Loading...
HomeMy WebLinkAboutNC0026051_Authorization to Construct_20180201♦ BLACK &VEATCH January 26, 2018 Subject: supporting documentation BY: cc: B&V Project 194729 B&V File 30.2000 z ■D O m i/) > ■u TJ =: n & r* 6' 3 ZEK Enclosure(s) Kyle Manning, DCo LDING A WORLD OF DIFFERENCF > n > ■o ■U • DJ I-*- o' 3 CC bi v> o C v> w 3 X O ■Q O 3 ECEIVEh | JAN 3 0 2018 II NC Dept of Environmental Quality FEB 0 | 2K8 Raleigh Regional Office H :Aa11 9102 0 t NVf II U3AI3O3Q Mr. Ron Berry North Carolina Department of Environment and Natural Resources Division of Water Resources/NPDES 512 N. Salisbury Street, 9th Floor Raleigh, North Carolina 27604 Attention: or require additional information. I Black & Veatch International Corporation 11000 Regency Parkway, Suite 410, Cary, NC 27518 p +1 919 462-7512 E ProffitKB@bv.com Mr. Ron Berry Request for Authorization to Construct Triangle WWTP Aeration System Improvements Project ?riabn?“prAae™ doSm 1^ 3n A«horization to Construct for the aeration blowers; in-kind replacement of existing submersible mixtogand pumnimz quipment; and basin cleanout to remove and dispose of all wastewater, solids and debris The construction timeline is as follows: Notice to Proceed to Substantia] Completion 240 Calendar Days Notice to Proceed to Final Completion 270 Calendar Days We are hereby transmitting the following items for your review • Application for Authorization to Construct • One set of Plans (22 x 34 size) • One set of Specifications • One copy of plant NPDES Permit NC0026051 • One copy of Basis of Design Report • One copy of Engineering Calculations notebook with • One electronic copy on CD of all above items Please contact me if you 1 can be reached at 919-462-7512 or e-mail at ProffitKB@bv.cnm Very truly yours, Black & Veatch International Company Kurtis B. Proffit, P.E. Engineering Manager 1^ APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) SECTION 1: INSTRUCTIONS AND INFORMATION *A. B. H. I.I J. SECTION 2: APPLICANT INFORMATION AND PROJECT DESCRIPTION A. APPLICANT Durham CountyApplicant's name Signature authority's name per ISA NCAC 02T .0106(b)Stephanie Brixey Interim Deputy Director / POTW DirectorSignature authority's title 5926 Highway 55 East, Durham, NC 27713Complete mailing address (919) 560-9034Telephone number sbrixey@dconc.govEmail address PROFESSIONAL ENGINEERB. Kurtis B. ProffitProfessional Engineer's name1 Professional Engineer's title Engineering Manager North Carolina Professional Engineer's License No.033729 Black & Veatch International CorporationFirm name *F-0794Firm License number 11000 Regency Parkway, Suite 410, Cary, NC 27518Complete mailing address Page 1Application for Authorization to Construct Permit (FORM ATC-12-14) State of North Carolina Department of Environmental Quality Division of Water Resources c. D. E. Water Resources ENVIRONMENTAL QUALITY 1 * * 1 F. G. The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete. Failure to submit all of the required items will result in the application package being returned as incomplete per 15A NCAC 02T .0105(b). Plans and specifications must be prepared in accordance with 15 NCAC 02H. 0100, ISA NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities. The plans and specifications submitted must represent a completed final design that is ready to advertise for bid. Any content changes made to this Form ATC-12-14 shall result in the application package being returned. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments. All information must be submitted bound or in a 3-ring binder, with a Section tab for each Section, except the Engineering Plans. Check the boxes below to indicate that the information is provided and the requirements are met. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced. For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS, etc. unless the project qualifies for a Determination of Minor Construction Activity. For more information, visit the Division of Water Resources web site at: https://deq.nc.gov/about/divisions/water- resources/water-resources-permits/wastewater-branch/npdes-wastewater/authorization-to-construct. In addition to this Authorization to Construct, the Applicant should be aware that other permits may be required from other Sections of the Division of Water Resources (for example: reclaimed water facilities permits; Class A or B biosolids residuals permit). APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-1 Telephone number (919) 462-7512 Email