Loading...
HomeMy WebLinkAboutNCC210434_NOT Closeout Documents_20241010 ROY COOPER � ' Governor ELIZABETH S.BISER ; Secretary WILLIAM E.TOBY VINSON,JR Interim Director NORTH C.AROLINA Envvrontnenta!_Qnattty Erosion and Sediment Control Inspection Report Dear Sir or Madam: Attached is a copy of the inspection report prepared following an on-site inspection of the subject site. This report provides you wittrinformatian concerning-the--status-of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contain corrective actions needed or comments that will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, if you have any questions, please contact the inspector named on the attached inspection report at the address shown or by dialing 704-235-2100 and asking for the inspector. Sincerely r—DocuSigned by: 4114,trig Eft4 `-4A35O6B02&2438_. Jerry W.Eplin, PE Regional Engineer Land Quality Section Mooresville Regional Office Enclosure: Inspection Report North Carolina Department of Environmental Quality Division of Energy.Mineral and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301!Mooresville,North Carolina 28115 704-235-2100 ®�+rara Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699 County: Iredell Project: Statesville Regional airport RW#10 River basin: Yadkin-PeeDee Person financially responsible:City of Statesville-John M Ferguson,Airport Project#: IREDE-2021-004 Manager Address: 238 Airport Road,Statesville,NC 28677 1. Project Location: Bethlehem Road,Statesville Pictures: No 2. Weather and soil conditions: Sunny,Workable soil. Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that appl ) Degree of damage: 8. Contact made with(name): no one on site. Title: Inspection report: Sent Report Date given/sent: September 25,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGO 1)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Brett Saunders Others present: Date of inspection: September 18,2024 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM cc: