HomeMy WebLinkAboutNC0026051_Final Permit_20060925Q
September 18, 2006
Subject:
Dear Mr. Whisler:
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
L
North Carolina Division of Water Quality
Internet: h2o.enr.state.nc.us
Mr. Glen E. Whisler, County Engineer
County of Durham
120 E. Parrish St.
Durham, North Carolina 27701
1617 Mail Service Center
512 N. Salisbury St.
Issuance of NPDES Permit
Permit NC0026051
Durham County Triangle WWTP
Durham County’
Phone (919)733-5083
FAX (919)733-0719
Michael F. Easley
Governor
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E., Director
Division of Water Quality
Raleigh, NC 27699-1617
Raleigh, NC 27604
SEP 25 2QGb
L« - & H
NorthCarolina'Naturally
Customer Service
1-877-623-6748
Division personnel have reviewed and approved your application for renewal of the subject permit. Accordingly,
we are forwarding the attached NPDES discharge permit. This permit is issued pursuant to the requirements of
North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the
U.S. Environmental Protection Agency dated May 9, 1994 (or as subsequently amended).
In response to your comments and other considerations the draft permit was modified as follows:
• The fluoride and mercury' limits will remain in the permit. The fluoride sample type was changed to
composite. The mercury limit was changed to a weekly average limit. The reasonable potential
analysis is based on a statistical method. All the values in a data set used in the analysis can be
below the allowable limit and the calculations will show that reasonable potential exists, which is
the case with your fluoride and mercury data. This statistical method is approved by EPA and
applied consistently to all permits.
• The description of the treatment system in the supplement to permit cover sheet was modified to
include existing components.
• The footnote reference for chloroform was corrected.
• Nutrient monitoring was modified from 3/Week to Weekly.
• Section A. (1) was modified to read “Beginning upon the effective day of this permit and lasting
until expiration...”
co /|il I ra
If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you,
you have the right to an adjudicatory’ hearing upon written request within thirty (30) days following receipt of this
letter. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina
General Statutes, and filed with the Office of Administrative Hearings (6714 Mail Service Center, Raleigh, North
Carolina 27699-6714). Unless such demand is made, this decision shall be final and binding.
Please note that this permit is - not transferable except after notice to the Division. The Division may require
modification or revocation and reissuance of the permit. This permit does not affect the legal requirements to
obtain other permits which may be required by the Division of Water Quality or permits required by the Division
of Land Resources, the Coastal Area Management Act or any other Federal or Local governmental permit that
may be required.
Sincerely,
Alan W. Klimek, P.E.
Cc:
If you have any questions concerning this permit, please contact Teresa Rodriguez at telephone number (919)
733-5083, extension 553.
Permit No. NC0047597
South Durham Water Reclamation Facility
Page 2
NPDES Files
Raleigh Regional Office - Surface Water Protection
Aquatic Toxicology Unit
USEPA Region 4
Permit NC0026051
PERMIT
TO DISCHARGE WASTEWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
Durham County
is hereby authorized to discharge wastewater from a facility located at the
The permit shall become effective November 1, 2006.
This permit and the authorization to discharge shall expire at midnight on April 30, 2011.
Signed this day September 18, 2006.
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
to receiving waters designated as Northeast Creek in the Cape Fear River Basin in accordance
with effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II,
III, and IV hereof.
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Durham County Triangle WWTP
5926 NC Highway 55
Durham County
r _______________________
Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit NC0026051
SUPPLEMENT TO PERMIT COVER SHEET
Durham County is hereby authorized to:
Mechanical fine screens
Mechanical grit removal
Parshall flume
Influent pump station
Three 5-stage BNR trains
Four secondary clarifiers
Five tertiary sand filters
Ultraviolet disinfection
Post aeration
Sludge lagoons
Waste and return activated sludge pumping system
Methanol, potassium hydroxide, and sodium hypochlorite storage and feed systems
2. Discharge from said treatment works (via Outfall 001) into Northeast Creek, a Class WS-IV
NSW water in the Cape Fear River Basin, at the location specified on the attached map.
1. Continue to operate an existing 12.0 MGD wastewater treatment facility located south of
Durham at the Durham County Triangle WWTP off NC Highway 55 in Durham County.
The facility includes the following treatment components:
All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby revoked.
As of this permit issuance, any previously issued permit bearing this number is no longer effective.
Therefore, the exclusive authority to operate and discharge from this facility arises under the permit
conditions, requirements, terms, and provisions included herein.
Outfall 001
1M1
Durham Co. Triangle WWTP - NC0026051
North SCALE 1: 24,000
Facility
Location
Lat.: 35°52’51”
Long.: 78o53’50”
USGS Quad Name: SW Durham
Receiving Stream: Northeast Creek
Stream Class: WS-IV NSW
Subbasin: Catawba - 03-06-05
h'fljrzW/
p- mi / B EVERETT JORDAN LAKE ■
c
,z7
v
K I) _■ ■■
>; H
w 7
IB
£o -.
'M/z
rr,--1 ■tLvszj /Z-
E
A Mi ;
%SWL
wage!.0isp6\ak
.X.Ppnds
mU-J' w
Permit NC0026051
A. (1)EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS
MONITORING REQUIREMENTSEFFLUENT LIMITATIONS
12.0 MOD RecordingContinuous
7.5 mg/L5.0 mg/L Daily Composite
10.0 mg/L 15.0 mg/L Daily Composite
45.0 mg/L30.0 mg/L Daily CompositeTotal Suspended Solids2
Effluent3.0 mg/1 Daily Composite1.0 mg/L
EffluentDaily1.8 mg/L 5.4 mg/1 Composite
17/xg/L Grab EffluentTotal Residual Chlorine3
Grab EffluentChloroform3
Grab EffluentBromodichloromethane3
EffluentGrab
Effluent400/100 ml Daily Grab200/100 ml
EffluentGrab
EffluentGrab
Grab Effluent
EffluentCompositeTKN
NO2-N +NO3-N
Total Nitrogen6
Total Phosphorus6
EffluentWeeklyGrab
EffluentComposite
EffluentComposite
EffluentComposite
EffluentChloride
EffluentAnnuallyEffluent Pollutant Scan8
EffluentQuarterlyComposite
EFFLUENT
CHARACTERISTICS Monthly
Average
Weekly
Average
Daily
Maximum
Measurement
Frequency
Composite
Calculated
Calculated
Sample
Type
Sample
Location1
Temperature
pH6
Dibromochloromethane3
Fecal Coliform
(geometric mean)
Dissolved Oxygen4
Total Mercury7
Fluoride
Total Copper
Total Zinc
Chronic Toxicity9
See notes on next page.
No Limit (mg/L
No Limit (pounds/month)
Annual Limit: 100,452 pounds/year
No Limit (mg/L)
No Limit (pounds/month)
Annual Limit: 10,204 pounds/year
1-8 Mg/h
1.3 gg/L
Weekly
Weekly
Monthly
Annually
Weekly
Monthly
Annually
Daily
2/Month
Monthly
Monthly
Weekly
Monthly
Weekly
Weekly
Composite
Composite/
Grab
Composite
Composite
Calculated
Calculated
Influent or
Effluent
Influent and
Effluent
Influent and
Effluent
Influent and
Effluent
Effluent
Effluent
Effluent
Effluent
Effluent
Effluent
Effluent
0.012 gg/L
1800 gg/L
Flow
BOD,5-day, 20°C
(April 1- October 31)2
BOD,5-day, 20°C
(November 1 - March 31)2
NH3 as N (April 1- October
31)_______________________
NH3 as N
(November 1 - March 31)
Daily
Daily
Daily
Weekly
Beginning upon the effective day of this permit and lasting until expiration, the Permittee is authorized
to discharge treated wastewater from Outfall 001. Such discharges shall be limited and monitored by
the Permittee as specified below:
Permit NC0026051
9.
