HomeMy WebLinkAboutNC0026051_Final Permit_20100803July 23, 2010
3
Dear Mr. Whisler:
Beverly Eaves Perdue
Governor
• Paragraph 4. - 'Industrial User discharging sending to the POTW' becomes 'Industrial User
discharging to the POTW'
Dee Freeman
Secretary
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-6300 \ FAX: 919-807-6492 \ Customer Service: 1 -877-623-6748
Internet: www.ncwaterquality.org
An Equal Opportunity \ Affirmative Action Employer
NorthCarolinaNaturally
In response to comments received July 21 from Joe Pearce, Utility Division Manager, please find
enclosed the following corrected pages for the County's NPDES permit, issued July 9, 2010:
• Supplement to Permit Cover Sheet. The facility description is revised to reflect a single 'Sludge
lagoon' rather than multiple 'Sludge lagoons,' and the three references to projected service dates
now specify '2011' instead of '2010.'
• Standard Conditions, Part IV, Section C, Municipal Control of Pollutants from Industrial Users.
Two grammatical/ typographical errors have been corrected:
• Subparagraph 2.b.5. - 'Heat in amount which will may inhibit' becomes 'Heat in amount
which will inhibit'
Subject: Technical Corrections
Permit NC0026051
Durham County Triangle WWTP
Durham County
Mr. Glen E. Whisler, County Engineer
Durham County
120 E Parrish Street, 1st Floor
Durham, North Carolina 27701
HCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
Please insert the new pages and discard or strike out the corresponding pages of the permit you
recently received.
These corrections do not alter the issuance or effective dates of the permit, which remain at July 9 and
August 1, 2010, respectively. Mr. Pearce indicated that the county received the permit on July 12. If the
permit, including these corrections, is not acceptable to the County, its 30-day window to file a petition
Engineer
with the OAH ends on August 11, 2010. Please refer to the July 9 permit cover letter for OAH contact
information and other details.
If you have any questions concerning this permit, please contact Mike Templeton at (919) 807-6402 or at
mike, templeton@ncdenr.gov.
Enclosure:
Copies:
Mr. Glen E. Whisler, Co
Technical Corrections
July 23, 2010
Technical corrections, NC0026051 (3 pages)
Joseph R. Pearce, Utility Division Manager
Chief, NPDES and Biosoiids Permits Section, Region IV, EPA
Raleigh Regional Office, Surface Water Protection
PERCS Unit
NPDES Files
Central Files
dZoleen H. Sullins
Permit No. NC0026051
SUPPLEMENT TO PERMIT COVER SHEET
Durham County
All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of
this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the
exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements,
terms, and provisions included herein.
2. Discharge from said treatment works (via Outfall 001) into Northeast Creek, a Class WS-IV NSW
water in the Cape Fear River Basin, at the location specified on the attached map.
is hereby authorized to:
1. Continue to operate an existing 12.0 MGD wastewater treatment facility located south of Durham
at the Durham County Triangle WWTP off NC Highway 55 in Durham County. The facility
includes the following treatment components:
• Mechanical fine screens
• Mechanical grit removal
• Parshall flume
• Influent pump station
• Three 5-stage BNR trains
• Four secondary clarifiers
• Five tertiary sand filters
• Ultraviolet disinfection
• Post aeration
• Sludge lagoon
• Waste and return activated sludge pumping system
• Methanol, potassium hydroxide, and sodium hypochlorite storage and feed systems
• Liquid waste activated sludge storage (projected service date is the end of 2011)
• Dewatering facility (projected service date is the end of 2011)
• Truck loading for contract composting operation (projected service date is the end of 2011)
npd:
Section C. Municipal Control of Pollutants from Industrial Users.
1.
b.
■ 1.
2.
3.
5.
6.
7.
8.
3.
Version 7/1/2010
rmit Standard Conditions
Page 15 of 18
Effluent limitations are listed in Part I of this permit. Other pollutants attributable to inputs from industries
using the municipal system may be present in the Permittee's discharge. At such time as sufficient information
becomes available to establish limitations for such pollutants, this permit may be revised to specify effluent
limitations for any or all of such other pollutants in accordance with best practicable technology or water
quality standards.
2. Prohibited Discharges
The Permittee shall report such discharges into the POTW to the Director or the appropriate Regional
Office. Any information shall be provided orally within 24 hours from the time the Permittee became
aware of the circumstances. A written submission shall also be provided within 5 days of the time the
Permittee becomes aware of the circumstances. The written submission shall contain a description of the
discharge, the investigation into possible sources; tire period of the discharge, including exact dates and
times; and if the discharge has not ceased, the anticipated time it is expected to continue; and steps taken
or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the Permittee to
supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to ensure compliance
a. Under no circumstances shall the Permittee allow introduction of pollutants or discharges into the waste
treatment system or waste collection system which cause or contribute to Pass Through or Interference as
defined in 15A NCAC 2H.0900 and 40 CFR 403. [40 CFR 403.5 (a) (1)]
Under no circumstances shall the Permittee allow introduction of the following wastes in the waste
treatment or waste collection system [40 CFR 403.5 (b)]:
Pollutants which create a fire or explosion hazard in the POFW, including, but not limited to,
wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees
Centigrade using the test methods specified in 40 CFR 261.21;
Pollutants which cause corrosive structural damage to the POTW, but in no case discharges with pH
lower than 5.0, unless the works is specifically designed to accommodate such discharges;
Solid or viscous pollutants in amounts which cause obstruction to the flow in the POTW resulting in
Interference;
4. Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow
rate and/or pollutant concentration which will cause Interference with the POTW;
Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in no
case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C (104°F)
unless the Division, upon request of the POTW, approves alternate temperature limits;
Petroleum oil, non-biodegradable cutting oil, or products of mineral oil origin in amounts that will
cause Interference or Pass Through;
Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity
that may cause acute worker health and safety problems;
Any trucked or hauled pollutants, except at discharge points designated by the POTW.
2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger as
influent to that POTW at the time of issuance of the permit.
3. For purposes of this paragraph, adequate notice shall include information on (1) the quality and quantity of
effluent introduced into the POTW, and (2) any anticipated impact that may result from the change of the
quantity or quality of effluent to be discharged from the POTW.
c. The Permittee shall investigate the source of all discharges into the POTW, including slug loads and other
unusual discharges, which have the potential to adversely impact the permittee's Pretreatment Program
and/or the operation of the POTW.
*>
July 9, 2010
L I
Dear Mr. Whisler:
Beverly Eaves Perdue
Governor
Mr. Glen E. Whisler, County Engineer
Durham County
120 E Parrish Street, 1st Floor
Durham, North Carolina 27701
Dee Freeman
Secretary
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St, Raleigh, North Carolina 27604
Phone: 919-807-6300 \ FAX: 919-807-6492 \ Customer Service: 1-877-623-6748
Internet: www.ncwaterquality.org
An Equal Opportunity \ Affirmative Action Employer
NorthCarolinaNaturally
Subject: NPDES Permit Modification
Permit NC0026051
Durham County Triangle WWTP
Durham County
Consistent with the Director's October 1, 2009, letter of intent to modify NPDES permits affected by the
Jordan Reservoir Nutrient Management Strategy rules and in consideration of public comments on the
subsequent draft permit modifications, the Division is forwarding herewith the revised NPDES permit
for the Durham County Triangle WWTP. This permit modification is issued pursuant to the
requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between North Carolina and the U.S. Environmental Protection Agency, dated October 15, 2007.
The Division received the County's comments on the draft permit during the initial public comment
period. We also received comments from several permittees, including the County, regarding the
standard permit conditions (Parts II, III, and IV) in the draft permits. The final permit includes the
following changes in addition to those proposed in the draft:
• Nitrogen Optimization. The Nitrogen Optimization condition has been deleted. The County
correctly noted that this requirement applies only to pre-BNR facilities.
• Standard Conditions. Jeff Poupart of the Point Source Branch has worked with other programs
within the Division and with EPA Region 4 staff to evaluate and address the comments received.
The final permit includes a newly revised version of the standard permit conditions. We
appreciate your patience in this matter and regret any inconvenience this delay may have caused.
Implementation of Total Phosphorus (TP) Limits. The Jordan Reservoir Wastewater Discharge
Requirements (T15A NCAC 02B .0270) established annual mass phosphorus limits for fourteen
treatment facilities, to become effective with calendar year 2010. Thus, even though the effective date of
this permit modification is August 1, 2010, the new limits became effective January 1,2010, by rule and
apply to calendar year 2010 in its entirety.
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Coleen H. Sullins
Director
*
a
Sincerely,
Enclosure:
Copies:
Final permit modification, NC0026051
Joseph R. Pearce, Utility Division Manager
Chief, NPDES and Biosolids Permits Section, Region IV, EPA
Raleigh Regional Office, Surface Water Protection
PERCS Unit
NPDES Files
Central Files
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable to you, you have tire right to an adjudicatory hearing upon written request within thirty
(30) days following receipt of this letter. This request must be in the form of a written petition,
conforming to Chapter 150B of the North Carolina General Statutes, and filed with the office of
Adnunistrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such .
demand is made, this permit shall be final and binding.
This permit is not transferable except after notice to the Division of Water Quality. The Division may
require modification or revocation and reissuance of the permit. This permit does not affect the legal
requirements to obtain other permits which may be required by the Division of Water Quahty, the
Division of Land Resources, the Coastal Area Management Act, or any other federal or local
governmental permit.
If you have any questions concerning this permit, please contact Mike Templeton at (919) 807-6402 or at
m ike. templeton@n cden r.gov.
