Loading...
HomeMy WebLinkAbout820091_routine_20240806�"ivision of Water Resources Facility Number � - � O Division of Soil and Water Conservation O Other Agency Type of Visit: omm�pliance Inspection O Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: GK outine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: i jQ Departure Time: -fl County: �� /r`r Region: %1 f : Farm Name: Owner Email: Owner Name: ���gZ/ Phone: Mailing Address: Physical Address: Facility Contact: �/ f,S Y:;Z ` I Title: / . OnsiteRepresentative:G�fjd�fJ� Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Latitude: N Phone::: Integrator: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Layers Non-L Pullets Other Poults Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes F]_o ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE 0 Yes [:]No ❑ NA ❑ NE ❑ Yes [2-< ❑ NA ❑ NE ❑ Yes to ❑ NA ❑ NE Page I of 3 511212020 Continued Facility Number: Date of Inspection: (�— Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes �J<o ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): �% �% Observed Freeboard (in): 5"9— 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes LJ '�o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes [?] No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [] No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [2'110 ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes l No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes EfNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop /Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop TYPe(s)= X.V'��r°'fylu�e2 13. Soil Type(s): L ,, 14. Do the receiving crops differ from those designated in the CAWMP. ❑ Yes []"No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [a< ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes E�N ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [ j-<o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes [l]No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate Coverage & Permit �lo of readily available? ❑ Yes ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Q'1;Io ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes Quo ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall 0 Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes Q No 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes E No ❑NA ❑NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑NA ❑NE Page 2 of 3 511212020 Continued Facility Number: -AVDate of Inspection: — U•' `1 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 21 lac ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [:]Yes [:]No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon _� i List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 21"No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes Cal�o ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: . 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E] No ❑ NA ❑ NE 0 Yes ❑ No ❑ NA ❑ NE ❑ Yes [�lo ❑ NA ❑ NE ❑ Yes [] No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [TNo ❑ NA ❑ NE ❑ Yes ❑' No ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: g�DJ����l�r Date: 511212020