Loading...
HomeMy WebLinkAboutNCC243148_ESC Approval Submitted_20241011 Iredell County Planning & Development Erosion Control Section IREDELL 349 North Center Street COUNTY N P.O. Box788 Statesville, NC 28687 Date: June 5th 2023 LETTER OF APPROVAL Brian Mahoney BBC Brantley, LLC 7224 Jameson Way Stanley,NC 28164 RE: Project Name: Brantley Acres Approved: 18.654 Project ID: MVLLE-2023-058 Project Location: PIN 4676110635.000 Submitted By: Yarbrough-Williams & Houle, Inc. Date Received: June 2nd 2023 Plan Type: New Dear Mr. Mahoney: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this letter of Approval. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3)years following the date of approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also,this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Letter of Approval Brantley June 5th 2023 Page 2 of 2 Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. As of May 1,2019, a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. As required in the approved plan construction sequencing, please schedule a preconstruction conference with our staff prior to land disturbing activity. Your cooperation is appreciated. Sincerely, Jonathan Williams, CESSWI Erosion Control Coordinator Enclosures: Fact Sheet on the New NCG01 Permit Permit Fact Sheet on the New NCG01 Permit Q?) April 2019 -, • w� The NC Construction General Permit(also known as"NCG01")was renewed on April 1, 2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably,there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or(919) 707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; a-NOI: Notice of Intent, application form for the NCG01 permit • Is clearly organized by topic; and e-NOT: Notice of Termination,form for closing out the NCG01 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be , included in the SWPPP, such as the '` " construction sequence, plans, calculations,etc. (p. 2-4);1 ii i I • Has updated language on bypasses and ' upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days" for clarity and The new NCG01 applies to permits approved on or after April 1,2019. consistency(p. 11 14);Z Permittees will no longer receive a copy of the NCG01 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 0.5 inch);3 and Under the new NCGO1 process, construction sites will continue to • Excludes weekends, state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCG01 by place (p. 23). completing an a-NOI (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. ' This list is based on website guidance by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCGO1 2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required per§143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC. That effort is part of a larger Permit Transformation project at DEMLR. IREDELL COUNTY tR1 L_)1-:L-L Erosion Control Permit Permit#: EC-2023-16235 Parcel#: 4676110635.000 Issued Date: June 05,2023 Expiration Date: June 04,2026 Project Address: 102 WINTER OAKS LN Project: MOORESVILLE, NC 28115 Owner: BBC Brantley, LLC Contractor: Address: Address: Phone: 7047517110 Phone: Project Details SQ Ft: 0 Valuation: $0.00 Permit Fees Name Amount Paid Due Added Acreage Fee for Erosion $3,325.00 $3,325.00 $0.00 Totals: $3,325.00 $3,325.00 $0.00 Notice Insert a permit notice prefix in the report text bank,entry:Permit_Notice Page 1 of 1