HomeMy WebLinkAbout310090_Application Attachment - Design Revision_20240910w ENGINEERS • MANUFACTURERS CONSTRUCTORS September 10, 2024 Christine Lawson NCDEQ Division of Water Resources 1601 Mail Service Center Raleigh, NC 27699-1601 AFO Permit Application Subject: B&C Farm Facility # AWS310090 State Digester General Permit — Design Revision Dear Ms. Lawson, Roeslein & Associates, on behalf of the farm owner, hereby submits the following revision for digester design at B&C Farm As discussed, we are revising the design to eliminate the mixing well at the digester. This mixing pump pulled water from the digester and discharged water back into the digester. Influent into the digester will either come from a wet well lift station between the barns and digester or directly from the barns via gravity pipe. The sampling protocol document verbiage has been updated to clarify that all digester influent sampling will be taken via cleanout in the influent piping prior to entering the lagoon. To facilitate your review of the enclosed documentation, the following is an itemized breakdown: 1. One (1) revised copy Sampling Protocol and Schedule 2. One (1) copy of revised General Arrangement Plan to reflect eliminated mixing pump 3. One (1) copy of revised Hydraulic Profile Plan to reflect eliminated mixing pump Please do not hesitate to contact me or my office if you have any questions, comments or require any additional information. Thank you, G . ;� Christopher Fey Manager, Building Design & Construction Roeslein & Associates Attachments Cc: Farm Owner Page 1 of 1 Sampling protocol and schedule for Monarch sites Date: 08/23/2024 R08.23.24 Sample collection at all sites should be done using the sampling protocol outlined below. A submittal sheet will be sent to the person in charge of sampling prior to sampling. The respective person is responsible for print submittal forms, conducting sampling, label samples as per submittal form, safely storing (refrigerated containers during storage) and shipping samples to the respective lab (instructions on submittal form) Required accessories: 1. Telescopic sampler extendable to 18 feet and the pendulum beaker 2. Gloves and sampling containers 3. Ice packs. 4. Sampling submittal forms 5. Safety supplies During sampling event two people should be responsible while supporting tasks (shipping etc.) can be conducted by the person in charge alone. Sampling protocol for digester samples 1. Influent and effluent samples are intended to be collected for all sites from shortlisted digesters on a quarterly basis. Sampling to be conducted by two persons at the site. 2. Label all sampling containers with respective sampling ids. 3. The influent sample must be collected from a "cleanout" just prior to entering the lagoon using the telescopic sampler and 5-gallon bucket while following all site -specific safety policies, including Lagoon Access Safety Procedure 4. The effluent sample must be collected from the crossover pipe/wet well using the telescopic sampler and 5-gallon bucket while following all site -specific safety policies, including Lagoon Access Safety Procedure 5. Procedure for sample collection from a Cross over pipe a. On opening the valve on crossover pipe it is recommended to allow enough time to pass such that the standing debris in the pipe is flushed out and a good representative sample can be collected. b. Collect 3 x 500 mL samples using the sampler into a clean 5-gallon bucket. c. Repeat this procedure 2 more times, while collecting all the samples into the same 5-gallon bucket. d. Allow sufficient time between two collection events such that pipe contents are flushed. e. At the end of the sampling event, you may have — 1.3-1.5-gallon sample, homogenize the contents of the bucket gently mixing using the sampler and the pendulum beaker on the sampler. 