Tom Schipporeit,P.E. Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced,except in full without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-5 Bulk(1-5 ft)CBR Raleigh,NC.27616 Page 1 of 1 Form No. TR-D1833-T193-3 Revision No. 0 CBR(California Bearing Ratio) of Laboratory #,S&ME Revision Date:2/6/08 Compacted Soil ASTMD 1883 Quality Assurance S&ME,lnc.Raleigh,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/13/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/4- 11/12/11 Client Name: • RS&H Client Address: Boring#: NA-11 Sample#: Bulk Sample Date: 10/27/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Light Brown and Gray Poorly Graded SAND with Silt(SP-SM) AS7rt/1)1557 :tlethad.1 Maximum Dry Density: 117.4 PCF Optimum Moisture Content: 11.9`71% Compaction Test performed on the Fine Fraction only %Retained on the 3/4"sieve: 0.0% Uncorrected CBR Values Corrected CBR Values CBR at 0.1 in. 8.3 I CBR at 0.2 in. 20.0 CBR at 0.1 in. 25.1 L CBR at 0.2 in. 32.3 600.0 I I I Corrected Value at.2"I :::: -- - I p,, [corrected Value at.1"1 300.0 -- - - F ("II 1 200.0 I NOV • 0.0 • •• •• • • •I o • L 0.00 0.10 0.20 0.30 Strain(inches)1 40 CBR Sample Preparation: Performed an the fine fraction Grading was in occw !he above meihnd and compact .r::R the 6"diameter CBR mold, Before Soaking After Soaking Compactive Effort(Blows per Layer) 56 Final Dry Density(PCF) 115.2 Initial Dry Density(PCF) 115.5 Average Final Moisture Content 12.8% _ Moisture Content of the Compacted Specimen 12.3% Moisture Content(top 1"after soaking) 13.1% Percent Compaction 98.4% Percent Swell -0.1% Soak Time: 97.25-hr Surcharge Weight Surcharge Wt.per.sq.Ft. 101.9 Liquid Limit 23 Plastic Index N.P. Notesil)evintions/ltci fences: Test specimen compacted to 98%at opt moisture. Tom Schipporeit,P.E. ,it '" Senior Engineer 11/17/2011 Technical Responsibility Signature Position Date This report shall not be reproduced except in full without the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-11 Bulk(1-5 ft)CBR Raleigh,NC.27616 Page 1 of 1 Form No.TR-D1833-T193-3 _Revision No. 0 CBR(California Bearing Ratio) of Laboratory simE� Revision Date:2/6/08 Compacted Soil i. ASTMD 1883 Quality Assurance S&ME,1nc.Raleigh.,3201 Spring Forest Road,Raleigh,North Carolina 27616 Project#: 1061-11-016A Report Date: 11/13/11 Project Name: Albert Ellis Airport Terminal Project Test Date(s) 11/4- 11/12/11 Client Name: RS&H Client Address: Boring#: NA-19 Sample#: Bulk Sample Date: 10/24/11 Location: Site-Borehole Offset: NA Depth(ft): 1 -5 ft. Sample Description: Gray Silty SAND(SM) AS TM I)698 Method.4 Maximum Dry Density: 12(3.0 PCF Optimum Moisttue Content: 1 t.9°/. Compactions 1,.,t herronned on the Fine Fraction only %Retained on the 3/4"sieve: 0.0% Uncorrected CBR Values Corrected CBR Values CBR at 0.1 in. 3.6 I CBR at 0.2 in. 7.3 CBR at 0.1 in. 16.8 I CBR at 0.2 in. 20..' r 600.0 500.0 11111111 400.0 in Corrected Value at.2" ■■■■■■ a d300� '=E Mi• � �tii �� �- sli..ttiE... t•t•t•t!t!tl----lltltl_ll_ �___ __ 200.0 Bones.Corrected Value at.1".RI IP7••- --'----- • IMltttt ----ltttttt�ltttIM =11- -r' •. il ----11--�! 100.0 ■■■■■■■■,,��M- �_ic'■�-'ZZIlaZINIQZZIEZ -llttiii n=lttttt�_ T .ter- s --ltttttt�--ltttttI-tom---ltttt�--- ----�- --rC---�1=111M1=al--- ------ 0.00 010 0.20 0.30 0.40 0.50 Strain(inches)1 N' CBR Sample Preparation: Performed on the fine fraction Grading u.ns in accordance with the erhove method and compacted using the 6"diameter CBR mold. Before Soaking After Soaking Compactive Effort(Blows per Layer) 45 Final Dry Density(PCF) 118.1 Initial Dry Density(PCF) 117.7 Average Final Moisture Content 12.2% Moisture Content of the Compacted Specimen 12.2% Moisture Content(top 1"after soaking) 12.2% Percent Compaction 98.1% Percent Swell -0.3% Soak Time: 97.75-hr Surcharge Weight -,o r., Surcharge Wt per sq Ft. 101.9 Licitid Lin± 23 Plastic Index N P. " e:i.1.)t'4ar oti a,se eo_eia:,c:es: Test specimen compacted to 98%at opt.moisture. Tom Schipporeit,P.E. f�`y6" f { � Senior Engineer l 1/17/20l l Technical Responsibility Signature Position Date This report shall not be reproduced,except in full eithout the written approval ofS&ME,Inc. S&ME,Inc.-Corporate 3201 Spring Forest Road NA-19 Bulk(1-5 ft)CBR Raleigh,NC.27616 Page 1 of 1 • Oedometer Settlement Tests Sample details • . Depth 18-20 ft. Sketctishowingspeciinen Description: Gray Fine Sandy Silty CLAY(CH) location in original Sample Type Undisturbed Height Ho(in) 0.992 Diameter D (in) 2,501 Weight Wo(gr) 143.58 B0lk Density p(PCF) 112.24 Particle Density ps 2.692 (measured) initial Conditions Settlement Channel 1001 Moisture Content w0% 43.5 Dry Density pd(PCF) 78.20 Voids Ratio e0 1.1482 Deg of Saturation S0% 100.0 Swelling Pressure Ss(TSF) 0.000 Final Conditions Moisture Content wf% 32.3 Dry Density pd(PCF) 92.80 Voids Ratio er 0.8101 Deg of Saturation Sf% 100.00 Settlement:(in) 0.156 Compression Index Cc 0.384 Notes: Test specimen taken from the middle portion of UD tube. ASTM D2435-96 Test name Consolidation Date of Test: 3-15-11 • It gm Site Reference: Elbert Ellis AP-New Terminal Sample: UD-1 Jobfile: E:\06111016.J06 Borehole: B-6A Operator. Checked: Approved: I _ Oedometer Settlement Tests 1.120 ■■■ii:::MI■■■ui111 1.■■01111 ■■■11111�r�\��III_■■■��111 1.042 _111■11111111 ■■■■EN 0.964 ■■■Mt INIM■ii1�1�■■■UI111 ■■■11N111=■■■1111111P®■■ N1 ■■■�1111�■■■11111=1■■uii111 ce 0.886 ■•■i1111_■■■■i111�■■■�1111 ■11111 ■■■iu111 M1■■u1111 > 0.808 _1111■■l1111ENMBR111_ M►7■E111 0.730 ■■■I1111�■■■■ III`:e■��Ill 99.0 95.0 91.0 m E • 87.0 m • 83.0 co• 79.0 0.380 E 0.310 a N a 0.240 E 0 U 0.170 - 0.100 0.030 ✓ 0.118 8 0.104 c 0 ✓• 0.090 w c O 0.075 0.061 0.047 0.100 1.000 10.000 Vertical Stress(TSF) ASTM D2435-96 Test name Consolidation Date of Test: 3-15-11 gmSite Reference: Elbert Ellis AP-New Terminal Sample: UD-1 Jobfile: E:106111016.JOB Borehole: B-6A Operator. Checked: Approved: Gedomeler Settlement Tests Sainple'details Depth 28-30 ft. 