HomeMy WebLinkAbout820113_Denial_20241001
October 1, 2024
Sue Butler
James Butler Farm 2
10475 N US Hwy 421
Clinton, NC 28328
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS820113
James Butler Farm 2
Animal Waste Management System
Sampson County
Dear Sue Butler:
The Division of Water Resources (Division) received your sludge survey information on September 24, 2024. Curtis Barwick submitted survey results on your behalf and requested an extension
of the sludge survey requirement for the lagoon at the James Butler Farm 2 facility. Due to the amount of treatment volume available, and the rate of sludge accumulation, the Division
feels that an extension is not appropriate for the lagoon at this facility.
The next sludge survey for the lagoon at James Butler Farm 2 should be performed before December 31, 2024. Please retain this letter and keep it with your farm records for reference.
Please call me at (919) 707-3667 if you have any questions.
Sincerely,
Melissa Abbott
Melissa Abbott
Animal Feeding Operations Program
cc:
Laserfiche File No: 820113