There shall be no discharge of floating solids or visible foam in other than trace amounts.
A. (2) INSTREAM MONITORING REQUIREMENTS
MONITORING REQUIREMENTS
Measurement Frequency Sample Type Sample Location2
Dissolved Oxygen Grab Upstream, DI, D2
Temperature Grab Upstream, DI, D2
Conductivity Grab Upstream, DI. D2
Fecal Coliform Grab Upstream, DI, D2
PH Grab Upstream, DI, D2
Grab
Grab
TKN Grab
NO2 + NO3 Grab
NH3 as N Grab
1.
Beginning upon the permit effective date and lasting until expiration, the Permittee shall monitor instream
conditions as specified below1:
2.
3.
INSTREAM
CHARACTERISTICS
Total Phosphorus
PO4
Upstream, DI, D2
Upstream, DI. D2
Upstream, DI, D2
Upstream, DI, D2
Upstream, DI, D2
Notes:
As a participant in the Upper Cape Fear River Basin Association, the instream monitoring requirements as
stated above are waived. Should your membership in the association be terminated, you shall notify the
Division immediately and the instream monitoring requirements specified in your permit shall be reinstated.
Upstream = at NCSR 1102. DI = Downstream at NCSR 1100. D2 = Downstream at NCSR 1732.
Samples shall be collected during June-September only.
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
3/Week (June-September)
Weekly (October -May)
Weekly (June-September)3
Weekly (June-September)3
Weekly (June-September) 3
Weekly (June-September) 3
Weekly (June-September) 3
Notes:
1. See Condition A. (2) for Instream monitoring requirements.
2. The monthly average effluent BODS and TSS concentrations shall not exceed 15% of the respective influent
value (85% removal).
3. Limit and/or monitoring applies only when chlorine is added to treatment system.
4. The daily effluent dissolved oxygen concentration shall not be less than 6.0 mg/L.
5. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units.
6. Refer to Special Condition A. (4) for Total Nitrogen and Total Phosphorus Loading Calculations.
7. Mercury samples shall be analyzed using EPA Method 163IE.
8. See Special Condition A. (7).
Chronic Toxicity (Ceriodaphnia) at 90%; Feb., May, Aug., and Nov.; refer to Special Condibon A. (6).
Permit NC0026051
A. (3) NUTRIENT MONITORING RE-OPENER
A. (4) CALCULATION OF MASS LOADS
The permitte shall calculate monthly and annual TN (or TP) loads as follows:a.
Monthly TN (or TP) Loads = TN (or TP) x TMF x 8.34i.
Where:
the total monthly flow of wastewater discharged during the month (MG/mo)TMF
8.34 conversion factor, from (mg/L x MG) to pounds
Annual TN (or TP) Load (Ib/yr) = Sum of 12 monthly TN (or TP) Loads for calendar year.ii.
b.
A. (5) REUSE OF TREATMENT PLANT EFFLUENT
■ Reuse piping valves will be properly labeled and locking.
The effluent from the Durham County Triangle WWTP is authorized for onsite reuse subject to the
following conditions:
• The reuse water will be used onsite, within the fenced perimeter of the wastewater treatment plant
with controlled public access, and for very specific internal uses (i.e., restrooms, HVAC system, and
vehicle washdown).
■ The reuse water will be used by plant personnel who are trained and knowledgeable about reuse
water.
■ An RPZ device will be required onsite to protect the potable water supply.
■ A water meter will be installed on the reuse line to monitor usage.
■ No runoff shall occur from the vehicle washdown area.
Pursuant to N.C. Gen. Stat. Section 143-215.1 and the implementing rules found in Title 15A of the
North Carolina Administrative Code, Subchapter 2H, specifically, 15ANCAC 2H.0112(b)(1) and
2H.0114(a), and Part II, Sections B-12 and B-13 of this Permit, the Director of DWQ may reopen this
permit to require supplemental nutrient monitoring of the discharge. The additional monitoring will be
to support water quality modeling efforts within the Cape Fear River Basin, and shall be consistent with
a monitoring plan developed jointly by the Division and affected stakeholders.
The permitte shall report monthly total nitrogen and total phosphorus results (mg/L and
Ib/mo) in the appropriate discharge monitoring report for each month and shall report each
year’s results (Ib/yr) with the December report for that year.
TN (or TP) = the average Total Nitrogen (or Total Phosphorus) concentration (mg/L) of the
composite samples collected during the month.
Permit NC0026051
A. (6) QUARTERLY CHRONIC TOXICITY PERMIT LIMIT
The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant
mortality to Cerioclaphnia dubia at an effluent concentration of 90%.
The permit holder shall perform at a minimum, quarterhi monitoring using test procedures outlined in
the “North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure,” Revised February 1998, or
subsequent versions or “North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure”
(Revised-February 1998) or subsequent versions. The tests will be performed during the months of
February, May, August, and November. Effluent sampling for this testing shall be performed at the
NPDES permitted final effluent discharge below all treatment processes.
If the test procedure performed as the first test of any single quarter results in a failure or ChV
below the permit limit, then multiple-concentration testing shall be performed at a minimum, in
each of the two following months as described in “North Carolina Phase II Chronic Whole Effluent
Toxicity Test Procedure” (Revised-February 1998) or subsequent versions.
The chronic value for multiple concentration tests will be determined using the geometric mean of the
highest concentration having no detectable impairment of reproduction or survival and the lowest
concentration that does have a detectable impairment of reproduction or survival. The definition of
“detectable impairment,” collection methods, exposure regimes, and further statistical methods are
specified in the “North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure” (Revised-
February 1998) or subsequent versions.
All toxicity testing results required as part of this permit condition will be entered on the Effluent
Discharge Monitoring Form (MR-1) for the months in which tests were performed, using the parameter
code TGP3B for the pass/fail results and THP3B for the Chronic Value. Additionally, DWQ Form AT-3
(original) is to be sent to the following address:
Attention: North Carolina Division of Water Quality
Environmental Sciences Section
1621 Mail Service Center
Raleigh, North Carolina 27699-1621
Completed Aquatic Toxicity Test Forms shall be filed with the Environmental Sciences Branch no later
than 30 days after the end of the reporting period for which the report is made.
Test data shall be complete, accurate, include all supporting chemical/physical measurements and all
concentration/response data, and be certified by laboratory supervisor and ORC or approved designate
signature. Total residual chlorine of the effluent toxicity sample must be measured and reported if
chlorine is employed for disinfection of the waste stream.
Should there be no discharge of flow from the facility during a month in which toxicity monitoring is
required, the permittee will complete the information located at the top of the aquatic toxicity (AT) test
form indicating the facility name, permit number, pipe number, county, and the month/year of the
report with the notation of “No Flow" in the comment area of the form. The report shall be submitted to
the Environmental Sciences Branch at the address cited above.
Should the permittee fail to monitor during a month in which toxicity monitoring is required, monitoring
will be required during the following month. Should any test data from this monitoring requirement or
tests performed by the North Carolina Division of Water Quality indicate potential impacts to the
receiving stream, this permit may be re-opened and modified to include alternate monitoring
requirements or limits.
NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control
organism survival, minimum control organism reproduction, and appropriate environmental controls,
shall constitute an invalid test and will require immediate follow-up testing to be completed no later
than the last day of the month following the month of the initial monitoring.
Permit NC0026051
A. (7) EFFLUENT POLLUTANT SCAN
Bis (2-chloroethyl) ether
Bis (2-chloroisopropyl) ether
Bis (2-ethylhexyl) phthalate
4-bromophenyl phenyl ether
Butyl benzyl phthalate
2-chloronaphthalene
4-chlorophenyl phenyl ether
Chrysene
Di-n-butyl phthalate
Di-n-octyl phthalate
Dibenzo(a,h)anthracene
1.2- dichlorobenzene
1.3- dichlorobenzene
1.4- dichlorobenzene
3.3- dichlorobenzidine
Diethyl phthalate
Dimethyl phthalate
2.4- dinitrotoluene
2,6-dinitrotoluene
1,2-diphenylhydrazine
Fluoranthene
Fluorene
Hexachlorobenzene
Hexachlorobutadiene
Hexachlorocyclo-pentadiene
Hexachloroethane
Indeno(l,2,3-cd)pyrene
Isophorone
Naphthalene
Nitrobenzene
N-nitrosodi-n-propylamine
N-nitrosodimethylamine
N-nitrosodiphenylamine
Phenanthrene
Pyrene
1.2.4- trichlorobenzene
Ammonia (as N)
Chlorine (total residual, TRC)
Dissolved oxygen
Nitrate/Nitrite
Kjeldahl nitrogen
Oil and grease
Phosphorus
Total dissolved solids
Hardness
Antimony
Arsenic
Beryllium
Cadmium
Chromium
Copper
Lead
Mercury*
Nickel
Selenium
Silver
Thallium
Zinc
Cyanide
Total phenolic compounds
Volatile organic compounds:
Acrolein
Acrylonitrile
Benzene
Bromoform
Carbon tetrachloride
Chlorobenzene
Chlorodibromomethane
Chloroethane
2-chloroethylvinyl ether
Chloroform
Dichlorobromomethane
1.1 -dichloroethane
1,2-dichloroethane
Trans-1,2-dichloroethylene
1.1 -dichloroethylene
1.2- dichloropropane
1.3- dichIoropropylene
Ethylbenzene
Methyl bromide
Methyl chloride
Methylene chloride
1.1.2.2- tetrachloroethane
Tetrachloroethylene
Toluene
1.1.1 -trichloroethane
1.1.2- trichloroethane
Trichloroethylene
Vinyl chloride
Acid-extraclable compounds:
P-chloro-m-cresol
2-chlorophenol
2.4- dichlorophenol
2.4- dimethylphenol
4,6-dinitro-o-cresol
2.4- dinitrophenol
2-nitrophenol
4-nitrophenol
Pentachlorophenol
Phenol
2,4,6 -trichloroph enol
Base-neutral compounds:
Acenaphthene
Acenaphthylene
Anthracene
Benzidine
Benzo (a) an thracene
Benzo(a)pyrene
3,4 benzofluoranthene
Benzo(ghi)peiylene
Benzo(k)fluoranthene
Bis (2-chloroethoxy) methane
The Permittee shall perform an annual Effluent Pollutant Scan for all parameters listed in the attached table. The
analytical methods shall be in accordance with 40 CFR Part 136 and shall be sufficiently sensitive to
determine whether parameters are present in concentrations greater than applicable standards and
criteria. Samples shall represent seasonal variations. Unless otherwise indicated, metals shall be
analyzed as “total recoverable.”
Test results shall be reported to the Division in DWQ Form- A MR-PPA1 or in a form approved by the
Director within 90 days of sampling. The report shall be submitted to the following address:
NC DENR / DWQ / Central Files, 1617 Mail Service Center, Raleigh, North Carolina 27699-1617.
*Mercury samples shall be analyzed using EPA Method 163IE.
Section A. Definitions
collected three times per week on three separate calendar days.
24-hour period proportional to the rate of flow.
of flow measured at the time of individual sample
Version 6/20/2003
PART II
STANDARD CONDITIONS FOR NPDES PERMITS
NPDES Permit Requirements
Page 1 of 16
.Arithmetic Mean
The summation of the individual values divided by the number of individual values.
Act or "the Act"
The Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, 33 USC 1251, et. seq.
Calendar Quarter
One of the following distinct penods: January through March, April through June, July through September, and
October through December.
Calendar Day
The period from midnight of one
consecutive 24-hour period that
2/Month
Samples are
Annual Average
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In the case of fecal
coliform, the geometric mean of such discharges.
3/Week
Samples are
collected twice per month with at least ten calendar days between sampling events.
Bypass
The known diversion of waste streams from any portion of a treatment facility including the collection system, which
is not a designed or established or operating mode for the facility.
day until midnight of the next day. However, for purposes of this permit, any
reasonably represents the calendar day may be used for sampling.
Composite Sample
A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 ml in
such a manner as to result in a total sample representative of the wastewater discharge during the sample period. The
Director may designate the most appropriate method (specific number and size of aliquots necessary, the time
interval between grab samples, etc.) on a case-by-case basis. Samples may be collected manually or automatically.
Composite samples may be obtained by the following methods:
(1) Continuous: a single, continuous sample collected over a
(2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour
period of discharge and combined proportional to the rate of flow measured at the time of individual sample
collection, or
(3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period
with the time intervals between samples determined by a preset number of gallons passing the sampling
point. Flow measurement between sample intervals shall be determined by use of a flow recorder and
totalizer, and die preset gallon interval between sample collection fixed at no greater than 1/24 of the
expected total daily flow at the treatment system, or
(4) Constant time/constant volume: a senes of grab samples of equal volume collected over a 24-hour period at
a constant time interval This method may only be used in situations where effluent flow rates vary
less than 15 percent. The grab samples shall be taken at intervals of no greater than 20 minutes apart
during any 24-hour period and must be of equal size and of no less than 100 milliliters. Use of this method
requires prior approval by the Director.
Version 6/20/2003
collected manually. Grab samples
samples).
NPDES Permit Requirements
Page 2 of 16
Grab Sample
Individual samples of at least 100 ml collected over a period of time not exceeding 15 minutes. Grab samples can be
5 must be representative of the discharge (or the receiving stream, for in stream
Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the Clean Water Act.
Daily Maximum
The highest “daily discharge” during the calendar month.
EMC
The North Carolina Environmental Management Commission.
DWQ or “the Division”
The Division of Water Quality, Department of Environment and Natural Resources.
In accordance with (4) above, influent grab samples shall not be collected more than once per hour.
Effluent grab samples shall not be collected more than once per hour except at wastewater treatment systems
having a detention time of greater than 24 hours. In such cases, effluent grab samples may be collected at
intervals evenly spaced over the 24-hour period that are equal in number of hours to the detention time of the
system in number of days. However, the interval between effluent grab samples may not exceed six hours nor
the number of samples less than four during a 24-hour sampling period
Facility Closure
The cessation of wastewater treatment at a permitted facility, or the cessation of all activities that require coverage
under the NPDES. Completion of facility closure will allow this permit to be rescinded
Continuous flow measurement
Flow monitoring that occurs without interruption throughout the operating hours of the facility. Flow shall be
monitored continually except for the infrequent times when there may be no flow or for infrequent maintenance
activities on the flow device.
