Loading...
HomeMy WebLinkAboutSW6231205_Add Info Request_20240327 orarc STATE Mnr o,u3 ROY COOPER �� A Governor ELIZABETH S.BISER Secretary WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality March 27, 2024 Morris & Ritchie Associates of NC, PC Attn: Jeremy Keeny, PE, PLS 530 Hinton Pond Road, Suite 104 Knightdale, NC 27545 AND Daniel W. Gardner Jr. & Jannet F. Gardner 4305 Old Buies Creek Road Angier,NC 27501 AND Kenneth D. Gardner& Debra A. Gardner 4144 Old Buies Creek Road Angier,NC 27501 Subject: Request for Additional Information Stormwater Permit No. SW6231205 Gardner Farms Harnett County Dear Mr. Keeny, Mr. & Mrs. Gardner, and Mr. & Mrs. Gardner: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on December 29, 2023. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please include the required vegetated setback from the existing on-site pond(surface water) in the main set of plans in accordance with 15A NCAC 02H .1042(2)(g)(iii). 2. The provided drainage area map to the SCMs indicates that a portion of the existing on- site pond is located within the SCM drainage area, which is not possible. Please revise the drainage area map to accurately reflect the drainage area boundary to the SCMs. This item is required per 15A NCAC 02H .1042(2)(g)(iv). 3. Please include the required SCM maintenance accesses and easements in the main set of plans in accordance with 15A NCAC 02H .1042(2)(g)(vi) and General MDCs 8 & 9. E Q�� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAROLJNA - uepan ntm 919.707.9200 4. There appears to be a mismatch between the BUA information entered into the Application/Supplement-EZ Forms and as shown in the calculations. For example, for SCM#2, the BUA accounting as shown in the Application/Supplement-EZ Form indicates 189,705 sf of BUA allocated to the individual lots, 21,040 sf of sidewalk BUA and 57,368 sf of roadway BUA(189,705 sf+21,040 sf+ 57,368 sf=268,113 sf). The calculations indicate a total of 333,421 sf of BUA within this drainage area. Please revise as needed for consistency. NOTE: "Contingency"BUA, as shown in the calculations, can be included in the Application/Supplement-EZ Form as "Future"BUA. NOTE: The total BUA within the drainage area to the SCM should be able to be calculated from the BUA information from the other BUA types as shown in the Application/Supplement-EZ Form (for example, the total BUA should be the sum of all of the applicable types of BUA shown on the form). 5. Please correct the following issues with the wet pond designs: a. When calculating the volume of the main pool or forebay, the storage volume provided in the sediment storage zone should not be included. For example, if the excavated bottom of the main pool is at elevation 273.5' and the minimum 6"of sediment storage is provided, the "bottom" of the main pool, for calculation purposes, would be at elevation 274.0' since the"storage"provided between elevations 273.5' and 274.0' is reserved for sediment storage (See guidance under MDC 3 in Part C-3 of the Manual). Please revise as needed. b. Please clearly indicate the elevation of the top of the sediment storage zone in the cross-sectional view of the wet ponds and ensure that the contours in the plan view extend to the excavated bottom of the wet pond. This item is required per Wet Pond MDC 3 and per 15A NCAC 02H .1042(2)(h)(i). c. The provided stage-storage tables for the wet pond forebays do not go all the way up to the permanent pool. For example, for Wet Pond#1, the forebay stage-storage table maxes out at elevation 263.0' whereas the permanent pool surface elevation for Wet Pond#1 is at elevation 263.5'. Please revise as needed. d. Per the design, it is unclear if the drawdown orifices used will be 2.5" or 3.0"in diameter. The notes on the outlet structure detail for each SCM reference both values. Please revise as needed. e. Wet Pond#1 —Plan sheet D4.2 indicates the "total plantings provided is 1,000" which is less than the minimum number of plants required per Wet Pond MDC 1 lb (and less than the number that are shown to be provided). Please revise as needed. f. As designed, the wet ponds appear to short-circuit. Short-circuiting is prohibited per Wet Pond MDC 4. Please increase the flow length between the inlets and outlets to better utilize the wet ponds. If berms or baffles will be added to increase the flow path, they must extent to at least the temporary pool surface elevation. Please revise as needed. 