Loading...
HomeMy WebLinkAboutSW6231205_email_20240717 Holland, Brianna From: Jeremy Keeny <JKeeny@mragta.com> Sent: Wednesday, July 17, 2024 6:46 PM To: Holland, Brianna; scott.roylance@meritagehomes.com Cc: svc_post_construction_stormwater;Joyner, Melissa; Knuth, Tristan Subject: [External] RE: SW6231205; Gardner Farms (Harnett) Attachments: Gardner Farms Subdivision Individual Certification .docx.pdf,- Nationwide Permit 29- FINAL (3).pdf, SAW-2022-02632 Gardner Farm AJD tear sheet_signed_final.pdf, SAW-2022-02632 Gardner Farn NWP 29 tear sheet_signed_final.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Brianna, A couple of quick follow-up questions to your comment below. 1. The subject site lies in the Cape Fear River Basin. The code section you referenced (15A NCAC 02B .0714) applies to the Neuse River and would be for the 50' Riparian Buffer I believe. Since this site is in the Cape Fear, I'm not aware of any state required vegetated setbacks for the Cape Fear. Is there a particular setback you're referring to? Can you reference where any vegetated setbacks are required in the code? 2. 1 believe we had the on-site determination with USACE staff and agreed upon by State staff with the 401/404 permits. I've attached all of the permit documents for the 401/404 approvals for reference if you didn't already have them. With the approval from the State and USACE, we were given approval to breach the dam of the existing on-site pond and drain it. We are in the process of getting the dam breach plans approved through the DEQ Regional Office, which would remove the pond from the site. I believe that would alleviate the need for any setbacks as well, but can you confirm? Hopefully one of these two items answers the question and we can get the permit processed. Let me know if you still need something else, and we'll jump on it! Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal MORRIS & RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mra-qta.com 2yealt,3 1979-2024 From: Holland, Brianna <brianna.holland@deq.nc.gov> Sent: Monday,July 15, 2024 5:40 PM To:Jared Medwar<JMedwar@mragta.com>;Jeremy Keeny<JKeeny@mragta.com>; 1 scott.roylance@meritagehomes.com Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>;Joyner, Melissa <melissa.joyner@deq.nc.gov> Subject: RE: SW6231205; Gardner Farms (Harnett) Good evening, The project appears to be complete except for one issue. Please provide the on-site determination performed by Authority staff and the permit can be processed. If it is determined that Authority staff that the surface water exists on-site, please revise the package as necessary. 1. Previous comment: Please include the required vegetated setback from the existing on-site pond (surface water) in the main set ofplans in accordance with 15A NCAC 02H.1042(2)(g)(iii). We use the USGS topographic map to determine if there are surface waters present on-site. We understand that these maps may not accurately reflect existing site conditions for all sites which is why relief from the surface water requirements can be allowed when surface waters are not present in accordance with 15A NCAC 02B .0714(3)(a). When a landowner or other affected party believes that the maps listed in Sub-Item (3)(a) of this Rule have inaccurately depicted surface waters or the specific origination point of a stream, or the specific origination point of a stream is in question or unclear, he or she shall request the Authority to make an on-site determination. On-site determinations shall be made by Authority staff that are certified pursuant to G.S. 143-214.25A. Registered Foresters under Chapter 89B of the General Statutes who are employees of the North Carolina Forest Service of the Department of Agriculture and Consumer Services can make on-site determinations for forest harvesting operations and practices. On-site determinations shall expire five years from the date of the determination. Any disputes over on-site determinations shall be referred to the Director in writing within 60 calendar days of written notification from the Authority. The Director's determination is subject to review as provided in G.S. 150B. Barring this on-site determination, it is assumed that this surface water is present and must be accounted for. Please either contact staff from the Fayetteville Regional Office to make a determination with regard to this surface water or account for this surface water by showing this surface water on the plans, excluding the surface area from the project area, and including the required vegetated setback. This on- site determination was not provided, and USACE