HomeMy WebLinkAboutNCC191727_Annual Fee NOD Letter (2024 Fee)_20241016 ROY COOPER
Governor
MARY PENNY KELLEY w.
se"-y
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
lnfrrkm Dhemcmr Enrrr emmenror Quuury
10/16/2024
Pine Gate Renewables, LLC
Attn: Patty Wright
130 Roberts Street
Asheville, NC 28801
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC191727-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 9/1/2024 and was due on 10/1/2024.The annual fee applies to the following construction site:
Spring Hope 3 Solar
Frazier Road, Spring Hope, NC
Nash County
Certificate of Coverage No. NCC191727
NC Reference No. NCG01-2019-1727
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� Ni.rth Cumlina Draarrmrnl nl Cn..•i.mrntd Q ulitr �rvi,i,.,,1 Cnrry�\linrrul enU Lunt Frtrnrrr+
Sl2 Nor lh Sulibur,5ti crr 1ct2 Meil Se..�e Crrle 0.el<yli.Nv Ur Cer�lirie 1ie99;612
+-� •---� 919.7079200