address ProffitKB@bv.com C. NC0026051 12.0 MGD D. El Not Applicable. Application for Authorization to Construct Permit (FORM ATC-12-14)Page 2 NPDES PERMIT NPDE5 Permit number □ □ Current Permitted flow (MGD) - include permit flow phases if applicable State of North Carolin Department of Environmental Qualit Division of Water Resource Water Resources ENVIRONMENTAL QUALITY * a* * * C. Special Order by Consent □ If the facility is subject to any Special Orders by Consent (SOC), submit the applicable SOC. E Not Applicable. B. NPDES Permit El Submit Part I of the Final NPDES permit for this facility that includes Part A (Effluent Limitations and Monitorin Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. Finding of No Significant Impact or Record of Decision Submit a copy of the Finding of No Significant Impact or Record of Decision for this project. Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decisior SECTION 3; APPLICATION ITEMS REQUIRED FOR SUBMITTAL FOR ALL PROJECTS A. Cover Letter El The letter must include a request for the Authorization to Construct; the facility NPDES Number; a brief project descriptic that indicates whether the project is a new facility, facility modification, treatment process modification, or facilil expansion; the construction timeline; and a list of all items and attachments included in the application package. El If any of the requirements of 15 NCAC 02H, 0100, ISA NCAC 02T, North Carolina General Statute 133-3, North Carolir General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatmer Facilities are not met by the proposed design, the letter must include an itemized list of the requirements that are not met D. PROJECT DESCRIPTION Provide a brief description of the project: Aeration system improvements within existing BNR Train No, 2 at the Triangle Wastewater Treatment Plant (WWTP) including addition of diffused aeration equipment and two aeration blowers; in-kind replacement of existing submersible mixing and pumping equipment; and basin cleanout to remove and dispose of all wastewater, solids, and debris. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) □ Not Applicable E Process Mechanical □ Not Applicable (3 Structural □ Not Applicable □ Not Applicable0 Electrical 13 Instrumentation/Controls □ Not Applicable □ Architectural 13 Not Applicable □ Building Mechanical □ Not Applicable □ Building Plumbing 3 Not Applicable 3 Civil □ Not Applicable □ Not Applicable3 Process Mechanical Page 3Application for Authorization to Construct Permit (FORM ATC-12-14) State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY Specifications shall include: 3 Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): F. 13 Engineering Specifications 3 Per ISA NCAC 02T .0504(c)(2), submit one set of specifications that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. 3 Specifications must be labeled as follows: FINAL SPECIFICATIONS - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION. Plans shall include: 3 Plans for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): 3 Civil 3 Plan and profile views and associated details of all modified treatment units including piping, valves, and equipment (pumps, blowers, mixers, diffusers, etc.) 3 Are any modifications proposed that impact the hydraulic profile of the treatment facility? EZJ Yes or No. If yes, provide a hydraulic profile drawing on one sheet that includes all impacted upstream and downstream units. The profile shall include the top of wall elevations of each impacted treatment unit and the water surface elevations within each impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains in service and (2) the peak hourly flow with one treatment train removed from service. 3 Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? O Yes or No. If yes, provide the process flow diagram or process flow schematic showing all modified flow paths including aeration, recyde/return, wasting, and chemical feed, with the location of all monitoring and control instruments noted. E. Engineering Plans 3 Per 15A NCAC 02T ■0504(c)(1), submit one set of detailed plans that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. 3 Per 21 NCAC 56 .1103(a)(6), the name, address and License number of the Licensee's firm shall be included on each sheet of the engineering drawings. 