HomeMy WebLinkAboutNCC243176_Site Plan or Location Map_20241016 .0.19 -7/ wW '''' •
54.
o-S - - CONSTRUCTION SCHEDULE DATE: PAGE:
lY h / 2 Inma I pam,i¢and plan approvals.Erosion and Sediment Convol(F&SC)permit end a Certificate of Coverage
® , -- I.Obtain all necessary
/ )
(COC)�must be obtained before any land disturbing activities occur. copy of the E&SC nem,n Me COC and a hard copy of the
ti ie
"h• plan m at be kept on site,preferably in apcm,iM box,and accessible Junng inspttdan
e gravel con rn es siu fem,reinforcN siltfenoe
0 0S' / no;
end Soles. areas st ,3.FinisM1 Ilea' and grubbing any necessary are on trap as they are arid.
4.B<gin lo,gmding and<xcavarion acdvitles ti u = = = �� P
�'� •
H, S4A9`6 S.BaBly or continue with house construction activitlea. tr 5 AL €- ,/ ,[
�F i ,,,yyyyyy
�' �> �f 6.Finish all rough grading an house conslrucaon.Alt not disturbed for)deys needs to have temporary or pem,eneat
:� .r 4 a° / I gmana<ov<r installed. p Ilous 1f JL .II. :Iii HOUSE ou Ha HOUSE]1 sWlan Ike dpan ,f
bQ B.Begin fine grading of lot I J
<Q 9Fne;g & g d b g ll revolve Me installation of sod on the lot TTesilt fence willRAI 1 L "'JAY
�' .0 �� AY LNO AY R AY
1 '1 h I dd d b'1' d d fees hold.
'� I / 10 TM1ec shall J If - f h J W'emotion control measures and complete lye followin6 C8 RO r AY ROADWAY HO HO
9 • / 'k comb J If' p f f d M1 DEMLR bs' G �URB INLET
of CUae
hops//www.deq.nc gov/about/divis,onstenergy-mineral-and-lend-resources/stormwamr/sm,mweter-progreMnpdes-constmclion-program. Notes:
a Twelve months ofcomplem inspemiw trams sM1ell be kept mr site and available for mspxtion at all times.lt u recommended a 1.If needetl.Tree Protection fencing should be installed along the buffer zone,wetland
copybe kept in apermim box.Ref:G5.113A-54.1 thrmrgh G.S.113A-5]Sections 15A NCAC 04A 0101 tlumrgh ISA LEGEND beuntlary antllor around protected trees,providing a radius of at least 1.25 feet for each
NCAC 04E.03,M Genttm Pttmit NCG 010000 NPDES for ConeWctirn Acdvitid. inch of trunk diameter.
OFFS ITE 1.whiin24 hours roeveaaronn evs<dimenrati°n cpmrol m<aaums are to be performed at Kest rime ovary ary<n citidm days and 2.Install S'JI Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on
y 11() wdhin 2A boors of every rep event of greamr Manlmch.Any seeded repairs shell be mode,mmedimelymmemm,a measures es N schemalicltlle dfald ed'usted.ftnecenco for lacement et low
70An SEPTIC FOR l 1 designed.A11 ESC measures aba116e mmntainM as epailed in the conslnclion delaJs on Nis plan.Amin gauge sM1allbe asatalled FLOW DIRELTIO p 9ramen 1 ry, p pe ind if lots ere
SR1vs �O"^rxo 31 LOT 66 \I the pOJem site for vi a rtonngl krs.Whrn lye he M1ell con DBM Rto clos<outthe P&SC SILT FENCE Fentices. antl have tlRa ant lantl owns aor builtlere.each lot shoultl have intlivitlual6itt
_ qD ' pecdan an ephnce project is comp petmitkeas SILT FENCE OUTLETOM-/i/y Plan.AtterlNCUUR infomu the ftbe lose out,viaiOT]Aon the shall visit CURB INLET
3.Install required Silt Fence within l0 feet of property line to ensure there is no conflict with
/ / pem,inee o project c p report, permivee ENTRANENE
CE septic system.It Is the responsibility f the builder to ensure the installation of sediment
"deq.ne.goNvrhss"to submit an electronic Notice of termination(e-NOT).A5120 annual general permit fee will be charged s p y poop Ityo
until the a-NOT has been filled out. m control measures does not impact the septic system and repair area(s).
OFFSITE 4.At leas[one Construction Entrance/Exit is to be installed per lot.
den / 5.Waste bins and other areas dedicated for managing building material waste shall be at
�� SEPTIC
least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that
1 SITE \ / o no other alternative exists.If this separation cannot be achieved,these areas must be
r ae FOR LOT65 ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY contained behind Sit Fence.
S �rg \ �=+ NCGS 113A-54.11S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR 6.Inlets downstream of disturbances should be protected:streets should be swept when
� a1teiC 1` COMPLETED AS AN EXCEL SPREADSHEET. sediment from the construction activity is present.
�yw °5� o
W l AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED „\NC-Environmental.jpeg ].Details for Silt Fence,Silt Fence Outlets,Construction Entrances end other measures are
,s ,,I{, EROSION AND -- - - provided on addltlonal sheets.Erosion and sediment control details are notdrzwn to prole.
.CK 3138 p`J SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A TYPICAL LOT LAYOUT WITH CURB AND GUTTER
a U / \ NCAC INS ND DATING
THAT MEASURE....DOCUMENTATION SHALL N ACCOMPLISHED BY
\ INITIALING AND DATING EACH OR PRACTICE SHOWN ON A COPY OF THE
_ 7 OPEN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
2° ° EN MAIL 40fi
�.;q SPACE DATING AND SIGNING AN INSPECPON REPORT THAT LISTS EACH MEASURE, DATE: PAGE:
`p' PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
° •F I �p�, KIOSK 41 67 \ CONTROL PLAN."
:tit I S ICE Fs\
�a
b ,vyg;6xoAo me-txa O / �J
VICINITY MAP o 66 /
N.T.S. / GONSTRUGTION / QOaa
LIMITS �• ` / ,4101
30 J\G / 413E1 8pM >
t/�`• 42 65 Q � • "'"�aaa
Lot Plan //// 362 / � � i � �
0
43 64 / �00%•_
look
DATE. PAGE: / Lotla /// / �' sran7:11:4(...74,,,414444.4.At,
JS' S /Watt 51 Sock/Wattle NOT:
FLOW�� ml Are' a FL IIMI ,. - - / Q�� • ��-JtWW
-1IT_ ',. iiv _11-.It. z. f rice. \
• 11se in sh ks compost 1
1 2" 2 acgs do not CONSTRU • ��n Construction Maintenance,
Stokes Stakes 3. e(1 nsta ed parcel. LIMITS °• '(mill'� 1,Clear the entrance and exit area of all vegetation,roots and other objectionable 1.Per NCGA1 inspect t k d after each f inch or
a.a minimum of 10 feet beyond the toe of a / Y p material and properly grade t greater rainfall, k y required p immediately.
SECTION e[eT oN °1°inl¢age o�,nsw / // 2,Place the gravel to the spedfic grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment
°nW�al»lo` der a / / 45 amoothit. o-omleaving meLDnStmalDnSde.rn'ISmay regmreparindm
lO �O wwamel lshaaltl betumea"d mly p oem / / ,/`�• 3.Provide drainage to carry water toasetlimem trap or other suitable oWet. topdressing with 2 inch stone.
