Loading...
HomeMy WebLinkAboutNCG140180 DMR WW (5)CERTIFICATE OF COV FACILITY NAME: PROCESS WASTEWATER — Quarterly Discharge Monitoring Repo 'V ED GENERAL PERMIT NO. NCG140000 APP 1, 2015 E No. NCG14_() I �L9 PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY: LIMIT VIOLATIONS? YES "NO �rient1:D Lab#Wt­- -Lab # AM— cemrR,gL Fl SAMPLE COLLECTION YEAR: (9 o ` S d W�'C�l�� SAMPLE QUARTER: Jul -Sept []Oct -Dec RJan-March April -lune COUNTY: ���b��� a�t� ec PHONE NO. (qO) t,( -3-1647 ADD TO LISTSERVE? []YES ONO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA QTrout []Other A' _ OPTIONAL INFO: 'art A: Wastewater Monitoring Requirements Date Sample 1 Type of Wastewater Outfall No. Collected z (VE, RM, MD)- (mm/dd/yr) _ Total Suspended PH Solids (standard) (mg/L) - 6-93'4 303,5 TPH using Discharge Settleable method 1664A Total Flow Solids SGT -NERC Duration (gallons/day)' (mL/L) (mg/L) (minutes) 53 (15)6 - PI make sure to mark the sample quarter above. 1 If wastewater systems have not discharged in this quarter— report No Flow or No Disc arge ere. ease Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RIN), Mixing Drum Cleanout (MO). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date' 7/1/2010-06/30/2015 r Last Revised 07/13/11 Page 1 of 2 Process wastewater discharges shall only be monitored for TPH when commingled with but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Act ons from VMA areas. TPH does not have a limit for wastewater, ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 026.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the ermittee obtain Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may re uire an annu report on a case-by-case basis. P cannot q al flow AT END OF MONITORING PERIO®IN CASE OF "IVO FLO•W'M TO; Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTlifC4T101V FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief,true, , accurate, and a system designed to complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for the system, or violations." �r n i1 knowing (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 3s e�,1-Is (Date) Last Revised 07/13/11 Page 2 of 2