HomeMy WebLinkAbout820331_Routine Inspection_20241008A l"im <
Arrival Time: Departure Time: Q'U County:
Owner Name: �Giyj� ay'�� Phone:
Mailing Address:
Physical Address:
Facility Contact: 5� t 97/ Title:
Onsite Representative: f I
Certified Operator: 9!
Back-up Operator:
Location of Farm:
Latitude:
Region: /C !
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Discharges and Stream Impacts
I . Is any discharge observed from any part of the operation? Yes -t:r—No NA NE
Discharge originated at: El Structure ❑ Application Field Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Dyes
F] No
M NA
F-1 NE
❑ Yes
No
❑ NA
NE
Yes
❑ No
NA
❑ NE
Yes
E2-No
NA
❑ NE
Yes
12'No
NA
NE
Page I of 3 511212020 Continued
Facility Number: Date of Inspection: g
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):, / G/
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes -�No
❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes ,❑ No
❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes : ErNo
❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes "[] No
❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes E_J No
❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes—�o
❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ffNNo ❑ NA ❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
M
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ Yes JHr�o
❑ Yes �o
❑ Yes <43-No
❑ Yes E]'INo
❑ Yes erNo
❑ Yes (jfFNo
❑ Yes _Lg_Xo
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑-No
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ Yes e No ❑ NA ❑ NE
❑ Yes L]-No ❑ NA ❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - Date of Ins ection: T - y
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes [D-NO, ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes . E3- Io ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes E]-Tqo ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes E]-`No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes Q'No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes .�o ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes E3-No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes 4E No
❑ NA
❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes -ET'No
❑ NA
❑ NE
33. Did the Reviewer/inspector fail to discuss review/inspection with an on -site representative?
[::]Yes L�FNo
❑ NA
❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes _120flo
❑ NA
❑ NE
Ice
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
5"=`12
Phone: 4AWAC�
D•' i
Page 3 of 3
44-r r • Con
r•acmry nro.L,7 -33 _ Time In Time Out
Farm Name s rem
177U'ec4/ Integrate
Owner
Site Rac
Operator
No.
lack -up
No.
_
COC
Circle: General . or NPDES
Dare
Design
qu I Design Current
41
Wean - Feed
Farrow - Feed
Wean- Finish
I Farrow - Finish
Feed :Finish
Guts / Boars
Farrow -.Wean
I I Other --
FREEBOARD: Design
Observed
Crop Yield
Rain Gauge
Soil Test 16'4f11'1�1 Wettable Acres
Weekly Freeboard ✓ Daily Rainfall L/
SprayJFreeboard Drop
Weather Codes 120 min Inspections
Waste Analysis:
Date Nitrogen (N)
P.0 -
Sludge Survey
Calibration/GPM
Waste Transfers
Rain Breaker
PLAT
1-in Inspections
Date Nitrogen (N)