'Sketch showingspecimen Description.: Gray Fine Sandy Silty CLAY(CH) location In original Sample . Type Undisturbed Height Ho(in) 0:999 Diameter Do(in) 2.501 Weight Wo(gr) 141.39 BU)k Density p.(PCF) 10:9,75 ParticleDensity ps 2.695 L (measured) I Initial Conditions Settlement Channel 1942 Moisture Content wo% 42.1 Dry Density pd(PCF) 77.25 Voids Ratio eo 1.1769 Deg of Saturation So% 96.3 Swelling Pressure Ss(TSF) 0.000 Final Conditions I Moisture Content wf% 39.8 Dry Density pd(PCF) 84.69 Voids Ratio of 0.9856 Deg of Saturation Sf% 100.00 Settlement:(in) 0.088 Compression Index Cc 0.476 Notes: Test specimen taken from the middle portion of UD tube. ASTM D2435-96 Test name Consolidation Bate of lest: 3-15-11 MESite Reference: Elbert Ellis AP-New Terminal Sample: UD-3 Jobfile: E:106111016.JOB Borehole: B-6A Operator. Checked: !Approved: Oedometer Settlement Tests 1180 �111111■1 :: 1_w■■.iill ■■■.i111 ■■■.i111 r.:51111�.■■■i11I 1.120 _..■.i111 ■•1■.i1iL uuii111 �..■.nll�..■.i111� 1■■■.n11 0 1060 .■■.iil1�..■.nll��■■.i111 �..■■1111�■■■■ii11_...■.ill ce tom _..■.:.11—.■■■1111 1E1■■.1111 ■■■.1111`��■�1111 M\■.i111 > 0.940 ==:■it1i1 MI•u11111= ,1i•111 0.880 105.0 1.01.0 • 97.0 N E • 93.0 89.0 • 85.0 g 0.087 �1.1•■131111 ■■■.illl ..■■i111 �■■■.►111 ■■■.i111�■■■■1111 Z 0.075 1111.■.■.i111M■■■11111 .■nn • 0.063 ••■•ii11�.■■.1111�.■■.i111 22 �.■■.il l lIMM1■■■.1111�■■■■1111 ■■■.ii11WN1■■■.1111 ■■■.i111 • 0.050 .■.illy..■i1111�■■■.111 0.038 IM• �■ ■•ii11� ■■1111 ■■■.1111 ■.■.Illl�iBE■!IIII M%■.1111 0.026 ■■11111 ■■■hiI:!I■.■.1111 43 0.320 8 0.274 c 0 'a 0.228 h c U 0.182 0.136 0.090 0.100 1.000 10.000 Vertical Stress(TSF) ASTM D2435-96 Test name Consolidation Date of Test: 3-15-11 tssin Site Reference: Elbert Ellis AP-New Terminal Sample: UD-3 Jobfile: E:\06111016.JOB Borehole: B-6A Operator: Checked: Approved: a x 0 rainieatnar6 row wORLD 11 *VIM%Smith and was,hK. APPENDIX C SUPPLEMENT FORMS AND CALCULATIONS ELU S cr AIRPORT �l �� Project Name: Albert J.Ellis Airport Master Stormwater Design Prepared by: LMK Project Number: 203-1169-002 Checked by: JBD IMPROVING YOUR I5VRLO Task Description: SCS RUNOFF CURVE NUMBER Date: 6/31/2012 Revised by: LMK Revised Date: 7/12/2012 BASIN NAME/NO.: Cape Fear PRE-DEVELOPMENT(Existing) Land Hydrologic SCS Curve Area Covered AREA*CN Use Type Soil Group Number Value by CN Value Impervious N/A 98 55.84 5472.32 Open Space,Good Cond. B 61 398.28 24295.08 SUm5rea•CN= 29767.40 Total Area= 454.12 Composite CN Value= 65.5 POST-DEVELOPMENT(Proposed) Land Hydrologic SCS Curve Area Covered I AREA*CN Use Type Soil Group Number Value by CN Value imrtprviniis N/A AR S2_1R 6093.64 !Open Space,Good Cond.I B 61 391.83 123901.63 Sumarea•cN= 29995.27 Total Area= 454.01 Composite CN Value= 66.1 POST-DEVELOPMENT(Future) Land Hydrologic SCS Curve Area Covered AREA*CN Use Type Soil Group Number Value by CN Value Impervious N/A 98 91.65 8981.70 Open Space,Good Cond. B 61 362.36 22103.96 SumA,ea.CN= 31085.66 Total Area= 454.01 Composite CN Value= 68.5 roddrsh_pw/pw_user\dms38250\CN Calcs_No Land Acqulsitlon.xlsx-Cape Fear 7/12/2012 I Project Name: Albert J.Ellis Airport Master Stormwater Design Prepared by: LMK —� Project Number: 203-1169-002 Checked by: JBD IMPROVING YOUR WORLD Task Description: SCS RUNOFF CURVE NUMBER Date: 5/31/2012 Revised by: LMK Revised Date: 7/12/2012 BASIN NAME/NO.: White Oak PRE-DEVELOPMENT(Existing) Land Hydrologic SCS Curve Area Covered AREA*CN Use Type Soil Group Number Value by CN Value Impervious N/A 98 31.79 3115.42 Open Space,Good Cond. B 61 190.98 11649.78 SumArea•cN= 14765.20 Total Area= 222.77 Composite CN Value= 66.3 POST-DEVELOPMENT(Proposed) Land Hydrologic SCS Curve Area Covered Use Type Soil Group Number Value by CN Value AREA*CN Impervious NIA 98 30.99 3037.02 'Open Space,Good Cond. B 61 191.88 111704.68 SumArea.CN= 14741.70 Total Area= 222.87 Composite CN Value= 66.1 POST-DEVELOPMENT(Future) Land Hydrologic SCS Curve Area Covered AREA*CN Use Type Soil Group Number Value by CN Value Impervious N/A 98 37.76 3700.48 Open Space,Good Cond. B 61 185.11 11291.71 SumAre5.CN= 14992.19 Total Area= 222.87 Composite CN Value= 67.3 voddrsh_pw1pw_userldms382501CN Calcs_No Land Acquisition.xlsx-White Oak 7/12/2012 Project Name: Albert J.Ellis Airport Master Stormwater Design Prepared by: LMK Project Number: 203-1169-002 Checked by: JBD Task Description: SCS RUNOFF CURVE NUMBER Date: 5/31/2012 Revised by: LMK Revised Date: 7/12/2012� BASIN NAME/NO.: Airport PRE-DEVELOPMENT(Existing) Land I Hydrologic SCS Curve Area Covered AREA*CN Use Type Soil Group Number Value by CN Value Impervious N/A 98 87.62 8586.76 Open Space,Good Cond. B 61 589.26 35944.86 Sumarea•cN= 44531.62 Total Area= 676.88 Composite CN Value= 65.8 POST-DEVELOPMENT(Proposed) Land Hydrologic SCS Curve Area Covered Use Type Soil Group Number Value by CN Value AREA*CN Impervious N/A Q8 93.17 9130.66 Open Space,Good Cond.' B 61 I 583.71 135606.31 SumArea-cN= 44736.97 Total Area= 676.88 Composite CN Value= 66.1 POST-DEVELOPMENT(Future) Land Hydrologic SCS Curve Area Covered AREA*CN Use Type Soil Group Number Value by CN Value Impervious N/A 98 129.40 12681.20 Open Space,Good Cond. B 61 547.48 33396.28 SumAre cN= 46077.48 Total Area= 676.88 Composite CN Value= 68.1 vork\rsh pw\pw_user\dms38250\CN Calcs_No Land Acquisition.xlsx-Airport 7/12/2012 CD )74 IINPROVI r NG YOUR WORLD APPENDIX D OPERATION AND MAINTENANCE PLAN ELLIS rr OAJ AIRPORT a 13 -c CD M m IMPROVING YOUR WORLD Ragnolda,Smith and Mille.Int. APPENDIX E MEETING MINUTES FROM J U N E 11 , 2012 r, ELLIS ow rvv OA-I AIRPORT fisH IMPROVING YOUR WORLD MEETING NOTES Reynolds,Smith end Hills,Inc. Copies To: Participants, File Date: June 13, 2012 Project: Albert J. Ellis Airport Stormwater Permit NE No.: 203-1169-002 Meeting Place: NCDENR—Wilmington, NC Office 1:30 p.m. Meeting Date: June 11,2012 Participants: Christopher White, OAJ Airport Director Linda Lewis, NCDENR Janet Russell, NCDENR Mike Randall, NCDENR Tom Slater, RS&H Justin Dewey, RS&H Michael Blackmore, RS&H Subject: Albert J. Ellis Airport Stormwater Permit—2nd Meeting The following represent a general summary of the topics discussed and subsequent action items. Please review and advise the writer of any changes within 5 days of receipt. Introduction 1) The meeting opened with introductions from all present; Mr. Slater then gave a brief overview of the Albert J. Ellis Airport Redevelopment Program and history of the comprehensive stormwater activities undertaken by RS&H since the 1st meeting with NCDENR. 