Erosion and Sediment Control Inspection Report
Dear Sir or Madam:
Attached is a copy of the inspection report prepared following an on-site inspection of the subject site.
This report provides you wittrinformatian concerning-the--status-of the site as it relates to compliance
with the North Carolina Sedimentation Pollution Control Act of 1973.
Please review this report carefully as it may contain corrective actions needed or comments that will
assist you in meeting the required performance standards of the Act.
It is our desire that any and all possible problems be discussed and resolved at the earliest possible
time. To facilitate this effort, if you have any questions, please contact the inspector named on the
attached inspection report at the address shown or by dialing 704-235-2100 and asking for the
inspector.
Sincerely
r—DocuSigned by:
4114,trig Eft4
`-4A35O6B02&2438_.
Jerry W.Eplin, PE
Regional Engineer
Land Quality Section
Mooresville Regional Office
Enclosure: Inspection Report
North Carolina Department of Environmental Quality Division of Energy.Mineral and Land Resources
Mooresville Regional Office 610 East Center Avenue,Suite 301!Mooresville,North Carolina 28115
704-235-2100
®�+rara
Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301,Mooresville,NC 28115 (704) 663-1699
County: Iredell Project: Statesville Regional airport RW#10 River basin: Yadkin-PeeDee
Person financially responsible:City of Statesville-John M Ferguson,Airport Project#: IREDE-2021-004
Manager
Address: 238 Airport Road,Statesville,NC 28677
1. Project Location: Bethlehem Road,Statesville
Pictures: No
2. Weather and soil conditions: Sunny,Workable soil. Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that appl )
Degree of damage:
8. Contact made with(name): no one on site. Title:
Inspection report: Sent Report Date given/sent: September 25,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCGO 1)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Brett Saunders Others present:
Date of inspection: September 18,2024 Time arriving on site: 11:00 AM Time leaving site: 11:30 AM