°.Via+ gW>r, ametslmg,g around eon thesilt / 4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled.washed or
subject to seepage or high water table. tracked onto public roadways.
sooldwattle.Stakes should he placed at a
ch or greater ralnfall.Remove iollploo,
CONSTRUCTION ENTRANCE/EXIT
notTnme>IIt>«Mwmne i;we" m a 4
-Fr
or Com %
o a1 NSThePllAght o log t g ntl 4 Min. 5. Me(ie.when
UNTRENCHED IONpavementMBB hind the M
II0i BE USED 1V.COMM"!
sock/wattle to hold it in
ng runoff
ISOMERIC VIE µY m ALrLDWaM ,, MAINTENANCE:tl1. ° saw W a)«>concrete blocks shall be used� kro a .� LG 60\ 111111°. SODDING
cavort
LAV SOD INA STAGGERED
Mulch or Compost .
for Undenmed Socks P�eare Be d one DMmster i�`) (;oo°,°,iso,.,,",) -7,,;) s^Tsor" 2. mre must he p n cloggedor
��'�I
�� rr
snemRna� �sNasaekm�(�°n 'AVM.;ia`mi a ° 59
o
werxAre if wattle /a (305 m) (398 m) ( m) 4 � anp>.,roralMMmo FIeaEa
Hys,alk n„ zs ,L3 s.o zzs larger
.il n dam seda dislodged.are /
r..z aat>iiif pP,nm 1;;N an ,ze" 7374" '. S,n°ds/w.le°°n shell.inspected until Iona Mb cea....find..areaa ethe 1111111111 parr"a ma.
im) /m/m) Iimkm) iimim) ,�gym) m,a>areha> pam remlyM; d. N / 49 5 ��
ST BE
n"
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION `., ""
•
DATE: Wire Fence Filter Fabric PAGE: N.
SD �§7 \1000
\
Steel Post sMa".Emes g me eut tee ten Wre Fence Wire Bo<kfll trench \ \ \ --- P
Steel Post _ thorou9hlyvcl Upe ope \, 7::
, wr,Ir frier os ca56 �»iM 1Mi dll N
MOW Men DIE SOD IS
ESTABLISHED.IN 2.9
•
Pla%war 4 I I / He SOIL Lyra Woa°.asTME%a HnHaa1. aMaw
f .
Wire ties 1e�n +MI a U I APPEARANCE OF GOOD SOD
aMin GROUND STABILIZATION I �) / `(//_
�(�}( + SITE AREA STABILIZATION
F/ OPEN Mp^'^ �'o'°n„o-e,aM1 DESCRIPTION TIME FRAME EXCEPTIONS a°'" II�II��III�1 7�� �plll
1 �` a4ro am / PERIMETER DIKES, 7 DAYS NONE 45131111100055 "g5 $PACE IFlier Fabrc \ ( , naaaa
Conrictthesetlmen b rengthor rengmhsynthetan CROSS SEC ONVEWswALES DIES 10 201 e t the edimentlamat exmam Lerfanxa e<SLOPES �.,- - ,aa„aaLoaa
2 Ensure mattln M1e nM Nme sed'memrence tloes notexceetl 24'n >a ve me grnuntl.(H gherrenros / l -' w.ruwAnixem>swmMarMaympound voumes of water sumcent m anseaure of memmcture) HIGH QUALITY 7 DAYS NONE o _ / // ,�6c ' "' `°° r
a.cenmmn menmr fable rram.comnaeu%ra mmmee tows WATER ZONES �" 1
necessary,securely fasten me filter cloth only at a supped post- feeminimumme post
4.Support standardm bytl Maureen (HOW) / 11
the wire mesh lope 1. nspex edl fencesafter eawl
side come rende gth inch or - immediately, SLOPES STEEPER 7 DAYS IF SLOPES ARE V- 62 \ ..o General Erosion Control Notes
5.when awre 2.Shpue fa-a THAN 3:1 10•OR LESS IN o
eev,rey into thee r Inches. support
ntivepam%a decompose,te LENGTH AND ARE / �� 1.Only the areas shown shall be dsturbed
n,hero a
6 S.Remweeea me eon Me
rumen me anenabdeereearmposts.wreo,pasnn�pnes should have mdmummso Poona tan:e Increge voume for Me next ren.rw reduce pressure on me NOT STEEPER ac 2.All disturbed areas shall be grassed and
Strength. fence.Take caret°avoid undermining urn9 I \ qT0 mulched ass s possbie dmaintained
7. eon a an
Ewapefrom trench Inure%wlx aria e-Hanes eett,along me pmpP%ea-ne pane pots aria Remove a. THAN 2:1, 14 a6a until pemanent cover's established.