2) Mr. Dewey presented a review of the existing stormwater conditions, conveyances and control devices for both the airfield and landside areas. Mr. Dewey then presented a general discussion which compared the existing stormwater conditions to those currently proposed for the 2012- 2016 OAJ development program. These stormwater improvements included use of sheet flow runoff coupled with a series of infiltration swales to disconnect surface areas that will increase the time of concentration and reduce the total site discharge. 3) NCDENR requested RS&H to prepare a conceptual plan showing the eventual reconfiguration of the OAJ public parking area that is bounded by the terminal loop roadway. Currently some of the surface runoff from the existing parking lots is collected in storm inlets that are piped to the enclosed stormwater system. RS&H stated its goal to limit and/or reduce this direct conveyance to the stomiwater system. 4) Another discussion item was the roof drain collection system. Both Mr. Slater and Mr. Dewey explained the National Fire Code requirement for the terminal roof drains to be discharged to an area or system that is not susceptible to vapor transmission caused by an accidental fuel spill. Mr. Blackmore noted he had looked at four different locations to connect the terminal roof drains to the landside stormwater conveyance system, but owing to the length and slope required, discharge to the landside stormwater system was not viable. Mrs. Lewis inquired whether a cistern between the building and the piped conveyance was a viable solution. RS&H will explore the potential for capturing untreated stormwater runoff as a source for the planned irrigation system. 5) Mr. Randall asked a series of questions related to the identified remote "blue line stream"; surface runoff from the proposed aircraft parking apron and stormwater collection area smith of the parking apron. RS&H noted that the referenced "blue line stream" was discovered and designated by the Corps of Engineers during the validation of a recent wetland survey. None of the identified stream is currently located on airport property. RS&H also noted that the entire planned aircraft parking apron stormwater runoff will sheet flow into the infiltration and collection basin south of the terminal building. This basin area requires an outfall control structure that can 1 RS IMPROVING YOUR WORLD MEETING NOTES Reynolds,Smith and Hills,Inc. be closed to isolate an inadvertent fuel spill. This basin provides more that the required infiltration capacity for the apron runoff as well as storage for any potential spill. 6) RS&H pledged to submit the requested additional information along with the application for the Phase I program that includes construction of the terminal building, adjoining aircraft parking apron and taxiways and landside loop roadways. Mrs. Lewis expressed concern about entertaining an express permit for the stormwater master plan and Phase I permit siting the comprehensive nature of the permit request coupled with the newness of the yet-to-be-officially adopted BMP's specific to NC airports. Mr. Randall noted that the General Assembly is slated to review and adopt the new stormwater rules during the upcoming legislative session; however, mentioned that NCDENR was committed to writing a low density permit providing the Airport meets the spirit of the new and remaining regulations. Mr. Slater noted that the timetable for beginning construction of the terminal (July 2012) and the grant funding already provided by the FAA—requires that airport and Onslow County to move ahead with the permitting within the next couple of months. Delay in receiving the permit will add further complications with Onslow County's construction management firm and jeopardize the pricing of the terminal program. Mr. Randall acknowledged the importance of receiving the permit and offered assistance to the Wilmington staff in writing the permit. 7) Given that the review and approval of the stormwater master plan might not be received until September [based on the timely receipt of the application from RS&H], Mr. Slater asked if NCDENR would entertain a modification to an existing permit to allow the County to initiate two initial contracts for the replacement T-Hangar facility and the new terminal building. Mrs. Lewis and Mr. Randall were amenable to the permit modification provided that the capacity of the existing stormwater controls(detention and sand filters)was sized to accommodate the permitted area and that the adjacent stormwater conveyances were initially routed to these stormwater controls. Mr. Slater agreed that this interim solution was the direction in which the airport should proceed. Mrs. Lewis then outlined the necessary documentation to modify the existing permit to Mr. Dewey and Mr. Blackmore and set a tentative date/time of June 21, 2012 at 3:00 pm to review the express permit modification application. Action Items 1) The RS&H Team is to develop a conceptual plan for the public parking lot redevelopment illustrating the envisioned application of stormwater BMP's consistent what is being adopted elsewhere in the terminal area. 2) RS&H shall add a notation to the stormwater master plan stating that the proposed land acquisition acreage shown on the master plan is not included in the low density permit. 