Loading...
HomeMy WebLinkAboutNCC243081_ESC Approval Submitted_20241009 Stimpson, Paul From: City of Winston-Salem <noreply@geocivix.com> Sent: Thursday, October 3, 2024 9:42 AM To: Stimpson, Paul Subject: lExt] Review Completed - 4672 Gallant Lane - SFD Construction cite ar I WIN STON-SALEM1 NORIII CAROLINA Application Type: 04.02)Grading/Erosion Control Permit Workflow: 04.02)Grading& Erosion Control Project: 4672 Gallant Lane -SFD Construction A/P#: EN2400249 Acreage to be Disturbed: 1.37 h_tlpsillw inston-salem.geocivix.comisecure/RrQject/?projeGtith--_149QZ74 Hello Keith Slate, Thank you for submitting your project to City of Winston-Salem. Review of the Erosion Control Plan for this project has been completed. The design is adequate to meet the ordinance standards and the plan has been approved. Be aware that this plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Also, acceptance and approval of this plan is conditioned upon compliance with Federal and State water quality laws, regulations, and rules. If you have not already done so, please provide an original signed and notarized Financial Responsibility/Ownership (FRO) form as applicable. This document is required prior to the issuance of the Grading/Erosion Control Permit. If this has already been provided, then please disregard this statement. Reminder that a completed FRO form is not required in the instance where a project qualifies to use the HB 489 Sketch Erosion Control Plan document. If this project will disturb more than 1 acre or is part of a larger common plan of development, the Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under the permit at the following website (https://edocs.deq.nc.gov/Forms/NCG01-NOI). Once coverage is obtained, please upload a copy of the Certificate of Coverage (COC)to the project documents in the electronic plan review system. The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is provided. Please direct questions about the eNOl form to