Loading...
HomeMy WebLinkAbout260042_Routine Inspection_20241014Reason for Visit: ✓C Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit:! Arrival Time: ,LLC 1' Departure Time: Countyam"Viegion: Cp Farm Name: \� Y ® �A Owner Email: Owner Name: O E,� i J6.d Phone: Mailing Address: ((: Physical Address: Facility Contact:./ t.7`-r�"`c1 Title: Phone: Onsite Representative: �� Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Discharges and Stream Impacts , 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 12No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes L2 No ❑ NA ❑ NE ❑ Yes L�No ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: -tlj jDate of Inspection: / Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes Efr<o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): o, Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes �No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [DNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Q"No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes _L3'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes _ETNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes :Eff'% ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes `[]rNo ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ W" ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes E]�No ❑ Yes P<o ❑ Yes JBlo ❑ Yes �' o ❑ Yes J2-lqo ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE ❑ NA ❑ NE ❑NA ❑NE [:]Yes JZ NNoo ❑ NA ❑ NE Yes El� �-rvo ❑ NA ❑ NE ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. [-]Yes fNo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes eNo ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 91-40 ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: G 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes _.No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [D'No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes 'O'No ❑ NA ❑ NE Other Issues No 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes _❑ ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes _[D�No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes , TNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ,0' 0 ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 2 10 ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? El Yes ❑ NA ❑ NE f Reviewer/InspectorName: n Phone: // Reviewer/Inspector Signature: Date: lU`1 L Page 3 of 3 511212020