. Coleen H. Su
Mr. Glen E. Whisler, Count^B^igineer
NPDES Permit Modification
July 9, 2010
r Permit No. NC0026051
PERMIT
TO DISCHARGE WASTEWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Durham County
is hereby authorized to discharge wastewater from a facility located at the
to receiving waters designated as Northeast Creek in the Cape Fear River Basin
This permit shall become effective August 1, 2010.
April 30, 2011.
Signed this day July 9, 2010.
p
in accordance with effluent limitations, monitoring requirements, and other conditions set forth in
Parts I, II, III, and IV hereof.
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful standards
and regulations promulgated and adopted by the North Carolina Environmental Management
Commission, and the Federal Water Pollution Control Act, as amended.
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
Coleen H. Sullins, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Durham County Triangle WWTP
5926 NC Highway 55
Durham County
This permit and authorization to discharge shall expire at midnight on
Permit No. NC0026051 .. ■
SUPPLEMENT TO PERMIT COVER SHEET
Durham County
2. Discharge from said treatment works (via Outfall 001) into Northeast Creek, a Class WS-IV NSW
water in the Cape Fear River Basin, at the location specified on the attached map.
is hereby authorized to:
1. Continue to operate an existing 12.0 MGD wastewater treatment facility located south of Durham
at the Durham County Triangle WWTP off NC Highway 55 in Durham County. The facility
includes the following treatment components:
• Mechanical fine screens
• Mechanical grit removal
• Parshall flume
• Influent pump station
• Three 5-stage BNR trains
• Four secondary clarifiers
• Five tertiary sand filters
• Ultraviolet disinfection
• Post aeration
• Sludge lagoons
• Waste and return activated sludge pumping system
• Methanol, potassium hydroxide, and sodium hypochlorite storage and feed systems
• Liquid waste activated sludge storage (projected service date is the end of 2010)
• Dewatering facility (projected service date is the end of 2010)
• Truck loading for contract composting operation (projected service date is the end of 2010)
All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked. As of
this permit issuance, any previously issued permit bearing this number is no longer effective. Therefore, the
exclusive authority to operate and discharge from this facility arises under the permit conditions, requirements,
terms, and provisions included herein.
Outfall 001
Durham Co. Triangle WWTP - NC0026051
North SCALE 1:24,000
Facility
Location
Lat: 35°52’51”
Long.: 78°53’50”
USGS Quad Name: SW Durham
Receiving Stream: Northeast Creek
Stream Class: WS-IV NSW
Subbasin: Catawba - 03-06-05
lOI
71'
I.
//
Wo Wi
w-Tfr
O.OiH
r
Permit No. NC0026051
EFFLUENT LIMITATIONS MONITORING REQUIREMENTS
Sample Location1Sample Type
Flow 12.0 MGD Continuous Influent or Effluent
Total Monthly Flow (MG)Monitor & Report Monthly Influent or Effluent
5.0 mg/L 7.5 mg/L Daily Influent & EffluentComposite
10.0 mg/L 15.0 mg/L Daily Composite Influent & Effluent
30.0 mg/L 45.0 mg/L Daily Influent & EffluentComposite
1.0 mg/L 3.0 mg/L Daily Composite Effluent
1.8 mg/L 5.4 mq/L Daily Composite Effluent
200/100mL 400/100mL Daily Grab Effluent
Grab Effluent
Grab Effluent
Grab Effluent
17 pg/L Grab Effluent
Grab Effluent
Grab Effluent
Grab Effluent
TKN Effluent
Effluent
Effluent
Calculated Effluent
Total Phosphorus, TP Composite Effluent
TP Load 6'7 Calculated Effluent
Grab Effluent
Effluent
Effluent
Effluent
Chloride Effluent
Annually Effluent
Quarterly Composite Effluent
All footnotes are listed on the following page.
EFFLUENT
CHARACTERISTICS Monthly
Average
Weekly
Average
Daily
Maximum
Measurement
Frequency
Recording
Recorded or
Calculated
NO3-N + NO2-N
Total Nitrogen, TN
Total Copper
Total Zinc
Weekly
Weekly
Monthly
Monthly
Monthly
Daily
Daily
Composite
Composite
Composite
Composite
Composite/
Grab
Composite
Composite
Composite
_____________________1-8 pg/L
_____________________1-3 pg/L
Monitor & Report (mg/L)
Monitor & Report (mg/L)
Monitor & Report (mg/L)
Monitor & Report (Ib/mo)
111,207 Ib/yr (effective 1/1/2010)
Monitor & Report
Monitor & Report (Ib/mo)
8,432 Ib/yr (effective 1/1/2010)
0.012 pg/L
1800 pg/L
Daily
Daily
2/Month
Weekly
Weekly
Weekly
Weekly
Weekly
Monthly
Annually
Weekly
Monthly
Annually
A.(l.) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS
Beginning upon the effective date of this permit and lasting until expiration, the Permittee is
authorized to discharge treated wastewater from Outfall 001. Such discharges shall be limited and
monitored by the Permittee as specified below:
TN Load 6'7
Total Mercury 8
Fluoride
BOD, 5-day, (20°C)2
(April 1 - October 31)
BOD, 5-day, (20°C)2
(November 1 - March 31)
Total Suspended Solids2
NH3 as N
(April 1-October 31)
NH3 as N
(November 1-March 31)
Fecal Coliform
(geometric mean)
Dissolved Oxygen3
Temperature (°C)
pH4_________________
Total Residual Chlorine5
Chloroform5
Bromodichloromethane5
Dibromochloromethane5
Chronic Toxicity 10
Effluent Pollutant Scan 9
Permit No. NC0026051 ■ • •
Footnotes:
There shall be no discharge of floating solids or visible foam in other than trace amounts.
MONITORING REQUIREMENTS
SAMPLE LOCATION2MEASUREMENT FREQUENCY SAMPLE TYPE
Dissolved Oxygen Grab Upstream, DI, D2
Temperature Grab Upstream, DI, D2
Conductivity Grab Upstream, DI, D2
Fecal Coliform Grab Upstream, DI, D2
pH Grab Upstream, DI, D2
1.
3.
4.
5.
6.
7.
8.
9.
1.
2.
INSTREAM
CHARACTERISTICS
2.
3.
As a participant in the Upper Cape Fear River Basin Association, the instream monitoring requirements as stated
above are waived. Should your membership in the association be terminated, you shall notify the Division
immediately and the instream monitoring requirements specified in your permit shall be reinstated.
Upstream = at NCSR1102. DI = Downstream at NCSR 1100. D2 = Downstream at NCSR 1732.
Samples shall be collected during June-September only.
A.(2.) INSTREAM MONITORING REQUIREMENTS
Beginning upon the permit effective date and lasting until expiration, the Permittee shall monitor
instream conditions as specified below1:
Grab
Grab
Grab
Grab
Grab
Upstream, DI, D2
Upstream, DI, D2
Upstream, DI, D2
Upstream, DI, D2
Upstream, DI, D2
Total Phosphorus
PO4__________
TKN
See Condition A. (2.), for Instream Monitoring Requirements.
The monthly average effluent BODS and TSS concentrations shall not exceed 15% of the respective influent value (85%
removal).
The daily effluent dissolved oxygen concentration shall not be less than 6.0 mg/L.
The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units.
Limit and/or monitoring applies only when chlorine is added to treatment system.
Refer to Special Condition A.(8.), Calculation of Total Nitrogen or Total Phosphorus Loads.
Compliance with mass limits shall be determined in accordance with Special Condition A.(7.), Annual Limits for Total
Nitrogen or Total Phosphorus.
Mercury samples shall be analyzed using EPA Method 1631E.
See Special Condition A. (4.), Effluent Pollutant Scan.
10. Chronic Toxicity (Ceriodaphnia) at 90%; February, May, August, and November; refer to Special Condition A.(3.).
NO2 + NO3
NH3 as N
Footnotes:
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
Weekly (June-September)3
Weekly (June-September)3
Weekly (June-September)3
Weekly (June-September)3
Weekly (June-September)3
Permit No. NC0026051
A.(3.) CHRONIC TOXICITY PASS/FAIL PERMIT LIMIT
The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant
mortahty to Ceriodaphnia dubia at an effluent concentration of 90%.
The permit holder shall perform at a minimum, quarterly monitoring using test procedures outlined in
the "North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure," Revised February 1998, or
subsequent versions or "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure"
(Revised-February 1998) or subsequent versions. The tests will be performed during the months of
February, May, August, and November. Effluent sampling for this testing shall be performed at the
NPDES permitted final effluent discharge below all treatment processes.
If the test procedure performed as the first test of any single quarter results in a failure or ChV below
the permit limit, then multiple-concentration testing shall be performed at a minimum, in each of the
two following months as described in "North Carolina Phase II Chronic Whole Effluent Toxicity Test
Procedure" (Revised-February 1998) or subsequent versions.
The chronic value for multiple concentration tests will be determined using the geometric mean of the
highest concentration having no detectable impairment of reproduction or survival and the lowest
concentration that does have a detectable impairment of reproduction or survival. The definition of
"detectable impairment," collection methods, exposure regimes, and further statistical methods are
specified in the "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure" (Revised-
February 1998) or subsequent versions.
All toxicity testing results required as part of this permit condition will be entered on the Effluent
Discharge Monitoring Form (MR-1) for the months in which tests were performed, using the parameter
code TGP3B for the pass/ fail results and THP3B for the Chronic Value. Additionally, DWQ Form AT-
3 (original) is to be sent to the following address:
NCDENR/ DWQ/Environmental Sciences Section
1621 Mail Service Center
Raleigh, North Carolina 27699-1621
Completed Aquatic Toxicity Test Forms shall be filed with the Environmental Sciences Section no later
than 30 days after the end of the reporting period for which the report is made.