3) RS&H shall analyze other BMP options for the terminal roof drains that meet the requirements of the NFPA Code and FAA criteria. 4) RS&H will initiate an Express Permit for the modification of the high density permit that LPA filed for the 2 sandfilters in order to get a permit to receive local building permits and initiate contract awards for the first to enabling projects. The Express Permit will be presented on 6/21/2012 at 3:00 pm at the Wilmington NC NCDENR Office by Mr. Blackmore. Mr. White will need to provide a$2,000 application fee and sign and notarize the application. Meeting adjourned at 15:30 Reynolds, Smith and Hills, Inc. 8601 Six Forks Road.,Suite 260 Raleigh,North Carolina 27615 PH 919.846.6701 Fax 919.573.9339 By:Tom Slater, PE, RS&H Aviation Manager—Mid-Atlantic 2 a -0 CD M a x 11 IMPROVING YOUR WORLD Raynolda,Smith and HIS.,Ina APPENDIX F TERMINAL ROOF PLANS ELLIS g. AIRPORT PLUMBING GENERAL NOTES: PLUMBING FIXTURE AND EQUIPMENT SCHEDULE PLUMBING LEGEND Mgt 1. DE DNLHCOR SINE FED VERIFY ALL EWE MD PROPOSED WLOODE Nxt UTIJOE3,PPE DES.LOWED.INTERNS,ETC,BEFORE 811.SEWN MEN R WIER l9 NAMOIS NO=LUCE NNW 95 KDEER K-43116,0 Dom,M EgD WILL MONIED SPOT AD WEER CLOSET NH CON:DIED UP ROR SRO: ADAMIND 15 TO ADM MICR TO ACTUAL FED COMM AT NO MOI1IRx.COST 10 THE OVER OE LER 11-/670t SCAN 16090 04N FINK SEAL'LEH SEEF SUDOON SEEM STEEL OEM HOD SLOW EMDEN =MEI IMPROVING YOUR WORLD 1111-3 1x RIBA ME VW Tr BACK SPIN COURIN4 TOO VOL BEMS,SOD 1040 N{SUPPORT II COW NO 2. THE O NEICIOR WEL GEORYO7!THE P1EW10 SE1EIWB INSMDATNE6 Ell NOUN OF STNETUID INAD,ELECTRICAL.CSEADD FOOD SOWN EpIPYENE AND RELIED TRY.EC,10 PRECLUDE NEEN7DFNCE77P 1 RTRSEET R LAIR ELQSRRD OONSIRRTON,OPALS,cams.FLOORS.ROOFS,ETC,A70 DAFOv MOWED m YATR E7NTNG EEITRIROEIG OONSIRIICINtI ALO FLNt9E5.WEDS o9ERr�POOLED. EON TRW PRIER EPEE FOR TEO p1 1154 1 010(WERE RENEW llS 11 04 ).P21-ARON SPAT PRIER NN S WOE ORVi10 PND(RAM MASS) ELAN TOP OLY ACHE NOOONT palm OF OE N T RENEW NH RODS TN PRONE MH/YIN vERnrx/IIOIODIOL WISE WIRER OM NENcC.ENE SO DDT 10P OF ME B 15'K.COLD Y WASTE CRIME RAPID(MJN-10YW MPSO:J RS&H 4. EQUIPMENT NE YRERV&EN,SPECIE OR MEWLED CR/KMD ON 11E AWACS.RE111S DEEMED AAE MIS DA MMA O NIXED CA DIE WOOER EPEROEE OM Elf COFLICTNC SPENRCEDWM ARCHITECTS-ENGINEERS- W 08 ND/OR RDDEIIFM9 E DEW 15 RAIAEEC MOWN LMIEWN&EWES.ES.DM DEWS ITRWS SPEWED,LEWD IT=S R3IESENTED SOROMALLY ON ME DROVES AND IDENTIFIED II 11E ------- V SNORT OR WASTE CANINE YOf PPPS LOE70 OLSCIYSIOrE IN ABa*'1911 E DESCRIPTIONS. Jdz ROWERK138&ADA-MflWN'FENCED,MEOW WAIL 1F11NIE°SP'D"'ET DER MEW EH MIMED PLANNERS,INC. 6 MET FLOW a TE9P ATURE m SPECFED FLINT R IMPEIATRE FOR AL FORCES PER CDDSE S R SLOW 11�MT F(1061 W6�E DNTH Ur LICK SEE COURSE, WL 061P10 RING�PPE SUPPORT d,FI NC200 ( AEFa RWRN "ADM SENSOR/YELERRO FAUCET'm OPERATE FOR Is SECONDS AND YAIBEN YED ION OLY 109E MID 8801 SIX Folks Road, WEER TEYPERMAE m E 110'FMRNEIT R SERE'SENSOR/MC LEVET EXCEPT NEW MO FOOD SERVE FNNEIS. DE N_ Raleigh,NC 27815 _ /ID DOE TRAP PIIIEIR TIP FOR WIPED RUSH VALVES DEWED).PROW STOW Ni-21-A TAP REM=OATH FEDOR MOB FROM 6 96TAU.ILL PIIIINQD 0761N3,THE ACCESSORIES MD WATFD RBS N A®IDWCE NTH TIE YNIFACTU E7S MRC01 PSRDICDOS ND REm1tl0WONS ND Al MAN ON NE PUREED DLNx6 SW/OIMADRE.%TERCEL/INRD0RAL CI�T F ND ELBOW TIP ONLY WHERE DEEM�.www POT mum).Nano THAT TOP O�'L Af Q or KNEW 6RDSE WM=PSI PRE PHONE 91&846.6701 FAX 919.846.9080 MR RICE S SC ECM OVATE MG(PROD) row,roan dh.com 7. NIA(VENT TEA R00k VENT PPC PENNRAING ROOF SHILL E STEM AN 110-110-10D OROMED SILL VAFOLL-PROF NOW OWE 111E MI 10'SEERESS LEAD RA91RO MRT 5'1A11 NE STEEL =TOURED NOT.CORONER 06OMED OUST IRON COUNIERRASEINC&VMOEL FLASH 1OCD RIO WEAL-PROOF SCREE.R10NDE DRY mW9UM TO SAL MNOM SPACE OF COOTFARA9IRO.PRIME SPEC6S MO ITCHIER K-49311-1,TIROS O A MALL WEED SPINAL AT URYL NE 0(•WOE 0ID SLOW((11111-11O L0D 1.1 DERMA STAR CAME PRNC(SED7I064 TYPE ASELELY FOR MIME OF ROOF PENETRANT. 1R S0NONC STAY REAL R00F S ITOS PROVIDE WELD ARNI MY AS ROTA)HERD HERE.NNWFAC111TD SPECIFICALLY FOR SMANDND SEAM EOTAL ROOF FLAT WE M71H 1f 110(SPUD GROAN..AUNT SO AN LP OF DNA 6 A MAUR O 24'IF.PRONE NH SYSISA 911E 0137 FLORA NNR LONE CORER.NOR NNE 9 0 NeuRN.GE DERWI N PRO 47 �,. 6 011010 L MIMES N 111E H 000611.PINE OF&IN OW.52,AP AD SSD pa DAME)RPM SAME SHALL NOT WE 0:14REER BENDS,SORT SWEEP OWNER BENDS OR SHORT SHEEP EWER HEM LED KMKER K-SIC-7.AM mLR1N1.MEOW MR WALL EOM SPOON.ET LAW Ell DE'BADE SR14 SOON 1�J. ND WALL NOT WED 4V UNLESS M 1Rffi CO ER S PROVIDED.AS PPNC Y REVILED AND mDON1TED EH ALL BNIDNG EMOTE IN TIE FEIS PINE ECS OR l�s Fop 101120m1 Rooms R BRANCHES 0+111 1N NSI VOW MO R•BOO SPUD COMM ROM SO THAT UP E UMLV.Y A WEED OF 17'FF. CN COYEEC COO WATER RPM E 11 f�+"'RPOIIT OF ALL RMNCE RflNC MIFFS WON YRE WATT HE OFFSET 0T DADE 0 ERECTION EVERY 40 FEET(001910Y SPAM FOR MOVIE WEER)OF DYD.OPE0 LENGTH Cl DROWN IW01B. PP01OE 111H SE M CB37 FLEE YOMT IRIPL 10 DOER ME _ -- 111 004LESOO HOT VIER RIM(1 AS F) • 9. UR R 1E R1JS91C ARAM REFER m AR7IECRSAL DRAMAS FOR DIMOSE ML LAYOUTS MO EXACT LOCATIONS OF RO WE EWES.Rom EWE FLOOR 9N6.ROOF OWNS.DIFRCF 1=ROOF DRAINS, LE ROI1ET/K-2215 ADA COYRNNT,UNOM IMIFR EM ORY NW 3 NOB.PROVE NEAOV1 STAMM/7O8 00YD0POUT NOZE9,ADA DANA ETC. HERE D1NA=APE NOT GIVEN COTERIE WARE RESIEN,WI110D MOO SRT EWE,Em,SELL E N m1IXMMCE NH THE FEDERAL AD&NORTH CARIIIN7 LAMIORY TRAIOSTATN IAA PEEVE ON GPM AERATOR,MINI EP-460A 11('CANE PLATED DIA44 RNA NAAR -- -140- 141 HN CNYE9L HOT WEER ARE(1/C F) 0WDY0 ONE MD RMH OWES PRAYED DOOR 2010 EDAM - VAN BEE CHTE CIE RiBtl148�0{'E PW 2NH SEWERS MG(2)STIR CNRN E 15 IO14 WED'HC1-620. 