Geometric Mean
The Nth root of the product of the individual values where N = the number of individual values. For purposes of
calculating the geometric mean, values of “0” (or “< [detection level]”) shall be considered = 1.
Instantaneous flow measurement
A measure of flow taken at the time of sampling, when both the sample and flow will be representative of the total
discharge.
Daily Sampling
Parameters requiring daily sampling shall be sampled 5 out of every 7 days per week unless otherwise specified in the
permit The Division expects that sampling shall be conducted on weekdays except where holidays or other
disruptions of normal operations prevent weekday sampling. If sampling is required for all seven days of the week
for any permit parameter(s), that requirement will be so noted on the Effluent Limitations and Monitoring Page(s).
Daily Discharge
The discharge of a pollutant measured during a calendar day or any 24-hour period that reasonably represents the
calendar day for purposes of sampling. For pollutants measured in units of mass, the "daily discharge" is calculated as
the total mass of the pollutant discharged over the day. The "daily discharge" concentration comprises the mean
concentration for a 24-hour sampling period as either a composite sample concentration or the arithmetic mean of all
grab samples collected during that period. (40 CFR 122 3)
Section B. General Conditions
The Permittee shall comply with effluent standardsa.
b.
Version 6/20/2003
Permit Issuing Authority
The Director of the Division of Water Quality.
NPDES Permit Requirements
Page 3 of 16
! use or disposal established under
the regulations that establish these
even if the permit has not yet been
Toxic Pollutant:
Any pollutant listed as toxic under Section 307(a)(1) of the Clean Water Act.
Weekly Average (concentrauon limit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the
coliform, the geometric mean of such discharges.
case of fecal
the treatment facilities which causes them to become inoperable,
can reasonably be expected to occur in the absence of a
caused by delays in production.
Severe property' damage
Substantial physical damage to property, damage to
or substantial and permanent loss of natural resources which
bypass. Severe property damage excludes economic loss
Monthly Average (concentration limit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of fecal
coliform, the geometric mean of such discharges.
1. Duty to Comply
The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a violation
of the Clean Water Act and is grounds for enforcement action; for permit termination, revocation and reissuance,
or modification; or denial of a permit renewal application [40 CFR 122.41].
- - -- • •. or prohibitions established under section 307(a) of the
Clean Water Act for toxic pollutants and with standards for sewage sludge
section 405(d) of the Clean Water Act within the time provided in f
standards or prohibitions or standards for sewage sludge use or disposal,
modified to incorporate the requirement.
The Clean Water Act provides that any person who violates section 301, 302, 306, 307, 308, 318 or 405 of the
Act, or any permit condition or limitation implementing any such sections in a permit issued under section
402, or any requirement imposed in a pretreatment program approved under sections 402(a)(3) or 402(b)(8)
of the Act, is subject to a civil penalty not to exceed $25,000 per day for each violation. [40 CFR 122.41 (a)
(2)]
The Clean Water Act provides that any person who negligently-violates sections 301, 302, 306, 307, 308, 318, or
405 of the Act, or any condition or limitation implementing any of such sections in a permit issued under
section 402 of the Act, or any requirement imposed in a pretreatment program approved under section
402(a)(3) or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a
negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of
violation, or by imprisonment of not more than 2 years, or both. [40 CFR 122.41 (a) (2)]
Upset .... ..
An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance with
permit effluent limitations and/or monitoring requirements. An upset does not include noncompliance caused by
operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive
maintenance, or careless or improper operation.
Quarterly Average (concentration limit)
The average of all samples taken over a calendar quarter.
d.
e.
f
g-
2.
3.
4.
fish kills.
5.
6.
Version 6/20/2003
disposal in
environment
or offshore physical structures or
NPDES Permit Requirements
Page 4 of 16
than $100,000 per day of violation, or imprisonment of not more
Onshore or Offshore Construction
This permit does not authorize or approve the construction of any onshore
facilities or the undertaking of any work in any navigable waters.
Duty to Mitigate
The Permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or
violation of this permit which has a reasonable likelihood of adversely affecting human health or the
[40 CFR 122.41 (d)].
Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302,
306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such
sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are
not to exceed $10,000 per violation, with the maximum amount of any Class I penalty assessed not to pyceed
$25,000. Penalties for Class II violations are not to exceed $10,000 per day for each - day during which the
violation continues, with the maximum amount of any Class II penalty not to exceed $125 000 [40 CFR
122.41 (a) (3)]
Civil and Criminal Liability
Except as provided in permit conditions on "Bypassing” (Part II. C. 4), “Upsets” (Part II. C. 5) and "Power
Failures (Part II. C. 7), nothing in this permit shall be construed to relieve the Permittee from any
responsibilities, liabilities, or penalties for noncompliance pursuant to NCOS 143-215.3,143-215.6 or Section 309
of the Federal Act, 33 USC 1319. Furthermore, the Permittee is responsible for consequential damages, such as
fish kills, even though the responsibility for effective compliance may be temporarily suspended.
Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee
from any responsibilities, liabilities, or penalties to which the Permittee is or may be subject to under NCOS 143-
215.75 et seq. or Section 311 of the Federal Act, 33 USG 1321. Furthermore, the Permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act, or any permit
condition or limitation implementing any of such sections in a permit issued under section 402 of the Act,
and who knows at that time that he thereby places another person in imminent danger of death or serious
bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not
more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangermenr
violation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more than
30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon conviction
of violating the imminent danger provision, be subject to a fine of not more than $1,000,000 and can be fined
up to $2,000,000 for second or subsequent convictions. [40 CFR 122.41 (a) (2)]
Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person
who violates or fails to act in accordance with the terms, conditions, or requirements of a permit [North
Carolina General Statutes § 143-215.6A]
Property Rights
The issuance of this permit does not convey any property rights in either real or personal property, or any
exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor
any infringement of Federal, State or local laws or regulations [40 CFR 12241 (g)].
Any person who /znonnngly violates such sections, or such conditions or limitations is subject to criminal
penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In
the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal
penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years or both
[40 CFR 122.41 (a) (2)]
7.
8.
9.
3.
Version 6/20/2003
1.
2.
(2)
(3)
NPDES Permit Requirements
Page 5 of 16
Duty to Provide Information
The Permittee shall fumish to the Permit Issuing Authority, within a reasonable time, any information which the
Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating this permit or to determine compliance with this permit. The Permittee shall also fumish to the
Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41 (h)].
11. Signatory Requirements
All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and certified
[40 CFR 122.41 (k)].
10. Expiration of Permit
The Permittee is not authorized to discharge after the expiration date. In order to receive automatic
authorization to discharge beyond the expiration date, the Permittee shall submit such information, forms, and
fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration date.
Any Permittee that has not requested renewal at least 180 days prior to expiration, or any Permittee that does not
have a permit after the expiration and has not requested renewal at least 180 days prior to expiration, will subject
the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq.