Test data shall be complete, accurate, include all supporting chemical/physical measurements and all
concentration/ response data, and be certified by laboratory supervisor and ORC or approved
designate signature. Total residual chlorine of the effluent toxicity sample must be measured and
reported if chlorine is employed for disinfection of the waste stream.
Should there be no discharge of flow from the facility during a month in which toxicity monitoring is
required, the permittee will complete the information located at the top of the aquatic toxicity (AT) test
form indicating the facility name, permit number, pipe number, county, and the month/year of the
report with the notation of "No Flow" in the comment area of the form. The report shall be submitted
to the Environmental Sciences Section at the address cited above.
Should the permittee fail to monitor during a month in which toxicity monitoring is required,
monitoring will be required during the following month.
Should any test data from this monitoring requirement or tests performed by the North Carolina
Division of Water Quality indicate potential impacts to tire receiving stream, this permit may be re
opened and modified to include alternate monitoring requirements or limits.
NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control
organism survival, minimum control organism reproduction, and appropriate environmental controls,
shall constitute an invalid test and will require immediate follow-up testing to be completed no later
than the last day of the month following the month of the initial monitoring.
Permit No. NC0026051 * •'
Bis (2-chloroethyl) ether
Bis (2-chloroisopropyl) ether
Bis (2-ethylhexyl) phthalate
4-bromophenyl phenyl ether
Butyl benzyl phthalate
2-chloronaphthalene
4-chlorophenyI phenyl ether
Chrysene
Di-n-butyl phthalate
Di-n-octyl phthalate
Dibenzo(a,h)anthracene
1.2- dichlorobenzene
1.3- dichlorobenzene
1.4- dichlorobenzene
3.3- dichlorobenzidine
Diethyl phthalate
Dimethyl phthalate
2.4- dinitrotoluene
2,6-d i nitro toluene
1,2-diphenylhydrazine
Fluoranthene
Fluorene
Hexachlorobenzene
Hexachlorobutadiene
Hexachl orocy clo-pentadiene
Hexachloroethane
Indeno(l,2,3-cd)pyrene
Isophorone
Naphthalene
Nitrobenzene
N-nitrosodi-n-propylamine
N-nitrosodimethylamine
N-nitrosod ipheny lamine
Phenanthrene
Pyrene
1.2.4- trichlorobenzene
A.(4.) EFFLUENT POLLUTANT SCAN
The Permittee shall perform an annual Effluent Pollutant Scan for ail parameters listed in the attached
table. The analytical methods shall be in accordance with 40 CFR Part 136 and shall be sufficiently
sensitive to determine whether parameters are present in concentrations greater than applicable
standards and criteria. Samples shall represent seasonal variations. Unless otherwise indicated,
metals shall be analyzed as 'Total recoverable."
Ammonia (as N)
Chlorine (total residual, TRC)
Dissolved oxygen
Nitrate/Nitrite
Kjeldahl nitrogen
Oil and grease
Phosphorus
Total dissolved solids
Hardness
Antimony
Arsenic
Beryllium
Cadmium
Chromium
Copper
Lead
Mercury*
Nickel
Selenium
Silver
Thallium
Zinc
Cyanide
Total phenolic compounds
Volatile organic compounds:
Acrolein
Acrylonitrile
Benzene
Bromoform
Carbon tetrachloride
Chlorobenzene
Chlorodibromomethane
Chloroethane
2-chloroethylvinyl ether
Chloroform
Dichlorobromomethane
1.1- dichloroethane
1.2- dichloroethane
Trans-l,2-dichloroethylene
1.1- dichloroethylene
1.2- dichloropropane
1.3- dichloropropylene
Ethylbenzene
Methyl bromide
Methyl chloride
Methylene chloride
1,1,2,2-tetrachloroethane
Tetrachloroethylene
Toluene
1.1.1- trichloroethane
1.1.2- trichloroethane.
Trichloroethylene
Vinyl chloride
Acid-extractable compounds:
P-chloro-m-cresol
2-chlorophenol
2.4- dichlorophenol
2.4- dimethylphenol
4.6- dinitro-o-cresol
2.4- dinitrophenol
2-nitrophenol
4-nitrophenol
Pentachlorophenol
Phenol
2.4.6- trichlorophenol
Base-neutral compounds:
Acenaphthene
Acenaphthylene
Anthracene
Benzidine
Benzo(a)anthracene
Benzo (a) pyrene
3,4 benzofluoranthene
Benzo(ghi)perylene
Benzo(k)fluoranthene
Bis (2-chloroethoxy) methane
Test results shall be reported to the Division in DWQ Form- DMR-PPA1 or in a form approved by the
Director within 90 days of sampling. The report shall be submitted to the following address:
NC DENR/ DWQ/ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617.
*Mercury samples shall be analyzed using EPA Method 1631E.
r
Permit No. NC0026051
Total Nitrogen Allocation
SOURCE DATE STATUS
Delivered (Ib/yr)Discharge (Ib/yr)
8/11/09 106,759 111,207Base Active
TOTAL 111,207106,759 Active
Footnote:
(1)Nitrogen Transport Factor = 96%
Total Phosphorus Allocation
SOURCE DATE STATUS
Delivered (Ib/yr)Discharge (Ib/yr)
8/11/09 8,432 ActiveBase8,179
TOTAL 8,179 8,432 Active
Footnote:
(1)Phosphorus Transport Factor = 97%
(b.) Any addition, deletion, or modification of the listed allocation(s) (other than to correct
typographical errors) or any change in status of any of the listed allocations shall be considered a
major modification of this permit and shall be subject to the public review process afforded such
modifications under state and federal rules.
ALLOCATION
TYPE
ALLOCATION
TYPE
A.(5.) REUSE OF TREATMENT PLANT EFFLUENT
The effluent from the Durham County Triangle WWTP is authorized for onsite reuse subject to the
following conditions:
• The reuse water will be used onsite, within the fenced perimeter of the wastewater treatment
plant with controlled public access, and for very specific internal uses (i.e., restrooms, HVAC
system, and vehicle washdown).
• The reuse water will be used by plant personnel who are trained and knowledgeable about
reuse water.
• An RPZ device will be required onsite to protect the potable water supply.
• A water meter will be installed on the reuse line to monitor usage.
• No runoff shall occur from the vehicle washdown area.
• Reuse piping valves will be properly labeled and locking.
A.(6.) NUTRIENT ALLOCATIONS
(a.) The following table lists the Total Nitrogen (TN) and Total Phosphorus (TP) allocations assigned
to, acquired by, or transferred to the Permittee in accordance with the Jordan Lake nutrient
management rule (T15A NCAC 02B .0270) and the status of each as of permit issuance. For
comptiance purposes, this table does not supersede any TN or TP limit estabtished elsewhere in
this permit or in the NPDES permit of a compliance association of which the Permittee is a Co
Permittee Member.
Assigned by Rule
(T15ANCAC 02B.0270)
Assigned by Rule
(T15ANCAC 02B .0270)
ALLOCATION AMOUNT ,1)
ALLOCATION AMOUNT (1)
Permit No. NC0026051 '''
.V
ince association on January
governed by that association's
A.(7.) ANNUAL LIMITS FOR TOTAL NITROGEN OR TOTAL PHOSPHORUS
(a.) Total Nitrogen (TN) and Total Phosphorus (TP) allocations and load limits for NPDES
dischargers in the Jordan Lake watershed are annual limits and apply on a calendar year basis.
(b.) For any given calendar year, the Permittee shall be in compliance with the annual TN (or TP)
Load limit in this Permit if:
(i.) the Permittee's annual TN (or TP) Load is less than or equal to the effective limit, or
(ii.) the Permittee is a Co-Permittee Member of a compliance association.
as the result of allowable changes in(c.) The TN (or TP) Load limit in this Permit may be modified
the Permittee's allocations.
(i.) Allowable changes include those resulting from purchase of TN (or TP) allocation from an
authorized mitigation banker, the Ecosystem Enhancement Program, or other source
allowed under applicable regulations; purchase, sale, trade, or lease of allocation between
the Permittee and other dischargers; regionalization; and other transactions approved by
the Division.
(ii.) The Permittee may request a modification of the TN (or TP) Load limit in this Permit to
reflect allowable changes in its allocation(s).
(A) Upon receipt of timely and proper appUcation, the Division will modify the permit as
appropriate and in accordance with state and federal program requirements.
(B) Changes in TN (or TP) limits become effective on January 1 of the year following
permit modification. The Division must receive application no later than August 31
for changes proposed for the following calendar year.
(iii.) Any requests for modification should be sent to:
NCDENR/ DWQ/ NPDES Programs
Attn: Jordan Lake Watershed Coordinator
1617 Mail Service Center
Raleigh, NC 27699-1617
(d.) If the Permittee is a member and co-permittee of an approved complia:
1 of a given year, its TN and TP discharges during that year are
group NPDES permit and the limits therein.
(i.) The Permittee shall be considered a Co-Permittee Member for any given calendar year in
which it is identified as such in Appendix A of the association's group NPDES permit.
(ii.) Association roster(s) and members' TN and TP allocations will be updated annually and in
accordance with state and federal program requirements.
(iii.) If the Permittee intends to join or leave a compliance association, the Division must be
notified of the proposed action in accordance with the procedures defined in the
association's NPDES permit.
(A) Upon receipt of timely and proper notification, the Division will modify the permit as
appropriate and in accordance with state and federal program requirements.
(B) Membership changes in a compliance association become effective on January 1 of the
year following modification of the association's permit.
(e.) The TN and TP monitoring and reporting requirements in this Permit remain in effect
throughout the term of the Permit and are not affected by the Permittee's membership in a
compliance association.