10. ROE COLLECTOR SHALL PAY IL REQUIRED MAZER GAS MIL SNNRT PRAM TOPS(EERY CONECTONS),METER&CRLSSmRECm1S(fl4GOLO/pRera 1 S)PETER iLEPECION NO TEST FEES AND ODER 1ENN R T 090 AI RIM,DEWED RAW SPRY NLVS(2)M TH ROSE EY CPFRAR,HOW CO,3*DST ADS TER BERM ICIB EC11CllO10'E PING(ItW FEES/S NAY E REARED R THE LOCAL AMAIN ALND.ARDIOUL 12PPI1.LEAN BRAS RAE MIME SET BAN MD A'COS 011001E RATED AI1DVD TUN OFTEN RSEPS(CT TO 14P- 14P AR COYESIIC ET LATER FEENDJW9R PANG(IC F) 11. PRATE CAS RCN EEP BEANO NAPSMAFICAERNS NO FLOOR SACS E841NIE4S WIENER PPID AMYL ISPVC R CAST ONE. ACIWWII ET COMMIT PER WNDRCTRERS REUSED OMR. ABLEST FAUCET m OPERATE FOR 15 SNIDE UNW �,4.AI 1E 09010 CAST INN CIEWDIIT TEES FOR RFA NE CAST 1EON TDOR a MI 91CLOPD 019010UT BOLA.PIRA NO FAROS DOMED m PING ERYID. COLCRN C.C 11 1 CRmNrtR COP!m E SELE110 N ME MEET EEG OONCLE N E EOF AL AYAIARE NCI!$m9w HAMERr axDE ti11TE'.16OLL EPODES WHOLE TIN RAE FOR SHOE FOE NSLIATON.SOME % ME O 1 PANG,EO DAEM,En:,1O RSA(DAMN SE L ILL 5, 5ND1V PIPNC ID 11 OW l SLOW UF-E07-A 4'T II PUCE FOR COUNTERTOPS NN 4'CER ET HOES PRONE STOW ET-6aB-A B'TR0 (-Fad r xs (S1MIF3111#YNE3.LASE SALE OSITFRH9 AS NEW SSISF IL 5,v,v,SD.Fes,p',HA Ot HTR) 1a SARAN R WASTE MIMES IN WEL SEEMS 1AMOO ES.NNW.WIRES.RWDSNS AND SDIM FRWES SWEL E COPPER WV TEE AND AMR. EYES,1EE4.DOSSES MD 00W6TOV Et MD)1 BE/CIS RAZE FOR COUNTERTOPS NTH 9'CENIE SE INC. • __ FEN K TONE 000 MEC CO PAD14140 EpPMEM,ETC. REIYvE I'NEW M. 4f PPR) AT 0641.4 O R EWE S=WILL E PREMED 1NTT W041E WI MOWS N W41,Ill OF WNW SELL NOT PEE706E FACE OF WALED; PRONE ELMS N DLL OF MASIE NW m ENSURE SICK ME (STSTII T7E VAIY.S,UM SUE WEBS AS N 513IESq LE:S.N.V.STD,E91,CY.MT at RIP) mNCWEMM. PPRROVE S N KOHLER N SOBS SIT-27-01 ADA WM POIEED 4 0 FAUCET.6110 ProRRS IC I W'NRf ID' BOL Y,1Yq TNEF RDf,RnL 1Rr,s Al AA MN ASS-SP-,a MI Bre NOEL NAMED NfH WEN ALBEIT J. ELLIS 14 AU.MARC WORK SAIL E II ACCOR0IOE 1119 TIE NORTH GROOM NADIR PARSING a 110310 ICU GOES(2010 EWES OW LATEST R ES18)MD NBA 101 APE WEE CODE(1904 EDIINR). ALL immune EEC 19LL1P 55 RI1 MEAEER SOW ER-0446 If CANE RATED EMA 9O STEM WTI UPSET p1 21 ODE VASE;LR1R BENET,101-RSIE SEµ MDT SS SW FRIG AN)DREW DK5 AIRPORT CONR ANE TONE ANDS NT,090410IC MAMA SPOUT YAM&E1C.SELL E N CORRODE NM THE WERE AD AND TE NORH GWEN WORE AND PWINRO CODES(2 0 1 0 0 0101E NH LATEST TAPED;SEEN EF-52Y AG DEFOR 1D VOICED Will.WMTOR ENCLOSURE ROPE RARE PM 2125 SEISES REMIND). PE-INNER 1D'ORAL 9NO AN IOW 1211 MD.ERNE RID CAT ERGS Off TRAP NTH CEACIT '�, WOE RICHLANDS, NC NO(2)SUPPLY CONY ND(2)WINIHf-FWN1-RED TEAM ml,POWER CHIDE RAW SPRY VANES(2) (Bf,LOCI)LOCATED N MITER.RBFR PRCEE WE ME NO______TIN I ITN ASS. 16 ALL REEVE NxT SILL E DULLED N A PROFESSION,EX ND NNCIRI ICE NAEERR FOR COWER=OM1INUCROR (MILL INS EEY 90100,NEW CD.3'CAE BROS WALE.ENN BRCS RACE NH ST SCE AO 20'LONG OEE RAID MAD TARE OFFSET RISERS(CUT TO LOON E 07111VWT0 PER Y 1017401VERS LAMA D911. a SE CAS BRACE TREED CA01T BMANCE WEE(ABM MEMORY BNP a WM 1E4 0.1/-12 CM IL ALL EXECIOS 10 ROE RERSPD WWI(SHALL E R 00002 N EIL N THE/S-BUILT OSYINGS AS PETERED PER TIE PROJECT BERG TRS IN THE PROJECT WALL ALL FAD 0AIRGA RS TO THE MUST FAUCET 10(PERM FOR 15 SENNS WON Ocilmnot PRATE MN SPN 0700(0)FROM Tiff 0NCFNED SEER ELL METE M EIMEEER'S APPROVAL LETTER ME SALE MIS uvlD1. EWER LE -DOUBLE R4'THE RA0 101 INSTALL ENDS NTIOUE WI RATE. ME WE 'Fr g IMOEIzaTO 9NIO aEE(POE EH n1EADD 0Dfi 115-S-Bp,OWN WI0iT5 pECTNN 0 TON 17. IL PELME MAR E,EVD HFASS,FIERES,11YA,PPE,ELVES WE E MADE N TIE USA(OOBSIC REYf,FOR 001E w1E1NS ND ASSSELL RRBSEC INERT WU.E FRONDED R OE SE OF EEW90-4 TROT P 8101 E1F-8W-A 4' H PRE FOR HOLE El wnl 4'MEET HOTS.PINE saw NEW TERMINAL MECO W L ERNE&061E 1M6q SEC;POEM NO CREW BILANG=VANS FRONE DIELECTRIC LIMON R TEE ESTER SE OF RID R SOLDERED ALVFS.DIELECTRIC OmWS ARE NOT E EOU ED N EIP ER-BOB-A B'TALI PANE FOR INGTORE4 EH F MERE HOE& FJ gpy DOWER SERVE NT{My4AL SILT-CIE aLWy�a NO EXELDxR18 ND ADIPIFR9 TO AMER FLORA TEE PEEL 0004.FULL PRL BILL WLYE. CUM FM T9C-0O14 IDAL P DEEP PREEN 7ERWD ACPDm BEE BON NH O ME MA OWµ S CMS D NL ��_ III OI1fCIEC UPON II ALL PPM BELOW FLOOR MD ELEM GRADE SHALL E MAILED WE 4.5 IR FOL EIEmM1E U1OFR WOULD WANING ND EN 111041 N TOPE WELD)A W00Y OF B'/ENE TO OF EWE FOR RING EBEL STOPS.SCULL Ili,YW-5424 S NNL WE E N ELL FLEE,PAL ROOK N CONTACT NN 8154}TNT&70-M ONE MAEND TED SANE HOSE NT1 DEEPER DWI 3Y DELON FEDORA/GRACE PRCWE MEWS WEE OD IDEx1IFIEON EPEE)AT 24'DEPTH 9TSAVls MONO ENDS H0110 ff PAWL NEE PIING ROTS m eeEE GEM R FLOOR SECURELY M OBCER FIT -A(O E CORN=WI-A)DONEEWSWAMI RR 1 HOSE TIDOS WBN11E RI! SS 9322 STROM AND m 1N WE WIER/NESTS(LETTER x0WE3 RI WPC) CONSULTANTS MINAS TAPE MD PRCACE STORMED PHENOLIC NE EPIATEs PENDENTLY SECURED MGM TO PEEIMTR.NUMMI TEXT SHALL IENIFY PRE/ER1E,VE111 MD WERE PEND EXECS T0. 1231-0 AMER 0TAFRDYN RICE EH VIE.NERM1 FRO 10-0C 2413'SS 3-BCITIR MOP EPODES PRATE 10. REEL CAS IRON PHNC IN REAEEI AR RENLE RAMC PPRS SAL MOT E INSTALLED N RETURN AR PLENUMS. MO SERI 721E 3'COT DON CEP SAL TRW a ON 09)-391 WICK EON DYIECIR FR PERM WEER CAST \-1 ELEN.RE NEW 20. WERE VOWS ARE NSNTIED ABOVE CELT=SOME YOML ENTFIGTON AT EIINC RD ACCESS OR I A6ESS PANELS NSTFD171R SIWL EWE FROM BEAN D 6 IS II M WIICO ROR R-1--- RNO. 9ORON 10 REI ERN.RN Mal(451 IOSIIHGTON N'OUEIEli3 SPARED IN 1E PIOIED WEL RENEE DE(FOR ICES PANELS SBFDODII SE/DEDUCE 1HS SHEET)R HERO(WSW WARD R PLASTER)DENIER m ACCESS AND YEEMN Et MAY TKNDR OM.-I SR-0 91-DYER,AEI.ENID DECIRC NAME NOSH YRRFR-TEFL AG 1W1VT. WLVEs WOWED wTERN R"Y W RRR B II AO FEEDER EY AND/RO SECID1 IL WEER L�E ME WERE IHN�K NC1EARNED�MT MEI Mt MR M ELBOµ IOBBC COMER) 21. ILL RPM ERECT m TITTLE 6 EDUED m E PROEM NH A EOM R-40 E61l41OR OO1E RIFE SUPPLY WE NIII LEE Er OPER11E,HEM'cif,Y GIST MS ERE.TERN RAS RIME WATER HAMMER ARRESTER SCHEDULE W01 ET OMR ND 20'HMO 0110E RATED ARMEED THE OFFSET REED(art m UD EN D mRRCTR POE EMIT 7INNIE=WO IDEFACRAO6 REBB 060E MD(2)TO'CET RE TRW EH CDAWT ATE SEY10E TEPECE STEC ED WE P.EL RATING ROOF URS OPACITY EERY PANE SE PCITAFL6 N0.NEB FMN7 EH LUCK 010X MEM SOY.PRONE EH MAIN AND REPO REIS,WWII MOOT OF 95 OH 0 57 0 EMV01 TEE OUT GF TO 0 PRE ACCEPTABLE MANUFACTURERS OF EQUIVALENT PRODUCTS A 1-11 3/4' 5005 1L3 F MA AN A A AEON1EY481TIEE APOF1LQ ELi MCA) DE SCHEME TWOS PECDOKE WHEN CONEINC EH SPED:ZEN SWIM 15414 15433.15440 NE 1500. a Is-Ss t1 2910 I�5 .