3 Plans must be labeled as follows: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION. 3 15A NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? [X] Yes or | | No. If no, provide an explanation: APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14] * £3 Structural *[3 Electrical E) Instrumentation/Controls □ Architectural* * H. Engineering Calculations Application for Authorization to Construct Permit (FORM ATC-12-14)Page 4 <1 C3 Per ISA NCAC 02T .0504(c)(3), submit one set of engineering calculations that have been signed, sealed and dated by e North Carolina Licensed Professional Engineer; the seal, signature and date shall be placed on the cover sheet of the calculations. □ Not Applicable □ Not Applicable □ Not Applicable El Not Applicable E Not Applicable El Not Applicable State of North Carolina Department of Environmental Quality Division of Water Resources * * Water Resources ENVIRONMENTAL QUALITY I □ Building Mechanical □ Building Plumbing 0 Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers, etc.), and instrumentation. E3 Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures anc pipelines, and performance testing requirements for equipment. El Bid Form for publicly bid projects. G. Construction Sequence Plan E Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Specification Sectior 01310 - Construction Scheduling For new or expanding facilities and for treatment process modifications that are included in Section 4.C, the calculations shal include at a minimum: □ Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. □ Influent pollutant loading demonstrating how the design influent characteristics in Section 4.B.2 of this form were determined. □ Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4.B.2 of thi* form were determined. □ Hydraulic loading for each treatment unit. E Sizing criteria for each treatment unit and associated equipment (blowers, mixers, pumps, etc.) □ Total dynamic head (TDK) calculations and system curve analysis for each pump specified that is included in Section 4.C.6. □ Buoyancy calculations for all below grade structures. E Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units. I.Permits X X* X X X X X X J. □ detailed explanation as to ho Application for Authorization to Construct Permit (FORM ATC-12-14)Page 5 j * * Other: Durham Level 1 Site Plan Review APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-: — Date Submitted Date Approved Permit/ Certification Number If Not Issued Provide Status and Expected Issuance Date Water Resources ENVIRONMENTAL OUAL'TY To Be Submitted in February 2018 Water Quality Certification (401) USCOE / Section 10 Soil Erosion and Sediment Control USCOE / Section 404 Permit Permit/Certification Dam Safety Stormwater Management Plan CAMA NCDOT Encroachment Agreement Railroad Encroachment Agreement Not Applicable X State of North Carolii Department of Environmental Quali Division of Water Resourc g) Provide the following information for each permit and/or certification required for this project: Residuals Management Plan □ A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handle processed, stored, treated, and disposed. An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residua production rate and ability to remove residuals. D ten"? L0' resi^als utilization or a wr‘tten commitment to the Applicant from a Permittee of a Department approve ua s d'sposal/ut'I'zat'on program that has adequate permitted capacity to accept the residuals or has submitted residuals/utilization program application. □ If oil, grease, grit or screenings removal and collection is a designated unit process, a the oil/grease will be collected, handled, processed, stored and disposed. £3 Not Applicable. ■ * APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12 A. Plant Flows Existing Plant Design MGD Current NPDES Permit Limit MGD MGD Maximum Month MGD MGD Maximum Day MGD MGD Peak Hour MGD MGD Application for Authorization to Construct Permit (FORM ATC-12-14) Page 6 * * * * For Past 12 Months: Start Date: month/yr End Date: month/yr For Past 24 Months: Start Date: month/yr End Date: month/yr Water Resources ENVIRONMENTAL QUALITY State of North Caro Department of Environmental Qu. Division of Water Resoui SECTION 4: PROJECT INFORMATION WASTEWATER TREATMENT RIANT FLOW INFORMATION - COMPLETE FOR NEW OR EXPANDING FACILITIES 1. Provide the following flow information: Current Annual Average (past 12 months) w APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-] Project Basis of Design Parameter mg/L Summer 1.0 mg/L Summermg/L mg/L Ib/day mg/L Winter 1.8 mg/L Winter mg/L Summer 5.0 mg/L Summermg/L mg/L Ib/day mg/L