6. Please correct the following issues with the Supplement-EZ Form: a. Cover Page: i. Line 2—This value should correspond to Section IV, 7 of the Application(it should not include the on-site surface water areas). ii. Line 3 —Pleas include all of the on-site surface areas. This value should correspond to Section IV, 6 of the Application. iii. Line 7—Please refer to 15A NCAC 02H .1017(10) for this value. Please revise the plans as needed to ensure that the minimum required vegetated setback from surface waters is being provided. b. Drainage Area Page: i. Entire Site Column: 1. Please note that the entire site column is an accounting of the entire project area, not necessarily a sum of the other provided columns. All of the on-site BUA, whether it drains to an SCM or not, should be included in this column and, typically, there are no off-site components to this column (since off-site areas are not part of the project area). 2. Please note that Lines 19-21 are not required for this column. 3. The total amount of BUA allocated to the individual lots (Line 9) does not correspond to the total amount of BUA allocated to the individual lots as shown in the Deed Restriction Form. Please revise as needed. ii. SCM Drainage Area Columns: 1. DA 1 —Per 15A NCAC 02H .1003(3)(b), any off-site areas that are not bypassed around the SCM must be accounted for at their full build-out potential. Full build-out potential is determined by having the property owners enter into a legal agreement limiting the amount of drainage area and BUA draining from the off-site area to the SCM, or by assuming that the off-site area is 100%BUA, its full build-out potential. Please revise as needed. 2. DA 2, Line 20—The design volume of a wet pond is the volume that can be stored between the permanent pool surface elevation and the invert of the lowest bypass device. Per the plans, the lowest bypass device is the weir with invert of 280.5'. Please revise as needed. 3. General—Please ensure that all of the new BUA is fully accounted for(there is more BUA shown on Line 8 than is shown in all of the other lines combined). Please revise as needed. c. Wet Pond Page: i. Wet Pond 1: 1. Line 6—Per the plans, there appears to be an engineered side slope (headwall) near the SCM outlet. 2. Line 55 —Please indicate that this SCM has two drawdown orifices. NOTE: It is recommended to include one larger drawdown orifice as opposed to two smaller drawdown orifices. ii. Wet Pond 2: 1. Line 2—The provided value, 9,010 cf, does not appear to be correct. Please revise as needed. The minimum required treatment volume is calculated based on the drainage area to the SCM and the design storm depth using either the Simple or Discrete NRCS Curve Number Method. 2. Line 26—The provided value, 22,267 sf, does not correspond to the value shown on the stage-storage table, 26,098 sf. Please revise as needed. 3. Line 35 — See earlier comment with regard to the design volume of the SCM. 4. Line 40— See earlier comment with regard to the design volume of the SCM, Since the design volume is changing, the drawdown calculations will need to be revised. iii. General: 1. Line 8 —This item is required per General MDC 5. 2. Line 20—Per the plans, the lowest excavated bottom elevation of the main pool for Wet Pond 1 is 257.5' and for Wet Pond 2 is 273.5'. Please revise as needed. 3. Line 21 —Please indicate the top of the sediment storage zone on the cross- sectional view of the SCMs. NOTE: The top of the sediment storage zone (Line 21)must be at a higher elevation than the bottom of the sediment storage zone (Line 20) and must be at least 6"higher(per Wet Pond MDC 3). 4. Line 25 — See earlier comment with regard to the design volume of the SCM. The temporary pool surface elevation is determined by the invert of the lowest bypass device. 5. Line 27— See earlier comment with regard to the sediment storage zone and excluding it from the main pool volume. 6. Line 28 —revise this calculation per the prior comment. 7. Line 32— See earlier comment with regard to the sediment storage zone and excluding it from the forebay volume. 8. Line 34—The cleanout depth of the forebay is the distance from the permanent pool surface elevation to the top of the sediment storage zone. 9. Line 37— See earlier comment with regard to the orifice diameter. Decimal values cannot be entered into this cell so if the orifice diameter is 2.5",please indicate this information in the additional information section(Line 55). 10. Line 42—Berms and baffles provided to increase the flow length through the wet pond must extend up to at least the temporary pool surface elevation. 