-. OWICI TEE OUT OF BORaI OF fRC C 33-10 1' 5021/ 1,2.3 EST IWSEY CRC,OE-0 ER-4 MALL WNID BMW WEED COOLER BPRER-FIE,AM OWLET,CARTED TO ERR 4 YI EN FRL 1FA0 FEEL OC FRL WILL YxNE0 ElJL11Y:RIVER CIDER WTH wIFR:0TR' O m CORPSES E ETxYOFA6,181 G ERYIEL GA FR MEdA OF MEMO MOUES NT pE 1I O -113 1' 5621 I..22� a DM RDN 8NN74 PINAE NN MOW ,3'caIL7-ICl-RR IOWY RI,S MI 0 I F. waNd Ta nrt rc ar s MOM OF SE FROND METED W AR 1 M E11 GROUP M KO g E 114-1N 1' 5050 1,P� TOED SUPPLY WEE NH WEE KEY MIMED D,REM!DP,3'CRP T1TO ECM ENE'RC FI110E MI ET MAME WE RN HEM �VIEWS YER ECM NO RM FNTAIES WTFR F 153-330 1' 5050 1..4L�S SOON MD M'ION CRIOE RAID NPFAD WE OFFSET PFLEA(5R TO ECM 0'MERCER PER FIIRI V,YEs 901Y1 INN. MOW NTR NWIFICIOEI6 RESIB GqT MO Ur 0191 ERRS 100 WI CF/11DUT ND SDI-CAST TNIPIECE.LID MD I/L'IOOW FAUCETS 9aVL ®�Pillnom WNW/10,0S MED MEN NETTLES O PER 5710211/El 11E01 AT MED BY 16 I WINKER RNA AN RECK OMT wIRYIE BON.RM1E WIN NOR NO OM ELBE WNW OPACITY OF 15 WH OF 97 WEE NBMMI►IE MC OIE-0OTH 03N,ILA AO/ SALE TITER AID DEN 1RY INYFA MEMO WE. SILL NEWEST'MERESNNL F ORDM AR BIERS HAY NE E F VIER NH A 7P F NNiT IElRAV1WIE DIP E EL EEL Cell) MI 10 BAWL FAUCET.MOP EVER THE a CARP.WO. GEWA LT OWED. EMIL NR91RS ELO.NCEME ENO IRIS WETS MAN - 1B7 CAST RN FROM t1FANXl1,WEE PM,591NE MICEL MOM 7W TO PM FLORA ENS® TERWO=TOM YR MS=111E E1:117E Ste SONRI6 STEEL SW NW OYEWia,JUST 9.-Ml-Ya75-ArR,TYPE 314 Fat EERIE,1e 6VA$ MI ADA I1 ME ME 3W EWE STEEL S IL@ JUST OPPE 311 SWIMS STEEL WI OVERRAN 1gRm manor CEP.SEE RIPE TYPE 314 SWIMS SISR.RDA CO1HRVIL VIM CRPMIIEM ER NTH 3 HODS, 11G1 CAST EN EEL GLENNE NE,WEE REV,MOH OISEE RATED RCN FREE a ACCESS CO9ER EMETIC N ER COMM RI0EY TRAM ®AEEDSS OWL E SHEERS SITS WEE WE CERTIFIED OWE EMENS PO-NOOI a 0711E EW DRN NO JUST WNAE ADE FULLS REME NO RNA Ki332-VS/K-1B95-FVS SOD R I EO AIDE RIPPLY MODE.NV EST BR OS MDR WERE 0E-104 SUPERSEDE S EMAN 6F PEW DE ARTS U S ME OWEEPTMLE ROD NAND ME ITPE FACT WITH RO-0IT 3-FUNCINN SPRAY EM NO 9W/WEN MEIE.R NM - JIM CIE IRON CIFAIWT R ONCE II 1Y:I2'N'CYOEIE PAD,TRITE LAER MD EEME RIC FLOOR RAN$ROW 9Nq REF ONES.MINCES.CAST HEN LIPS MD 10946E SPEEM S SIM JE,W ARESIBS EEL E N1T 0110 DERRY O EMIRS STELE AD E PNOIEAOD NC 00111 EANLES UM FROG NW EL A Y E SEE SBOW SOUL PRATE NH K-0317-fP 0ME ROD 200 WIER WRIER/BREHM SOME JEER IRE R7YNENLY WSCISM(PS THE FIIEEIY. DIO-91RWEE B ETRE IRA 1-BO16 PRONE NAME PE 2110 SEAMS RE-M ORTD Of'CNN ASSAMELVER CRATE EN W.MEMPLICEE MOW&=WW1 NH I PIE-MAPPED AIDW SIPPORRD P1 IM10R1/1,90R RWEIEE MO SURLY INSIMIOI Ens ANAL ®/f VI RE PONE lE �Y NE a MESH, M gYWE18E8VLL BE AS 155E-FILEL ICI MN DUM POISED KW OISE REED CEDEBRCS�T D SUPPLY WE CLEM W((M�SUPPLY Y��W Q7 ffi Mr TM IDOF,sraEYW COWL RVEf Wxr TASHNC ARROW WITH WIT ER YEl9.SHEDS FIN ELL MINT IMRES a SIX WEEDER SEEN PETER AR9R0E4 S VA RI1EO71ED R WM O NERD EUYL,SERIFS OD-E,CM-PL O MR FOR MS R (z1 MI LOOS:LEY .TOR TEAT • CM 3'MT BRAN RPM.HEM'00W RADE INN 93 SCAN ND 20'LAC CRAM RATED AWE7IFD METE ffiI FLOOR C M NTH CAST RR DID SERUMS TRIP a PEER TAP(WHEW ECHO TYPE) WEN WEE PA M SEAL SE SEEM ROW).B7TgOD INCE SOENEE ROE&) CERES WM OFFSET MESS(CUT 10(00111 R CRIIROT0 R7!IL4MIEAcnEE RIMED DWI.REM MST M1 mW1WT W EL EL0TINEC WOG AWE NEELFS EN INTENSE RECIRCULATE PURR ARRTOP sVNESS s7O1 sOW C6PN6FT. ii SEE 1rnY A FLOOR SR NM 51 ONE OE NOT EID SEEMS TRIP(NASA EDG1F5 TYPE) 0ECRC EEC WHY,1E1 ID ACCESSOREN RA10EN,11EI0L LARDY 1nDRVI1&ELL ILOIWTS ID YID WRIER RAIN(,MEWL MMOMN TRAP SEAL PRIMER AND DISTRIBUTION UNIT SCHEDULE A�6I.1 1 HE�ERaFR 1 FLEE w MIKE IDLVAFGRAY-INII DEW wN RASING CRUD SERVE CE MA ETNE STARERS A' m STAKED STEEL CM MI Wm SPRY MILD OVAL 6 KLE ASGBY NIH CAST RE DEEP FANG TRW WINO CODER AMOS=INO 90 PRIM MOOD /,�, ENT MU ROOF NE FLAEMO ARId@ WIELD ((1000ND ON4DN)R N01MR ERE YAR MR CIINTIY LOB YN7.IRONER NET CPT TNRMSIN9IPT NNS SEEDED 119 F 3'CUTLET.40WEAL RDR CAM ROOK EN CI NE ELM ROPED THEM R01110 IRE PROEM W1111 90 FES1lEPPEC WSW RI(91115.MIME FESEOPPNG MOUES R APPROVE EON_ )E aE Yz-7m-Re 1 1 1,2,34 FROM 722a �3-R r OR 1WWYF WIDE TR AST ESN T P WITH O ATE OVEjC -Y MIN 10003 NO SUPPORT 08EMs B-IFE R MANED ECU. AD 11-12 1,7�4 ACCESS RUES(5Pk YEN!DOOR CA-R.NPR SNP R APROID FYME F''TI EEC M fi 0 W Y-011' 1 ! T9.1A WEN BETE EDAM PLUG NA 5•DEEP LINER SN. - R6 DWI(♦D)R EQUATOR ORME(ETD)NIx OSP s 44193 TRIP a PRYER 77P. WOE SOLI(.F.F N=UNIT 8& )$CNN 1R M1-1m-RS A1O 4 Y-W L 1 1.7.3.4 TP TRAP ROES PP9S-TYPE L SW COPPER 119ND-NO ATTEAS BELOW MST FICA RE�EAFq IRO 111-M 91-38. MD 47NPER ERB;BRAZED NH RC 1V1C11XO TRBL100N PROMS NC. By;FINN'ENT RIOY MANED RY RDA DUN JA E1H sm91' O-U-C OWN NO 9T0-S - 11& 4 PPP.NG -JO 1 L 1,4 RWEL;COOED C R CAST NON DEP=RI WAN DMMI IY ROPE CAE EWE 318 SEMI SM.EWER XEts MR NWJM RAN/Y1EA1E PUMP.SENOR SUET.OWL PROOF.1RP PEER TAP.EH 3'OR 4'RATES WORD �'1 Ea AVM RN LAWN WITH II'AUAWERI CORM DEER NEWS HYPE;92S El CRONES ABBREVIATIONS ®ALL FLOOR CWIS(FINLFPff YW RISE MD RWR 91N3)MAIL E FRIED. NSOLL NL WORD PPE SW ECM FOR EACH RAN ON THE WADED PRONE MDT BEN 72278-04-B-M 4'METERDEPONENTS Cr NDYS ETIEY N ERE MCODVDE NIN TIE ST/IDVD RUED GED WM ACE E901IT CORING WIDE, RAWNWWNWB W PANG NO 5'[STEP VEER SEN./A MIXER OLn1 LffiS SEEOUW 9):EERWCY)REF ONI(15'AWL ILL N a MERE.DIE ETHER WATER ME:943 ONCNG$ ABEAM 1900141 ADS 1994 D DINS mow ROES SW.E ROPED AM FARE RILE TYPE ROES(RISE FLIER ECM N WE OWE M INN 011E3 OOPS SELL E PAYED YM PMYR ELMS ND FE AN MRITNLE YOYL 115171110 090.1 MH FRESH M LOWER RWM� WOOED RE MCP a SMELL ER NY g 1PRI DI EWE FLOOR OWL 1/SQUARE TO MD FREE STAFNNC SEEM BIDET AR STIR 2415Y-IL 0161 MI AREA DRYS 91H CAST RR 90N AO PANEL TiYE TOP REVISIONS MALL