Loading...
HomeMy WebLinkAbout20151288 Ver 1_More Info Received_20160208Burdette, Jennifer a From: Bob Zarzecki <bzarzecki@sandec.com> Sent: Monday, February 08, 2016 10:06 AM To: Burdette, Jennifer a Subject: RE: question on ITB Holdings, Wake Forest Road Mixed Use Project Attachments: Summary of Results.pdf, Sand Filter Design.pdf, 2912 Wake Forest Road Redevelopment Buffer Availability Letter.pdf responseThe information that you requested on this one was provided back to you in multiple emails. I want to make sure that you had what you needed and didn't need me to package it up into a single before, Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA From: Bob Zarzecki Sent: Friday, February 05, 2016 5:22 PM To: Jennifer.Burdette@ncdenr.gov Cc: boyd.devane@ncdenr.gov Subject: Fwd: question on ITB Holdings, Wake Forest Road Mixed Use Project Sent from my iPhone Begin forwarded message: From: "Shinn, Josh" <shinn@mcadamsco.com> Date: February 5, 2016 at 3:43:59 PM EST To: "Devane, Boyd" <boyd.devane@nc_denr_f,,ov> Cc: 'Bob Zarzecki' <bzarzeck0sandec.com> Subject: RE: question on ITB Holdings, Wake Forest Road Mixed Use Project M Attached are PDFs of the replacement sheets for the Stormwater Impact Analysis. I changed the design summaries to show the minimums as being greater than/equal to (>_) the value instead of equal to (=) the value. There was already a note in the design summary that describes these minimum values. If you think we need additional clarity on this page, please let me know. I updated the summary of results to match the design spreadsheet. Let me know if you need anything else or would prefer me to resubmit a new SIA notebook. Thanks, Josh Shinn, PE Project Manager Water Resources & Infrastructure Office: 919-361-5000 Direct: 919-287-0897 Design/ng Tomorrow's hnfrostructure8 Communities Frum:BobZaoecN[mai|to:bzaoecN(@sandec.com Sent: Wednesday, February 0l20I64:06PM To: Devane'Boyd Cc: Shinn, Josh Subject: RE: question on ITB Holdings, Wake Forest Road Mixed Use Project AOhZarz8Cki Wetlands Department Manager Soil & Environmental Consultants, PA From: Devane,Boyd Sent: Wednesday, February 03, 2016]:5]PM To: BnUZarzecW Cm: Shinn,]osh Subject: RE: question on ITB Holdings, Wake Forest Road Mixed Use Project Jennifer had sent the note out today but forgot to copy me. Therefore, I thought you had received the note | sent toJosh and had taken that as the official request—vvhich it wasn't. My note to Josh was the exact words that Jennifer had included inher letter. See below: I'm happy. From: Devane'Boyd Sent: Wednesday, February 03'20I6II:374M To: Shinn, Josh Subject: you might want to look at this. Below is the language that I sent to Jennifer Burdette to put in the letter to the owner. Uyou see any problems with it, please let me know. In the "Stormvvater Impact Analysis & Preliminary Design ofStormvvater Management Facility", please add a note of explanation or revise the placement of the "SAND FILTER SUMMARY" section to minimize the opportunity for confusion on the "Required Sedimentation Chamber Surface Area" and "Sand Filter Surface Area." In appearance, it seems to indicate that the sum of surface areas for the 587 sf "Sedimentation Chamber" and the 913sf"Sand Filter" are 3337s[ Similarly, inthe second "Sand Filter Design" page ofthe "StormwaterManagement Facility Preliminary Design [a|cu|ations" document, the placement ofthe information could lead toconfusion. There are also some inconsistencies inthe size calculations between the two sections of the document that need to be corrected. From: Bob ZaoecN[mai|to�bzaoecN��sandecco Sent: Wednesday, February 0l20I63:38PM To: Devane'Boyd Cc: Burdette'Jennifer a Subject: RE: question on ITB Holdings, Wake Forest Road Mixed Use Project 11111 Fill i III 1 1111 111 1 AOhZarz8Cki Wetlands Department Manager Soil & Environmental Consultants, PA From: Devane,Boyd Sent: Wednesday, February 