HomeMy WebLinkAboutNCG020159 DMR WW (2)ANNUAL SUMMARY DMR - WASTEWATER
SEND TO. CENTRAL OFFICE.
.PROCESS MINE/DEWATERING WASTEWATER
GENERAL PERMIT NO. NCG020000
Report All Wastewater discharge monitoring_ data on this form (including No'Flow and No Discharge"and Per`mii"Limit Violations) by'MARCH 1 of each year: If "
you have limit violations, you, must also1 have turned in a Limit Violation DMR to your local Regional Office,tivithin 30 days of receiving sample results.from"a, lab :
CERTIFICATE OF COVERAGE NO. NCG020159
FACILITY NAME: Vulcan Construction Materials, LP./Elkin Quarry
PERSON COLLECTING SAMPLES: Marty Taylor
CERTIFIED LABORATORY: Research & Analytical Labs Lab #34
Lab #
LIMIT VIOLATIONS? YES ❑ NO X
SAMPLE COLLECTION YEAR: 2014
COUNTY: Surry
PHONE NO. (33J6 835-1439
ADD TO LISTSERVE? YES ❑ NOF] EMAIL:
INDUSTRIAL SAND'? [:1DISCHARGING TO SA WATERS°. ❑
'art A: Wastewater Monitoring Re uirements
y
3 ` s e., C. 3^s "�e 5 k i E .: E J
re a k
v z Date Sam le f' c " .. 3; . ,
p x _ Total Suspended ;'' Turbidity' , .'
Ogtfall No. l .Total"Flow„ , , Settleable Solids, pH Fecal:,Cohforms .4
Collected . Sohds` , a.
�emm%dd/yr (
. M.
N3Vm24Ttandard
-. may..
001 01/14/14 0.086 25.0 35.94 <0.1 7.9 N/A
001 05/14/14 0.334 5.0 12.75 <0.1 7.2 N/A
001 09/02/14 0.075 17.8 12.6 <0.1 7.36 N/A
001 11/10/14 0.085 <5.0 6.86 <0.1 7.1 N/A
All mines must monitor WW discharges for TSS. Only industrial sand mine discharges are subject to TSS limits.
z
If an effluent limit is exceeded, the permittee is required to institute monthly monitoring for that parameter for the remaining permit term.
a The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs
designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the
Stormwater Discharge Outfall. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the discharge.
a Only facilities discharging to SA waters are required to monitor for Fecal coliforms.
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Pagel of 2
'art A Continued: Wastewater Monitoring Requirements
Date Sam le
P Total Flow ,Total Suspended"i" Tur`bidity'p '
Outfall No:'` 4 r Settleable.Solids pH .Fecal`Coliforms,
Collected Solids?
yr, . i sm /teNTII "m 1/1 }y Standard; cd/ml'
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY fINCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH I OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information 'submitted. Based on my inquiry of the person or persons who manage the system, or
those persons direct) responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
I am awa�thXe are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
ure of Permittee)
Date: 1 / 1 /2010-12/31 /2014
January 21, 2015
(Date)
Last Revised 02-02-11
Page 2 of 2