6. Sampling for sample collection from a wet well or cleanout. a. Using the telescopic sampler (beaker attached to the rod) gently homogenize contents of the wet well. b. Collect 6-8 beakers of sample into a 5-gallon bucket from different areas of the wet well/cleanout to get a representative sample. c. Gently homogenize the contents of the bucket. 7. Grab a sample from the homogenized mixture to fill the labeled sampling container (influent or effluent) and put the container cap tightly ensuring a watertight seal. 8. If the samples are to be stored for more than 2 hours before shipping, store them in a refrigerator preferably 4°C or lower. 9. If refrigeration is not available use frozen icepacks to cool the samples and replace icepacks at regular intervals, store the samples in a well -ventilated space. 10. DO NOT STORE SAMPLES IN REFRIGERATORS MEANT FOR FOOD STORAGE 11. Ship samples to the lab (details in the submittal form) to deliver overnight. Include ice packs in the shipping box to keep samples cool during transit. Sampling protocol for lagoon liquid samples (Secondary lagoon 1. Lagoon liquid samples are intended to be collected from all the open lagoons at every site on a quarterly basis. 2. Label all sampling containers with respective sampling ids. (Refer sample list for Sample IDs) 3. The sample must be collected from the multiple spots (6-8) in the open lagoon using the telescopic sampler and 5-gallon bucket while following all site -specific safety policies, including Lagoon Access Safety Procedure 4. Use the 18 feet telescopic sampler to reach lagoon water surface from the berm, it is needed that the sampling in charge is accompanied by another operator onsite for this sampling for ease of equipment handling and safety. 5. Collect 2 x 500 mL samples at each spot, using the sampler into a clean 5-gallon bucket. 6. Repeat this procedure at all 6-8 randomly chosen spots along with periphery of the lagoon, collect all the samples into the same 5-gallon bucket. 7. At the end of the sampling event, you may have — 1.3-1.5-gallon sample, homogenize the contents of the bucket gently mixing using the sampler and the pendulum beaker on the sampler. 8. Grab a sample from the homogenized mixture to fill the labeled sampling container and put the container cap tightly ensuring a water/airtight seal. 9. If the samples are to be stored for more than 2 hours before shipping, store them in a refrigerator preferably 4C or lower or use frozen icepacks to cool the samples in a small container and replace icepacks at regular intervals, store the samples is a well -ventilated space. 10. DO NOT STORE SAMPLES IN REFRIGERATORS MEANT FOR FOOD STORAGE 11. Ship samples to the lab (details in the submittal form) to deliver overnight. Include ice packs in the shipping box to keep samples cool during transit. Sludge survey and sampling from secondary lagoon 1. The secondary lagoon, source of sludge, will be examined for sludge levels once every four years. 