Loading...
HomeMy WebLinkAboutSW6240701_Supplement-EZ Form_20241008 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name McDonald's Hoke Landing 2 Project Area(ac) 1.33 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? Yes COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: W.Brian Burchett-Professional Engineer 28 Organization: Sambatek NC PC 29 Street address: 8312 Creedmoor Rd 30 City,State,Zip: Raleigh,NC 27613 31 Phone number(s): 919-848-6121 32 Email: bburchett@sambatek.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ,,,',.u.n....' so`“" n.4 s* kl\s3 T EK NCA.' ,�� N . �� GjP.��ED CORAL .0 �, Q.� / �i ✓' ••�� fir• /•••:, ;��' o; :Q by Signature of Designer C-4993 2• SEA r• 'ue ° 2450 A o ?•_ • • 10/08/2024 •,. ti,NORTH"'T P �'��.R BAN BV�G Odder SW, 2024 Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Off-Site 5 Total drainage area(sq ft) 57748 sf 57748 sf 6 Onsite drainage area(sq ft) 57748 sf 57748 sf 7 Offsite drainage area(sq ft) 0 0 8 Total BUA in project(sq ft) 37666 sf 37666 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) 37666 sf 37666 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 11 Offsite BUA(sq ft) 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) _ 32,302 sf 32,302 sf -Sidewalk(sq ft) 1,672 sf 1,672 sf -Roof(sq ft) 3,692 sf 3,692 sf -Roadway(sq ft) 0 sf 0 sf -Future(sq ft) 14,294 sf 14,294 sf -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) _ 0 sf 0 sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) 0 sf 0 sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) 0 sf _ 0 sf 16 Existing BUA that is already permitted(sq ft) 0 sf 0 sf 17 Existing BUA that will be removed(sq ft) 0 sf 0 sf 18 Percent BUA 65% 65% 19 Design storm(inches) 20 Design volume of SCM(cu ft) 21 Calculation method for design volume ADDITIONAL INFORMATION LPlease use this space to provide any additional information about the 22 drainage area(s): OFF-SITE SCM THE DRAINAGE AREA 1 Drainage area number for this project 1 2 Master permit number SW 6190901 3 Drainage area number from the master permit 1 4 Lot or outparcel number 3A 5 BUA allocated by Master Permit 51960 sf INFORMATION ABOUT THE OFF-SITE SCM 6 Type of off-site SCM Wet Pond 7 Available treatment capacity in the off-site SCM (cu ft) 228200 cf 8 Have deed restrictions limiting the BUA on the site been recorded? Yes 9 Has an Engineer's Certification for the off-site SCM been submitted to DEQ? Yes 10 Are there any Notices of Violation for the off-site system? No 11 Has the off-site SCM been maintained in accordance with its O&M Plan? Yes 12 Will the collection system be maintained in its design state and kept clean? ADDITIONAL INFORMATION 13 Please use this space to provide any additional information about the off-site SCM(s):