03, 20163:21PM To: BnUZarzecW Cc: Burdette,]ennifera Subject: RE: question onITB Holdings, Wake Forest Road Mixed Use Project Bob, The note | sent toJosh Shinn today was just to check with him to make sure that | had stated my issues with the plan correctly. |twas not anofficial request. That will come from Jennifer orKaren. FYI From: Bob ZaoecN[mai|to�bzaoecN��sandecco Sent: Wednesday, February 0l20I63:I3PM To: Purdy, Brian ,Padiak,Andy Cc: Jolly, Adam ,Burdette,Jennifer aPathckSm�h Devane'Boyd Subject RE: question onITB Holdings, Wake Forest Road Mixed Use Project Attached is a request by DWR for additional information to assist them in their review of our variance request. S&EC will (or already has) responded to items 1 and 2 of the Can McAdams provide a response to Item 3 regarding the sand filter? I've copied bo Boyd Devane & Jennifer Burdette of DWR on this request, as I believe that you may have discussed this with Boyd already. I WAKE FOREST MIXED USE SUMMARY OF RESULTS H. DEW, EI 2/5/2016 Design Drainage Area = 4.00 acres Design Impervious Area = 3.50 acres % Impervious = 87.5% 222.46 Required Sedimentation Chamber Surface Area >_ 803 sf Required Sand Filter Surface Area >_ 1248 sf Required Sed Chamber and Sand Filter Surface Area >_ 4560 sf Design Drainage Area = 16.64 acres Design Impervious Area = 13.31 acres % Impervious = 80.0% 222.46 Vault Length = 113 It Vault Width = 50 It Vault Height = 10 It Vault Volume = 56,500 cf Water Quality Volume = 12,161 cf Maximum Temp Depth in Sand Filter = 2 It Sand Filter Drain Time = 1.67 days Orifice 1 Bottom Elevation = 217.0 It Orifice 1 Datum Elevation = 217.5 in Orifice 1 Area = 2.75 sf Number of Openings = 2 Orifice 2 Bottom Elevation = 224.00 It Orifice 2 Datum Elevation = 224.25 in Orifice 2 Area = 0.5 sf Number of Openings = 1 Weir Length = 28.00 It Weir Crest = 226.25 It Barrel Diameter = 54.00 in 9 of Barrels = 1.00 Upstream Invert = 217.00 It Downstream Invert = 216.00 It Length = 100.00 It Slope = 0.01 ft/ft Return Period Inflow [cfs] Outflow [cfs] Max. WSE [ft] Freeboard [ft] 2 -Year 75.96 42.11 222.46 4.54 10 -Year 102.37 55.76 224.64 2.36 25 -Year 115.95 62.55 225.74 1.26 100 -Year 133.40 92.96 226.75 0.25 WAKE FOREST MIXED USE SAND FILTER DESIGN H. DEW, EI 2/5/2016 Note: The following design calculations are based upon requirements from the 2007 NCDENR BMP Manual. WQV = (P)(R v)(A)/12 x 43,560 where, WQV= water quality volume (CF) Rv = 0.05+0.0090 where I is percent impervious cover A = area in acres P = rainfall (in inches) Input data: Total area, A = 4.00 acres Impervious area= 3.50 acres Percent impervious cover, I = 87.5 % Rainfall, P = 1.0 inches Calculated values: Rv = 0.84 WQV= 0.28 acre -ft = 12161 cf. Determine the reauiredSedimentation Chamber Surface Area The minimum required sedimentation chamber surface area, as computed by the Camp -Hazen equation is as follows: A s = 0.066x WQV where, A s = sedimentation chamber surface area (SF) Note: The above equations compute surface area using the Camp -Hazen equation and assume a sediment trapping efficiency of 90%. As = 802.59 sf. (minimum sedimentation chamber surface area required) Determine the required Sand Filter Surface Area The required filter bed area (A F) is computed using the following equation: AF—[("QV)(d 011 ")(hA+dF)(t)J where, AF = surface area of filter bed (SF.) WQV= water quality volume (CF) dF = filter bed depth (feet) k = coefficient of permeability of filter media (ft/day) hA = average height of water above filter bed (feet) t= design filter bed drain time (days) WAKE FOREST MIXED USE SAND FILTER DESIGN H. DEW, EI 2/5/2016 Input data: WQV= 12161 cf. dF = 1.5 ft. (18" minimum depth) k = 0.02 gal/min/sf. (assumed at 0.02 gal/min/sf) = 3.50 ft/day (assume 1 sf of filter media) hmaxfilter = 2.00 ft. (max temp depth, between 2 and 6 feet) hA = 1.0 ft. (average height of water above the filter bed) t= 1.67 days (40 