All permit applications shall be signed as follows:
For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible
corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in
charge of a principal business function, or any other person who performs similar policy or decision
making functions for the corporation, or (b) the manager of one or more manufacturing, production, or
operating facilities, provided, the manager is authorized to make management decisions which govern the
operation of the regulated facility including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other comprehensive measures to assure long
term environmental compliance with environmental laws and regulations; the manager can ensure that
the necessary systems are established or actions taken to gather complete and accurate information for
permit apphcation requirements; and where authority to sign documents has been assigned or delegated
to the manager in accordance with corporate procedures
For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
For a municipality. State, Federal, or other pubEc agency: by either a principal executive officer or
ranking elected official [40 CFR 122.22).
b. All reports required by the permit and other information requested by the Permit Issuing Authonty shall be
signed by a person described in paragraph a. above or by a duly authorized representative of that person. A
person is a duly authorized representative only if:
The authorization is made in writing by a person described above;
The authorization specified either an individual or a position having responsibiEty for the overall
operation of the regulated faciEty or activity, such as the position of plant manager, operator of a well or
well field, superintendent, a position of equivalent responsibiEty, or an individual or position having
overall responsibiEty for environmental matters for the company. (A duly authorized representative may
thus be either a named individual or any individual occupying a named position.); and
The written authorization is submitted to the Permit Issuing Authority [40 CFR 122,22]
Duty to Reapply
If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the
Permittee must apply for and obtain a new permit [40 CFR 122.41 (b)J.
Severability
The provisions of this permit are severable. If any provision of this permit, or the apphcation of any provision of this
permit to any circumstances, is held invahd, the apphcation of such provision to other circumstances, and the remainder
of this permit, shall not be affected thereby [NCGS 150B-23).
a.
(1)
Section C. Operation and Maintenance of Pollution Controls
Version 6/20/2003
13: Permit Modification, Revocation and Reissuance, or Termination
The issuance of this permit does not prohibit the permit issuing authority from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations
contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North Carolina
Administrative Code, Subchapter 2H .0100; and North Carolina General Statute 143-215.1 et. al.
The ORC of each Class I facility must
> Visit the facility at least weekly
> Comply with all other conditions of 15A NCAC 8G.0204.
The ORC of each Class II, III and IV facility must
> Visit the facility at least daily, excluding weekends and holidays
> Properly manage and document daily operation and maintenance of the facility
> Comply with all other conditions of 15A NCAC 8G.0204.
NPDES Permit Requirements '
Page 6 of 16
14. Annual Administering and Compliance Monitoring Fee Requirements
The Permittee must pay the annual administering and compliance monitoring fee within thirty days after being
billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 2H.0105 (b) (4)
may cause this Division to initiate action to revoke the permit
12. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the
Permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned
changes or anticipated noncompliance does not stay any permit condition [40 CFR 122.41 (f)].
Once the facility is classified, the Permittee shall submit a letter to the Certification Commission designating the
operator in responsible charge:
a. Within 60 calendar days prior to wastewater being introduced into a new system
1. Certified Operator
Upon classification of the permitted facility by the Certification Commission, the Permittee shall employ a
certified water pollution control treatment system operator in responsible charge (ORC) of the water pollution
control treatment system. Such operator must hold a certification of the grade equivalent to or greater than the
classification assigned to the water pollution control treatment system by the Certification Commission. The
Permittee must also employ one or more certified Back-up ORCs who possess a currently valid certificate of the
type of the system. Back-up ORCs must possess a grade equal to (or no more than one grade less than) the grade
of the system [15A NCAC 8G.0201].
d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the
following certification [40 CFR 122.22]:
7 certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate
the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.'
c. Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate
because a different individual or position has responsibility for the overall operation of the facility, a new
authorization satisfying the requirements of paragraph (b) of this section must be submitted to the Director
prior to or together with any reports, information, or applications to be signed by an authorized
representative [40 CFR 122.22]
>
Proper Operation and Maintenance2.
3.
4.
a.
b.
(D
(2)
(3)
Version 6/20/2003
(A) Bypass
(B) There ’
NPDES Permit Requirements
Page 7 of 16
Need to Halt or Reduce not a Defense
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary' to halt or
reduce the permitted activity in order to maintain compliance with the condition of this permit [40 CFR 122.41
(c)]-
Bypass from the collection system is prohibited and the Permit Issuing Authority may take enforcement
action against a Permittee for a bypass as provided in any current or future system-wide collection system
permit associated with the treatment facility.
Bypassing of Treatment Facilities
Bypass not exceeding limitations [40 CFR 122.41 (m) (2)]
The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded, but
only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject to the
provisions of Paragraphs b. and c. of this section.
- An upset constitutes an affirmative defense to an action
ice with such technology based permit effluent limitations if the requirements of
paragraph b. of this condition are met No determination made during administrative review of claims that
or severe property damage;
feasible alternatives to the bypass, such as the use of auxiliary treatment facilities,
retention of untreated wastes or maintenance during normal periods of equipment downtime. This
condition is not satisfied if adequate backup equipment should have been installed in the exercise of
reasonable engineering judgment to prevent a bypass which occurred during normal periods of
equipment downtime or preventive maintenance; and
(Q The Permittee submitted notices as required under Paragraph b. of this section.
Prohibition of Bypass
Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take enforcement
action against a Permittee for bypass, unless:
> was unavoidable to prevent loss of life, personal injury
were no 1
The Permittee shall at all times provide the operation and maintenance resources necessary to operate the existing
facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all facilities and
systems of treatment and control (and related appurtenances) which are installed or used by the Permittee to
achieve compliance with the conditions of this permit. Proper operation and maintenance also includes adequate
laboratory controls and appropriate quality assurance procedures. This provision requires the Permittee to install
and operate backup or auxiliary facilities only when necessary to achieve compliance with the conditions of the
permit [40 CFR 122.41 (e)].
b. Within 120 calendar days of:
> Receiving notification of a change in the classification of the system requiring the designation of a
new ORC and back-up ORC
A vacancy in the position of ORC or back-up ORC.
The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects, if
the Permit Issuing Authority determines that it will meet the three conditions listed above in Paragraph c.
(1) of this section.
Notice [40 CFR 122.41 (m) (3)]
(1) Anticipated bypass. If the Permittee knows in advance of the need for a bypass, it shall submit prior
notice, if possible at least ten days before the date of the bypass; including an evaluation of the
anticipated quality and effect of the bypass.
(2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required in Part
II. E. 6. (24-hour notice).
Upsets
a. Effect of an upset [40 CFR 122.41 (n) (2)]:
brought for noncompliani
d.
Section D. Monitoring and Records
1.
Version 6/20/2003
NC DENR / Division of Water Quality / Water Quality Section
ATTENTION: Centra] Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
b. Conditions necessary for a demonstration of upset: A Permittee who wishes to establish the
affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or
other relevant evidence that:
(1) An upset occurred and that the Permittee can identify the cause(s) of the upset;
(2) The Pemuttee facility was at the time being properly operated; and
(3) The Permittee submitted notice of the upset as required in Part II. E. 6. (b) (B) of this permit.
(4) The Permittee complied with any remedial measures required under Part II. B. 2. of this permit
Burden of proof [40 CFR 122.41 (n) (4)]: The Permittee seeking to establish the occurrence of an
upset has the burden of proof in any enforcement proceeding.
NPDES Permit Requirements
Page 8 of 16
noncompliance was caused by upset, and before an action for noncompliance, is final administrative action
subject to judicial review.
6. Removed Substances
Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of wastewaters
shall be utilized/disposed of in accordance with NCGS 143-215.1 and in a manner such as to prevent any pollutant
from such materials from entering waters of the State or navigable waters of the United States. The Permittee
shall comply with all existing Federal regulations governing the disposal of sewage sludge. Upon promulgation of
40 CFR Part 503, any permit issued by the Permit Issuing Authority for the udlization/disposal of sludge may be
reopened and modified, or revoked and reissued, to incorporate applicable requirements at 40 CFR 503. The
Permittee shall comply with applicable 40 CFR 503 Standards for the Use and Disposal of Sewage Sludge (when
promulgated) within the time provided in the regulation, even if the permit is not modified to incorporate the
requirement. The Permittee shall notify the Permit Issuing Authority of any significant change in its sludge use
or disposal practices.
