HomeMy WebLinkAboutNCC243122_ESC Approval Submitted_20241014 ROY COOPER d �
Governor +°
ELIZABETH BISER t �
Secretary G�� -I;
WILLIAM E.TOBY VINSON,JR. FAQ°"""
Interim Director NORTH CAROLINA
Environmental Quality
September 25, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Winston-Salem/Forsyth County Board of Education
Attention:Nicholas Seeba, Director of Construction and Facilities
PO Box 2513
Winston-Salem,NC 27102
RE: Project Name: New Brunson Elementary
Acres Approved: 10.66
Project ID: FORSY-2024-013
County: Forsyth .
City: Winston-Salem
Address: Patterson Ave
River Basin: Yadkin-Pee Dee
Stream Classification: C
Submitted By: Stimmel Associates, P.A.
Date Received by LQS: September 1, 2023
Plan Type: NEW
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOl) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the foini is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual peilnit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO-form submitted for
this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stonnwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG010000 penult require that the following documentation be
kept on file at the job site:
North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Ns9
Winston-Salem Regional Office 1450 West Hanes Mill Road,Suite 300 1 Winston-Salem,North Carolina 27105
336-776-9800
a
Letter of Approval with Modifications
Winston-Salem/Forsyth County Board of Education
September 25, 2023
Page 2 of 4
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and-implementation oTthe revisions to ensure-compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land-disturbing activity. This approval does not supersede any other petiiiit or approval.
Please note that this approval is based in part on the accuracy of the infoiivation provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
yl2 ff�t.aL--t- 2
Nicole Chips, EI
Assistant-Regional-Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: Stimmel Associates, P.A.
Attention: Elam Summey, PE •
601 N Trade Street, Suite 200
Winston-Salem,NC 27105
Letter of Approval with Modifications
Winston-Salem/Forsyth County Board of Education
September 25, 2023
Page 3 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: New Brunson Elementary
Project ID: FORSY-2024-013
County: Forsyth
Plan Reviewed By: Ashley Vikara, EI
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Erosion and sediment control measures are shown outside the proposed disturbed limits. All area
required for stockpiling of topsoil, contractor staging, temporary access,haul roads,erosion control
measures or other land-disturbing activities associated with this project must be included within the
disturbed limits. Please submit a revised erosion control plan reflecting the additional area, along
with any associated fees. [15A NCAC 4B .0118]
2. A Rational runoff coefficient of 0.75 is recommended for urban and industrial disturbed areas.
Please evaluate the sediment traps with the higher runoff coefficient and adjust the basin/trap sizes,
if necessary. [G.S. 113A-57(3)]
3. Please notify this office prior to your pre-construction conference for this project by calling
(336) 776-9800 and asking to speak with the Land Quality inspector for your county.
Permission must be obtained and granted from NC DEQ DEMLR prior to the removal of any
ESC measures. [GS 113A-51, 15A NCAC 4B .0120]
4. Any off-site borrow and waste required for this project must come from a site with an
approved erosion control plan, a site regulated under the Mining Act of 1971, or a landfill
regulated by the Division of Solid Waste Management. Trash/debris from demolition
activities or generated by any activities on site must be disposed of at a facility regulated by
the Division of Solid Waste Management or per Division of Solid Waste Management or
Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
5. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
6. The NCGO1 has a $100 yearly fee and our office often receives closure inspection requests
days prior to yearly NCGO1 fee payment due dates. Be advised the project requires a closure
inspection report by DEMLR prior to filing the Notice of Termination (NOT) to teiminate
NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of
temporary ESC measures, including basins, requires prior approval. Often, a full growing
season is necessary between initial seeding/mulching and removal of measures. Please plan
Letter of Approval with Modifications
Winston-Salem/Forsyth County Board of Education
September 25,2023
Page 4 of 4
your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a
closure inspection. [General Comment]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
°,[' ' = �
'alt g = Ni) C..) ,46.3 t) -/- W
0 = -.1 6 Fo CIS
g CI
°F.*
'� e
44 E ......., ...../
u,) -4,..) h h 0 4
'V In ® ,
`6 all 6-, ® it,
pi.„1 ti:-!/: .-,,..4i ,-,,,,,-8,, . .
limmt
4
4.) 75 :04 4.,,,:o e__ 4 Z N --...:z:-'-'--- '---.-
WO 1,,,:j-T
�_ .„ l !�
04 4z Ea* col ® ® °®
.4.4 ele `tin, ;71 0 : i
*10 I) � �
ta
® 1/4
_ a
® el -
te
e� ) U