Permit No. NC0026051
TMF
8.34
A.(9.) NUTRIENT MONITORING REOPENER
Pursuant to N.C. General Statute Section 143-215.1 and the implementing rules found in Title 15A of
the North Carolina Administrative Code, Subchapter 2H, specifically, 15A NCAC 2H.0112(b) (1) and
2H.0114(a), and Part II, Sections B-12 and B-13 of this permit, the Director of DWQ may reopen this
permit to require supplemental nutrient monitoring of the discharge. The additional monitoring will
be to support water quality modeling efforts within the Cape Fear River Basin, and shall be consistent
with a monitoring plan developed jointly by the Division and affected stakeholders.
= the average Total Nitrogen or Total Phosphorus concentration
(mg/L) of the composite samples collected during the month
= the Total Monthly Flow of wastewater discharged during the
month (MG/mo)
= conversion factor, from (mg/L x MG) to pounds
A.(8.) CALCULATION OF TOTAL NITROGEN OR TOTAL PHOSPHORUS LOADS
(a.) The Permittee shall calculate monthly and annual TN Loads as follows:
(i.) Monthly TN (or TP) Load (lb/mo) = TN (or TP) x TMF x 8.34
where:
TN or TP
(ii.) Annual TN (or TP) Load (lb/yr) = Sum of the 12 Monthly TN (or TP) Loads for the calendar
year
(b.) The Permittee shall report monthly Total Nitrogen and Total Phosphorus results (mg/L and
lb/mo) in the appropriate discharge monitoring report for each month and shall report each
calendar year's results (lb/yr) with the December report for that year.
NPDi
Section A. Definitions
Version 7/1/2010
'ermit Standard Conditions
Pagel of!8
Annual Average
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In the case of fecal
coliform, the geometric mean of such discharges.
3/Week
Samples are collected three times per week on three separate calendar days. These samples shall be representative
of the wastewater discharged during the sample period.
PART II
STANDARD CONDITIONS FOR NPDES PERMITS
2/Month
Samples are collected twice per month with at least ten calendar days between sampling events. These samples
shall be representative of the wastewater discharged during the sample period.
Arithmetic Mean
The summation of the individual values divided by the number of individual values.
Calendar Week
The period from Sunday through the following Saturday.
Calendar Quarter
One of the following distinct periods: January through March, April through June, July through September, and
October through December.
Composite Sample
A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 ml in
such a manner as to result in a total sample representative of the wastewater discharge during the sample period.
The Director may designate the most appropriate method (specific number and size of aliquots necessary, the time
interval between grab samples, etc.) on a case-by-case basis. Samples may be collected manually or automatically.
Composite samples may be obtained by the following methods:
Bypass
The known diversion of waste streams from any portion of a treatment facility including the collection system,
which is not a designed or established or operating mode for the facility.
Calendar Day
The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any
consecutive 24-hour period that reasonably represents the calendar day may be used for sampling.
(1) Continuous: a single, continuous sample collected over a 24-hour period proportional to the rate of flow.
(2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour
period of discharge and combined proportional to the rate of flow measured at the time of individual
sample collection, or
(3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period
with the time intervals between samples determined by a preset number of gallons passing the sampling
point. Flow measurement between sample intervals shall be determined by use of a flow recorder and
totalizer, and the preset gallon interval between sample collection fixed at no greater than 1/24 of the
expected total daily flow at the treatment system, or
Act or "the Act"
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et.
seq.
>
Version 7/1/2010
Grab Sample
Individual samples of at least 100 ml collected over a period of time not exceeding 15 minutes. Grab samples can be
collected manually. Grab samples must be representative of the discharge (or the receiving stream, for instream
samples).
NPDES Permit Standard Conditions
Page 2 of 18
EPA
The United States Environmental Protection Agency
Daily Maximum
The highest "daily discharge" during the calendar month.
DWQ or "the Division"
The Division of Water Quality, Department of Environment and Natural Resources.
Geometric Mean
The Nth root of the product of the individual values where N = the number of individual values. For purposes of
calculating the geometric mean, values of "0" (or "< [detection level]") shall be considered = 1.
Facility Closure
Cessation of all activities that require coverage under this NPDES permit. Completion of facility closure will allow
this permit to be rescinded.
Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the CWA.
EMC
The North Carolina Environmental Management Commission
Daily Discharge
The discharge of a pollutant measured during a calendar day or any 24-hour period that reasonably represents the
calendar day for purposes of sampling. For pollutants measured in units of mass, the "daily discharge" is
calculated as the total mass of the pollutant discharged over the day. The "daily discharge" concentration
comprises the mean concentration for a 24-hour sampling period as either a composite sample concentration or the
arithmetic mean of all grab samples collected during that period. (40 CFR 122.2)
(4) Constant time/constant volume: a series of grab samples of equal volume collected over a 24-hour period at a
constant time interval. Use of this method requires prior approval by the Director. This method may only be
used in situations where effluent flow rates vary less than 15 percent. The following restrictions also apply:
Influent and effluent grab samples shall be of equal size and of no less than 100 milliliters
> Influent samples shall not be collected more than once per hour.
> Permittees with wastewater treatment systems whose detention time < 24 hours shall collect effluent grab
samples at intervals of no greater than 20 minutes apart during any 24-hour period.
> Permittees with wastewater treatment systems whose detention time exceeds 24 hours shall collect
effluent grab samples at least every six hours; there must be a minimum of four samples during a 24-hour
sampling period.
Daily Sampling
Parameters requiring daily sampling shall be sampled 5 out of every 7 days per week unless otherwise specified in
the permit. Sampling shall be conducted on weekdays except where holidays or other disruptions of normal
operations prevent weekday sampling. If sampling is required for all seven days of the week for any permit
parameter(s), that requirement will be so noted on the Effluent Limitations and Monitoring Page(s).
Continuous flow measurement
Flow monitoring that occurs without interruption throughout the operating hours of the facility. Flow shall be
monitored continually except for the infrequent times when there may be no flow or for infrequent maintenance
activities on the flow device.
Section B. General Conditions
1.
a.
c.
Version 7/1/2010
Quarterly Average (concentration limit)
The average of all samples taken over a calendar quarter.
Monthly Average (concentration limit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of
fecal coliform, the geometric mean of such discharges.
'ermit Standard Conditions
Page 3 of 18
Upset
An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance
with permit effluent limitations and/or monitoring requirements. An upset does not include noncomphance
caused by operational error, improperly designed treatment facilities, inadequate treatment facihties, lack of
preventive maintenance, or careless or improper operation.
NP I
Permit Issuing Authority
The Director of the Division of Water Quality.
Instantaneous flow measurement
A measure of flow taken at the time of sampling, when both the sample and flow will be representative of the total
discharge.
as toxic under Section 307(a)(1) of the CWA.
Severe property damage
Substantial physical damage to property, damage to the treatment facilities which causes them to become
inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in
the absence of a bypass. Severe property damage excludes economic loss caused by delays in production.
Toxic Pollutant:
Any pollutant listed
The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308, 318, or 405 of
the Act, or any condition or limitation implementing any of such sections in a permit issued under section
402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3)
or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
Duty to Comply
The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a
violation of the CWA and is grounds for enforcement action; for permit termination, revocation and
reissuance, or modification; or denial of a permit renewal application [40 CFR 122.41].
The Permittee shall comply with effluent standards or prohibitions established under section 307(a) of the
CWA for toxic pollutants and with standards for sewage sludge use or disposal established under section
405(d) of the CWA within the time provided in the regulations that establish these standards or
prohibitions or standards for sewage sludge use or disposal, even if the permit has not yet been modified
to incorporate the requirement.
Weekly Average (concentration limit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the case of
fecal coliform, the geometric mean of such discharges.
b. The CWA provides that any person who violates section[s] 301, 302, 306, 307, 308, 318 or 405 of the Act, or
any permit condition or limitation implementing any such sections in a permit issued under section 402,
or any requirement imposed in a pretreatment program approved under sections 402 (a) (3) or 402 (b) (8)
of the Act, is subject to a civil penalty not to exceed $37,500 per day for each violation. [33 USC 1319 (d)
and 40 CFR 122.41 (a) (2)]
e.
f.
2.
5.
Version 7/1/2010
|NPDES Permit Standard Conditions
Page 4 of 18
Property Rights
The issuance of this permit does not convey any property rights in either real or personal property, or any
exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor
any infringement of Federal, State or local laws or regulations [40 CFR 122.41 (g)].
Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person
who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [North
Carolina General Statutes § 143-215.6A]
Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act, or any permit
condition or limitation implementing any of such sections in a permit issued under section 402 of the Act,
and who knows at that time that he thereby places another person in imminent danger of death or serious
bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not
more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangerment
violation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more
than 30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon
conviction of violating the imminent danger provision, be subject to a fine of not more than $1,000,000 and
can be fined up to $2,000,000 for second or subsequent convictions. [40 CFR 122.41 (a) (2)]
Duty to Mitigate
The Permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in
violation of this permit with a reasonable likelihood of adversely affecting human health or the environment
[40 CFR 122.41 (d)].
imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a
negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of
violation, or by imprisonment of not more than 2 years, or both. [33 USC 1319 (c) (1) and 40 CFR 122.41 (a)
(2)1
d. Any person who knowingly violates such sections, or such conditions or limitations is subject to criminal
penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In
the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal
penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or
both. [33 USC 1319 (c) (2) and 40 CFR 122.41 (a) (2)]
g. Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302,
306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such
sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are
not to exceed $16,000 per violation, with the maximum amount of any Class I penalty assessed not to
exceed $37,500. Penalties for Class II violations are not to exceed $16,000 per day for each day during
which the violation continues, with the maximum amount of any Class II penalty not to exceed $177,500.