Representative Sampling
Samples collected and measurements taken, as required herein, shall be characteristic of the volume and nature of
the permitted discharge. Samples collected at a frequency less than daily shall be taken on a day and time that is
characteristic of the discharge over the entire period the sample represents. All samples shall be taken at the
monitoring points specified in this permit and, unless otherwise specified, before the effluent joins or is diluted
by any other wastestream, body of water, or substance. Monitoring points shall not be changed without
notification to and the approval of the Permit Issuing Authority [40 CFR 122.41 (j)].
2. Reporting
Monitoring results obtained during the previous month(s) shall be summarized for each month and reported on a
monthly Discharge Monitoring Report (DMR) Form (MR 1, LI, 2, 3) or alternative forms approved by the
Director, postmarked no later than the 28th day following the completed reporting period
The first DMR is due on the last day of the month following the issuance of the permit or in the case of a new
facility, on the last day of the month following the commencement of discharge. Duplicate signed copies of
these, and all other reports required herein, shall be submitted to the following address-
7. Power Failures
The Permittee is responsible for maintaining adequate safeguards (as required by 15A NCAC 2H.0124 -
Reliability) to prevent the discharge of untreated or inadequately treated wastes during electrical power failures
either by means of alternate power sources, standby generators or retention of inadequately treated effluent.
3.
6.
Version 6/20/2003
>
>
INPDES Permit Requirements
Page 9 of 16
To meet the intent of the monitoring required by this permit, all test procedures must produce minimum
detection and reporting levels that are below the permit discharge requirements and all data generated must be
reported down to the minimum detection or lower reporting level of the procedure. If no approved methods are
determined capable of achieving minimum detection and reporting levels below permit discharge requirements,
then the most sensitive (method with the lowest possible detection and reporting level) approved method must
be used.
Flow Measurements
Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be selected
and used to ensure the accuracy and reliability of measurements of the volume of monitored discharges. The
devices shall be installed, calibrated and maintained to ensure that the accuracy of the measurements is consistent
with the accepted capability of that type of device. Devices selected shall be capable of measuring flows with a
maximum deviation of less than 10% from the true discharge rates throughout the range of expected discharge
volumes. Flow measurement devices shall be accurately calibrated at a minimum of once per year and maintained
to ensure that the accuracy of the measurements is consistent with the accepted capability of that type of device.
The Director shall approve the flow measurement device and monitoring location prior to installation.
7. Recording Results
For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record
the following information [40 CFR 122.41):
5. Penalties for Tampering
The Clean Water Act provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any
monitoring device or method required to be maintained under this permit shall, upon conviction, be punished by
a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation, or
by both. If a conviction of a person is for a violation committed after a first conviction of such person under this
paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not more
than 4 years, or both [40 CFR 122.41).
4. Test Procedures
Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to
NCGS 143-215.63 et seq.), the Water and Air Quality Reporting Acts, and to regulations published pursuant to
Section 304(g), 33 USC 1314, of the Federal Water Pollution Control Act (as Amended), and 40 CFR 136; or in
the case of sludge use or disposal, approved under 40 CFR 136, unless otherwise specified in 40 CFR 503, unless
other test procedures have been specified in this permit [40 CFR 122.41).
Once-through condenser cooling water flow monitored by pump logs, or pump hour meters as specified in Part I
of this permit and based on the manufacturer’s pump curves shall not be subject to this requirement.
Records Retention
Except for records of monitoring information required by this permit related to the Permittee’s sewage sludge
use and disposal activities, which shall be retained for a period of at least five years (or longer as required by 40
CFR 503), the Permittee shall retain records of all monitoring information, including:
all calibration and maintenance records
all original strip chart recordings for continuous monitoring instrumentation
copies of all reports required by this permit
> copies of all data used to complete the application for this permit
These records or copies shall be maintained for a period of at least 3 years from the date of the sample,
measnrement, report or application. This period may be extended by request of the Director at any time [40 CFR
122.41).
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) analyses were performed;
d. The individual(s) who performed the analyses;
a.
b.
c.
d.
Section E Reporting Requirements
1.
2.
a.
b.
c.
3.
4.
5.
a.
b.
Version 6/20/2003
The analytical techniques or methods used; and
The results of such analyses.
NPDES Permit Requirements ' •
Page 10 of 16
e.
f.
terms and conditions of this permit. The discharge
frequently than or at a level in excess of that authorized shall
Change in Discharge
All discharges authorized herein shall be consistent with the
of any pollutant identified in this permit more
constitute a violation of the permit.
must be kept under the conditions of this
Monitoring Reports
Monitoring results shall be reported at the intervals specified elsewhere in this permit [40 CFR 122.41 (1) (4)].
Anticipated Noncompliance
The Permittee shall give advance notice to the Director of any planned changes to the permitted facility or other
activities that might result in noncompliance with the permit [40 CFR 122.41 (1) (2)].
Enter upon the Permittee's premises where a regulated facility or activity is located or conducted, or where
records must be kept under the conditions of this permit;
Have access to and copy, at reasonable times, any records that
permit;
Inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices,
or operations regulated or required under this permit; and
Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise
authorized by the Clean Water Act, any substances or parameters at any location [40 CFR 122.41 (i)].
Transfers
This permit is not transferable to any person except after notice to the Director. The Director may require
modification or revocation and reissuance of the permit to document the change of ownership. Any such action
may incorporate other requirements as may be necessary under the Clean Water Act [40 CFR 122.41 (1) (3)].
8. Inspection and Entry
The Permittee shall allow the Director, or an authorized representative (including an authorized contractor acting
as a representative of the Director), upon the presentation of credentials and other documents as may be required
by law, to;
Monitoring results must be reported on a Discharge Monitoring Report (DMR) (See Part II. D. 2) or forms
provided by the Director for reporting results of monitoring of sludge use or disposal practices.
If the Permittee monitors any pollutant more frequently than required by this permit, the results of such
monitoring shall be included in the calculation and reporting of the data submitted on the DMR.
Planned Changes
The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or
additions to the permitted facility [40 CFR 122.41 (I)]. Notice is required only when:
The alteration or addition to a permitted fadlitv may meet one of the criteria for new sources at 40 CFR
122.29 (b); or
The alteration or addition could significantly change the nature or increase the quantity of pollutants
discharged. This notification applies to pollutants subject neither to effluent limitations in the permit, nor to
notification requirements under 40 CFR 122.42 (a) (1). ■
The alteration or addition results in a significant change in the Permittee’s sludge use or disposal practices,
and such alternation, addition or change may justify the application of permit conditions that are different
from or absent in the existing permit, including notification of additional use or disposal sites not reported
during the permit application process or not reported pursuant to an approved land application plan
6.
a.
b.
7.
8.
9.
a.
b.
c.
Version 6/20/2003
NPDES Permit Requirements
Page 11 of 16
The Director may waive the written report on a case-by-case basis for reports under this section if the oral
report has been received within 24 hours.
Occurrences outside normal business hours may also be reported to the Division’s Emergency Response
personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300.
Other Information
Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or
submitted incorrect information in a permit application or in any report to the Director, it shall promptly submit
such facts or information [40 CFR 122.41 (1) (8)].