2. Sludge levels in the covered digesters will be examined once every four years appropriate sludge management plans will be put in place to keep sludge levels in the digester under control. 3. Sludge sampling, from the secondary lagoon, will be conducted during sludge management events to determine sludge composition especially Nitrogen, Phosphorus, potassium, and other micronutrients. 4. This sampling protocol is intended to help evaluate progression of sludge level in the secondary lagoon and covered digeste and ensure agronomic land application. 5. Sludge sampling will be conducted using a sludge judge, while sludge surveys will be conducted using sonar devices that can be remotely controlled from the berm following all site -specific safety policies, including Lagoon Access Safety Procedure. Recommended analysis Table 1 Recommended tests for lagoon/digester effluent sampling Digester effluent, secondary lagoon effluent and sludge testing Manure package Eff-MMDDYY Inff-MMDDYY Nitrogen, Ammonium Nitrogen, Organic Nitrogen, Phosphate, Potash, Calcium, Copper, Iron, Magnesium, Manganese, Sodium, Sulfur, Zinc, Moisture/Total Solids, Total Salts, pH VS Alkalinity Volatile organic acids COD BOD5 Total testing cost Amongst the manure package TS, Ammonium nitrogen, pH are mandatory tests and if done separately cost more than the package. Table 2 Optional tests for lagoon/digester effluent sampling Orthophosphate Sulfate Sulfide EC Carbon FARM j - ' ' k 7 I ` + ' dot qr i i L �• - =d. ti f � ko ! • �y yy r �•� _i + •� "- �� +ELL, II 4 SEWER INFLUENT LINE v # * MODIFICATIONS NEEDED 27519BI RA-STD-285 (POSSIBLY USE EXISTING) - - 6 - 7 RECYCLE PUMP • , • � t � `�-2 RA-STD-295 - - 7 S-1 RA-STD-280 a, EXISTING WELL. ( ) S-3 - - 100' SET BACK; �'�� _ ICI RA-STD-274 - (S-7) RA-STD-264 0 j � ;% GRAVITY TRANSFER PROPOSED GAS LINE PROPOSED METER DROP DIGESTER • / INFLUENT PROPOSED METER DROP - e �� z -- p 5 RAINWATER LINE - DIGESTER () S-4 RA-STD-271 T / EFFLUENs� (S-9) RA-STD-261 �. X ��,� 5 (S-9) RA-STD-267 rn � (S-1) RA-STD-280 GAS � o 0 0 ,' (S-4) RA-STD-271 'Ilk 86.00 o 0 Ir W (S-1) RA-STD-285 - 1 SEWER INFLUENT LINE MODIFICATIONS NEEDED t• WATER TRANSFER LINE RA-STD-266 F LAGOON 27019 �o (S-8) RA-STD-255 lop IL Z_ ; ' ' 4 i +IF IN t rb (S-8) RA-STD-255 Ir TEMPORARY FLARE. MIN 50' AWAY *► E#, _ 41L AREA 1000 B&C FARMS 27019 LOCATION DETAIL ZACHARY STEWART 9/5/2024 9:34:46 AM C:\VAULT\PROJECTS\MONARCH BIO ENERGY\REGISTER NC\CADD\01 RA270\ORTHOS\DWGS\00 GENERAL ARRANGEMENTS\RA270-00-27019.DWG I HEREBY CERTIFY THAT THIS I / ENGINEERING DOCUMENT WAS PREPARED BY ME OR UNDER MY McC L U R E TM DIRECT PERSONAL SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER m a k i n lives better g THE LAWS OF THE STATE OF NORTH CAROLINA. 2001 W. BROADWAY, COLUMBIA MO 65203 573-814-1568 MY LICENSE NUMBER IS NC CERTIFICATE OF AUTHORITY C-4628 LICENSE —NO 0 �I t, D i -lei a � 0 N TRUE NORTH t 10 F A: ,S ❑ t PRODUCTION INFORMATION CITY AVG ANNUAL ANIMAL POPULATION 7344 ESTIMATED RNG I NJ DTH/YR 9837 AN I MAL TYPE GF BARN OPERATION TYPE Flush SYSTEMS SYSTEM OPTION SELECTED CITY EXISTING BARN EFFLUENT GRAVITY SEWER 5 S-1 DIGESTER INFLUENT LIFT STATION 2 S-2 DIGESTER EFFLUENT GRAVITY &FORCED WATER TRANSFER 2 S-3 WET WELL YES 2 S-4 COVER/RAIN WATER REMOVAL YES 2 S-5 POWER FLUSH YES 1 S-6 SLUDGE REMOVAL YES 1 S-7 EMERGENCYVENT YES 2 S-8 BIOGAS INTERFACE YES 1 DIGESTER PARAMETER