HomeMy WebLinkAboutWQ0044497_20241016_FTSE_PECERT_ACKSchutte, Maria
From:
Schutte, Maria
Sent:
Wednesday, October 16, 2024 11:51 AM
To:
margaret.puckett@tripointehomes.com
Cc:
Andrew Grant; David Kelso; Glenn Warren; Sean Schuttler; Brian Amos; Nevills, Matthew;
Preston, Karen; Joe Niland; Cantrell, Keri; Wilson, Carl
Subject:
WQ0044497 Arrowood Road Townhomes - Final Engineering Certification -
Acknowledgment of Complete Certification Received
Ms. Pucket,
Acknowledgement of Complete Certification Received
This email is acknowledgment that your Fast Track Sewer Extension Certification for permit # WQ0044497
Arrowood Road Townhomes, and a copy of the Ownership Change letter, has been received by the Mooresville
Regional Office, electronically on October 14, 2024, and a paper copy also received on October 15, 2024.
Per Session Law 2024-49 Senate Bill 166 (Section 4.3), after construction of the sewer system is completed, and
within 14 days of receiving all necessary certifications from a professional engineer that the sewer system
extension complies with all applicable rules and Minimum Design Criteria, the Commission shall issue a receipt of
certification. Per Part II Standard Conditions, Item 7 of the permit, upon completion of construction and prior to
operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall
be submitted with the required supporting documents to the address provided on the form. A complete
certification is one where the form is fully executed, and the supporting documents are provided as
applicable. Supporting Documentation contents are identified in subitems a, b, and c of the same
condition. Additionally, per the Fast Track Sewer Engineering Certification form, a Final Certification shall be a
complete set of record drawings and design calculations regardless of whether partials have been submitted.
While Division staff may review the certification submittal in the future and reach out with any questions, by
certifying the project, the signatory Professional Engineer has indicated that it complies with all applicable
permit requirements, State and Federal rules and the Minimum Design Criteria for the permitting of Fast
Track Sewer Extension projects and has submitted all required supporting documents. Preliminary review of
the submittal has found the certification to be complete. The certification has been placed in our Laserfiche
Document Management System under the permit number.
Sincerely,
Maria Schulte
Environmental Specialist
Water Quality Regional Operations Section
Division of Water Resources
North Carolina Department of Environmental Quality
Direct: (704) 235-2184 1 Cell: (704) 560-0480
maria.schutte deq.nc.gov
Mooresville Regional Office
610 East Center Avenue
Suite 301
Mooresville, NC 28115
Main Office: (704) 663-1699 1 Fax: (704) 235-2101
NORTH CAROLINAD_ E Q�/ /j
Department Df Environmental Qualityf
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.