Loading...
HomeMy WebLinkAboutNC0003417_Inspection_20241011ROY COOPER Governor MARY PENNY KELLEY Secretary RICHARD E. ROGERS, JR. Director Mike Graham Duke Energy Progress LLC 1199 Black Jack Church Road Goldsboro, NC 27530 NORTH CAROLINA Environmental Quality October 10, 2024 SUBJECT: Compliance Inspection Report Lee Steam Electric Plant NPDES WW Permit No. NC0003417 Wayne County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the Lee Steam Electric Plant on 9/05/2024. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0003417. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". If you should have any questions, please do not hesitate to contact Robbie Bullock with the Water Quality Regional Operations Section in the Washington Regional Office at 252-946-6481 or via email at robert.e.bullock@deq.nc.gov. Sincerely, Zagva T"" Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Washington Regional Office Division of Water Resources, NCDEQ ATTACHMENTS Cc: Laserfiche North Carolina Department of Environmental Quality I Division of Water Resources Noan+��NA Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 DWM ^^^ ^��� ^^m•^� � �� 252,946,6481 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NC0003417 111 121 24/09/05 I17 18 I C I 19 Ls_] 201 � I 211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I n,J I I I 71 I 74 79 I I I I I I I80 701� I 711 L LJ L Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:OOAM 24/09/05 22/12/01 Lee Steam Electric Plant 1677 Old Smithfield Rd Exit Time/Date Permit Expiration Date Goldsboro NC 27533 12:30PM 24/09/05 24/03/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data William Michael Graham/ORC/919-722-6551/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Kris Edmondson,1677 Old Smithfield Rd Grifton NC 28530//919-580-3911/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports Facility Site Review 0 Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date David L May DWR/WARO WQ/252-946-6481 Ext.357/ 9/9/2024 Robert E Bullock %�BGC1G2 U?ue�C/� DWR/WARO WQ/252-948-3843/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date Plow Tom. DEQ DWR WQROS 252-948-3921 10/11/2024 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NC0003417 I11 12I 24/09/05 117 18 i c i (Cont.) Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Robbie Bullock and David May (DWR/WaRO) met with Mike Graham (Duke Energy) to complete a Compliance inspection for NPDES permit NC0003417. This inspection included a review of the July 2024 Discharge Monitoring Report (DMR), tour of the Staged Turbulent Air Reactor (STAR) and a visual inspection of Outfalls 001, 002, 002a, 005a and 005b. The July 2024 Discharge Monitoring Report (DMR) was spot checked for accuracy with no discrepancies found. The current permit was set to expire on March 31, 2024. A renewal application has been submitted and the existing permit will remain effective until a new permit is issued. James Herring is the ORC with Mike Graham, Bradley Mayhew and Eric Stroupe as the Backup ORC's. Page# Permit: NC0003417 Inspection Date: 09/05/2024 Owner -Facility: Lee Steam Electric Plant Inspection Type: Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ■ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ■ ❑ ❑ ❑ application? Is the facility as described in the permit? ■ ❑ ❑ ❑ # Are there any special conditions for the permit? ■ ❑ ❑ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑ Comment: The current permit was set to expire on March 31, 2024. A renewal application has been submitted and the existing permit will remain effective until a new permit is issued. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? ■ ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ■ ❑ ❑ ❑ Dates, times and location of sampling ❑ Name of individual performing the sampling ❑ Results of analysis and calibration ❑ Dates of analysis ❑ Name of person performing analyses ❑ Transported COCs ❑ Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ■ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ❑ ❑ ■ ❑ operator on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ ■ Is the ORC certified at grade equal to or higher than the facility classification? ■ ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility ■ ❑ ❑ ❑ classification? Page# 3 Permit: NC0003417 Owner -Facility: Lee Steam Electric Plant Inspection Date: 09/05/2024 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑ Comment: James Herrinq is the ORC with Mike Graham, Bradley Mayhew and Eric Stroupe as the Backup ORC's. The July 2024 DMR was spot checked for accuracy with no discrepancies found. Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Effluent Pipe Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Yes No NA NE ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 4