Other Noncompliance
The Permittee shall report all instances of noncompliance not reported under Part II. E. 5 and 6. of this permit at
the time monitoring reports are submitted. The reports shall contain the information listed in Part II. E. 6. of
this permit [40 CFR 122.41 (1) (7)].
Any occurrence at the water pollution control facility which results in the discharge of significant amounts of
wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a sludge
digester, the known passage of a slug of hazardous substance through the facility; or any other unusual
circumstances.
Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate
wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc.
Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass directly to receiving
waters without treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report within 5 days following first
knowledge of the occurrence.
Noncompliance Notification
The Permittee shall report by telephone to either the central office or the appropriate regional office of the
Division as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following:
10. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33
USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the offices
of the Division of Water Quality. As required by the Act, effluent data shall not be considered confidential.
Knowingly making any false statement on any such report may result in the imposition of criminal penalties as
provided for in NCGS 143-215.1 (b)(2) or in Section 309 of the Federal Act.
11. Penalties for Falsification of Reports
The Clean Water Act provides that any person who knowingly makes any false statement, representation, or
certification in any record or other document submitted or required to be maintained under this permit, including
monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of
Twenty-four Flour Reporting
The Permittee shall report to the Director or the appropriate Regional Office any noncomphance that
potentially threatens public health or the environment. Any information shall be provided orally within 24
hours from the time the Permittee became aware of the circumstances. A written submission shall also be
provided within 5 days of the time the Permittee becomes aware of the circumstances. The written
submission shall contain a description of the noncompliance, and its cause; the period of noncompliance,
inrinding exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is
expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance [40 CFR 122.41 (1) (6)].
a.
per liter (500 pg/L) for 2.4-dinitrophenol and for 2-methyl-4.6-dinitrophenol; and
Version 6/20/2003
Section C. Changes in Discharges of Toxic Suhstances
The Permittee shall notify the Permit Issuing Authority as soon as it knows or has reason to believe (40 CFR 122.42):
PART III
OTHER REQUIREMENTS
•ursue the most environmentally sound
Section E. Facility Closure Requirements
The Permittee must notify the Division at least 90 days prior to the closure of any wastewater treatment system
covered by this permit The Division may require specific measures during deactivation of the system to prevent
12. Annual Performance Reports
Permittees who own or operate facilities that collect or treat municipal or domestic waste shall provide an annual
report to the Permit Issuing Authority and to the users/customers served by the Permittee (MCGS 143-215.1 C).
The report shall summarize the performance of the collection or treatment system, as well as the extent to which
the facility was compliant with applicable Federal or State laws, regulations and rules pertaining to water quality
The report shall be provided no later than sixty days after the end of the calendar or fiscal year, depending upon
which annual period is used for evaluation.
NPDES Permit Requirerhents
Page 12 of
not more than $25,000 per violation, or by imprisonment for not more than two years per violation or by both
[40 CFR 122.41].
Section A. Construction
The Permittee shall not commence construction of wastewater treatment facilities, nor add to the plant's treatment
capacity, nor change the treatment process(es) utilized at the treatment plant unless the Division has issued an
Authorization to Construct (AtC) permit Issuance of an AtC will not occur until Final Plans and Specifications for
the proposed construction have been submitted by the Permittee and approved by the Division.
Section B. Groundwater Monitoring
The Permittee shall, upon written notice from the Director of the Division of Water Quality, conduct groundwater
monitoring as may be required to determine the compliance of this NPDES permitted facility with the current
groundwater standards.
That any activity has occurred or will occur which would result in the discharge, on a routine or frequent
basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the
following "notification levels";
(1) One hundred micrograms per liter (100 pg/L);
(2) Two hundred micrograms per liter (200 pg/L) for acrolein and acrylonitrile; five hundred micrograms
per liter (500 pg/L) for 2.4-dinitrophenol and for 2-methyl-4.6-dinitrophenol; and one milligram per liter
(1 mg/L) for antimony;
(3) Five times the maximum concentration value reported for that pollutant in the permit application.
Section D. Evaluation of Wastewater Discharge Alternatives
The Permittee shall evaluate all wastewater disposal alternatives and pi
alternative of the reasonably cost effective alternatives. If the facility is in substantial non-compliance with the terms
and conditions of the NPDES permit or governing rules, regulations or laws, the Permittee shall submit a report in
such form and detail as required by the Division evaluating these alternatives and a plan of action within 60 days of
notification by the Division.
b. That any activity has occurred or will occur which would result in any discharge, on a non-routine or
infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the
highest of the following "notification levels";
(1) Five hundred micrograms per liter (500 pg/L);
(2) One milligram per liter (1 mg/L) for antimony;
(3) Ten times the maximum concentration value reported for that pollutant in the permit application.
Section A. Publicly Owned Treatment Works (POTWs)
1.
2.
3.
Section B. Municipal Control of Pollutants from Industrial Users.
1.
2.
b.
c.
d.
f.
g-
h.
3.
4.
Version 6/20/2003
PART IV
SPECIAL CONDITIONS FOR MUNCIPAL FACILITIES
^M^BNPDES Permit Requirements
Page 13 of 16
adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit
continue at the permitted facility.
Under no circumstances shall the Permittee allow introduction of the following wastes in the waste
treatment system:
a.
The Permittee shall require any industrial discharges sending influent to the permitted system to meet
Federal Pretreatment Standards promulgated in response to Section 307(b) of the Act Prior to accepting
wastewater from any significant industrial user, the Permittee shall either develop and submit to the
Pollutants which create a fire or explosion hazard in the PO1W, including, but not limited to,
wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees
Centigrade using the test methods specified in 40 CFR 261.21;
Pollutants which will cause corrosive structural damage to the POTW, but in no case Discharges
with pH lower than 5.0, unless the works is specifically designed to accommodate such Discharges;
Solid or viscous pollutants in amounts which will cause obstruction to the flow in the POTW7
resulting in Interference;
Any pollutant, including oxygen demanding pollutants (BOD, eta) released in a Discharge at a flow
rate and/or pollutant concentration which will cause Interference with the POTW;
Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in
no case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C
(104°F) unless the Division, upon request of the POTW, approves alternate temperature limits;
Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin in amounts that will
cause interference or pass through;
Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a
quantity that may cause acute worker health and safety problems;
Any trucked or hauled pollutants, except at discharge points designated by the POTW.
With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the
Permittee to supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to
ensure compliance by the Permittee with all applicable effluent limitations. Such actions by the Permittee
may be necessary regarding some or all of the industries discharging to the municipal system.
All POTWs must provide adequate notice to the Director of the following
Any new introduction of pollutants into the POTW from an indirect discharger which would be subject to
section 301 or 306 of CWA if it were directly discharging those pollutants; and
Any substantial change in the volume or character of pollutants being introduced by an indirect discharger
as influent to that POTW at the time of issuance of the permit
For purposes of this paragraph, adequate notice shall include information on (1) the quality and quantity of
effluent introduced into the POTW, and (2) any anticipated impact of the change on the quantity or quality
of effluent to be discharged from the POTW.
Effluent limitations are listed in Part I of this permit Other pollutants attributable to inputs from
industries using the municipal system may be present in the Permittee’s discharge. At such time as
sufficient information becomes available to establish limitations for such pollutants, this permit may be
revised to specify effluent limitations for any or all of such other pollutants in accordance with best
practicable technology or water quality standards.
5. ’
2.
3.
4.
5.
