Loading...
HomeMy WebLinkAboutSW6180703_Compliance Inspection_20241010 Arf 4' ,y',d yr a,rn, , IYA ' ! .,1 ROY COOPER i5 ,�,'.;, �`= = 4 Governor �, ';%.' C MARY PENNY KELLEY C csY M,x�, SecretarySr- WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality October 10, 2024 Little Cross, LLC Attn: Hugh Surles, Member/Manager 8615 Mt Pleasant Church Road Willow Spring, NC 27592 Subject: Compliance Evaluation Inspection —Non-Compliance Status State Stormwater Management Permit SW6180703 Avery Pond Subdivision Phase 3A & 3B Harnett County Dear Mr. Surles: On September 20, 2024, I, Melissa Joyner from the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR), conducted a Compliance Evaluation Inspection at the Avery Pond Subdivision Phase 3A& 3B Development off of Chalybeate Road, in Harnett County, North Carolina. The purpose of the inspection was to ensure compliance with State Stormwater Management Permit SW6180703 prior to the transfer of this permit to the Avery Pond Homeowner's Association. This permit was issued on October 28, 2015. A copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is not compliant with the conditions of the subject permit and approved plans. Please refer to the enclosed Compliance Inspection report for additional comments and observations made during the inspection. If you have any questions or this office can be of any assistance, please contact me at(910)433-3384 or by e-mail at melissa.joyner@deq.nc.gov Sincerely, Melissa Joyner Environmental Senior Specialist DEMLR Enclosure: Compliance Inspection Report ec: Tyrus Clayton, P.E. -TRC Companies, Inc. DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO—DEMLR, State Stormwater Files, SW6180703 D_E ) North Carolina Department of Environmental Quality I Divisbn of Energy,Mineral and Land Resources Fayetteville Regional Office 1225 Green Street,Suite 714 I Fayetteville,North Carolina 28301 NORTH CAROLCA wpwuiarmc nosbla,ar 910.433.3300 Compliance Inspection Report Permit: SW6180703 Effective: 08/15/18 Expiration: 08/14/26 Project: Avery Pond Subdivision Phase 3A&3B Owner: Little Cross LLC County: Harnett Adress: 174 Mineral Springs Ln Region: Fayetteville City/State/Zip: Fuquay Varina NC 27526 Contact Person:Hugh Surles Title: Phone:919-422-7065 Directions to Project: intersection of Avery Pond Drive and Mineral Springs Lane Type of Project: State Stormwater-HD-Detention Pond Drain Areas: 1 -(Coopers Branch) (03-06-07)(WS-IV;HQW) 2-(Coopers Branch) (03-06-07 )(WS-IV;HQW) 3-(Coopers Branch) (03-06-07)(WS-IV;HQW) On-Site Representative(s): Related Permits: Inspection Date: 09/20/2024 Entry Time 11:20PM Exit Time: 11:40PM Primary Inspector: Melissa A Joyner laid a. pitni Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Transfer Renewal Permit Inspection Type: State Stormwater Facility Status: 0 Compliant • Not Compliant Question Areas: III State Stormwater (See attachment summary) page 1 Permit: SW6180703 Owner-Project: Little Cross LLC Inspection Date: 09/20/2024 Inspection Type Transfer Renewal Reason for Visit: Routine Inspection Summary: The inspection was conducted to determine compliance with the State Stormwater Management Permit SW6180703 prior to the transfer of this permit to the Avery Pond Homeowners Association. The following issues in regards to the operation and maintenance of the stormwater control measures were observed.: 1. Pond 1 - One of the two permanent diversions/conveyance swales (inlets)to the forebay as shown on the approved plans appears to have been eliminated. A swale is installed which is discharging to a wetland instead of to Pond 1. A revised stormwater plan will need to be submitted regarding these modification or the stormwater control measures will need to be installed per the approved plans. 2. Pond 3: One of the two permanent diversions (inlets) to the forebay as shown on the approved plans appears to have been eliminated. A revised stormwater plan will need to be submitted regarding this modification or the stormwater control measure will need to be installed per the approved plans. The facility is not compliant with the conditions of State Stormwater Management Permit SW6180703 and will be inspected within 6 months of the issuance of this Compliance Inspection Report. page 2 Permit: SW6180703 Owner-Project: Little Cross LLC Inspection Date: 09/20/2024 Inspection Type Transfer Renewal Reason for Visit: Routine File Review Yes No NA NE Is the permit active? ® ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? • ❑ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ® ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ® ❑ ❑ ❑ Comment: Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? II ❑ ❑ Is the drainage area as per the permit and approved plans? ® ❑ ❑ ❑ Is the BUA(as permitted) graded such that the runoff drains to the system? ® ❑ ❑ ❑ Comment: The associated BUA appears to be constructed per the permit and the approved plans. SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? • ❑ ❑ ❑ Are the inlets located per the approved plans? ❑ II ❑ Are the outlet structures located per the approved plans? II ❑ ❑ Comment: One of the two permanent diversions (inlets)to Pond 1 and to Pond 3, as shown on the approved stormwater plans, appears to have been removed. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ II ❑ Are the SW BMP inspection and maintenance records complete and available for review or ❑ ❑ ❑ ■ provided to DWQ upon request? Comment: See the Inspection Summary for details. Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? • ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ❑ ❑ III ❑ Comment: page 3