Winter 10.0 mg/L Winter Fecal Coliform per 100 mL 200 per 100 mL mg/L mg/L mg/L mg/L mg/LTotal Nitrogen Ib/year 111,207 Ib/year mg/L mg/LTotal Phosphorus mg/L mg/L Ib/day Ib/year 8,432 Ib/year mg/L mg/L Ib/day mg/L 30.0 mg/L Application for Authorization to Construct Permit (FORM ATC-12-14)Page 7 Total Suspended Solids (TSS) Influent Concentration - Current Annual Average (past 12 months) if Available Design Influent Concentration (Must be supported by Engineering Calculations [Section 3.H]) Design Influent Load (Must be supported by Engineering Calculations [Section 3.H]) Design Effluent Concentration and/or Load State of North Carolii Department of Environmental Quali Division of Water Resoura ------------------------------- ---------------- ■. eatment □ No. If no, provide justification as to why the NPDES Permit Limit; (monthly average) Biochemical Oxygen Demand (BODs) Ammonia Nitrogen (NHa-N) Water Resources ENVIRONMENTAL QUALITY Nitrate + Nitrite Nitrogen (NOa-N + NO2-N)_________ Total Kjeldahl Nitrogen B. WASTEWATER TREATMENT FACILITY DESIGN INFORMATION - COMPLETE FOR NEW OR EXPANDING FACILITIES i FOR TREATMENT PROCESS MODIFICATIONS ------------------------------akanuinu FACILITIES/ general Statute 143-215.1,'and ^XTwate^e^^ Facilities been met by the proposed design and specifications? Yes or requirements are not met, consistent with 15A NCAC02T .OlOSfn): ‘th df T inflUent and effluent characteristlcs that are as the basis for the project design, and the NPDES permil a the.foll°'™g Parameters: No change to Influent and effluent characteristics. The new diffused aeration system .J d!.r ‘ BNR N°" 2 feP'aCeS ^ush aerator equipment as a more cost-effective long-tern so upon, when cons'denng the energy sav.ngs of the diffused aeration system and remaining useful design life of the brush aerators. Refer to APR calculation withm the set of blower calculations which documents the basis of sizing of the diffused aeration system to be equivalent to the four existing brush aerators. ---------------------- Lfl APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) 3. 4. 5. 6. > 7. 8. 9. 1.PRELIMINARY AND PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): NOT APPLICABLE 2. Treatment Unit Type Size per Unit gallons gallons gallons 0 gallons Application for Authorization to Construct Permit (FORM ATC-12-14)Page 8 > > Per ISA NCAC 02T .0505(1), by-pass and overflow lines are prohibited. Is this condition met by the design? [X] Yes or | | No If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges: No. of Units State of North Carolina Department of Environmental Quality Division of Water Resources Plan Sheet Reference Specification Reference Calculations Provided? (Yes or No) Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? Yes or No. If no, describe how and why the Permit Limits will not be met: Water Resources ENVIRONMENTAL QUALITY design? Q Yes or Q No. If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .IQStn): Not Applicable, design does not change existing sludge production and/or sludge processes. Per 15A NCAC 02T .OSOStq), the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: Plant has an existing full perimeter security fence and plant entrance gate which is always closed and opens only by security code or calling into the Control Building requesting the gate be opened. The project does not impact the existing security fencing. Is the treatment facility located within the 100-year flood plain? [XI Yes or | | No. If yes, describe how the facility is protected from the 100-year flood: A berm surrounding the facility is raised approximately 1,4 feet above the 100 year flood elevation. Aerobic Zones/ ____Tanks____ Anoxic Zones/ Tanks Anaerobic Zones/Tanks Sequencing Batch Reactor (SBR) SECONDARY TREATMENT (BIOLOGICAL REACTORS AND CLARIFIERS) (i.e., biological and chemical processes to remove organics and nutrients) C. WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION - COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS Per 15A NCAC 02T .OSOStk), multiple pumps shall be provided wherever pumps are used. Is this condition met by the design? Yes or [J No. If no, provide an explanation:_ Per ISA NCAC 02T .0505(1), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided per 15A NCAC 02H. 0124(2)(a). Is this condition met by the design? XI Yes or | | No. If no, provide (as an attachment to this Application) written approval from the Director that the facility: Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and Has sufficient storage capacity that no potential for overflow exists, and Can tolerate septic wastewater due to prolonged detention. Per ISA NCAC 02T .0505(0), a minimum of 30 days of residual storage shall be provided. Is this condition met by the vvaici nusuurcei *0 ft sideCircular ft sideRectangular 2 50' x 36' YesM-l / M-2 11570 3. 