October 10, 2024
Little Cross, LLC
Attn: Hugh Surles, Member/Manager
8615 Mt Pleasant Church Road
Willow Spring, NC 27592
Subject: Compliance Evaluation Inspection —Non-Compliance Status
State Stormwater Management Permit SW6180703
Avery Pond Subdivision Phase 3A & 3B
Harnett County
Dear Mr. Surles:
On September 20, 2024, I, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy,
Mineral and Land Resources (DEMLR), conducted a Compliance Evaluation Inspection at the Avery
Pond Subdivision Phase 3A& 3B Development off of Chalybeate Road, in Harnett County, North
Carolina. The purpose of the inspection was to ensure compliance with State Stormwater Management
Permit SW6180703 prior to the transfer of this permit to the Avery Pond Homeowner's Association. This
permit was issued on October 28, 2015. A copy of the Compliance Inspection Report is enclosed for your
review. As a result of the inspection and subsequent file review, it has been determined that the facility is
not compliant with the conditions of the subject permit and approved plans.
Please refer to the enclosed Compliance Inspection report for additional comments and observations
made during the inspection. If you have any questions or this office can be of any assistance, please
contact me at(910)433-3384 or by e-mail at melissa.joyner@deq.nc.gov
Sincerely,
Melissa Joyner
Environmental Senior Specialist
DEMLR
Enclosure: Compliance Inspection Report
ec: Tyrus Clayton, P.E. -TRC Companies, Inc.
DEMLR NPDES Stormwater Permit Laserfiche File
cc: FRO—DEMLR, State Stormwater Files, SW6180703
D_E ) North Carolina Department of Environmental Quality I Divisbn of Energy,Mineral and Land Resources
Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301
NORTH CAROLCA
wpwuiarmc nosbla,ar 910.433.3300
Compliance Inspection Report
Permit: SW6180703 Effective: 08/15/18 Expiration: 08/14/26
Project: Avery Pond Subdivision Phase 3A&3B
Owner: Little Cross LLC
County: Harnett Adress: 174 Mineral Springs Ln
Region: Fayetteville
City/State/Zip: Fuquay Varina NC 27526
Contact Person:Hugh Surles Title: Phone:919-422-7065
Directions to Project:
intersection of Avery Pond Drive and Mineral Springs Lane
Type of Project: State Stormwater-HD-Detention Pond
Drain Areas: 1 -(Coopers Branch) (03-06-07)(WS-IV;HQW)
2-(Coopers Branch) (03-06-07 )(WS-IV;HQW)
3-(Coopers Branch) (03-06-07)(WS-IV;HQW)
On-Site Representative(s):
Related Permits:
Inspection Date: 09/20/2024 Entry Time 11:20PM Exit Time: 11:40PM
Primary Inspector: Melissa A Joyner laid a. pitni Phone:
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Transfer Renewal
Permit Inspection Type: State Stormwater
Facility Status: 0 Compliant • Not Compliant
Question Areas:
III State Stormwater
(See attachment summary)
page 1
Permit: SW6180703 Owner-Project: Little Cross LLC
Inspection Date: 09/20/2024 Inspection Type Transfer Renewal Reason for Visit: Routine
Inspection Summary:
The inspection was conducted to determine compliance with the State Stormwater Management Permit
SW6180703 prior to the transfer of this permit to the Avery Pond Homeowners Association. The following issues
in regards to the operation and maintenance of the stormwater control measures were observed.:
1. Pond 1 - One of the two permanent diversions/conveyance swales (inlets)to the forebay as shown on the
approved plans appears to have been eliminated. A swale is installed which is discharging to a wetland instead
of to Pond 1. A revised stormwater plan will need to be submitted regarding these modification or the stormwater
control measures will need to be installed per the approved plans.
2. Pond 3: One of the two permanent diversions (inlets) to the forebay as shown on the approved plans
appears to have been eliminated. A revised stormwater plan will need to be submitted regarding this
modification or the stormwater control measure will need to be installed per the approved plans.
The facility is not compliant with the conditions of State Stormwater Management Permit SW6180703 and will be
inspected within 6 months of the issuance of this Compliance Inspection Report.
page 2
Permit: SW6180703 Owner-Project: Little Cross LLC
Inspection Date: 09/20/2024 Inspection Type Transfer Renewal Reason for Visit: Routine
File Review Yes No NA NE
Is the permit active? ® ❑ ❑ ❑
Signed copy of the Engineer's certification is in the file? • ❑ ❑ ❑
Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file? ® ❑ ❑ ❑
Comment:
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? II ❑ ❑
Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑
Is the BUA(as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑
Comment: The associated BUA appears to be constructed per the permit and the approved plans.
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? • ❑ ❑ ❑
Are the inlets located per the approved plans? ❑ II ❑
Are the outlet structures located per the approved plans? II ❑ ❑
Comment: One of the two permanent diversions (inlets)to Pond 1 and to Pond 3, as shown on the
approved stormwater plans, appears to have been removed.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ❑ II ❑
Are the SW BMP inspection and maintenance records complete and available for review or ❑ ❑ ❑ ■
provided to DWQ upon request?
Comment: See the Inspection Summary for details.
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? • ❑ ❑ ❑
Comment:
Other WQ Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? ❑ ❑ III ❑
Comment:
page 3