DE MIRED ABM cOWE(ELNNlr NEATER DID FEW ROLLED ABOE CLMIRED m AE SWAM101T MD HEED NH LEE EMBER ODE SILL E USED EL VTET WU DO:010119AL DROVED YNOlL-FTOOF W00 YODEL-7 CM(TM MIT 10'SEWED LEAD a ID la OWED CAA RCN L-MWIED GUTTER OWN BOOT EH NEED ROTE DCA 91FPSOQT NN P MD. ISLE N STET THREE NH MWUROTRNB W ITEM I SRUC106 ARIL RASED SRR 5'TAIL EH SEEN.RMERI20 DOT,(NOTWED mIMIE(UN11S NE NSFL-ROOF SOFTENS AO FLASHED CAP NO. DESCRATION DATE PRIERS N EARLY IID4SSBE LOWI05. PIPERS SIL T 90 L E NV FED ADJUSIYNTB. BCE.PRONE EREDEORO WI SA.MULE SPACE OF D AINIFNIA9WO SOME SPECIE TYPE As9Y01T IRA o 1 RI 1M EOLS BEE E DEMOUT WEE MC RAIL FWD MI 91O SCREENACT ROD1 N M ME LAY- 01RIC1 RITE 9E A4RITLY WHERE OF ROOF RIEIRANT. ®WIS SILL E GIP/0E O PROPER F711CNN MEN INSVD0 OUT OF RDB R HEAR.A 'A A 1B le RECESSED MVL M'RVIT.MIMED FROM LOCCO CONE OMER TEL(SOH 5512-PE-UP) PP WE ROM-REFUSE TO EW OF FINISHED R S RANA(N) MEND/110O1T OP A ER SHALL E DARREM TO NINE AI WARE DRAMS RALLY AND M RIM CAD-0W EWES ME ORIEL WAIN RAM),CAD-Ft EWES TER PIASTER NH TETE LAM,YRR SEBS NFRYLY. PEACE WEI RMOORE ALTER SCREW OPERATIC PACE N PS TO C PS. (FOR FE RODE LS NO RUES},FW H MOBS 003R DR FILLET,RECESSED OR FOE PAN(15DEPT WH)H -I,Du III 1P FRAMES EDP M.MDRWT,MEND BRYRG IDCOO COWL QUAVER TEN(STYE 5519 BFBMWFUER(EIERILY NOTES WED PRO 9SOIED BELOW MR)) ROPE STEEL PIPED WE DOOR MD RIME 4.,DACE 000R/11 IRE FREE RR WED),COVERED FLIT PIN VEER a4M1NN EEL E MERLE LA N940R 11CITM F1NIS D THE dSOIVTE OILED EEY LOT. WE FIE NRTIWL .•P::IWEL R DOOR I)RANEE HNHNTIE ACCESS m COAXED SECTION WHEN Ri MOON 9E ENTIRE MICE TO II=ENT TO PAS 111001 TO OE 10195.LED NINES/ESE&ERAP FRIER CDT=OWE4,ETC.FOR ISMEN,ALIMENT R -4 El MT 14'EMS DEMERS RECESSED DOT YAW EWE CAST N COWEN PAD,CON TO WWI.ED(ACCORD Ys) BC SEWN NNE(EM ELT NEWER ADD IRE WILLED SLOP RAGE APRON AM/R W EIDER) M 110(11 0 OMEN. SECURE ND PROTECT PRE FROM DAYNE NO TRUE FMTWIE R REREDOS. NICER S0 RR MEC/WAS ND ADA MS E 556'AM 1Ya12•FUR WCO D MPS, DEBRIS REFS D15EDE1. 11900.E FLIER PE PRE NO PE-ACE FREE I IMENEM ND PRIEST. MA SIBS DOORS SHALL E ELF C®ML WADED FIVE Rini MOM EXAM -A 111 111 14'ON4E PLOD 905 HOSE 99 wows BFEASTER.TE EY MIME E RICERA ALO FLO CON E M OPENED EIWP EN.PEER LEAST SY TITS MD MERRY PRIER OWED STRAPS.DIAL SWISS RA WEED C209RF'Er ENE.II LOLLS FOR ORE,"MOCK TERM HER 1901101E (WORD z4P-3/4) BE CEDE ICI AIL,2INI11 NR1D1961NE OlIH4 S NSW 101-0WRSNE NN.Y TIC(FE RETARDANT 12 .R Dee R ACES PATFL RECEDE FLEW EE ELM STET,LOCO&WE RATED N PIE COMMETEN C CST NON PRE.ATOM NO COURTIER.ETC.(COT MN RNEEV) (A1 MDR ORBS MIL E PAID DA Els'(ELDTROW TRIP SW WWI MAR 0RETNE 10I 1014 UL USED WTOINA STIlE FE MVOWL NPROSO Ni0 TRIP SEA FRIES ND DSTIREON UE6 SHE E 15IMFACN9D BY ION ORqpI OWNED HOWL MEOW ALL 11E RENDERED W E EXPOSED IRS NEWT IANINN MEET Of 9E REDUCED D RES MIEW URE RC PEEPER CLAL YODE L RP-4 CAM P APPEND EOM EO B3 PESE RE ODE AM 9U90 LASE ON;IEEE(Hb)MD MUSH(PM LAIN C ONCE RATED MESH IN S EYE MEALD RNMEALORPM EAON AE9 DIFNOED E/rss SHALL E 0ISWAI PLATED OR WALLETS ESL MIA.DIESA1 DATE WBIIm4,RIB TS.5015 E YWUFACTED F PECBDR RULED PRODUCTS,NC.PRONE 120 VOLT WEE NO EMT 2'SE REDUCE PREBIWE 9F0HOW PLOWER CA-WI.YODEL RP-4 R PER MEWED ECU. -4- RG mac D59 DI 1091AE R WE TUBNO TOGWGF(5) NE COPPER PPMN,IlWARR RRAPER;RAER;TIPS O DPPEM ROKAD RICER E(MERE SIENENWOR WILL ILL L EL REORDERS MH � EMME Ms 0WE108WiL-0-0-/0 MA6ORE or OVEIER NW WE MN SE ODI1ET,L-19PED TEEM 1 . LAY . ON NB0110N TASTE NE HEM;MEW MC SEEN ME SINP REELER MD EWER EEL PROOF NE-903 ME ENDED FIN EACH 9ME M ER1N CA TIE 4 I OHMMETER Fro nTMO9ENR 1AEL1;1C WL M7DIOk ADJISOHF•EEC(N4)ND ODD(P96)LETS BT BL DRAWN NM NNE IY2i FAME NM YN1Y. -FM/SCDN IETTEA R WE NOER/RSR EWE IDENIFI 01CR DESIGNED BY. BL D DIRO1E PRIM IRA mMxa AS COURSEELC.NHICTIE TRW WRNEIL) ®p);WOIDOY-DO-C-R-'A0=MOLE TOE'WEER ROOF WE NH 3'WEER WEERI M.5DAe EL L4L7HE ELFL7ROOC FLORA OWE 7RR^SEAL PEW i RR THE 9WED WEE WEE NOS FLEE i 1111E WNW R W DES ME ODWED FOR ETCH NON.L SEES MEEK NEIE RAN,SEDER EOL OR RSA ADM ISDAM ABP PROJECT EMBER 2031169.001 HAM WEE PER ERR(LAIN EATS 1 AIR 151m 04R-4 BRAZE BOA DER AAR AN LAMA MILT NNE AAEMD OAP INS TRACT PLUMBING FIXTURE AND EQUIPMENT SCHEDULE CENT. IRA SEGUED NA YAM FREE ACNE SCENE,245 SANE NOES O'FLEE AREA ROTE MI RASING me / ®HAIL REYNOLDS.SMH NM HILLS INC. A4A,7D SW NGdC1NW 4'OVNOEF R1II. I"_-� SHEET TITLE IE PPE DER[ELEWONN-EMCEE HISSED WEE WE FIDE SUB TERCEL!ODD'.MOHSy 33111ER E940-0305 P9014 D AAA SAP PLOP SYSTEM(TIP OF TNq SLa DI-M Ni SPAN Pm R 16011 RHaEE PPE.,EMS ND D1H91G,WIC,('O.NELL LULDINE WSW) 1119,1.I011 ON THE DREOEUED ACME ENNPOA YitaE EH RR1707U SIZES NE ND NE HAWED NM AO.SYTH ICOR GE-60-,2 4901,3 FWD 71 NOS;ET AT 120 F OP OF Mk TWA X0L-6) S EW=REST E DWRNT/LY PROEM)ROOF R N E AEA NC110W VERILY.WALLS IB R DFO R R,DA BOSS Ira RICE EEO vim UWE 1E KEY CPELWOR POLISHED ORO4E FEW TRH 01401E RATED CCM SEA R , 11'BET NECI01 sm. N2 EEIDES2412 120',1.4N11,2G SIR2E FONT Wow TVmE4 EOFA EFAE7Q STET AT I2T F(IMP OF T4EE: N,ra ,>,� PLUNGING p�NOTES ss saWlEse sE6 RPN4 RTEB AD aME Ws9 ETC (TRIERS Em N9ERAL) W NOOF910 BN AnaMnc ONEYl FREIDR4 WALL 1LONNf MH ROE aNRD ENT 9Ri0 YFC W WE STEEL AND LEGENDS 1E ASE ARMED COMM MIPAVUE ND PRESSURE REEF INE BE/RR FR9E9LP0D(I/O'DE PER F/8-711 OOT)CUED D LENGTH EX I DBGY SCTCA TRAIN 3'CURET ND E3•001.1 IDEIt N HCR ATED KA SET YD DDIO D TE11 WEED CRVINO.FEEDERS URTY WEE ACTH HOE C918TNN ANTFE4KN NICUN ELMS TIE EOP CP 9E CUE OIRE7E 1ET NEI REED'SE04 CITY Om1110 Mi24'LONG ACNE RCN SEAM NTH A SAFE LAE LOAD 0 PM 1042 LES. lg SEE ROM OWN 1ROP SW PROPER DEED 91R0 LLTEES MAT MIRE SAES) A SDI0L1 IDro150FlA 050E-0IYE ICE WEER E/W W/OUT CRY CBI MI 1(-11IE 1911 VILE NC WIER HAM ER MiIE in L1FM SEEM T1200-F-0 1Y NE STEEL FRAME,AND RATE RS= LLCDM'IED 1 7/Val Y/B'11/4'YE M TN ENROL NE REAL N MOW M2E RR STEEL FRAME AN MEW TFS LEWD STET 20'PR MEOW SPAR. SWIM EH 24'LED, • VON TRESS OMEN WED ND ON DID PIM 111114-1Bp BALL VEE NI TWEE WEER NESTER. AREA RED'SEAL DM'LEVERED CAME RN MEEL PREF CRAZES NTH SV A E LE TOE OP WE10,D0 LB& SHEET EMBER DR NEE-1ENFROOR MAL-PROOF,NH SIRS.BER RAPED AD DEO I LI 0 01 D R DI "DEW R T9aSM0 MR CIOEI'N7 EOM PREFIX SWAM RIM WERE EH IC FOR WIER AP9D PERMIT NOT RELEASED FOR CONSTRUCTION DOCUMENTS 1 2 3 ® 4. ® 6 7 8 9 10 0. 