Loading...
HomeMy WebLinkAboutNCG100134_Inspection_20241008 ROY COOPER Governor MARYPENNYKELLEY R 1 �4 Secretary WILLIAM E.TOBY VnQSON,IR. "�:,,,,,�:�•- Inlerim Director NORTH CAROLINA Envlronmenlal Qualffy October 8, 2024 AAA Auto Salvage Inc Attention: Wayne Nurney 1304 Cox Ave Archdale,NC 27263 Subject: Compliance Evaluation Inspection AAA Auto Salvage Inc NPDES Certificate of Coverage—NCGI O0134 Randolph County,North Carolina Dear Sir or Madam, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the AAA Auto Salvage Inc facility on September 18, 2024. Please note that in the stormwater inspection report summary we ask that you update the SWPPP and include the current permit and conduct analytical and qualitative monitoring quarterly. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Ashley Vikara at (336) 776-9655 or by E-mail at Ashley.vikara@deq.nc.gov. Sincerely, amera ph E Regional Elofineer Land Quality Section Enclosure: Compliance Inspection Report c: Laserfiche North Carolina RgionalDepartment Office Hameal ill lity Road, Division01 Winstonergy,n-Salem, Mineral and Land Resources Winston-Salem Regional Office�450 Hanes Mill Road,Suite 300�Winston-Salem,North Carolina 27105 336-776-9800 Nenrr�rcvu wvwv�awwrr srry� Compliance Inspection Report Permit:NCG100134 Effective: 07/01/21 Expiration: 06/30/26 Owner: Wayne U Nurney SOC: Effective: Expiration: Facility: AAA Auto Salvage Inc County: Randolph 5791 Clayton St Region: Winston-Salem Archdale NC 27263 Contact Person:Wayne U Nurney Title: Phone:336-886-5076 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/18/2024 Entry Time 11:15AM Exit Time: 11:30AM Primary Inspector:Ashley J Vkara Phone: 336-776-9655 Secondary Inspector(s): Margeory Castellanos Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Used Motor Vehicle Parts Stormwater Discharge COC Facility Status: ❑ Compliant N Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG100134 Owner-Pacility:Wayne U Nurney Inspection Date: 09/18/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility was inspected on September 18, 2024. During the inspection the following items were noted: 1. The SWPPP was out of date and incomplete. Update the SWPPP and review and update the SWPPP annually. 2. Qualitative and Analytical monitoring data was missing. Qualitative and Analytical monitoring should be conducted quarterly. 3. The most current permit was not on site. Please include the most current permit in the SWPPP. Please give the above items your attention. If you have any questions, you can reach me at (336)776-9655. Page 2 of 3 Permit: NCG100134 Owner•Facility:Wayne U Nurney Inspection Date: 09/18/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ #Does the Plan include a General Location (USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a "Narrative Description of Practices"? N ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ 0 ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? E ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: See summary Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ 0 ❑ ❑ Comment: See summary Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ N ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑ Comment: See summary Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: See summary Page 3 of 3