jurisdictional waters are distinct from water of the state. Therefore a determination must be made by an individual named above. Thankyou, Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9218 brianna.holland@deq.nc.gov (email preferred) Mailing address: 1612 Mail Service Center, Raleigh,NC 27699-1612 Physical address:512 North Salisbury Street, Raleigh,NC 27604 2 Electronic Transmittal U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2022-02632 County:Harnett U.S.G.S.Quad:NC-Coats GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: Meritne Homes Chris Mehl Address: 3300 Paramount Parkwav,Suite 120 Raleigh,NC 27560 Telephone Number: 919-768-2346 E-mail: Chris.Mehl(&meritagehomes.com Size(acres) 53 acres Nearest Town Angier Nearest Waterway West Buies Creek River Basin Cane Fear USGS HUC 03030004 Coordinates Latitude:35.488742 Longitude: -78.739828 Location description: The Droiect is located near 4583 Old Buies Creek Road near Angier,Harnett County,North Carolina. PIN:0673-72-4977,0673-72-7501,and 0673-52-9183 Description of projects area and activity: This verification authorizes the permanent conversion of 0.144 acre of wetland and temporary impacts to 0.144 acre of wetland and 38 LF of stream for the purpose of installing a sanitary sewer Dive connection to support the proposed new subdivision known as Gardner Farm. Applicable Law(s): ❑X Section 404(Clean Water Act,33 USC 1344) ❑Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Nationwide Permit 29—Residential Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions,your application signed and dated 12/12/2023,and the enclosed plans Waters of the U.S.Impact MaD Overall(Figure 1),revised on 12/21/2023,Waters of the U.S.Impact Ma;Inset 1(Fitwe 2),and Waters of the U.S.Impact Map Profile(Figure 3)dated 12/8/2023.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified,suspended or revoked. If,prior to the expiration date identified below,the nationwide and/or regional general permit authorization is reissued and/or modified,this verification will remain valid until the expiration date identified below,provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit,activities which have commenced(i.e.,are under construction)or are under contract to commence in reliance upon the nationwide and/or regional general permit,will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration,modification or revocation,unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act(CAMA),prior to beginning work you must contact the N.C.Division of Coastal Management Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal,State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,please contact Katharine Elks at(910)251-4567or katharine.b.elks(&usace.armv.mil. Katharine Elks Digitally signed by Katharine Elks Corps Regulatory Official: Date:2024.01.29 09:15:30-os'oo' Date: 1/29/2024 Expiration Date of Verification: 3/15/2026 Copies provided by email: George Buchholz,Colliers Engineering(agent) Chad Turlington,NC DWR SAW-2022-02632 SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. b. Suitable habitat for tricolored bat(Perimyotis subflavus)may be present at the site. On September 14, 2022, the USFWS published a proposal in the Federal Register to list the tricolored bat as endangered under the Endangered Species Act(ESA). The permittee understands and agrees that all work associated with the clearing and removal of trees and removal or modification of culverts must be completed prior to the effective date of the final listing in the Federal Register. Work associated with the aforementioned activities not completed by that time must cease and the permittee must contact the Corps' (Katharine Elks, 910-251-4567, Katharine.B.Elksgusace.army.mil)to determine if additional coordination with the United States Fish and Wildlife Service is required under Section 7 of the Endangered Species Act prior to continuing work. U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: Meritage Homes(Chris Mehl) Action ID:SAW-2022-02632 Project Name:Gardner Farm Subdivision County: Harnett Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit,or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements Permitted Impacts Requiring Mitigation*: 8-digit HUC and Basin:03030004,Cape Fear River Basin Stream Impacts(linear feet) Wetland Impacts(acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.144 *If more than one mitigation sponsor will be used for the permit,only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin:03030004,Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 0.144 Mitigation Site Debited: NC DMS (List