Version 6/20/2003
NPDES Permit Requirements
Page 14 of 16
an existing ’or modify
Sewer Use Ordinance (SUQ)
The Permittee shall maintain adequate legal authority to implement its approved pretreatment program
Industrial Waste Survey (IWS)
The Permittee shall update its Industrial Waste Survey (IWS) to include all users of the sewer collection
system at least once every five years.
Headworks Analysis (HWA) and Local Limits
The Permittee shall obtain Division approval of a Headworks Analysis (HWA) at least once every five
years, and as required by the Division. Within 180 days of the effective date of this permit (or any
subsequent permit modification) the Permittee shall submit to the Division a written technical evaluation
of the need to revise local limits (Le., an updated HWA or documentation of why one is not needed) [40
CFR 122.42]. The Permittee shall develop, in accordance with 40 CFR 403.5(c) and 15A NCAC 2H .0909,
1x5011 to implement the prohibitions listed in 40 CFR 403.5(a) and (b) and 15A NCAC 2H
Industrial User Pretreatment Permits (TUP) & Allocation Tables
In accordance with NCGS 143-215.1, the Permittee shall issue to all significant industrial users, permits for
operation of pretreatment equipment and discharge to the Permittee's treatment works. These permits
shall contain limitations, sampling protocols, reporting requirements, appropriate standard and special
conditions, and compliance schedules as necessary for the installation of treatment and control
technologies to assure that their wastewater discharge will meet all applicable pretreatment standards and
requirements. The Permittee shall maintain a current Allocation Table (AT) which summarizes the results
of the Headworks Analysis (HWA) and the limits from all Industrial User Pretreatment Permits (IUP).
Permitted IUP loadings for each parameter cannot exceed the treatment capacity of the POTW as
determined by the HWA.
Under authority of sections 307(b) and (c) and 402(b)(8) of the Clean Water Act and implementing regulations 40
CFR Part 403, North Carolina General Statute 143-215.3 (14) and implementing regulations 15A NCAC 2H
.0900, and in accordance with the approved pretreatment program, all provisions and regulations contained and
referenced in the Pretreatment Program Submittal are an enforceable part of this permit.
The Permittee shall operate its approved pretreatment program in accordance with Section 402(b)(8) of the Clean
Water Act, the Federal Pretreatment Regulations 40 CFR Part 403, the State Pretreatment Regulations 15A
NCAC 2H .0900, and the legal authorities, policies, procedures, and financial provisions contained in its
pretreatment program submission and Division approved modifications there of. Such operation shall include
but is not limited to the implementation of the following conditions and requirements-
1.
Division a Pretreatment Program for approval per 15A NCAC 2H .0907(a)
Pretreatment Program per 15A NCAC 2H .0907(b).
This permit shall be modified, or alternatively, revoked and reissued, to incorporate or modify an approved
POTW7 Pretreatment Program or to include a compliance schedule for the development of a POTW
Pretreatment Program as required under Section 402(b)(8) of the Clean Water Act and implementing
regulations or by the requirements of the approved State pretreatment program, as appropriate.
Section C. Pretreatment Programs
Monitoring Plan
The Permittee shall implement a Division approved Monitoring Plan for the collection of facility specific
data to be used in a wastewater treatment plant Headworks Analysis (HWA) for the development of
specific pretreatment local limits. Effluent data from the Plan shall be reported on the DMRs (as required
by Part II, Section D, and Section E.5.).
6.
7.
SIU Self Monitoring and Reporting8.
9.
10.
a.)
b.)
c-)
A)
Version 6/2Q/2003
Authorisation to Construct (A to Q
The Permittee shall ensure that an Authorization to Construct permit (AtC) is issued to all applicable
industrial users for the construction or modification of any pretreatment facility. Prior to the issuance of
an AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to
comply with all Industrial User Pretreatment Permit (TUP) limitations.
These reports shall be submitted according to
following
a schedule established by the Director and shall contain the
^B^^NPDES Permit Requirements
Page 15 of 16
For all other active pre treatment programs, the Permittee shall submit two copies of a Pretreatment Annual
Report (PAR) describing its pretreatment activities over the previous twelve months to the Division at the
following address:
Pretreatment Annual Reports (PAR)
The Permittee shall report to the Division in accordance with 15A NCAC 2H .0908. In lieu of submitting
annual reports. Modified Pretreatment Programs developed under ISA NCAC 2H .0904 (b) may be
required to meet with Division personnel periodically to discuss enforcement of pretreatment requirements
and other pretreatment implementation issues.
POTW Inspection & Monitoring of their STUs
The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division
approved pretreatment program in order to determine, independent of information supplied by industrial
users, compliance with applicable pretreatment standards. The Permittee must
a.
b.
The Permittee shall require all industrial users to comply with the applicable monitoring and reporting
requirements outlined in the Division approved pretreatment program, the industry’s pretreatment permit,
or in ISA NCAC 2H .0908.
Inspect all Significant Industrial Users (SIUs) at least once per calendar year; and
Sample all Significant Industrial Users (SIUs) at least twice per calendar year for all permit
limited pollutants, once during the period from January 1 through June 30 and once during the
period from July 1 through December 31, except for organic compounds which shall be sampled
once per calendar year;
Enforcement Response Plan (ERP)
The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards
promulgated pursuant to section 307(b) and (c) of the Clean Water Act (40 CFR 405 et. seq.), prohibitive
discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 2H .0909, and specific local limitations.
All enforcement actions shall be consistent with the Enforcement Response Plan (ERP) approved by the
Division.
NC DENR / DWQ / Pretreatment Unit
1617 Mail Service Center
Raleigh, NC ’ 27699-1617
Narrative
A brief discussion of reasons for, status of, and actions taken for all Significant Industrial
Users (SIUs) in Significant Non-Compliance (SNQ;
Pretreatment Program Summary (PPS)
A prerreatment program summary (PPS) on specific forms approved by the Division;
Significant Non-Compliance Report (SNCR)
The nature of the violations and the actions taken or proposed to correct the violations on
specific forms approved by. the Division;
Industrial Data Summary Forms (ID$F)
4
e.)
11.
12.
13.
14.
Version 6/2Q/2003
Funding and Financial Report
The Permittee shall maintain adequate funding and staffing levels to accomplish the objectives of its
approved pretreatment program.
Public Notice
The Permittee shall publish annually a list of Significant Industrial Users (SIUs) that were in Significant
Non-Compliance (SNC) as defined in the Permittee’s Division approved Sewer Use Ordinance with
applicable pretreatment requirements and standards during the previous twelve month period. This list
shall be published within four months of the applicable twelve-month period.
Record Keeping
The Permittee shall retain for a minimum of three years records of monitoring activities and results, along
with support information including general records, water quality records, and records of industrial impact
on the PO1W.
Modification to Pretreatment Programs
Modifications to the approved pretreatment program including but not limited to local limits
modifications, POTW monitoring of their Significant Industrial Users (SIUs), and Monitoring Plan
modifications, shall be considered a permit modification and shall be governed by 15 NCAC 2H .0114 and
ISA NCAC 2H .0907..
NPDES Permit Requirements
16 of 16
Monitoring data from samples collected by both the POTW and the Significant Industrial
User (SIU). These analytical results must be reported on Industrial Data Summary Forms
(IDSF) or other specific format approved by the Division;
Other Information
Copies of the POTW*s allocation table, new or modified enforcement compliance schedules,
public notice of SIUs in SNC, and any other information, upon request, which in the
opinion of the Director is needed to determine compliance with the pretreatment
implementation requirements of this permit;