[33 USC 1319 (g) (2) and 40 CFR 122.41 (a) (3)]
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee
from any responsibilities, liabilities, or penalties to which the Permittee is or may be subject to under NCGS
143-215.75 et seq. or Section 311 of the Federal Act, 33 USG 1321. Furthermore, the Permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
3. Civil and Criminal Liability
Except as provided in permit conditions on "Bypassing" (Part II. C. 4), "Upsets" (Part II. C. 5) and "Power
Failures" (Part II. C. 7), nothing in this permit shall be construed to relieve the Permittee from any
responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6 or Section 309
of the Federal Act, 33 USC 1319. Furthermore, the Permittee is responsible for consequential damages, such as
fish kills, even though the responsibility for effective compliance may be temporarily suspended.
NPD(
6.
7.
8.
All permit applications shall be signed as follows:a.
(1) The authorization is made in writing by a person described above;
Version 7/1/2010
’ermit Standard Conditions
Page 5 of 18
Onshore or Offshore Construction
This permit does not authorize or approve the construction of any onshore or offshore physical structures or
facilities or the undertaking of any work in any navigable waters.
Severability
The provisions of this permit are severable. If any provision of this permit, or the application of any provision
of this permit to any circumstances, is held invalid, the application of such provision to other circumstances,
and the remainder of this permit, shall not be affected thereby [NCGS 150B-23].
Duty to Provide Information
The Permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which
the Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and
reissuing, or terminating this permit or to determine compliance with this permit. The Permittee shall also
furnish to the Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41
(h)].
9. Duty to Reapply
If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit,
the Permittee must apply for and obtain a new permit [40 CFR 122.41 (b)].
10. Expiration of Permit
The Permittee is not authorized to discharge after the expiration date, hi order to receive automatic
authorization to discharge beyond the expiration date, the Permittee shall submit such information, forms, and
fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration
date. Any Permittee that has not requested renewal at least 180 days prior to expiration, or any Permittee that
does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration,
will subject the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq.
11. Signatory Requirements
All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and
certified [40 CFR 122.41 (k)].
b. All reports required by the permit and other information requested by the Permit Issuing Authority shall
be signed by a person described in paragraph a. above or by a duly authorized representative of that
person. A person is a duly authorized representative only if:
(1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible
corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in
charge of a principal business function, or any other person who performs similar policy or decision
making functions for the corporation, or (b) the manager of one or more manufacturing, production,
or operating facilities, provided, the manager is authorized to make management decisions which
govern the operation of the regulated facility including having the explicit or implicit duty of making
major capital investment recommendations, and initiating and directing other comprehensive
measures to assure long term environmental compliance with environmental laws and regulations;
the manager can ensure that the necessary systems are established or actions taken to gather complete
and accurate information for permit application requirements; and where authority to sign documents
has been assigned or delegated to the manager in accordance with corporate procedures .
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipahty. State, Federal, or other public agency: by either a principal executive officer or
ranking elected official [40 CFR 122.22],
c.
Section C. Operation and Maintenance of Pollution Controls
Version 7/1/2010
14. Annual Administering and Compliance Monitoring Fee Requirements
The Permittee must pay the annual administering and compliance monitoring fee within thirty days after
being billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 2H.0105
(b) (2) may cause this Division to initiate action to revoke the permit.
NPDES Permit Standard Conditions
Page 6 of 18
12. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the
Permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned
changes or anticipated noncompliance does not stay any permit condition [40 CFR 122.41 (f)].
1. Certified Operator
Upon classification of the permitted facility by the Certification Commission, the Permittee shall employ a
certified water pollution control treatment system operator in responsible charge (ORC) of the water pollution
control treatment system. Such operator must hold a certification of the grade equivalent to or greater than the
classification assigned to the water pollution control treatment system by the Certification Commission. The
Permittee must also employ one or more certified Back-up ORCs who possess a currently valid certificate of
the type of the system. Back-up ORCs must possess a grade equal to (or no more than one grade less than) the
grade of the system [15A NCAC 8G.0201],
13. Permit Modification, Revocation and Reissuance, or Termination
The issuance of this permit does not prohibit the permit issuing authority from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and
regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North
Carolina Administrative Code, Subchapter 2H.0100; and North Carohna General Statute 143-215.1 et. al.
Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate
because a different individual or position has responsibility for the overall operation of the facility, a new
authorization satisfying the requirements of paragraph (b) of this section must be submitted to the
Director prior to or together with any reports, information, or applications to be signed by an authorized
representative [40 CFR 122.22]
(2) The authorization specified either an individual or a position having responsibility for the overall
operation of the regulated facility or activity, such as the position of plant manager, operator of a well
or well field, superintendent, a position of equivalent responsibility, or an individual or position
having overall responsibility for environmental matters for the company. (A duly authorized
representative may thus be either a named individual or any individual occupying a named position.);
and
(3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.22]
d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the
following certification [40 CFR 122.22], NO OTHER STATEMENTS OF CERTIFICATION WILL BE
ACCEPTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
NPDi
The ORC of each Class I facility must:
The ORC of each Class II, III and IV facility must:
>
a.
3.
Version 7/1/2010
Within 60 calendar days prior to wastewater being introduced into a new system
b. Within 120 calendar days of:
'ermit Standard Conditions
Page 7 of 18
(1) Anticipated bypass. If the Permittee knows in advance of the need for a bypass, it shall submit prior
notice, if possible at least ten days before the date of the bypass; including an evaluation of the
anticipated quality and effect of the bypass.
(2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required in
Part II. E. 6. (24-hour notice).
> Visit the facility as often as is necessary to insure proper operation of the treatment system; the
treatment facility must be visited at least weekly
> Comply with all other conditions of ISA NCAC 8G.0204.
>
>
Visit the facility as often as is necessary to insure proper operation of the treatment system; the
treatment facility must be visited at least five days per week, excluding holidays
Properly manage and document daily operation and maintenance of the facility
Comply with all other conditions of ISA NCAC 8G.0204.
Need to Halt or Reduce not a Defense
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compUance with the condition of this permit [40 CFR 122.41
(c)].
> Receiving notification of a change in the classification of the system requiring the designation of a new
ORC and back-up ORC
> A vacancy in the position of ORC or back-up ORC.
2. Proper Operation and Maintenance
The Permittee shall at all times provide the operation and maintenance resources necessary to operate the
existing facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all
facilities and systems of treatment and control (and related appurtenances) which are installed or used by the
Permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also
includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires
the Permittee to install and operate backup or auxihary facilities only when necessary to achieve compliance
with the conditions of the permit [40 CFR 122.41 (e)].
Once the facility is classified, the Permittee shall submit a letter to the Certification Commission designating
the operator in responsible charge:
NOTE: Properly and officially designated operators are fully responsible for all proper operation and
maintenance of the facility, and all documentation required thereof, whether acting as a contract operator
[subcontractor] or a member of the Permittee's staff.
4. Bypassing of Treatment Facilities
a. Bypass not exceeding limitations [40 CFR 122.41 (m) (2)]
The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded,
but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject
to the provisions of Paragraphs b. and c. of this section.
b. Notice [40 CFR 122.41 (m) (3)]
Prohibition of Bypassc.
c.
6.
7.
Version 7/1/2010
NPDES Permit Standard Conditions'
Page 8 of 18
Burden of proof [40 CFR 122.41 (n) (4)]: The Permittee seeking to establish the occurrence of an upset has
the burden of proof in any enforcement proceeding.
(2) Bypass from the collection system is prohibited and the Permit Issuing Authority may take
enforcement action against a Permittee for a bypass as provided in any current or future system-wide
collection system permit associated with the treatment facility.
(3) The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects,
if the Permit Issuing Authority determines that it will meet the three conditions listed above in
Paragraph c. (1) of this section.
(1) An upset occurred and that tire Permittee can identify the cause(s) of the upset;
(2) The Permittee facility was at the time being properly operated; and
(3) The Permittee submitted notice of the upset as required in Part II. E. 6. (b) of this permit.
(4) The Permittee complied with any remedial measures required under Part II. B. 2. of this permit.
(1) Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take
enforcement action against a Permittee for bypass, unless:
(A) Bypass was unavoidable to prevent loss of life, personal injury or severe property damage;
(B) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities,
retention of untreated wastes or maintenance during normal periods of equipment downtime.
This condition is not satisfied if adequate backup equipment should have been installed in the
exercise of reasonable engineering judgment to prevent a bypass which occurred during normal
periods of equipment downtime or preventive maintenance; and
(C) The Permittee submitted notices as required under Paragraph b. of this section.
Power Failures
The Permittee is responsible for maintaining adequate safeguards (as required by ISA NCAC 2H.0124) to
prevent the discharge of untreated or inadequately treated wastes during electrical power failures either by
means of alternate power sources, standby generators or retention of inadequately treated effluent.
Removed Substances
Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of
wastewaters shall be utilized/disposed of in accordance with NCGS 143-215.1 and in a manner such as to
prevent any pollutant from such materials from entering waters of the State or navigable waters of the United
States. The Permittee shall comply with all existing Federal regulations governing the disposal of sewage
sludge. Upon promulgation of 40 CFR Part 503, any permit issued by the Permit Issuing Authority for the
utilization/disposal of sludge may be reopened and modified, or revoked and reissued, to incorporate
applicable requirements at 40 CFR 503. The Permittee shall comply with applicable 40 CFR 503 Standards for
the Use and Disposal of Sewage Sludge (when promulgated) within the time provided in the regulation, even
if the permit is not modified to incorporate the requirement. The Permittee shall notify the Permit Issuing
Authority of any significant change in its sludge use or disposal practices.