11 1 12 13 O 0 1/J�I/!�J -1 I 11 _, , r ® Y J RStri IMPROVING YOUR WORLD I I I I I , I I I I I II 1 I I I RSBH °0 001r R°"PAWL ARCHITECTS-ENGINEERS- MEPRO WE F MOE a I I PLANNERS,INC. ME WE 671E 6VDE I 1 J__— I - I 1 1 1 I I I I I 1 DP/ �� I 6601 ShI PLANNERS, Road,IN . Y BIl MM �..- I T—r 1661 _ _ �_—_—_ _—_—_.{�._�_—_�_ _—� ' >Dl 1Y �. s)Dm Rcy IBPE y-- wT - CC RalelBh,NC 276?B II rPRORIE A aEwOlf RKELE 260 PHONE 9?9.84&6707 FAX 919.8489080 I 1N 'r;EPY L,y'x.....,,R 11£SW CV RE ' !g®1.N^WVJL WWW.rseadh.com 4' r9D r!m r50 I rSD ,r 50 la'M 1r AI I (r'.r'!�.�it !Y !61' a0 F's.I r.r`, __I__ ,i_ _w F- +I 1 v aF ;aE°°IRiEaI J- r - -, I J _ 3 E I BB RT 17PME As ROAD A ( • 1 - �..- _. - I y E - L`-] I� �I "-I [ TEl�9F11E1Ana1 _ _ti____, I� __ TEBlm671E5°4 i�AI = - L 1 I f _ O __ r T l III 1E2 li �a - IBA. � cJ _ti- n R•a PEE IIKE10 IIIIIIREIIII�I i �� 4 ��.. Iffelift PIMLMe00AWIeEwurra0`La I- •u Lam} 'Sp DNM FROM ELK. AIM GIMP N MIL m IL„ I Q t� 11 B me it ILOYE FmW J I TMEEE I OF TE'ESTLE IIIIIII, I I 1- • - - 1111 171E BASE 6 THE SSE -- _ 1 I.•J_igloo_° JSa-- 1 e aB BBNI fw1lTm 'Lws� L,J laid ,.J T IIIIIIII I� a illlllllllll MEflER`AE"CVBFSEX I I I 1 6 I`----1----. 1 L,..' I ` �M® I I I I WI {iI *'FORCE °"9Q I R �•,® '' •. I ALBERT J. ELLIS I I I 1 LOOR FEE wow NIIpLOW' ' jam+ h Ho Di WILL 10 IRE I 4p I �L�y"W I I e 1 1 lb IR AIRPORT �- EUIit * RICHLANDS NO I I I 1 a'NOI6 W®a OTOT •11 I C I i._ I1E11ai,, J �.a ' I _ ILFI I� �I' I —_ t 1 I - r_ - n NM $4 0AI NIXIE L 1 199.E , I I -_- •R 7 I - [_—_C~ A YitlY PRNCE 9ECJNI01 SLEEVE! � r.. 4 11 in J 1,., •:. Y 111 1 NaE . . a KKu PRO 1 °`Ps�SLEEYE SEAL WE HANAN RE NEW TERMINAL IL ��� --y- .c7 LV 1-010E r CL Y L7 ABNE cEIIR 0r a j I-i M u� - ., riONOR� i�FrJ� ^"C �i5 -- - it_ i'' 5E Plm iN car wa I L B➢ ,,-�, r AVIA AT 10's* WE FOR FUME EIIE7✓= pm., 11 , .WW1 _ TNOIa Eatov701 MU:IM1Wf CONSULTANTS 1 ;1 1 I a CW N to LIB,N ti.a I r� ; 11 V STCK LIR I -- , ELMO cf r a A-4W BFLNr OFAIMBE a CM 9BW N r L,••� EE1r'm I, - Y 1 I P1m FOR car Ft09 TO FNESEO H. MEP mxoEW NIS 4•S BELOW I - --- - REF.POE A El L`J ']1 tit i t71 Vs; I 4�aD1, L( ROm FIE OF 0L0� = INIBE PAnm FED MIRE I .' 1 xr ro u 2K'ow 1 1 21� fl I'I C �R I i v RE + ROOr I Ij _- _. wNr91DE NO 99E1®a© BID r ROP a Brix Y m�arr' I. IrPM . 0r € Ma I r ' Effili � ® 7 ND sin �- i - - 9riaa MEER- cow sr a ICE NNBENWRW4 ARM; J IF • I XFP:. ROOM I I, 'N NRW:.,� Ir1,. ■ A'.•. r1j/ III l.'r4:ALA/ 4.� I ,0, �I /II■CML O9YWMB FOR co mum a r$ A ,; •nm1o,mNma MIL;SEE _ i LA L'J i )Z R90R.r v m r:^•-?E� .4i 1 142 '' 1I In W,re I' YEEE10N r s ain. i/� 4• taw.7WrM 5. t PP ., ..NIR . - Y.. 1. C� B.!' , , I_.J a `Zf' , ----t BS III 1� 112,i." F!mE SE FOR COWL SOME NAR-0OFF WIVE Ida 7W 6]AW `I 'C.'�- N WOW MERE BO% 1 - 4• �� Y d AC Y CE Ac .._ + 1 = I• PRONE or WIER 1E119 f 124'OM ROOM 9AIA0N Ea NI ' , OF P@E Cf1JB , iA®YE L9M0 �illll,l�_ % 4.' r� /POLE ��,Pirill �� � o _ ..4 Y. I�i ' oiw24 QY BBOR AN N..i.l� , ii��I eum .,, ..,. ..,....� .—..—. .i , 11E 61W 671E 9rMf 1 lfLltl OPOP I ®___.-- - I I NWE., � BP �� '6 � rVSVIX IP, SE Ow=EWRS NM NIENER1ER SEE CPA.COMO e_� •Rpmbk,, ,=•� I I E FYIMNLI Y80.f.W111 .: 'RIDiOE A FradCAM7R p N 1XE Etlg 6 nE sv01 I Im'�CO" -Ir 9)ECM FIANR 11E eEE 671E SUCK IV I I I r 91®AI FLOOR I I NO E I I a4fft71E AK I AWE NMIEE A CIDAWI I - FOR WOIILOdI . a If ® r-.6 r W F E47 4'ER r_,_ ffi r SO 6 r SO Er fBl P f1& 7HE ESE 6 PEE STMX '3� 1 4'80i Y'SOi f55 Itsow INIMI.— rSOM - • O• 'lll� II OWBE COMM 99�0$BOUM 1'10-1N IWill B, p I 16 El' -- 1 L Ikb a I I� 16 SEEttI DEt�Os17 A3 NO= 1• RII=RBI8 R I R R - 111.0312-5199.7 SEER . 1 u0613-16 our EIS ,n wRn PWR j . — ' SFA�VWOtR EIIHEI I ? . S. AHo -- 1Gi5f- , . -'I� - ;� E3 --- - €3 -- "ua' ---�3— 0 �_ ". + ,' `III .�€-, .1 i in1111Ell. ' I.. i J E19aN9 ro aV E 4'SO WE FRE B� I {. , ,. o 6t/MEW - L 1 ' IIIII�]_ I '1{♦ I uA1 4'SO DOEI1 Im.E. - SO 11111� ;>�� �-�•g m I I I• 7PROCE 1E ELSE" nE WC< ..'.. SD BON mat NRYE. I r1 r nil 4916 R PROSE HOPE. . A ••• Ill 6 TE sr10c Irir RM+O A , _r7 -- 1 -Al,a•� I.. - - -1 - - I --- 1 FR011 4•RN FLOOR1 .' nE ROSE 671E I.. 4�1 1:j I,_.- I A. I IWI Pm.EI '' I HEAT W/Of1AI 1EIYNE Nffi M7R1 OONRL7MIItt� 4 Ir` 47 `� F W BF i _J I VF'9/ wan�'mal=- �'SC. �I� Or DIM 1,22,2221, HID NC COME 1N1Eq nav MN mmR>EREVISIONS I1 _ I ElI r AFIRE FOR 02101E PERMED LACER pR�q 15,SEIM MIER Ira _ _ -_' --- _ N+ 191'PLOW fa mBW - ................................r.l......1-s..,.................... N0. DESORPTION DATE I I I �EOM 10`1WE AT PEW at �MAE M I \1.�M�'I�!J.� �'_J I I 1 Y I I F I - �i ��.i 0 6 �N442144 10 4(14 RAE W -. 'm*'+� I FLOE FC41 Mist SEE NC C I tn:r- r ee - I a:E e:: I �,I 10001a Enx mtl.IN EWE 51145l 711E.Iti 6 t1E t160A r v sAOc 6 F WPM FOR PART 9MIE(3 WTSI r. -I'I To r vra a I I. L J ............................... ...................0 T E BE7A1 ROIw , Ali -'MATE I . ......... 1 N E SEE FOR OW. _ �-,,,,,,,,,1. ' r.I 1 = DATE ISSUED,JIMB?B,2012 CA70 1 ,. i1 _ _I _ ^1 i REVIEWED BY,JAM a L J DRAWN BY. IL BIER ...................,............, DESIGNED BY, EL WV PROJECT NURSER -121,•... 1 2031169.001 1 1 L i ; i = ®POI 2YIN1soli111,9Y NW 2514E 1 I WEST TITLE 4•A®A I 1 eeeme0R rV EDI FIRST LEVEL ;, :_ PLUMBING PLAN 711011 1 lNI 31 ALIT WE AC{UTERI-11 %a NW FIRER 1250164101 PRECAST OR SE BIT 44 ''R-.. WITH EINTE ENLII0r31 FLOE EH(3)=INA Y\ __ _WN101.13-=- YIE NO)FSrNSW 10 OME I N BEM r a SHW PUNIER ' `( ''1 FIRST 1 FVFI PLUI! !NC PLAN rSBEM I\/ .,,8 ;OWE r-0' N SE Cat FOR CON-, P110 / ..k 2 FIRST LEVEL PLUMBING PLAN (CONT.) - ,, P 11 0 SELL 3/12•-1'-r PERMIT NOT RELEASED FOR CONSTRUCTION DOCUMENTS