Good Afternoon Matthew,
In accordance with the signed mitigation banking instrument and corresponding approved Bank Parcel
Development Plan, Restoration Systems submitted an As-Built Report on June 17th, 2024 with a revision date of
th
September 25 to the Division of Water Resources (DWR) for the Saints Delight bank parcel (DWR ID#:
20211037v2) for review and approval. By copy of this correspondence, this As-Built Report has been reviewed and
is approved. Once DWR receives a monitoring bond per the requirements of the mitigation banking instrument,
then DWR can proceed with the issuance of a credit release for Task 3. The performance bond that DWR currently
has on file is attached to this email and is no longer required.
Thank you,
Blake Hartshorn (he/him)
Mitigation Specialist, Division of Water Resources
North Carolina Department of Environmental Quality
Office: (919) 707-3684
Cell: (919) 817-0360
blake.hartshorn@deq.nc.gov
1