Loading...
HomeMy WebLinkAbout820122_Routine_20240826Division of Water Resources Facility Number - I l Division of Soil and Water Conservation .0 Other Agency , type of Visit: W Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance 2eason for Visit: V Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: '� L, Arrival Time: Departure Time: County: FarmName: �� Owner Email: YI I Owner Name: Q ce M u m Phone: Mailing Address: Physical Address: Facility Contact: m rw I G� Title: Phone: Onsite Representative4l 1J� I �iy h aY wi.( Integrator: I [_�r Certified Operator: Certification Number:(? Back-up Operator: Location of Farm: Design Current Swine Capacity • ,Pop.::_, Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other' Discharges and Stream Impacts Certification Number: Latitude: Design Current,` ?Vet Poultry Capacity Pop.. Layer Non -Layer Design Current ilry Pnnitry "anaeity ' Pon_ Layers Non -Layers Pullets Turkeys Turkey Poults Other Longitude: Region: Design Current " Cattle Capacity Pop. y Cow y Calf y Heifer Cow Beef Stocker Beef Feeder Beef Brood Cow 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes IN No ❑ NA ❑ NE El Yes No ❑ NA ❑ NE ❑ Yes [j No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 0 No ❑ NA ❑ NE "Is a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 16 _ f�- 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes _TSj'No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes �No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes tS�No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ` qNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes t]�o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes '�'qNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): `k 13. Soil Type(s): 1 `y U [ I 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 'qNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E�No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes `� No `� ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes bNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes * No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspecti ns ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes &o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ] Yes ❑ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: W l 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes n No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No Other Issues ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E No ❑ NA ❑ NE and report mortality rates that were higher than normal? N 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes S� No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No R ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes N No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ki No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). ►agooh bn,fS K beHiy, hlgh C61vdIe. Reviewer/Inspector Name: Phone: Reviewer/Inspector Signature: -1-- Page 3 of 3 Date: 511212020