Loading...
HomeMy WebLinkAboutWQ0044497_20241016_FTSE_PECERT_ACKSchutte, Maria From: Schutte, Maria Sent: Wednesday, October 16, 2024 11:51 AM To: margaret.puckett@tripointehomes.com Cc: Andrew Grant; David Kelso; Glenn Warren; Sean Schuttler; Brian Amos; Nevills, Matthew; Preston, Karen; Joe Niland; Cantrell, Keri; Wilson, Carl Subject: WQ0044497 Arrowood Road Townhomes - Final Engineering Certification - Acknowledgment of Complete Certification Received Ms. Pucket, Acknowledgement of Complete Certification Received This email is acknowledgment that your Fast Track Sewer Extension Certification for permit # WQ0044497 Arrowood Road Townhomes, and a copy of the Ownership Change letter, has been received by the Mooresville Regional Office, electronically on October 14, 2024, and a paper copy also received on October 15, 2024. Per Session Law 2024-49 Senate Bill 166 (Section 4.3), after construction of the sewer system is completed, and within 14 days of receiving all necessary certifications from a professional engineer that the sewer system extension complies with all applicable rules and Minimum Design Criteria, the Commission shall issue a receipt of certification. Per Part II Standard Conditions, Item 7 of the permit, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed, and the supporting documents are provided as applicable. Supporting Documentation contents are identified in subitems a, b, and c of the same condition. Additionally, per the Fast Track Sewer Engineering Certification form, a Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. While Division staff may review the certification submittal in the future and reach out with any questions, by certifying the project, the signatory Professional Engineer has indicated that it complies with all applicable permit requirements, State and Federal rules and the Minimum Design Criteria for the permitting of Fast Track Sewer Extension projects and has submitted all required supporting documents. Preliminary review of the submittal has found the certification to be complete. The certification has been placed in our Laserfiche Document Management System under the permit number. Sincerely, Maria Schulte Environmental Specialist Water Quality Regional Operations Section Division of Water Resources North Carolina Department of Environmental Quality Direct: (704) 235-2184 1 Cell: (704) 560-0480 maria.schutte deq.nc.gov Mooresville Regional Office 610 East Center Avenue Suite 301 Mooresville, NC 28115 Main Office: (704) 663-1699 1 Fax: (704) 235-2101 NORTH CAROLINAD_ E Q�/ /j Department Df Environmental Qualityf Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.