VALU E UNITS LENGTH 330 FT WI DTH 170 FT TOP OF DIKE ELEVATION 97.95 FT DEPTH 12 FT BOTTOM ELEVATION 85.95 FT DIKE WIDTH 15 FT INTERIOR SLOPE 3:1 EXTERIOR SLOPE 3:1 OPERATING HEIGHT 10 FT OPERATING ELEVATION 95.95 FT LOW DIGESTER OPERATING HEIGHT N/A FT LOW DIGESTER OPERATING ELEVATION N/A FT OPERATING VOLUME 2923874 GAL TOTAL VOLUME 3755881 GAL CUT 8818 CY FI LL 8851 CY NET —33 CY PIPE SERVICE SIZE SPECIFICATION CITY UNITS BARN EFFLUENT (GRAVITY) 1211 PL01 350 FT EXISTING BARN EFFLUENT (FORCED) N/A N/A N/A N/A LIFT STATION OVERFLOW 1211 HP01 100 FT DIGESTER INFLUENT (FORCED) 611 HP02 2800 FT DIGESTER INFLUENT (FORCED) N/A N/A N/A FT DIGESTER INFLUENT CLEANOUT X11 PL01 N/A EA DIGESTER EFFLUENT (FORCED) 611 HP02 2000 FT WATER TRANSFER WET WELL LATERAL 1211 HP01 50 FT DIGESTER EFFLUENT (GRAVITY) 1211 HP01 300 FT WET WELL LATERAL N/A N/A N/A FT COVER WATER SUCTION 311 HP01 80 FT COVER WATER DISCHARGE 311 HP02 200 FT POWER FLUSH 611 HP02 100 FT SLUDGE REMOVAL 1211 HP02 50 FT MIXING SUCTION 811 HP02 50 FT MIXING DISCHARGE 611 H P02 350 FT I SC LE SIZE I�I 1 - 150' E MILLIMETERS: 2 04SEPT24 UPDATED BACKGROUND INFORMATION AND DATA TABLE ZTS CF KPL XX -+O.10 1 19APR24 ISSUED FOR PERMITTING ZTS CF KPL DIMENSION TOLERANCE (UNLESS OTHERWISE XXX=±0.010 0 15APR24 ISSUED FOR PERMITTING LMB CF KPL 9 % _ SPECIFIED) ANGLES =+0.5° REV # DATE REVISION DESCRIPTION DRWN BY CHK'D I BY APP'D BY FRACTIONS: INCHES: THIS DOCUMENT, ALONG WITH ITS DESIGNS, KNOW-HOW AND DRAWINGS, CONTAINS CONFIDENTIAL AND PROPRIETARY INFORMATION THAT IS THE PROPERTY OF ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC AND IS PROTECTED UNDER STATE AND FEDERAL LAW, INCLUDING 18 USC SECTION 1836 AND 17 USC SECTION 101 et se ROESLEIN & ASSOCIATES, INC. AND ROESLE IN ALTERNATIVE ENERGY, LLC RESERVES ALL PATENT, COPYRIGHT AND OTHER PROPRIETARY RIGHTS TO THIS DOCUMENT, INCLUDING ALL DESIGN, MANUFACTURING, REPRODUCTION, USE, AND SALES RIGHTS THERETO, EXCEPT TO THE EXTENT SAID RIGHTS ARE EXPRESSLY GRANTED TO OTHERS. THIS DOCUMENT MUST NOT BE DUPLICATED OR DISCLOSED, IN WHOLE OR IN PART, WITHOUT THE EXPRESS WRITTEN OFROESLEIN & ASSOCIATES INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC. ANY USE OF THE INFORMATION i �� 0 ` ♦ !. /' -♦ MACHINED PARTS -±1/64 HOLE LOCATIONS ON WELDED ASSEMBLIES LINEAR DIMENSIONS ON =±1/16 STRUCTURAL WELD . .X =±020 010 .XXX =±.005 .XXXX=±.0002 ANGLES =±.05° CONTAINEDIN DOCUMENTTHIS THA ORIZED RECIPIENTX RBEEN FORHE EXPRESSWHICH OTHTED.ER ANGLES =±1 °PROV ISN TIR LION DIED TLY HE REQUEST OF ROESLEIN & AT AND ROESLEIN ALTERNATIVE TERNAT ENERGY, LC 09/05/: THE HOLDER OF THIS DOCUMENT AGREES TO IMMEDIATELY RETURN OR DESTROY THIS DOCUMENT AND ALL COPIES THEREOF IN ITS POSSESSION. 92023 ROESLEIN & ASSOCIATES, INC. AND ROESLEIN ALTERNATIVE ENERGY, LLC D O NOT SCALE PRINT MONARCH BIOENERGY REGISTER, NC AREA 1000 B&C FARMS GENERAL ARRANGEMENTS ENGINEERS • MANUFACTURERS • CONSTRUCTORS DWG. SHEET REV NO. RA270-00-27019 4OF6 2 120 120 NOTE: INVERTS OF EXISTING GRAVITY PIPING ARE APPROXIMATED BASED ON BEST AVAILABLE SURVEY INFORMATION. LEGEND: TOB: TOP OF BANK ELEVATION FF: FINISHED FLOOR ELEVATION FB: FREEBOARD ELEVATION EG: EXISTING GRADE ELEVATION OL: OPERATING LEVEL ELEVATION INV: INVERT ELEVATION SHWT: SEASONAL HIGH WATER TABLE LIQUID FLOW DIRECTION AMILTON 8/22/2024 11:47:20 AM R:\200599\06-DRAWINGS\CIVIL\AlK\REGISTER-CLUSTER 1\AFO PERMIT DRAWINGS\27019 B&C AFO PERMIT.DWG