HomeMy WebLinkAboutNCS000259_Inspection Report_20240911 Compliance Inspection Report
Permit:NCS000259 Effective: 01/01/21 Expiration: 12/31/25 Owner: Nouryon Surface Chemistry LLC
SOC: Effective: Expiration: Facility: Nouryon Surface Chemistry LLC
County: Rowan 485 Cedar Springs Rd
Region: Mooresville
Salisbury NC 28147
Contact Person:Chris Fleming Title: Phone: 704-633-1731
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 09/11/2024 Entry Time 01:OOPM Exit Time: 03:OOPM
Primary Inspector:Jerry W Eplin Phone: 704-663-1699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000259 Owner-Facility:Nouryon Surface Chemistry LLC
Inspection Date: 09/11/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Conducted a Compliance Evaluation Inspection as follow up to a recent tank failure at the facility. Met with Chris Flemming,
Quinn Alexander, and Lyyn White, all of Nouryon.
Facility stormwater records were present for review. It is recommended that the site map be updated to show the entire site,
including outfalls. It is also recommended that an index or table of contents be added to the SWPPP to aid in review and
locating information. SWPPP annual review was slightly past due, however the facility reviewed and provided documentation
of the review on 9/12/24.
Qualitative and Analytical records were available for review and were up to date.
Training records were up to date.
It is recommended that the concrete joints in the flammable storage area be evaluated to determine if additional caulking or
sealing are needed.
As follow up to the recent tank failure, no sheen was observed at Outfall 4.
Page 2 of 3
Permit: NCS000259 Owner-Facility:Nouryon Surface Chemistry LLC
Inspection Date: 09/11/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑
Comment: Last illicity discharge evaluation was 10/5/2023. SWPPP plan annual review was slightly past
due. Facility reviewed SWPPP and provided documentation to DEQ on 9/12/2024. It is
recommended that the facility site map be updated to show the entire site, including outfalls. It
is also recommended that an index be provided for the SWPPP to assist with review/inspeciton.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment: Qualitative monitoring records were up to date.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑
Comment: Analytical monitoring was up to date.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑
Comment: It is recommended that the joints in the flammable storage area be evaluated to determine if
additional caulking/sealing are needed.
Page 3 of 3