Loading...
HomeMy WebLinkAbout20211423 Ver 1_Staff Report Maria Polizzi_20241015Mitigation Project Information Upload Initial Review and Submittal ID#* 20211423 Mitigation Project Submittal - 10/9/2024 Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Version* 1 Is this a Prospectus,Technical Proposal or New Site?* Yes No Project Contact Information Contact Name: * Jeff Keaton Project Information Existing 20211423 (DWR) ID#: Project Name: Project Type: * County: Great Meadow Mitigation Site DMS Mitigation Bank Nash Document Information Mitigation Document Type:* Mitigation Plans Email Address: * jkeaton@wildlandseng.com Existing 1 Version: (numbers only) All attachments have been uploaded into Laserfiche for your review. Signature Print Name: * Signature: * Jeff Keaton Staff Review Staff Review by Maria Polizzi ................................................................................................................................................................................................................................................................................ Project Location: WaterResources\DWR - Wetlands Program\Non DOT\20211423\Ver 1 Staff Comments File Upload Jpg or pdf only Staff Review Completed Date: 10/15/2024