the name of the bank to be debited.For umbrella banks,also list the specific site. For NCDMS,list NCDMS. If the NCDMS acceptance letter identifies a specific site,also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document(see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District,are currently available at the mitigation site identified above. Further,I understand that if the Sponsor fails to provide the required compensatory mitigation,the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Date July 7,2020 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation(NCDOT),construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form,confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor,and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager(address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case-by-case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved,higher mitigation ratios maybe applied,as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office,3331 Heritage Trade Drive,Suite 105, Wake Forest,NC 27587(or by email to SAWMIT@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: Katharine Elks USACE Field Office: Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 Email: Digitally signed by Katharine Elks Katharine Elks Date:2024.01.29 09:33:43-05'00' January 29,2024 Wilmington District Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. Page 2 of 2 tDLO E LZ u E o A;U .o co > 0 Ln 0 u LZ t 0 r4 oo u �D E a) C) C) r4 cu 4-j rq rl A m WL., —5i Jay r\j —4 7C3 7t 4-1 4'i ff bi Eb o o m E u u -6 z z ol '7z o o 0 v C V � c � is v N J `o +n fO Lf] � O O O v m EA C N U) m � � .,h 2�o ,-1 — N N ti CC u a a ry - II Q � 0O Yk N p ` F W 1714 q. 4 V Qfu a iJ�C1 ppcc a q Sr L � IiS mN z O �\ �1W I v o �G �❑+ �F � � +p rJ � N cu oo - --- - LL i� • _ ,` - U In ♦�.�� ♦ i; O • i '�yf N E L U Ln > O N�I H w Q UOn 7 ' ( NE. Y G M m G w 7 � i N rl f6 C .--I O [0ao . .� E C V w ♦ ♦ .♦ ♦. . L V lu a WE Ln IyN'♦ ♦mot•_ US�Ckpp< ILL E JOi+ O L O - L � ♦ _ 54 zffry a H a in In =o 00 m V O T a y Q E i O O N O N V v m (0 S Z en ry Z 33� 6 2 o a � 3 i muO maw m 'Fa 0 (n O = tl u �ILL oin � ro � N N �d1 a` a` ii z3d � X3 v ago ago } LL = V X3 E L J Y (6 U 2 7p :C v w m � kf) o X3 a (14,X3#HWS;01 WQ5Z =IW'ANI.9 ff ww I#Hkt%YI.OMd NI n 9b"95L="ANI ?3d NI —I 'O E tM55 WOMB . )9b"95Z=ANI X3 �i5 CC 51'ZLZ=WIb G � 90'i�'135�_10 bS 4Z b1S"I� V Cola.ei)z nHWA ++ L >a o # oo — L z o lh1LL2Id 0 A` j v azcz x3 �+ V1 N N O uz ad u G) V sl�x3 s a 4-- v t1� c et•ILL ad ° �+ o J QJ 0 oo N 19O!-Z TJd 0 t BBt X3 + a 01'M ad Z TOM x3 p H w V s-wz x3 W Z3 �d Z _ VW X W W c Nkl resz x3 o W TM x3 LL LL ad p SIM 7(3 TId A ZIM)(3 G� 'dd C wm 7C3 'a6 OW 1C3 lid 2 ZTW Y3 'dd h STU X3 21d o O'WZ X3 (L 55 WOMB NI.9)111 92='ANI `m w L9Z=WI21 bdv a m O'13S4d0 OaOO+C V15"17 X3 1 E n k = v (vlQ 9h)I HW C3 dHtl95 x° E u N z o {� moZ a 26d ifs °0 a o L { M n ol i oN N V - O i L- O LL om in cc ro co mom, a a Action ID Number: SAW-2022-02632 County: Harnett Permittee: Merita2e Homes, Chris Mehl Project Name: Gardner Farm Subdivision Date Verification Issued: 1/29/2024 Project Manager: Katharine Elks Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Katharine Elks Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 or katharine.b.elks@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date NCH I H CAHOLINA 74M Q D_ E Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please direct all post-construction permitting questions and correspondences to our new group email address, postconstruction@deq.nc.gov From: Farkas,Jim J <Jim.Farkas@deg.nc.gov> Sent:Wednesday, March 27, 2024 4:02 PM To:Jared Medwar<JMedwar@mragta.com>;Jeremy Keeny<JKeeny@mragta.com>; scott.roylance@meritagehomes.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>;Joyner, Melissa<melissa.ioyner@deg.nc.gov> Subject: RE: SW6231205; Gardner Farms (Harnett) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on December 29,2023.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkasPdeq.nc.gov D_ E NCH I H CAHOLINA 74M Q ki ; Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent: Friday, December 29, 2023 11:34 AM To:Jared Medwar<JMedwar@mragta.com>;Jeremy Keeny<JKeeny@mragta.com>; 3 scott.roylance@meritagehomes.