Loading...
HomeMy WebLinkAboutSW6240101_Emails_20241016 Beeker, Jacob I From: Beeker, Jacob I Sent: Wednesday, October 16, 2024 11:08 AM To: bradley@bradleybuiltnc.com Cc: svc_post_construction_stormwater;Joyner, Melissa;Jernigan Jr., Wallace L; Fleet Temple; djohnson@harnett.org Subject: Re: [External] Re: SW6240101; Freedom Acres (Harnett) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR) received a complete Stormwater Management Permit Application for the subject project on September 17th, 2024.Staff review of the plans and specifications has determined that the project, as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 - 1062 rules.We are forwarding Permit No.SW6240101, dated October 16th, 2024,for the construction,operation and maintenance of the built-upon areas (BUA)and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, BS Land, LLC, at the following address (NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): BS Land, LLC Attn: Bradley Stancil, Member 466 Stancil Road Angier, NC 27501 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstruction(-)deq.nc.gov. Thankyou, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality (919) 707-9214 Jacob.Beeker(abdeq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Fleet Temple<fleet@ftempleengineering.com> Sent:Wednesday, September 4, 2024 4:44 PM To: Holland, Brianna <brianna.holland@deq.nc.gov> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: [External] Re: SW6240101; Freedom Acres (Harnett) 1 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Brianna, regarding: On the Supplement-EZ,you updated the Low Density Page, Line 11 to indicate that treatment swales are used. Treatment swales are primary SCMs and the vegetated conveyances you have in the plans do not meet the MDC for these. Unless the package is revised to meet the MDC, "no" should be indicated on this line.You can either provide written direction in email to me to mark it out and revise. ----This email constitutes written direction/permission to please mark out and revise Line 11 at my request I'll get you a revised original cover page of O&M form. Thanks for your help. On Wed, Sep 4, 2024 at 2:07 PM Holland, Brianna <brianna.hollandCCbdeq.nc.gov>wrote: Hi Fleet, The package looks good to go besides two minor issues. On the Supplement-EZ,you updated the Low Density Page, Line 11 to indicate that treatment swales are used. Treatment swales are primary SCMs and the vegetated conveyances you have in the plans do not meet the MDC for these. Unless the package is revised to meet the MDC, "no" should be indicated on this line.You can either provide written direction in email to me to mark it out and revise, or you could email me a copy of the revised page, whatever your preference is. This project appears to use "vegetated conveyances" which are distinct from treatment swales and curb outlet swales, which have more requirements. The only requirements for a vegetated swale are that it is nonerosive in the 10-year storm and has side slopes no steeper than 3:1. The other issue is that the O&M cover page changed so it will need to be notarized and the original provided to us. Unfortunately, we can not accept something that was changed after notarization. It's recommended to make 2 copies of this, and retain one for the applicant, because a permitting condition is that the applicant has to record their copy with the Register of Deeds. Since these are relatively minor issues, one I receive these revised documents I can permit the project without another official review. Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9218 brianna.holland@deq.nc.gov(email preferred) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address:512 North Salisbury Street, Raleigh, NC 27604 2 ki ;NORTH CAROLINA - Department o1 Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please direct all post-construction permitting questions and correspondences to our new group email address, postconstruction@deq.nc.gov From: Holland, Brianna Sent: Friday, July 19, 2024 2:20 PM To: Fleet Temple <fleet _ftempleengineering.com>; brad ley(cbbradleybuiltnc.com Cc:Joyner, Melissa <melissa.joyner _ deq.nc.gov>; svc_post_construction_stormwater <postconstructionCcbdeq.nc.gov> Subject: RE: SW6240101; Freedom Acres (Harnett) Good afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on April 24, 2024.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. NOTE: Per Division policy, the next review of this application will be the final review. Failure to provide the requested information will result in the project being returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. When responding to this request, please mail all requested documents to the address provided in the letter. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Thankyou, Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9218 brianna.holland@deq.nc.gov(email preferred) Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address:512 North Salisbury Street, Raleigh, NC 27604 D E NORTH CAROLINA - Department o1 Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 3 Please direct all post-construction permitting questions and correspondences to our new group email address, postconstruction@deq.nc.gov From: Farkas, Jim J <Jim.Farkas(@deq.nc.gov> Sent:Wednesday,April 3, 2024 4:00 PM To: Fleet Temple <fleet _ftempleengineering.com>; brad ley(cbbradleybuiltnc.com Cc:Joyner, Melissa <melissa.joyner _ deq.nc.gov>; svc_post_construction_stormwater <postconstructionCcbdeq.nc.gov> Subject: RE: SW6240101; Freedom Acres (Harnett) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on January 5, 2024.