HomeMy WebLinkAboutNC0003417_Inspection_20241011ROY COOPER
Governor
MARY PENNY KELLEY
Secretary
RICHARD E. ROGERS, JR.
Director
Mike Graham
Duke Energy Progress LLC
1199 Black Jack Church Road
Goldsboro, NC 27530
NORTH CAROLINA
Environmental Quality
October 10, 2024
SUBJECT: Compliance Inspection Report
Lee Steam Electric Plant
NPDES WW Permit No. NC0003417
Wayne County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Lee Steam
Electric Plant on 9/05/2024. This inspection was conducted to verify that the facility is
operating in compliance with the conditions and limitations specified in NPDES WW Permit No.
NC0003417. The findings and comments noted during this inspection are provided in the
enclosed copy of the inspection report entitled "Compliance Inspection Report".
If you should have any questions, please do not hesitate to contact Robbie Bullock with the
Water Quality Regional Operations Section in the Washington Regional Office at 252-946-6481
or via email at robert.e.bullock@deq.nc.gov.
Sincerely,
Zagva T""
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS
Cc: Laserfiche
North Carolina Department of Environmental Quality I Division of Water Resources
Noan+��NA Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
DWM
^^^ ^��� ^^m•^� � �� 252,946,6481
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0003417 111 121 24/09/05 I17 18 I C I 19 Ls_] 201 � I
211111 I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I n,J I I I 71 I 74 79 I I I I I I I80
701� I 711 L
LJ L
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
10:OOAM 24/09/05
22/12/01
Lee Steam Electric Plant
1677 Old Smithfield Rd
Exit Time/Date
Permit Expiration Date
Goldsboro NC 27533
12:30PM 24/09/05
24/03/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
William Michael Graham/ORC/919-722-6551/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Kris Edmondson,1677 Old Smithfield Rd Grifton NC 28530//919-580-3911/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports
Facility Site Review 0 Effluent/Receiving Wate
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
David L May DWR/WARO WQ/252-946-6481 Ext.357/ 9/9/2024
Robert E Bullock %�BGC1G2 U?ue�C/� DWR/WARO WQ/252-948-3843/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Plow Tom. DEQ DWR WQROS 252-948-3921 10/11/2024
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NC0003417 I11 12I 24/09/05 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Robbie Bullock and David May (DWR/WaRO) met with Mike Graham (Duke Energy) to complete a
Compliance inspection for NPDES permit NC0003417. This inspection included a review of the July
2024 Discharge Monitoring Report (DMR), tour of the Staged Turbulent Air Reactor (STAR) and a
visual inspection of Outfalls 001, 002, 002a, 005a and 005b.
The July 2024 Discharge Monitoring Report (DMR) was spot checked for accuracy with no
discrepancies found.
The current permit was set to expire on March 31, 2024. A renewal application has been submitted
and the existing permit will remain effective until a new permit is issued.
James Herring is the ORC with Mike Graham, Bradley Mayhew and Eric Stroupe as the Backup
ORC's.
Page#
Permit: NC0003417
Inspection Date: 09/05/2024
Owner -Facility: Lee Steam Electric Plant
Inspection Type: Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ■ ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ■ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit
Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new ■ ❑ ❑ ❑
application?
Is the facility as described in the permit?
■
❑
❑
❑
# Are there any special conditions for the permit?
■
❑
❑
❑
Is access to the plant site restricted to the general public?
■
❑
❑
❑
Is the inspector granted access to all areas for inspection?
■
❑
❑
❑
Comment: The current permit was set to expire on March 31, 2024. A renewal application
has
been submitted and the existing permit will remain effective until a new
permit is issued.
Record Keeping
Yes
No
NA
NE
Are records kept and maintained as required by the permit?
■
❑
❑
❑
Is all required information readily available, complete and current?
■
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
■
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
■
❑
❑
❑
Is the chain -of -custody complete?
■
❑
❑
❑
Dates, times and location of sampling
❑
Name of individual performing the sampling
❑
Results of analysis and calibration
❑
Dates of analysis
❑
Name of person performing analyses
❑
Transported COCs
❑
Are DMRs complete: do they include all permit parameters?
■
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
■
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
❑
❑
■
❑
operator on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
■
Is the ORC certified at grade equal to or higher than the facility classification?
■
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility
■
❑
❑
❑
classification?
Page# 3
Permit: NC0003417 Owner -Facility: Lee Steam Electric Plant
Inspection Date: 09/05/2024 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑
Comment: James Herrinq is the ORC with Mike Graham, Bradley Mayhew and Eric Stroupe as the
Backup ORC's.
The July 2024 DMR was spot checked for accuracy with no discrepancies found.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment:
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Yes No NA NE
❑ ❑ ❑
Yes
No
NA
NE
❑
❑
❑
❑
❑
❑
❑
❑
❑
Page# 4