5. Upsets
a. Effect of an upset [40 CFR 122.41 (n) (2)]: An upset constitutes an affirmative defense to an action brought
for noncompliance with such technology based permit effluent limitations if the requirements of
paragraph b. of this condition are met. No determination made during administrative review of claims
that noncompliance was caused by upset, and before an action for noncompliance, is final administrative
action subject to judicial review.
b. Conditions necessary for a demonstration of upset: Any Permittee who wishes to estabhsh the
affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs,
or other relevant evidence that:
NPD|
Section D. Monitoring and Records
1.
27699-1617
3.
4.
Version 7/1/2010
The first DMR is due on the last day of the month following the issuance of the permit or in the case of a new
facility, on the last day of the month following the commencement of discharge. Duplicate signed copies of
these, and all other reports required herein, shall be submitted to the following address:
NC DENR / Division of Water Quality / Surface Water Protection Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina
'ermit Standard Conditions
Page 9 of 18
Flow Measurements
Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be
selected and used to ensure the accuracy and reliability of measurements of the volume of monitored
discharges. The devices shall be installed, calibrated and maintained to ensure that the accuracy of the
measurements is consistent with the accepted capability of that type of device. Devices selected shall be
capable of measuring flows with a maximum deviation of less than 10% from the true discharge rates
throughout the range of expected discharge volumes. Flow measurement devices shall be accurately cahbrated
at a minimum of once per year and maintained to ensure that the accuracy of the measurements is consistent
with the accepted capability of that type of device. The Director shall approve the flow measurement device
and monitoring location prior to installation.
Once-through condenser cooling water flow monitored by pump logs, or pump hour meters as specified in
Part I of this permit and based on the manufacturer's pump curves shall not be subject to this requirement.
Test Procedures
Laboratories used for sample analysis must be certified by the Division. Permittees should contact the
Division's Laboratory Certification Section (919 733-3908 or http://portal.ncdenr.org/web/wq/lab/cert) for
information regarding laboratory certifications.
To meet the intent of the monitoring required by this permit, all test procedures must produce minimum
detection and reporting levels that are below the permit discharge requirements and all data generated must
be reported down to the minimum detection or lower reporting level of the procedure. If no approved
methods are determined capable of achieving minimum detection and reporting levels below permit discharge
2. Reporting
Monitoring results obtained during the previous month(s) shall be summarized for each month and reported
on a monthly Discharge Monitoring Report (DMR) Form (MR 1, 1.1, 2, 3) or alternative forms approved by the
Director, postmarked no later than the last calendar day of the month following the completed reporting
period.
Representative Sampling
Samples collected and measurements taken, as required herein, shall be characteristic of the volume and
nature of the permitted discharge. Samples collected at a frequency less than daily shall be taken on a day and
time that is characteristic of the discharge over the entire period the sample represents. All samples shall be
taken at the monitoring points specified in this permit and, unless otherwise specified, before the effluent joins
or is diluted by any other wastestream, body of water, or substance. Monitoring points shall not be changed
without notification to and the approval of the Permit Issuing Authority [40 CFR 122.41 (j)J.
Facilities whose personnel are conducting testing of field-certified parameters only must hold the appropriate
field parameter laboratory certifications.
Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to
NCGS 143-215.63 et. seq.), the Water and Air Quahty Reporting Acts, and to regulations published pursuant to
Section 304(g), 33 USC 1314, of the CWA (as amended), and 40 CFR 136; or in the case of sludge use or
disposal, approved under 40 CFR 136, unless otherwise specified in 40 CFR 503, unless other test procedures
have been specified in this permit [40 CFR 122.41],
6.
a.
b.
c.
Section E Reporting Requirements
1.
Version 7/1/2010
requirements, then the most sensitive (method with the lowest possible detection and reporting level)
approved method must be used.
NPDES Permit Standard Conditions
Page 10 of 18
Records Retention
Except for records of monitoring information required by this permit related to the Permittee's sewage sludge
use and disposal activities, which shall be retained for a period of at least five years (or longer as required by
40 CFR 503), the Permittee shall retain records of all monitoring information, including:
all calibration and maintenance records
all original strip chart recordings for continuous monitoring instrumentation
copies of all reports required by this permit
copies of all data used to complete the application for this permit
Enter upon the Permittee's premises where a regulated facility or activity is located or conducted, or
where records must be kept under the conditions of this permit;
Have access to and copy, at reasonable times, any records that must be kept under the conditions of this
permit;
Inspect at reasonable times any facilities, equipment (including monitoring and control equipment),
practices, or operations regulated or required under this permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise
authorized by the CWA, any substances or parameters at any location [40 CFR 122.41 (i)].
7. Recording Results
For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record
the following information [40 CFR 122.41]:
5. Penalties for Tampering
The CWA provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any
monitoring device or method required to be maintained under this permit shall, upon conviction, be punished
by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation,
or by both. If a conviction of a person is for a violation committed after a first conviction of such person under
this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not
more than 4 years, or both [40 CFR 122.41],
These records or copies shall be maintained for a period of at least 3 years from the date of the sample,
measurement, report or application. This period may be extended by request of the Director at any time [40
CFR 122.41].
Change in Discharge
All discharges authorized herein shall be consistent with the terms and conditions of this permit. The
discharge of any pollutant identified in this permit more frequently than or at a level in excess of that
authorized shall constitute a violation of the permit.
8. Inspection and Entry
The Permittee shall allow the Director, or an authorized representative (including an authorized contractor
acting as a representative of the Director), upon the presentation of credentials and other documents as may be
required by law, to;
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
NPD(
a.
c.
a.
c.
8.
Version 7/1/2010
>jO^ermit Standard Conditions
Page 11 of 18
Other Information
Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or
submitted incorrect information in a permit application or in any report to the Director, it shall promptly
submit such facts or information [40 CFR 122.41 (1) (8)].
on a case-by-case basis for reports under this section if the oral
5. Monitoring Reports
Monitoring results shall be reported at the intervals specified elsewhere in this permit [40 CFR 122.41 (1) (4)].
4. Transfers
This permit is not transferable to any person without approval from the Director. The Director may require
modification or revocation and re’ssuance of the permit to document the change of ownership. Any such
action may incoiporate other requirements as may be necessary under the CWA [40 CFR 122.41 (1) (3)].
3. Anticipated Noncompliance
The Permittee shall give advance notice to the Director of any planned changes to the permitted facility or
other activities that might result in noncompliance with the permit [40 CFR 122.41 (1) (2)].
7. Other Noncompliance
The Permittee shall report all instances of noncompliance not reported under Part II. E. 5 and 6. of this permit
at the time monitoring reports are submitted. The reports shall contain the information listed in Part II. E. 6. of
this permit [40 CFR 122.41 (1) (7)].
6. Twenty-four Hour Reporting
The Permittee shall report to the Director or the appropriate Regional Office any noncompliance that
potentially threatens public health or the environment. Any information shall be provided orally within 24
hours from the time the Permittee became aware of the circumstances. A written submission shall also be
provided within 5 days of the time the Permittee becomes aware of the circumstances. The written
submission shall contain a description of the noncompliance, and its cause; the period of noncompliance,
including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is
expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance [40 CFR 122.41 (1) (6)].
b. The Director may waive the written report
report has been received within 24 hours.
Occurrences outside normal business hours may also be reported to the Division's Emergency Response
personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300.
2. Planned Changes
The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or
additions to the permitted facility [40 CFR 122.41 (1)]. Notice is required only when:
The alteration or addition to a permitted facility may meet one of the criteria for new sources at 40 CFR
122.29 (b); or
b. The alteration or addition could significantly change the nature or increase the quantity of pollutants
discharged. This notification applies to pollutants subject neither to effluent limitations in the permit, nor
to notification requirements under 40 CFR 122.42 (a) (1).
The alteration or addition results in a significant change in the Permittee's sludge use or disposal
practices, and such alteration, addition or change may justify the application of permit conditions that are
different from or absent in the existing permit, including notification of additional use or disposal sites not
reported during the permit application process or not reported pursuant to an approved land application
plan.
a. Monitoring results must be reported on a Discharge Monitoring Report (DMR) (See Part II. D. 2) or forms
provided by the Director for reporting results of monitoring of sludge use or disposal practices.
b. If the Permittee monitors any pollutant more frequently than required by this permit, the results of such
monitoring shall be included in the calculation and reporting of the data submitted on the DMR.
a.
b.
c.
The report shall be sent to:
27699-1617
Version 7/1/2010
NC DENR / Division of Water Quality / Surface Water Protection Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina
NPDES Permit Standard Conditions’
Page 12 of 18
a written report within 5 days following first
10. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33
USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the
offices of the Division. As required by the Act, effluent data shall not be considered confidential. Knowingly
making any false statement on any such report may result in the imposition of criminal penalties as provided
for in NCGS 143-215.1 (b)(2) or in Section 309 of the Federal Act.
Persons reporting such occurrences by telephone shall also file
knowledge of the occurrence.
Any occurrence at the water pollution control facility which results in the discharge of significant amounts
of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a
sludge digester; the known passage of a slug of hazardous substance through the facility; or any other
unusual circumstances.
Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate
wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc.
Any failure of a pumping station, sewer line, or treatment faedity resulting in a by-pass without treatment
of all or any portion of the influent to such station or facility.
11. Penalties for Falsification of Reports
The CWA provides that any person who knowingly makes any false statement, representation, or certification
in any record or other document submitted or required to be maintained under this permit, including
monitoring reports or reports of comphance or noncompliance shall, upon conviction, be punished by a fine of
not more than $25,000 per violation, or by imprisonment for not more than two years per violation, or by both
[40 CFR 122.41].