5. RESIDUALS TREATMENT - NOT APPLICABLE 6. Location Purpose Type BNR Train No. 2 2 Diffused Aeration Rotary Lobe PD M-l 11615 9. ODOR CONTROL - NOT APPLICAB1F D. SETBACKS- 1. Setback Parameter 100 ft No 100 ft Yes 50 ft Yes No 100 ft 50 ft 2. Application for Authorization to Construct Permit (FORM ATC-12-14) Page 9 No. of Blowers Plan Sheet Reference Specification Reference -es UITY gallons ft diameter; water depth square feet; water depth Minimum Distance Required from Nearest Treatment/Storage Unit Is Minimum Distance Requirement met by the Design? If "No", identify Setback Waivers in Item D.2 ______ Below o a Water Res■. ENVIRONM£Nt4 Capacity of each Blower (CFM) 1,500 7. 8. .. > Yes No No. If yes, have these waivers been :s or No. If Yes Yes Secondary Clarifier Other: Diffused Aeration No No NCAC 02T .OSOefd)? Yes or f ' -..J recorded with the County Register of Deeds? Ye: drain PumPs)-^OT APPIICA^TejN-K^Nd'wal'lpTmP REPI A’rFMFNTON^y16 5'UdEe' 5'Ud8e and Plant BLUWEKS^1 IN~KIND MIXER REPLACEMENT ONLY Membrane Disc TERTIARY TREATMENT - NOT APPLICABLE 4. DISINFECTION - NOT APPLICABLE Any habitab,e residence or place of assembly under separate -Ownership or not to be maintained as part of the project site Any private or public water supply source “Surface waters (streams - intermittent and perennial, perennial waterbodies, and wetlands) Any well with exception of monitoring wells Any property line Have any setback waivers been obtained per ISA NCA, written, notarized and signed by all parties involved and no, provide an explanation: APPLICATION FOR AUTHORI J^ON TO CONSTRUCT PERMIT (FORM ATC-12-14 COMPLETE FOR NEW WASTEWATER TREATMENT STRUCTURES - NOT APPLICABI F Le“wT: d'StanCe f°r Parame‘er the treatment/storage units per LSA NCAC 02T .OSOBib, Membrane Bioreactor (MBR) Secondary Clarifier Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) SECTION 5; APPLICATION CERTIFICATION BY PROFESSIONAL ENGINEER Page 10Application for Authorization to Construct Permit (FORM ATC-12-14) Professional Engineer's Certification per ISA NCAC 02T .0105: , attest that this application package for an Authorization to Construct 1 iI r r I rI r rI * * * I * I I *I * *I I H I I rflif Water Resources ENVIRONMENTAL QUALITY V ' > ••••••••• '"/s B . I, Kurtis B. Proffit (Typed Name of Professional Engineer) for the Triangle WWTP Aeration System Improvements project---------- ------------------------------------- ---------------------------------- (Facility and Project Name) was prepared under my direct supervisory control and to the best of my knowledge is accurate, complete and consistent with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with all applicable regulations and statutes, 15 NCAC 02H. 0100,15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.B.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this application package. I further understand that the application package may be subject to a future audit by the Division. Although certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. I understand that in accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dated: Date: Page 11 * I * * * I l KC’ Water Resources ENVIRONMENTAL QUALITY 1 P * State of North Carolina Department of Environmental Quality Division of Water Resources By Courier/Special Delivery: 512 N. SALISBURY STREET, 9TH FLOOR RALEIGH, NORTH CAROLINA 27604 TELEPHONE NUMBER: (919) 807-6351 Application for Authorization to Construct Permit (FORM ATC-12-14) APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES/NPDES By U.S. Postal Service 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 SECTION 6: APPLICATION CERTIFICATION BY APPLICANT Applicant’s Certification per ISA NCAC 02T .0106(b); for the SLanfile WWTP Aeration System Improvements Project (Facility and Project Name) ' ---------------------------------------------- --------------------------- appeals have been abandoned or exhausted are comnliant urtT 30 outstand,n8 civil Penalty where all overdue annual fees. ' Wl any actlve comPliance schedule, and does not have any ....... Signature: well as civil penalties up to $25,000 per violation.