HomeMy WebLinkAbout20140090 Ver 3_FW U-2579B str #22 Diversion channel modification to avoid a power pole_20160219Wanucha, Dave
From:
Sent:
To:
Subject:
Attachments:
Braquet, Stephanie
Friday, February 19, 201611;10 AM
John,T,Thomas,JR@usace,army,mil; Wanucha, Dave
FW; U-2579B str, #22 Diversion channel modification to avoid a power pole
proposed revisions to culvert 22,pdf
Please see atta�hed, This is in referen�e to stru�ture 22 on the �eltway proje�t that the �ontra�tor wants to pipe,
Thanks
° �r �
DIUISION ENUIRONMEN�iALSPECIALIST
Division ofi Hi�hwaVs—Division Nine
(336� 747-7$�0
From: Panek, Lindsey F
Sent: Friday, February 19, 201610;50 AM
To: Braquet, Stephanie
Cc. Guy, Jeremy M; Wyrick, Scott D; Riddick, Darryl M
Subject: U-25796 str, #22 Diversion channel modification to avoid a power pole
Stephanie,
The �ontra�tor has subcnitted a revision to the diversion �hannel for �ulvert str, #22 on Y-1�see atta�hed�, They would like to cnodify the lo�ation of the diversion
�hannel and utilize 40 LF of 54" CMP in the lower part of the diversion �hannel to avoid a power pole that is in dire�t �onfli�t with the original plan lo�ation of
the �hannel, If you have any questions please let cne know,
Thanks,
Lindsey Panek
Assistant Resident Engineer
Division 9
Winston-Salecn Constru�tion Offi�e
336 747 7950 office
Ipanek@n�dot,�ov
375 Silas Creek Parkway
Winston-Salecn, NC 27127
Illki��i�il �oi�i�ospoi��ei°�ao �Co �i°�d �fi�oi��i �Cl�is woi°�doi� Is wublea�C �Co �Cl�o IV C� I�:��'ubIIG I��oaoi�ds I.��� �i°�d i��i�y bo dls�lose� �Co �Cl�li�d p�i��Clos�
P0.01ER REFFRENCE NO. SXER NO.
U-2579B ec-eicorvsrs
M4 SNEEi NO.
FOA�WAY DESIGN HYOMVLICS
fNGWEEP ENGINEEP
CULVERT CONSTRUCTION SEQUENCE STA. 23 + 11 -Yl-
PHASE I PHASE II
1. CONSTRUCT STILLING BASIN (200 Cl�. 5. CONSTRUCT PROPOSED CULVERT AND ANY NECESSARY INLETi17UTLET CHANNEL IMPROVEMENTS.
2. CONSTRUCT TEMPORARY CHANNEL CHANGES WITH LINER (4 FT. BASE, 3 Ff. DEEP, 2:1 SIDE SLOPES). 6. REMOVE TEMPORARY CHANNEL CHANGES AND IMPERVIOUS DIKES, ALLOWING NORMAL FLOW THROUGH
3. CONSTRUCT IMPERVIOUS DIKES, DIVERTING FLOW THROUGH TEMPORARY CHANNEL CHANGES. PROPOSED CULVERT.
4. REMOVE EXISTING CULVERT. 7. REMOVE STILLING BASIN.
8. COMPLETE ROADWAY.
�
�
TENPORARY CHANNEL STORAGE TEMPOPARV CHANNEL ` `
CHANGE WRM LINER I�00 CY� CHANGE WRIi LINER
r•/
�I �� � �� . �� � �� �
� � � 4'v —/ � - % I
J � i � %� _ 's o � �� .�� i� � i �( .'s's� ._ __'s�s—% �
� I / �; _ � is_� � 7—_ ,-
�
-_ i � � � i 5�/ m
__� ��, � _; ' ,°./, �
-- = - -- -- -'-, y- , 'y� / � --� i /
= � �—_ _ — � , ys j / � — , ,,r /
�F � � — �' � �F - � /
/�/�' � ' /���ji �� �� C //I
. s •� � � � % � r I
. �� I � A / I � I
� ��i� '� ♦ � / / .1 � I
I
� I / p J
��� � � � � � � . �� I
� �
a y/ � � I �
c� I II � I m � 1��
� � 1
� �� ` m ` �/ I �
9 °,�� � ---- I r i�l � � ;,,y ; � � � w
� ; ��i ,i ,� �i � � % -,
���� -�.���� � �� � I �= �� I I
/ /�!%"� i ii i�' � ;
� �r�:%�� ! i ii q ,I �
'��� i i! i� � �� 5 ; I �
m � �� I � �m A � �
� � � ' I
. " A �� � I II �� I / i ��
IMPERVIOUS
OIKES
�1i 1� l.-.� � SZ..I� CLiQm'�T�. P. (i-Q. �`a� 1
� — ��� �iiv¢�-5��� �umpla�¢ , �dj�S� �+i i'i�.e I'���< ,
C� S Nece Ssa ✓�
��