9. Noncompliance Notification
The Permittee shall report by telephone to either the central office or the appropriate regional office of the
Division as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following:
12. Annual Performance Reports
Permittees who own or operate facilities that collect or treat municipal or domestic waste shall provide an
annual report to the Permit Issuing Authority and to the users/customers served by the Permittee (NCGS 143-
215.1C). The report shall summarize the performance of the collection or treatment system, as well as the
extent to which the facility was compliant with applicable Federal or State laws, regulations and rules
pertaining to water quality. The report shall be provided no later than sixty days after the end of the calendar
or fiscal year, depending upon which annual period is used for evaluation.
r
NP'
Section A. Construction
Section B. Groundwater Monitoring
Section C. Changes in Discharges of Toxic Substances
Section D. Evaluation of Wastewater Discharge Alternatives
Section E. Facility Closure Requirements
Version 7/1/2010
The Permittee shall evaluate all wastewater disposal alternatives and pursue the most environmentally sound
alternative of the reasonably cost effective alternatives. If the facility is in substantial non-compliance with the
terms and conditions of the NPDES permit or governing rules, regulations or laws, the Permittee shall submit a
report in such form and detail as required by the Division evaluating these alternatives and a plan of action within
60 days of notification by the Division.
The Permittee must notify the Division at least 90 days prior to the closure of any wastewater treatment system
covered by this permit. The Division may require specific measures during deactivation of the system to prevent
adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit
continue at the permitted facility.
(1) Five hundred micrograms per liter (500 pg/L);
(2) One milligram per liter (1 mg/L) for antimony;
(3) Ten times the maximum concentration value reported for that pollutant in the permit application.
PART III
OTHER REQUIREMENTS
The Permittee shall notify the Permit Issuing Authority
122.42):
’D^BPermit Standard Conditions
Page 13 of 18
as soon as it knows or has reason to believe (40 CFR
The Permittee shall not commence construction of wastewater treatment facilities, nor add to the plant's treatment
capacity, nor change the treatment process(es) utilized at the treatment plant unless the Division has issued an
Authorization to Construct (AtC) permit. Issuance of an AtC will not occur until Final Plans and Specifications for
the proposed construction have been submitted by the Permittee and approved by the Division.
The Permittee shall, upon written notice from the Director, conduct groundwater monitoring as may be required
to determine tire compliance of this NPDES permitted facility with the current groundwater standards.
(1) One hundred micrograms per liter (100 pg/L);
(2) Two hundred micrograms per liter (200 pg/L) for acrolein and acrylonitrile; five hundred micrograms per
liter (500 pg/L) for 2.4-dinitrophenol and for 2-methyl-4.6-dinitrophenoI; and one milligram per liter (1
mg/L) for antimony;
(3) Five times the maximum concentration value reported for that pollutant in the permit application.
b. That any activity has occurred or will occur which would result in any discharge, on a non-routine or
infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest
of the following "notification levels";
a. That any activity has occurred or will occur which would result in the discharge, on a routine or frequent
basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the
following "notification levels";
1
Section A. Definitions
In addition to the definitions in Part II of this permit, tire following definitions apply to municipal facilities:
(a)
(b)
(c)
Section B. Publicly Owned Treatment Works (POTWs)
All POTWs must provide adequate notice to the Director of the following [40 CFR 122.42 (b)]:
Version 7/1/2010
PART IV
SPECIAL CONDITIONS FOR MUNICIPAL FACILITIES
NPDES Permit Standard Conditions’
Page 14 of 18
Indirect Discharge or Industrial User
Aiiy non-domestic source that discharges wastewater containing pollutants into a POTW regulated under section
307(b), (c) or (d) of the CWA. [40 CFR 403.3 (i) and (j)]
All POTWs are required to prevent the introduction of pollutants into the POTW which will interfere with the
operation of the POTW, including interference with its use or disposal of municipal sludge, or pass through the
treatment works or otherwise be incompatible with such treatment works. [40 CFR 403.2]
Pass Through
A discharge which exits the POTW into waters of the State in quantities or concentrations which, alone or with
discharges from other sources, causes a violation, including an increase in the magnitude or duration of a
violation, of the POTW's NPDES permit, or of an instream water quality standard. [15A NCAC 2H.0903 (b) (23)]
Interference
Inhibition or disruption of the POTW treatment processes; operations; or its sludge process, use, or disposal which
causes or contributes to a violation of any requirement of the POTW's NPDES Permit or prevents sewage sludge
use or disposal in compliance with specified applicable State and Federal statutes, regulations, or permits. [ISA
NCAC 2H.0903 (b) (13)]
discharges an average of 25,000 gallons or more per day of process wastewater to the POTW (excluding
sanitary, noncontact cooling and boiler blowdown wastewaters) or;
contributes more than 5 percent of the design flow of the POTW treatment plant or more than 5 percent of the
maximum allowable headworks loading of the POTW treatment plant for any pollutant of concern, or;
is required to meet a national categorical pretreatment standard, or;
(d) is, regardless of Parts (a), (b), and (c) of this definition, otherwise determined by the POTW, the Division, or
the EPA to have a reasonable potential for adversely affecting the POTW's operation or for violating any
pretreatment standard or requirement or POTW's receiving stream standard, or to limit the POTW's sludge
disposal options.
Publicly Owned Treatment Works (POTW)
A treatment works as defined by Section 212 of the CWA, owned by a State or local government entity. This
definition includes any devices and systems used in the storage, treatment, recycling and reclamation of municipal
sewage or industrial wastes of a liquid nature. It also includes sewers, pipes, and other conveyances only if they
convey wastewater to a POTW. The term also means the local government entity, or municipality, as defined in
section 502(4) of the CWA, which has jurisdiction over indirect discharges to and the discharges from such a
treatment works. [15A NCAC 2H.0903 (b) (27)]
1. Any new introduction of pollutants into tire POTW from an indirect discharger, regardless of the means of
transport, which would be subject to section 301 or 306 of CWA if it were directly discharging those
pollutants; and
"Significant Industrial User" or "SIU"
An industrial user that discharges wastewater into a publicly owned treatment works and that [15A NCAC
2H.0903 (b) (34)]:
1
NP1
3.
Section C. Municipal Control of Pollutants from Industrial Users.
1.
a.
b.
1.
2.
3.
4.
5.
6.
7.
8.
c.
Version 7/1/2010
The Permittee shall investigate the source of all discharges into the POTW, including slug loads and other
unusual discharges, which have the potential to adversely impact the permittee's Pretreatment Program
and/or the operation of the POTW.
’□Mfe’ermit Standard Conditions
Page 15 of 18
Under no circumstances shall the Permittee allow introduction of pollutants or discharges into the waste
treatment system or waste collection system which cause or contribute to Pass Through or Interference as
defined in 15A NCAC 2H.0900 and 40 CFR 403. [40 CFR 403.5 (a) (1)]
Under no circumstances shall the Permittee allow introduction of the following wastes in the waste
treatment or waste collection system [40 CFR 403.5 (b)]:
The Permittee shall report such discharges into the POTW to the Director or the appropriate Regional
Office. Any information shall be provided orally within 24 hours from the time the Permittee became
aware of the circumstances. A written submission shall also be provided within 5 days of the time the
Permittee becomes aware of the circumstances. The written submission shall contain a description of the
discharge, the investigation into possible sources; the period of the discharge, including exact dates and
times; and if the discharge has not ceased, the anticipated time it is expected to continue; and steps taken
or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance,
3. With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the Permittee to
supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to ensure compliance
Effluent limitations are listed in Part I of this permit. Other pollutants attributable to inputs from industries
using the municipal system may be present in the Permittee's discharge. At such time as sufficient information
becomes available to establish limitations for such pollutants, this permit may be revised to specify effluent
limitations for any or all of such other pollutants in accordance with best practicable technology or water
quality standards.
2. Prohibited Discharges
Pollutants which create a fire or explosion hazard in the POTW, including, but not limited to,
wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees
Centigrade using the test methods specified in 40 CFR 261.21;
Pollutants which cause corrosive structural damage to the POTW, but in no case discharges with pH
lower than 5.0, unless the works is specifically designed to accommodate such discharges;
Solid or viscous pollutants in amounts which cause obstruction to the flow in the POTW resulting in
Interference;
Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow
rate and/or pollutant concentration which will cause Interference with the POTW;
Heat in amounts which will may inhibit biological activity in the POTW resulting in Interference, but
in no case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C
(104°F) unless the Division, upon request of the POTW, approves alternate temperature limits;
Petroleum oil, non-biodegradable cutting oil, or products of mineral oil origin in amounts that will
cause Interference or Pass Through;
Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity
that may cause acute worker health and safety problems;
Any trucked or hauled pollutants, except at discharge points designated by the POTW.
2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger as
influent to that POTW at the time of issuance of the permit.
For purposes of this paragraph, adequate notice shall include information on (1) the quality and quantity of
effluent introduced into the POTW, and (2) any anticipated impact that may result from the change of the
quantity or quality of effluent to be discharged from the POTW.
Section D. Pretreatment Programs
1.
2.
3.