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkasCcbdeq.nc.gov DE kjle� NORTH CAROLINA Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov> Sent:Tuesday, January 9, 2024 10:10 AM To: Fleet Temple <fleet _ftempleengineering.com>; brad ley(cbbradleybuiltnc.com Cc: Farkas, Jim J <Jim.Farkas(@deq.nc.gov>, Joyner, Melissa <melissa.joyner _ deq.nc.gov>; svc_post_construction_stormwater<postconstructionCcbdeq.nc.gov> Subject: SW6240101; Freedom Acres (Harnett) Good Morning, We received your post-construction stormwater permit application for the subject project on 1/5/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete.You can see where this project stands in the review queue by emailing postconstructionCadeq.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type.Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form.YOU MUST CLICK ON THE "ADD ANOTHER POST-CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files 4 (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6240101 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstructionCcbdeq.nc.gov or at 919-707-3646. Thankyou, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstructionCadeq.nc.gov D:.-,.E Q NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent:Tuesday, January 2, 2024 8:16 AM To: Fleet Temple <fleet _ftempleengineering.com>; brad ley(cbbradleybuiltnc.com Cc: Farkas, Jim J <Jim.FarkasCcbdeq.nc.gov>, Joyner, Melissa <melissa.joyner _ deq.nc.gov>; svc_post_construction_stormwater<postconstructionCcbdeq.nc.gov> Subject: RE: [External] RE: Freedom Acres; Lillington, Harnett County Fleet, Please see the attached pdf for instructions on the Basin Information Table. Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstructionCcbdeq.nc.gov z,,-�--D.- E NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 5 From: Fleet Temple <fleet _ftempleengineering.com> Sent: Saturday, December 30, 2023 5:59 PM To: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov>; brad ley(Jabradleybuiltnc.com Cc: Farkas, Jim J <Jim.Farkas(@deq.nc.gov>;Joyner, Melissa <melissa.joyner _ deq.nc.gov>; svc—post—construction—stormwater<postconstruction(adeq.nc.gov> Subject: [External] RE: Freedom Acres; Lillington, Harnett County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin I have one question: • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section IV, 10—The value for% Impervious Area** (total) in Drainage Area 2 is incorrect. Please revise. Based on this comment- It appears that total drainage area does not include surface waters? Is that correct? Thanks, -Fleet Fleet Temple Engineering, PLLC 5245 Red Hill Church Rd. Coats, NC 27521 910-658-2446 From: Peck, Kaitlin <kaitlin.peck _ deq.nc.gov> Sent: Friday, December 29, 2023 9:34 AM To: Fleet Temple <fleet _ftempleengineering.com>; bradley(@bradleybuiltnc.com Cc: Farkas, Jim J <Jim.Farkas0bdeq.nc.9ov>, Joyner, Melissa <melissa.joyner _ deq.nc.gov>; svc—post—construction—stormwater<postconstruction(&deq.nc.gov> Subject: Freedom Acres; Lillington, Harnett County Good Morning, We received your application for a new post-construction stormwater permit on 12/28/23. At this time,the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 1/27/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)): • Please be aware that, effective October 3, 2023, our permit application fee structure is as follows: • New Permit or Major Modification for a project with one (1) or fewer SCMs = $1,000 • New Permit or Major Modification for a project with two (2) SCMs = $1,250 • New Permit or Major Modification for a project with three (3) SCMs = $1,750 • New Permit or Major Modification for a project with four(4) or more SCMs = $2,250 • Minor Modification = $250 • Renewal= $750 • Transfer= $750 • Renewal&Transfer Combination = $1,500 6 General Permit= $700 • Per the submittal items, this project will require an application fee of$1000 as this application is for a New Permit for a project with 0 SCMs. Please provide a new application fee check in this amount so that we may process your application.We will void and return the provided application fee check to the permittee (unless a different return address is indicated by close of business tomorrow). • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section IV, 10—The value for% Impervious Area** (total) in Drainage Area 2 is incorrect. Please revise. • 1x hard copy of the stormwater narrative.This item is required per 15A NCAC 02H .1042(2)(a)(vi) and per Section VI, 5 of the Application. • 1x hard copy of sealed, signed, and date calculations relevant to the application's project.This item is required per 15A NCAC 02H .1040(2)(f) and per Section VI, 7 of the application. • 1x hard copy of a soils map. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Vegetated setback from surface waters.This item is required per 15A NCAC 02H .1042(2)(g) &Section VI, 8p of the Application. Vegetated setbacks are required from all surface waters (more information can be found in 15A NCAC 02H .1003(4) &.1017(10)). NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstructionCcbdeq.nc.gov D_ E :� NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Thanks, Fleet Fleet Temple Engineering, PLLC (P-2357) 5245 Red Hill Church Road Coats, NC 27521 910.658.2446 fleet _ftempleengineering.com 8