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deq.nc.gov> Subject: SW6231205; Gardner Farms (Harnett) Good Afternoon, We received your post-construction stormwater permit application for the subject project on 12/29/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW6231205 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA Department of Environmenlal Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 4 From:Jared Medwar<JMedwar@mragta.com> Sent: Friday, December 29, 2023 11:06 AM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Cc:Jeremy Keeny<JKeeny@mragta.com> Subject: [External] RE: Gardner Farms;Town of Angier, Harnett County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, Please see the revised page attached.The Site area has been updated to reflect no costal wetlands with the percent impervious of the site being updated per these changes. Please feel free to contact me if you have any questions! Thanks! Jared From:Jeremy Keeny<JKeeny@mragta.com> Sent: Friday, December 29, 2023 10:45 AM To:Jared Medwar<JMedwar@mragta.com> Subject: Fwd: Gardner Farms;Town of Angier, Harnett County Thanks, Jeremy M. Keeny, PE, PLS Vice President I Principal MORRIS&RITCHIE ASSOCIATES OF NC, PC 530 Hinton Pond Road, Suite 104, Knightdale, NC 27545 Tel: 984-200-2103 1 Cell: 252-290-5209 1 www.mragta.com Begin forwarded message: From: "Peck, Kaitlin" <kaitlin.peck@deq.nc.gov> Date: December 29, 2023 at 10:41:41 AM EST To: Scott.Roylance@meritagehomes.com,Jeremy Keeny<JKeeny@mragta.com> Cc: "Farkas,Jim J" <Jim.Farkas@deq.nc.gov>, "Joyner, Melissa"<melissa.ioyner@deq.nc.gov>, svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: Gardner Farms;Town of Angier, Harnett County Good Afternoon, We received your application for a new post-construction stormwater permit on 12/29/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items by close of business on 1/20/24 so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. 5 1. 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): 1. Section IV, 5—As this project is not in a coastal county, there should be no coastal wetlands. Please revise this value and the total project area. 2. Section IV, 8—The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). As these items are minor things,the revised page of this application can be emailed and I can add it to your existing application. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Kaitlin Peck 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Kaitlin Peck 512 N. Salisbury Street, Office 625X Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707- 9209. Thank you, 6 Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH AROLINA eprtment of EnrrironrrrentlluIity "'s CIE Email correspondence to and from this c Carolina Public Records Law and may From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Thursday, December 21, 2023 2:04 PM To: scott.roylance@meritagehomes.com; Keeny,Jeremy<JKeenv@mragta.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>;Joyner, Melissa <melissa.ioyner@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Gardner Farms;Town of Angier, Harnett County Good Afternoon, We received your application for a new post-construction stormwater permit on 12/21/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 1/20/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. 2. 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): 1. Section III, 2b—Please provide the contact information (email address and phone number)for the property owners. A file has been attached to allow for space for all 4 property owners. 2. Section IV, 8—The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). 3. Section VI—Please initial indicating that you have submitted all the required information relevant to the project's application. 3. 1x hard copy of sealed, signed, and date calculations relevant to the application's project.This item is required per 15A NCAC 02H .1040(2)(f) and per Section VI, 7 of the application.The cover page for this is missing a seal and signature. 4. 1x hard copy of official documentation showing that the Applicant is in good standing with the Secretary of State and showing the title and position information for the signing official (These items are required per 15A NCAC 02H .1040(1), .1042(2)(b), and per Section VI, 11 of the Application). 5. 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: 1. Signature and seals. 2. Project boundary delineation labeled with accurate bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Kaitlin Peck 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Kaitlin Peck 512 N. Salisbury Street, Office 625X Raleigh, NC 27604 s If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707- 9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov <i mage001.png> Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: This email originated from outside the organization. Do not click links or open attachments unless yo� recognize the sender and know the content is safe. 9