Version 7/1/2010
Under authority of sections 307 (b) and (c) and 402 (b) (8) of the CWA and implementing regulations 40 CFR 403,
North Carolina General Statute 143-215.3 (14) and implementing regulations 15A NCAC 2H.0900, and in
accordance with the approved pretreatment program, all provisions and regulations contained and referenced in
the Pretreatment Program Submittal are an enforceable part of this permit. [40 CFR 122.44 (j) (2)]
NPDES Permit Standard Conditions'
Page 16 of 18
Sewer Use Ordinance (SUO)
The Permittee shall maintain adequate legal authority to implement its approved pretreatment program. [15A
NCAC 2H.0905 and .0906; 40 CFR 403.8 (f) (1) and 403.9 ( b) (1), (2)]
Monitoring Plan
The Permittee shall implement a Division-approved Monitoring Plan for the collection of facility specific data
to be used in a wastewater treatment plant Headworks Analysis (HWA) for the development of specific
pretreatment local limits. Effluent data from the Plan shall be reported on the DMRs (as required by Part II,
Section D, and Section E.5.). [15A NCAC 2H.0906 (b) (2) and .0905]
The Permittee shall operate its approved pretreatment program in accordance with Section 402 (b) (8) of the CWA,
40 CFR 403, 15A NCAC 2H.0900, and the legal authorities, policies; procedures, and financial provisions contained
in its pretreatment program submission and Division approved modifications thereof. Such operation shall
include but is not limited to the implementation of the following conditions and requirements. Terms not defined
in Part II or Part IV of this permit are as defined in 15A NCAC 2H.0903 and 40 CFR 403.3.
Industrial Waste Survey (IWS)
The permittee shall implement an IWS consisting of the survey of users of the POTW, as required by 40 CFR
403.8 (f) (2) (i-iii) and 15A NCAC 2H.0905 [also 40 CFR 122.44 (j) (1)], including identification of all industrial
users that may have an impact on the POTW and the character and amount of pollutants contributed to the
POTW by these industrial users and identification of those industrial users meeting the definition of SIU. The
Permittee shall submit a summary of its IWS activities to the Division at least once every five years, and as
required by the Division. The IWS submission shall include a summary of any investigations conducted under
paragraph B, 2, c, of this Part.
4. Head works Analysis (HWA) and Local Limits
The Permittee shall obtain Division approval of a HWA at least once every five years, and as required by the
Division. Within 180 days of the effective date of this permit (or any subsequent permit modification) the
Permittee shall submit to the Division a written technical evaluation of the need to revise local limits (i.e., an
updated HWA or documentation of why one is not needed) [40 CFR 122.44], The Permittee shall develop, in
accordance with 40 CFR 403.5 (c) and 15A NCAC 2H.0909, specific Local Limits to implement the prohibitions
listed in 40 CFR 403.5 (a) and (b) and 15A NCAC 2H.0909. Pursuant to 40 CFR 403.5, local limits are
enforceable Pretreatment Standards as defined by 40 CFR 403.3(1).
by tire Permittee with all applicable effluent limitations. Such actions by the Permittee may be necessary
regarding some or all of the industries discharging to the municipal system.
4. The Permittee shall require any Industrial User discharging sending to the POTW to meet Federal
Pretreatment Standards developed under Section 307(b) of the Act as amended (which includes categorical
standards and specific local limits, best management practices and narrative requirements). Prior to accepting
wastewater from any Significant Industrial User, the Permittee shall either develop and submit to the Division
a new Pretreatment Program or a modification of an existing Pretreatment Program, for approval as required
under section D below as well as 15A NCAC 2H.0907 (a) and (b). [40 CFR 122.44 (j) (2)]
5. This permit shall be modified, or alternatively, revoked and reissued, to incorporate or modify an approved
POTW Pretreatment Program or to include a compliance schedule for the development of a POTW
Pretreatment Program as required under Section 402 (b) (8) of the CWA and implementing regulations or by
the requirements of the approved State pretreatment program, as appropriate.
X r NPDj
5.
6.
7.
8.
9.
10.
Version 7/1/2010
Enforcement Response Plan (ERP)
The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards
promulgated pursuant to section 307(b) and (c) of the Clean Water Act (40 CFR 405 et. seq.), prohibitive
discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 2H .0909, and specific local limitations. All
remedies, enforcement actions and other, shall be consistent with the Enforcement Response Plan (ERP)
approved by the Division. [15A NCAC 2H .0906(b)(7) and .0905; 40 CFR 403.8(f)(5)]
•jO^ermit Standard Conditions
Page 17 of 18
Industrial User Pretreatment Permits (IUP) & Allocation Tables
In accordance with NCGS 143-215.1, the Permittee shall issue to all significant industrial users, permits for
operation of pretreatment equipment and discharge to the Permittee's treatment works. These permits shall
contain limitations, sampling protocols, reporting requirements, appropriate standard and special conditions,
and compliance schedules as necessary for the installation of treatment and control technologies to assure that
their wastewater discharge will meet all applicable pretreatment standards and requirements. The Permittee
shall maintain a current Allocation Table (AT) which summarizes the results of the HWA and the limits from
all lUPs. Permitted IUP loadings for each parameter cannot exceed the treatment capacity of the POTW as
determined by the HWA. [15A NCAC 2H.0909, .0916, and .0917; 40 CFR 403.5, 403.8 (f) (1) (iii); NCGS 143-
215.67 (a)]
POTW Inspection & Monitoring of their IUs
The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division
approved pretreatmer.t program in order to determine, independent of information supplied by industrial
users, compliance with applicable pretreatment standards. [15A NCAC 2H .0908(d); 40 CFR 403.8(f)(2)(v}j
The Permittee must.
IU Self Monitoring and Reporting
The Permittee shall require all industrial users to comply with the applicable monitoring and reporting
requirements outlined in the Division-approved pretreatment program, the industry's pretreatment permit, or
in 15A NCAC 2H .0908. [15A NCAC 2H .0906(b)(4) and .0905; 40 CFR 403.8(f)(l)(v) and (2)(iii); 40 CFR
122.44(j)(2) and 40 CFR 403.12]
Authorization to Construct (AtC)
The Permittee shall ensure that an Authorization to Construct permit (AtC) is issued to all applicable
industrial users for the construction or modification of any pretreatment facility. Prior to the issuance of an
AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to comply
with all Industrial User Pretreatment Permit (IUP) limitations. [15A NCAC 2H.0906 (b) (6) and .0905; NCGS
143-215.1 (a) (8)]
Pretreatment Annual Reports (PAR)
The Permittee shall report to the Division in accordance with 15A NCAC 2H .0908. In lieu of submitting
annual reports. Modified Pretreatment Programs developed under 15A NCAC 2H .0904 (b) may be required to
submit a partial annual report or to meet with Division personnel periodically to discuss enforcement of
pretreatment requirements and other pretreatment implementation issues.
a. Inspect all Significant Industrial Users (SIUs) at least once per calendar year; and
b. Sample all Significant Industrial Users (SIUs) at least twice per calendar year for all permit-limited
pollutants, once during the period from January 1 through June 30 and once during the period from July 1
through December 31, except for organic compounds which shall be sampled at least once per calendar
year; For the purposes of this paragraph, "organic compounds" means the types of compounds listed in
40 CFR 136.3(a), Tables IC, ID, and IF, as amended.
27699-1617
Version 7/1/2010
For all other active pretreatment programs, the Permittee shall submit two copies of a Pretreatment Annual
Report (PAR) describing its pretreatment activities over the previous twelve months to the Division at the
following address:
NC DENR / Division of Water Quality / Surface Water Protection Section
Pretreatment, Emergency Response, and Collection Systems (PERCS) Unit
1617 Mail Service Center
Raleigh, North Carolina
NPDES Permit Standard Conditions’ 7
Page 18 of 18
12. Record Keeping
The Permittee shall retain for a minimum of three years records of monitoring activities and results, along
with support information including general records, water quality records, and records of industrial impact on
the POTW. [15A NCAC 2H .0908(f); 40 CFR 403.12(o)]
13. Funding and Financial Report
The Permittee shall maintain adequate funding and staffing levels to accomplish the objectives of its approved
pretreatment program. [15A NCAC 2H .0906(a) and .0905; 40 CFR 403.8(f)(3), 403.9(b)(3)]
a. ) Narrative
A brief discussion of reasons for, status of, and actions taken for all Significant Industrial Users (SIUs) in
Significant Non-Compliance (SNC);
b. ) Pretreatment Program Summary (PPS)
A pretreatment program summary (PPS) on specific forms approved by the Division;
c. ) Significant Non-Compliance Report (SNCR)
The nature of the violations and the actions taken or proposed to correct the violations on specific forms
approved by the Division;
d. ) Industrial Data Summary Forms (IDSF)
Monitoring data from samples collected by both the PQTW and the Significant Industrial User (SIU) in
SNC. These analytical results must be reported on Industrial Data Summary Forms (IDSF) or other specific
format approved by the Division;
e. ) Other Information
Copies of the POTW's allocation table, new or modified enforcement compliance schedules, public notice
of SIUs in SNC, and any other information, upon request, which in the opinion of the Director is needed to
determine compliance with the pretreatment implementation requirements of this permit;
14. Modification to Pretreatment Programs
Modifications to the approved pretreahnent program including but not limited to local limits modifications,
POTW monitoring of their Significant Industrial Users (SIUs), and Monitoring Plan modifications, shall be
considered a permit modification and shall be governed by 40 CFR 403.18,15 NCAC 2H .0114 and 15A NCAC
2H .0907.
These reports shall be submitted according to a schedule established by the Director and shall contain the
following:
11. Public Notice
The Permittee shall publish annually a list of Significant Industrial Users (SIUs) that were in Significant Non-
Compliance (SNC) as defined in the Permittee's Division-approved Sewer Use Ordinance with applicable
pretreatment requirements and standards during the previous twelve month period. This list shall be
published within four months of the applicable twelve-month period. [15A NCAC 2H ,0903(b)(35), .0908(b)(5)
and .0905 and 40 CFR 403.8(f)(2)(viii)]