11. Lines 43 & 44—The depth of the forebay is measured from the permanent pool to the excavated bottom of the forebay near either the entrance or exit. Per Wet Pond MDC 5b, the bottom of the forebay near the entrance must be deeper than the bottom of the forebay near the exit and per Wet Pond MDC 3, there must be at least 6" of sediment storage provided above the bottom of the forebay (near the exit). See Figure 5 in Part C-3 of the Manual for more information. 12. Line 48 —Per the detail, there is a downward curved elbow, the purpose of which is to drawdown from below the permanent pool elevation. 13. Line 53 — Specify the type of turfgrass that will be planted on the dam and embankments on this form and on the plans. 7. Please provide a Response to Comments letter indicating, in a point-by-point manner, how each of the above comments has been addressed. This item is required per 15A NCAC 02H .1042(3)(b). 8. When uploading electronic files to the portal (at the following address: https:,Iledocs.deq.nc.gov/Forms/SW-Sul2plemental-Upload)please ensure that the plan sheets are separated out by type, as indicated on the form, instead of uploading the entire plan set as a single file. The form automatically renames the uploaded files based on the file type selected and the form has a difficult processing large files. Please upload the plan sheets by type in future submissions. 9. Provide PDFs of all revisions, 2 hardcopies of revised plan sheets, 1 hardcopy of other documents, and a response to comments letter briefly describing how the comments have been addressed. a. PDFs must be uploaded using the form at: https:Iledocs.deq.nc.gov/FormsISW-Sul2plemental-Upload b. Hard copies must be mailed or delivered to the following address: i. For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640M Raleigh,NC 27604 ii. For USPS: Jim Farkas 1612 Mail Service Center Raleigh,NC 27699-1612 iii. Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)will be able to receive the submission. Do not leave the uackne in the foyer with the security ward. NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the submission package may be lost while being sent from the Regional Office to me in the Central Office. While it is not required, it is recommended that the off-site drainage from upstream properties be diverted around the SCM since the Applicant cannot maintain control over the development of property that they do not own. If the Applicant elects to account for off-site drainage, it must either be accounted for as 100%BUA (its full build out potential, or there must be a recorded legal agreement in place between the Applicant and the Owner of the upstream property in which the Owner of the upstream property agrees to record a deed restriction limiting the minimum/maximum amount of BUA on the upstream property that will be treated in the Applicant's SCM, the locations and sizes of access and drainage easements, how construction and/or ongoing maintenance costs will be handled, maintenance responsibility, a list of legal recourses available to each party should one party fail to hold up their end of the agreement, and any other related legal issues. To ensure a fair, timely, and transparent review process, any disagreement with provided comments will need to be addressed in writing as part of the requested information resubmission, within the required resubmittal window. The merits of the disagreement will be reviewed during the next scheduled technical review and, if applicable, will be addressed in further requests for additional information. If the resolution provided by the reviewer is found to be unsatisfactory, the applicant can agree in writing to a longer review period, during which the dispute will be brought to the technical review committee and a final determination will be made. Due to staffing limitations and to ensure an efficient project review, requests for individual meetings to discuss provided comments are decided at the discretion of the reviewer. We encourage you to carefully review the written feedback provided and the applicable rules. The NCDEQ Stormwater Design Manual provides additional insight into design criteria. Any questions or further requests for clarification should be submitted in writing in the requested information resubmission, within the required resubmittal window. We appreciate your understanding and cooperation in this streamlined process. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 26,2024, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW6231205 on all correspondence. If you need additional time to submit the information,please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at postconstructiongdeq.nc.gov or(919) 707-3646. Sincerely, Jim Farkas State Stormwater Engineer DEMLR Post-Construction Stormwater Program cc: Fayetteville Regional Office