Loading...
HomeMy WebLinkAboutNCC243187_Site Plan or Location Map_20241016 GRADING NOTES SITE KEY 1. Contractor shall notify all necessary utility companies 48 g a SILT FENCE �'' hours minimum prior to digging for verification of all / N m e e,'9 underground utilities,irrigation and all other obstructions and 7 + s LIMIT OF DISTURBANCE +,, Wakefield Way 4, coordinate with Owners Representative prior to initiating ` 0, -2, D "� operations.Drawings are prepared according to the best — o SEPTIC LINE `°a%,� information available at the time of preparing these documents. — 2 0) a zx REPAIR SEPTIC LINE 2. Contractor shall familiarize himself/herself with existing site 4-, y, a1 r Cherry H;,, Ilk conditions prior to initiating grading. All existing site furnishings, ra - 3 2PROPERTY LINE paving,landscape and other elements to remain shall be L 1, o 1 / protected from any damage unless otherwise noted. �-1 .., �••• WATER FLOW DIRECTION V1 a o / 3. Unless otherwise noted,the limits of construction are the a 11111111111111111111 TREE PROTECTION FENCING , clearing limits noted on the drawings. m / Mag Nail Set 4. Report any discrepancies between the construction drawings MINOR CONTOUR LINE Elev.2134.64' j PAVER APRON and field conditions to the Landscape Architect i CONSTRUCTION ENTRANCE immediately. - ,,��CARp'O', MAJOR CONTOUR LINE PORTA POTTY °-..'.........•.<i 5. Contractor shall coordinate all work with related ;`��' ""°S`°F y i AREA TO BE STABILIZED WITHIN 7-14 DAYS(TYP.) `2.a fl. r` ,, .",, 1 contractors and with the general construction of the project in ;t, , / 7 1 ; EX.TREE TO REMAIN(TYP.) order not to impede the progress of the work of others or the 4•N _ ` a 15"HDPE PIPE Contractor's own work. m '• _ as - .... ' RIVERSTONE OUTLET PROTECTION; F. KM G�. EX.TREE TO BE REMOVED(TYP.) i �.. 10'x13.5'x3.5'WITH 6"MEDIAN STONE SIZE(TYP.) 6. Contractor shall field stake the location of all road centerlines ^,^^ i1 L` 1 &clearing limits prior to initiating clearing&grading,for the CONSTRUCTION ENTRANCE ; SILT FENCE review and approval of the Owner's Representative and/or 1.�ARo<;'', RIVERSTONE SWALE ç ' z,32004111111N I-14- 6 ... ] i �' j / ' , 7. Contractor shall mulch or grass all disturbed areas not paved, 115"HDPE PIPE i 1 I j/ o 1 z a. •. �o�, built or landscaped. w2134 ;3000 /1 I e a\ I ' ♦♦ 8. Contractor is responsible for erosion control of off-site borrow / 1 j \ 0 , � �� �' � pits&disposal areas unless released of responsibility in writing by / i "�: �� ��� property owner. ., - I ), ,� / / , . 9. Temporary vegetation shall be seeded&mulched within 15 ^, `�Q" �� /S5 . q% working days following completion of any phase of grading. `V HATCHED AREA BELOW WALL INDICATES �/ ifif e '. I. / ,�, / �,_. ,� 'i,� U APPROXIMATE WALL BATTER TW 2134.00 a' / +�� 1 '0 / / )� - �' 10. Grade site to subgrade elevation. Refer to Sheet L401 for cJ; BW:212fl00 I �R` 2126.,0 �- i l / �C' l �1 Q BOULDER RETAINING WALL(TYP.) i 000� �` / K. �\ depths to subgrade. Z 24"x24"DRAIN ' 1 i i / i % J g� e / / / / - - 1 1. All spot elevations are at base of curb or wall at finished -70 STONE INLET PROTECTION r / J / ' % �= C (r z,zsaa% ; / , / , 20 UblayEasern grade unless otherwise noted. N 0 12"x12"DRAIN BOX �� RE212510 6. /Y l 1 / r� ,��ae,Pia,aerMazza ♦ / 1 AIL ��►'..iez,za,o I ,‘ / / / i /�/ '^ Q DUMPSTER . ♦ 12. Contractor shall clean the work areas at the end of each v` O m l �� \ zn 0 00 / �, /� U /,' ,= // ;- 0, working day.Rubbish and debris shall be collected and deposited ` ) a / rike �N 2,2ss0 • ;// / ;' / off-site daily.All materials, products and equipment shall be �' / 2125.42 � a , �� ! ,=�;/ stored in an organized fashion as directed by the Owner's W w:z;zs-°o 1 HOUSE: / / - , > Representative. p4 0 EX.TREE TO BE REMOVED(TYP.) 4 1 / / ry1A)N:2126212600 , -' i� : _-, :�- (., Z LIMITS OF DISTURBANCE 12,810 SF °l GAS oweR.2114.00 , % i , 13. Site Key: VJ • 1 i ♦ i %� BW:Bottom of wall E. 0 SILT FENCE 1 213'0Op / / / / 74 Z / ,; / t' % TW:Top of wall O E os ,.. I i / / i HP:High point / i , / ' , 0.+ U) J 132I _1 I j j' �`, �\ SILT FENCE OUTLET(TYP.) CONSTRUCTION SEQUENCE: •• 1 % .� � 6"PVC DRAIN PIPE i l / 1 ` ". 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE NCDEQ. // �' �' j ' DOWNSPOUT(TYP.) / / / 2. SET UP A ON SITE PRE CONSTRUCTION CONFERENCE WITH GRADING l / % /7 i ' / �� DOWNSPOUT LEADER(TYP.) ' CONTRACTOR. 1 /� I` / / - / / `r r ' 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE/EXIT,SILT FENCE,TREE �i r / , J t / i / ; POP UP EMITTER(TYP.) / i i / / PROTECTION,AND OTHER MEASURES AS SHOWN ON PLANS,CLEARING ONLY r / i / J/ / / / i I / l / / ;' SILT FENCE OUTLET(TYP.) AS NECESSARY TO INSTALL THESE DEVICES. i / / / /,' i ), � / % / / j / / / i / J 4. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL S ( -' ( / /% 1 ` ( / / ) ; EROSION CONTROL DEVICES AND STRUCTURES. / /? i 1 Y / i ' ( ;� /' / O 5. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. / 1 ;/ 1 /' 7 , j I 6. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE ;i / I / / / / / / / / ) / I WITH THE N.C.EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN OZ / / % /l i )/ i / 1 , / ' MANUAL. ' / ,/ / 6, 1 / 8. PERFORM SELF INSPECTION,RECORD KEEPING AND REPORTING AS REQUIRED j o BY NCDEQ. w =/ / 9. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF u I EROSION CONTROL MEASURE. o o i a) N -e N N M 7 CD _____ Q u a a zase ______________ back 0 d Z Q — aaw" Q J - 0 20 40 60 feet LJ J SCALE:1"=20' P I— z