hours typical drain time) Calculated values: AF = 1248.3 s£ (minimum sand filter area required) Check to see if required surface areas meet temporary storake requirements Minimum required sand filter area, AF = 1248.3 SF (previously computed) Minimum required sedimentation chamber area, As = 802.6 SF (previously computed) hm�fiite,. = 2.0 feet (previously computed) Sizing is based upon the adjusted water quality volume, WQV adt (75% of the total WQV). WQVadj = 9120 cf. (Volume contained between the sedimentation chamber and the sand filter - above the sand) To meet required water quality storage requirements: As + AF= WQVadi / h.fli,, Desi -n Summary Therefore, As + AF = 4560.2 SF (minimum total sand and sedimentation chamber surface area) Note: All three minimum surface areas must be satified for the design of the sand filter. Each of the sand and sedimentation chambers must meet the individual surface area requirements, and the total of the two must meet the combined minimum requirement. As + AF >_ 4560.2 SF (minimum total sand and sedimentation chamber surface area) AF >_ 1248.3 SF (minimum sand filter area required) As >_ 802.6 SF (minimum sedimentation chamber area required) hmaXslter = 2.0 (maximum ponding depth in facility) IIA = 1.0 (average ponding depth in facility) Statement of Buffer Mitigation Credit Availability February 1, 2016 I.T. B. Holdings, LLC Attn: Sherman Richardson c/o: Mr. Bob Zarzecki Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road Suite 104 Raleigh, NC 27615 Re: Availability of Riparian Buffer credits for the 2912 Wake Forest Road Redevelopment project Bank Name: WEI - Neuse 01 Nutrient Offset and Buffer Umbrella Bank Bank Site: Buck Swamp Parcel and/or Caraway Creek Parcel Bank Sponsor: Wildlands Holdings II, LLC (wholly owned by Wildlands Engineering, Inc.) DWR Project #: 2012-0144 Riparian Buffer Credits Available: 63,435 sq. ft. Neuse 03020201 River Basin Applicable Local Government/Municipality jurisdiction: NC Division of Water Recourses Dear Mr. Richardson: Wildlands Holdings II, LLC has the above mentioned Riparian Buffer Credits from the WEI — Neuse 01 Nutrient Offset and Buffer Umbrella Bank - Buck Swamp Parcel and/or Caraway Creek, (DWQ Project #: 2012-0144), to satisfy a portion of the Riparian Buffer mitigation requirements related to the above mentioned project. The Project is located within the service area (HUC 03020201 - non -Falls) of the Bank. An invoice for this transaction will be sent upon your request and we will reserve the credits for a period of 30 days from invoice. This letter is not a guarantee of availability or a reservation of the credits. Final transfer of the credits will be made upon full receipt of your payment in the amount of $1.00 per sq. ft. to Wildlands Holding II, LLC, at which time a credit transfer certificate verifying your credit purchase will be issued to the North Carolina Division of Water Resources and to you for your records. At that time we will require a copy of the Riparian Buffer Authorization Approval from NC Division of Water Resources. Note that Wildlands Holdings III, LLC is in the process of opening a Neuse 01 (not Falls) bank to be called the Falling Creek Nutrient and Buffer Bank. This bank will most certainly have the necessary credits available for your full buffer requirement by the end of 2016. Wildlands Holding II, LLC; � Wildlands Engineering, Inc � 1430 South Mint Street, Charlotte, NC; 28203 We appreciate the opportunity to assist you with your mitigation requirements. Please contact me at (704) 719- 2100 or rbugg@wildlandseng.com if you have any questions or need any additional information. Sincerely, Robert W. Bugg Wildlands Engineering, Inc. Director: Land Acquisition rbugg@wildlandseng.com 0: (704) 332-7754 ex. 105 M: (704) 719-2100 WEI -- Bunk Swamp, LLC: - Vdildlands Engineering, Inc. - 312 Vilest Millbrook Road, Suite 225, Raleigh, NC: 27609