up>ope from the - 4.Remove all rennr,g mmena> 'era aepa%im DAYS ARE ' q
6 Place 12 inches - bottom and see of the trench. and brng me area to grade. - - ecomdbAng I ALLOWED �\\\ ��
9 am�ro.�ianae peammana. over me nnersen and ware Tnanaenamnpaminn nfine bankfi a are page area has been ceoenr drab-i>ed. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR N 12 sea \ z
10.Do not ansee near rabncmexl>nng arming... FLATTER SLOPES GREATER ( - I M \
THAN 50'IN (\I
ANC-Erivo-c rnm,ml.jpey SILT FENCE LENGTH \ \
FFFFcrISFu F, �,,,�, ALL OTHER AREAS 14 DAYS NONE(EXCEPT
WITH SLOPES FOR PERIMETERS
FLATTER THAN 4:1 AND HOW ZONES) 14 115 I116
DATE: PAGE: / /, \ ` \ \
MI" .� FENCE /
PAGE 1of2
\
/ / / TOTAL DISTURBED ACREAGE: 0.93 ACRES
TOP OF SILT FENCE LEAST 1' / \ z / LOT EROSION CONTROL PLAN
ABOVBE
THETOP OF
HEW WASHED STONE / LOTS 42 & 43
STEEL FENCE POST
E 1 / �- WALTERS
HRDwAaE "TMN RaNTwEwBURY WIRE FENCE,FILTER FABRIC,
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION MEADOW
WASHED STONE _FILTER OF#57 e L CLOTH IN TRENCH FOR
3'FILTER FABRIC NOTES: INTO SOLID GROUND General-AID measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be I.I
� GROUND 1.Hardware cloth andgreveI hoPART MuIdoverlaythesiltfenceOatleastl2E tel on the lot to insure that the potential for sedimentationrunoftis eliminated as much aspossible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained toinsure proper ground stabilizing cover. DFI I LLC
a°roe' inches. Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all
°°gym 2.Stone owetsshould be placed on low elevation areas orantfence objectionable materials spilled,washed,or tracked onto public roadways. QUEWHIFFLE TOWNSHIP HOKE COUNTY
and based on field conditions. Silt Fence-Sedimentfences should be inspected at least once a week and after each rainfall event,Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' SEPTEMBER 2024
MAINTENANCE: that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations,
of 1.Per retrrainf inspect outlet ample lest once ewrekaairsim edc rely. or Sodding The sod should bemaintained to insure that the take holds in the areas beingd.The sod should be watered as necessary to maintain adequate moisturethe root zone andprevent dormancyof the sod.The sod should not be mowed to close,since this could inhibit adequate growth
GRAPHIC SCALE
HARDWARE CLOTH FILTER FABRIC IN TRENCH greeter rainfall event Complete any required repairs immediately. q- eel properlyd. grass lotion ry quae in quae tiro too 0 50 100 200 400
2.Freshen stone when sediment accumulation exceeds 6 inches. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
3.Keep mesh tree of debris to provide adequate flow. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI
SECTION VIEW 4.Remove sediment when half of stone outlet is covered. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
5.Replace stone as needed to facilitate de-watering.
..\Nc-Envh enlrn.Jpeg Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET )
SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft
Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE lfF-0106
LAST SAVED:10/1/2024 7:55 AM LAST PLOTTED:10/2/2024 12:59 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-02 WALTERS MEADOW-EC\PLANS\WALTERSMEADOWEC-LOTS42&43.DWe