HomeMy WebLinkAboutNCC243187_Site Plan or Location Map_20241016 GRADING NOTES
SITE KEY 1. Contractor shall notify all necessary utility companies 48 g
a
SILT FENCE �'' hours minimum prior to digging for verification of all / N m
e e,'9 underground utilities,irrigation and all other obstructions and 7 + s
LIMIT OF DISTURBANCE
+,, Wakefield Way 4, coordinate with Owners Representative prior to initiating ` 0, -2,
D "� operations.Drawings are prepared according to the best — o
SEPTIC LINE `°a%,� information available at the time of preparing these documents. — 2
0) a
zx
REPAIR SEPTIC LINE 2. Contractor shall familiarize himself/herself with existing site 4-, y, a1 r
Cherry H;,, Ilk conditions prior to initiating grading. All existing site furnishings, ra - 3 2PROPERTY LINE paving,landscape and other elements to remain shall be L 1, o 1
/ protected from any damage unless otherwise noted. �-1 ..,
�••• WATER FLOW DIRECTION V1 a o
/
3. Unless otherwise noted,the limits of construction are the a
11111111111111111111 TREE PROTECTION FENCING , clearing limits noted on the drawings. m
/ Mag Nail Set 4. Report any discrepancies between the construction drawings
MINOR CONTOUR LINE Elev.2134.64' j PAVER APRON and field conditions to the Landscape Architect
i CONSTRUCTION ENTRANCE immediately. - ,,��CARp'O',
MAJOR CONTOUR LINE PORTA POTTY °-..'.........•.<i
5. Contractor shall coordinate all work with related ;`��' ""°S`°F y i
AREA TO BE STABILIZED WITHIN 7-14 DAYS(TYP.) `2.a fl.
r` ,, .",, 1 contractors and with the general construction of the project in
;t, , / 7 1 ; EX.TREE TO REMAIN(TYP.) order not to impede the progress of the work of others or the 4•N _
` a 15"HDPE PIPE Contractor's own work. m '• _
as - ....
' RIVERSTONE OUTLET PROTECTION; F. KM G�.
EX.TREE TO BE REMOVED(TYP.) i �.. 10'x13.5'x3.5'WITH 6"MEDIAN STONE SIZE(TYP.) 6. Contractor shall field stake the location of all road centerlines ^,^^
i1 L` 1 &clearing limits prior to initiating clearing&grading,for the
CONSTRUCTION ENTRANCE ; SILT FENCE review and approval of the Owner's Representative and/or
1.�ARo<;'',
RIVERSTONE SWALE ç
' z,32004111111N I-14- 6 ... ]
i �' j
/ ' , 7. Contractor shall mulch or grass all disturbed areas not paved,
115"HDPE PIPE i 1 I
j/ o 1 z a. •. �o�, built or landscaped.
w2134
;3000 /1 I e a\ I ' ♦♦ 8. Contractor is responsible for erosion control of off-site borrow
/ 1 j \ 0 , � �� �' � pits&disposal areas unless released of responsibility in writing by
/ i "�: �� ��� property owner.
., - I ), ,� / / , . 9. Temporary vegetation shall be seeded&mulched within 15 ^,
`�Q" �� /S5 . q% working days following completion of any phase of grading. `V
HATCHED AREA BELOW WALL INDICATES �/ ifif e '. I. / ,�, / �,_. ,� 'i,� U
APPROXIMATE WALL BATTER TW 2134.00 a' / +�� 1 '0 / / )� - �' 10. Grade site to subgrade elevation. Refer to Sheet L401 for cJ;
BW:212fl00 I �R` 2126.,0 �- i l / �C' l �1 Q
BOULDER RETAINING WALL(TYP.) i 000� �` / K. �\ depths to subgrade. Z
24"x24"DRAIN ' 1 i i / i % J
g� e / / /
/ - - 1 1. All spot elevations are at base of curb or wall at finished -70
STONE INLET PROTECTION r / J / ' % �= C
(r z,zsaa% ; / , / , 20 UblayEasern grade unless otherwise noted. N 0
12"x12"DRAIN BOX �� RE212510 6. /Y l 1 / r� ,��ae,Pia,aerMazza ♦ / 1
AIL ��►'..iez,za,o I ,‘ / / / i /�/ '^ Q
DUMPSTER . ♦ 12. Contractor shall clean the work areas at the end of each v` O
m l �� \
zn 0 00 / �, /� U
/,' ,= // ;- 0, working day.Rubbish and debris shall be collected and deposited ` ) a
/ rike �N 2,2ss0 • ;// / ;' / off-site daily.All materials, products and equipment shall be
�' / 2125.42 � a , �� ! ,=�;/ stored in an organized fashion as directed by the Owner's W
w:z;zs-°o 1 HOUSE: / / - , > Representative. p4 0
EX.TREE TO BE REMOVED(TYP.) 4 1 / / ry1A)N:2126212600 , -' i� : _-, :�- (., Z
LIMITS OF DISTURBANCE 12,810 SF °l GAS oweR.2114.00 , % i , 13. Site Key: VJ •
1 i ♦ i %� BW:Bottom of wall E. 0
SILT FENCE 1 213'0Op / / / / 74 Z
/ ,; / t' % TW:Top of wall O E
os
,.. I i / / i HP:High point
/ i , / ' , 0.+ U)
J 132I _1
I j j' �`, �\ SILT FENCE OUTLET(TYP.) CONSTRUCTION SEQUENCE: •• 1
% .� � 6"PVC DRAIN PIPE
i l / 1 ` ". 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE NCDEQ.
// �' �' j ' DOWNSPOUT(TYP.)
/ / / 2. SET UP A ON SITE PRE CONSTRUCTION CONFERENCE WITH GRADING
l / % /7 i ' / �� DOWNSPOUT LEADER(TYP.) ' CONTRACTOR.
1 /� I` / / - / / `r r ' 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE/EXIT,SILT FENCE,TREE
�i r
/ , J t / i / ; POP UP EMITTER(TYP.)
/ i i / / PROTECTION,AND OTHER MEASURES AS SHOWN ON PLANS,CLEARING ONLY
r
/ i / J/ / / / i I / l / / ;' SILT FENCE OUTLET(TYP.) AS NECESSARY TO INSTALL THESE DEVICES.
i / / / /,' i ), � / % / / j / / / i / J 4. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL S
( -' ( / /% 1 ` ( / / ) ;
EROSION CONTROL DEVICES AND STRUCTURES.
/ /? i 1 Y / i ' ( ;� /' / O 5. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE.
/ 1 ;/ 1 /' 7 , j I 6. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE ;i
/ I
/ / / / / / / / ) / I WITH THE N.C.EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN OZ
/ / % /l i )/ i / 1 , / ' MANUAL.
' / ,/ / 6, 1 / 8. PERFORM SELF INSPECTION,RECORD KEEPING AND REPORTING AS REQUIRED j o
BY NCDEQ. w =/
/ 9. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF u
I EROSION CONTROL MEASURE. o
o
i
a) N
-e N
N M
7
CD
_____ Q
u
a a
zase ______________
back
0 d
Z Q —
aaw" Q J -
0 20 40 60 feet
LJ J
SCALE:1"=20' P I— z